Overpark Protective Fencing Mandatory Pre-Bid Sign-In Sheet.pdf

PDF 589 KB Posted

Attached to
COE ITB 20272018 Overpark Protective Fencing
Solicitation number
S-KE0010-00018143
Issued by
Lane County, Oregon

About this file

This is a Mandatory Pre-Bid Sign-In Sheet for the City of Eugene, Oregon Facility Management Division's Invitation to Bid (ITB 20272018) for installation of protective chain link fencing on the 5th floor of the Overpark Garage located at 99 East 10th Avenue. The project involves installation of 1-inch-by-1-inch 9-gauge chain link fencing mounted above existing concrete panels with specified posts and rails, all with stainless steel or ASTM A153 Class C hot-dipped galvanized fasteners and connectors. A mandatory pre-bid conference was held on October 13, 2026, at the garage's top level, and sealed bids were due October 27, 2026, at 2:00 p.m. via the OregonBuys online portal. The contractor must maintain access to one traffic lane, one entry lane, one exit lane, and the ADA ramp at all times, with bus lane closures permitted only after 6:30 p.m. Monday-Friday or on weekends, requiring 14 days' advance notice for any access closures. A full-time on-site superintendent is required throughout project duration, and all work must comply with Oregon Specialty Code, ASCE 7-22 standards with 110 mph design wind speed, and Seismic Design Category D requirements.

The contractor must be registered with the Oregon Construction Contractors Board and demonstrate that all subcontractors are registered or exempt, with first-tier subcontractors representing five percent or more of the total bid (minimum $15,000) disclosed no later than two hours after bid opening. Bid security equal to ten percent of the base bid plus any additive alternates is required, along with performance and labor/material payment bonds equal to 100 percent of the contract sum before work begins. A 5 percent retainage provision applies with payment due within 30 days of invoice or 15 days after project manager approval, whichever is earlier. All work is subject to Oregon prevailing wage requirements under ORS 279C.800-279C.870, and the contractor must comply with employee drug testing programs. The contractor is responsible for field-verifying all dimensions, scanning for existing reinforcing steel to prevent severing, and notifying the structural engineer of record (Woodchuck Engineering) of any discrepancies.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .