This Addendum No. 1, dated October 21, 2026, modifies the original bidding documents for the City of Eugene Facility Management Division's Overpark Protective Fencing project (ITB 2027-2018, Project No. 51332) located at 99 East 10th Avenue, Eugene, Oregon. The scope of work involves installing chain link fencing along the perimeter of the 5th floor level of the Overpark Garage to address falling object hazards, with contractors responsible for safety measures including screens, mesh, scaffolding, barricading, and right-of-way closures. A mandatory pre-bid walkthrough occurred on October 13, 2026, and the bid opening date has been extended to November 3, 2026, at 2:00 p.m. via electronic bid opening on Microsoft Teams. The addendum includes revised bid forms, an Evidence of Responsibility Form requiring bidders to demonstrate experience with similar projects involving right-of-way closures, and a new Section 01 23 00 establishing Alternate Bid 1 for decorative metal fencing as an option to the base chain link fencing specification. The substantial completion date has been extended to March 31, 2027, and contractors must submit a Site Logistics Plan within 14 days of Notice to Proceed outlining work sequences, anticipated closures, signage plans, and safety measures.
The addendum clarifies multiple specification details through 26 question-and-answer responses, including confirmation that liquidated damages will not be included in the project, that temporary fencing must remain in place during construction while allowing relocation to accommodate work, that the contractor bears responsibility for providing fence product samples, and that contractors have discretion in determining installation means and methods. Bid security requirements remain at ten percent of the base bid plus any additive alternates, and general liability insurance limits are specified at $2 million/$3 million for general contractors with subcontractor requirements to be the general contractor's responsibility. The City of Eugene will remove existing temporary fencing at project completion, and existing ADA sign supports may require modification or relocation per updated drawing A01. Finishes have been clarified with curved line, corner, and terminal posts to receive polyester powder coating while wire fabric, components, and accessories are to be vinyl coated. No Engineer's Estimated value has been provided, and the project is subject to Oregon prevailing wage requirements under ORS 279C.800-279C.870.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum No. 1 October 21, 2026 Project No. 51332
Addendum No. 1 page1
PDD Overpark Protective Fencing 1000 Oak Street Eugene, Oregon 97401
This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated October 7, 2026, as noted below. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification.
GENERAL
1. The bid opening is being changed in this Addendum to occur on November 3rd at 2pm.
2. The mandatory Pre-Bid Walkthrough occurred on October 13th at 10:30am. Attached is the sign-in sheet.
3. Scope of Work consists of installing fencing along the perimeter of the 5th floor level of the Overpark which presents a falling object hazard. Contractors are responsible for safety associated with the Work, which may include screens, mesh, scaffolding, barricading fall hazard areas, or other measures. Right-of-Way closures will also be necessary for falling object hazard protection. It is encouraged that Bidders familiarize themselves with the site, including the ground level, to better understand Project requirements.
4.Questions:
1. Q:Will the top lot be closed for staging?
A: No, parking in the center of the garage, as currently provided, is to remain open.
2. Q: Are there samples of fencing product?
A: No, the successful Bidder is responsible for providing samples.
3. Q: Will rusted bolts or posts need to be replaced?
A: We will evaluate during construction.
4. Q: Will the temporary fencing come down during construction?
A: No, the temporary fencing must remain during construction. The fencing can be moved to accommodate construction, but the secure barrier between public/patron use and building edge must remain.
5. Q: Will grinding and feathering of concrete be required on the rough concrete surface?
A: No.
6. Q: Will scaffolding be required for mounting the fencing on the outside?
A: The means and methods of installation are to be determined by successful bidder.
7. Q: When can we expect Notice to Proceed issuance?
A: Notice to Proceed may be issued as soon as the Contract is finalized and will be negotiated with successful bidder.
8. Q: When is work expected to commence?
A: As soon as materials are available and Contractor is ready to start.
Addenda 1 Page 1 of 37
Addendum No. 1 page 2
9. Q: Contract Draft - Article 4.5 indicated there may be Liquidated Damages. If Liquidated Damages will apply, what is the amount?
A: Liquidated Damages will not be included in this project.
10. Q: Specification Section 01 35 53 1.02.A references project manual section 01 60 00 - Storage and Protection of Products. Project Manual provided titles 01 60 00 "Product Requirements".
Please clarify or provide Manual Section for Storage & Protection of Products.
A: Disregard reference to Section 01 60 00 – Storage and Protection of Products in Section 01 35 53 Security Procedures.
11. Q: Specification Section 01 35 53 1.02.B references project manual section 01 73 63 - Security Requirements. Please provide.
A: Disregard reference to Section 01 73 63 – Security Requirements in Section 01 35 53 Security Procedures.
12. Q: Will scope require GPR locates to be removed from concrete if rebar layout is marked on concrete, or will locate marks be allowed to remain in place?
A: Locate markings shall be removed.
13. Q: How much of the area of work can the Contractor assume will be provided to them in order to perform scope? Can temporary fencing be set up at the beginning of stall striping (approx 22' from face of concrete wall) around perimeter?
A: Yes, temporary fencing can be set up at beginning of stall. Other provisions may also be accommodated if impact to available parking is limited and a drive aisle is provided.
14. Q: Is there an Engineer's Estimated value for this project?
A: No.
15. Q: Does the City have a preferred GPR/Scanning provider, or will this be Contractor's choice?
A: Contractor’s choice. The city doesn’t have a preferred GPR/scanning provider.
16. Q: G02 provides some limitations to closures at ground elevation, particularly at entry/exit lanes, ADA ramps and underpass lanes. Are there limitations/restrictions to the amount of storefront entries receiving overhead pedestrian protection at any given time?
A: Storefront entries shall always remain open but walk paths may be redirected as needed for safety.
17. Q: Please provide expectations for preconstruction efforts and ongoing OAC meetings.
Estimating meeting cadence, submittal expectations etc.
A: Expectations are outlined in the Project Manual.
18. Q: Are all building entries to remain accessible at all times?
A: Yes.
19. Q: In instances where significant leveling is not required, can baseplate be installed directly to concrete, using shimming?
A: Yes.
20. Q: Is Builders Risk provided by the Owner?
A: No, the City of Eugene does not provide Builders Risk Insurance.
Addenda 1 Page 2 of 37
Addendum No. 1 page3
21. Q: With reference to notes 4 & 5 G02, please confirm overhead protection and safe-off/closing will be required. Notes in bid documents are vague.
A: Safety procedures are the responsibility of the successful bidder. If falling object hazards are present from work occurring above, areas of risk are to be protected. Bidders are encouraged to familiarize themselves with the site and ground level, to better understand Project requirements.
22. Q:General Liability insurance limits noted in the AIA Exhibit A are noted as $2Million / $3Million.
Subcontractors in the Eugene market typically have $1Million / $2Million for General Liability per occurrence and aggregate. Please advise if these lower limits are acceptable for subcontractors.
A: General contractors are required to meet the minimum insurance limits. General contractors are responsible for subcontractor requirements.
23. Q: Will existing temporary fence be available to Contractor for purposes of temporary barriers throughout the project, with Contractor responsible for all required relocating and reconfiguration?
A: Temporary fence may be utilized if a secure barrier between the public side of the fencing and the building edge is maintained.
24. Q: Who is responsible for removal of existing temporary fencing?
A: Owner will have fencing removed at project completion.
25. Q. Existing ADA Stall Signage supports may conflict with the fence-fabric plane and may require modifications. Is modifying or relocating ADA sign supports in contract scope?
A: See updated sheet A01 issued in this addendum.
PROJECT MANUAL
5. SECTION 00 11 13 – ADVERTISEMENT TO BID: Replace Advertisement to Bid with attached revised
Advertisement to Bid.
Change Summary: Bid date was changed to November 3, 2026 at 2pm.
6. SECTION 00 41 10 - BID FORM: Replace Bid Form with attached revised Bid Form.
Change Summary: Alternate 1 was added to the Bid Form.
7. SECTION 00 45 25 – EVIDENCE OF RESPONSIBILITY FORM: Replace Evidence of Responsibility
Form with attached revised Evidence of Responsibility Form.
Change Summary: Bidders project “Record of Satisfactory Performance” are to include similar projects with Right-of-Way closures.
8. SECTION 01 11 00 – SUMMARY OF WORK: Replace Section with attached new Section.
Change Summary: Date of Substantial Completion was extended.
9.SECTION 01 23 00 - ALTERNATES: Add new Section.
Change Summary: Alternate 1 is added to Project.
10.SECTION 01 31 00 – PROJECT MANAGEMENT AND COORDINATION: Replace Section with attached new Section.
Change Summary: A Site Logistics Plan was added as a Contractor requirement.
11.SECTION 05 50 00 – METAL FABRICATIONS: Replace Section with attached new Section.
Change Summary: Fabricated Items were added for Bid Alternate 1.
Addenda 1 Page 3 of 37
Addendum No. 1 page 4
12.SECTION 32 31 13 – CHAIN LINK FENCES AND GATES: Add Replace Section with attached new Section Change Summary: Finishes were clarified. Curved line, corner, and terminal posts are to be powder coated. Wire fabric, components, and accessories are to be vinyl coated.
13.SECTION 32 31 19 – DECORATIVE METAL FENCES AND GATES: Add new Section.
Change Summary: Alternate 1 is added to Project.
SHEET DRAWINGS
14. DRAWING A01 – ELEVATIONS: Replace Drawing with revised Drawing attached. Revisions include:
a. Fencing Elevation: Dimension were revised.
b. Plan View – Level 5 South:
a. Scope additions were added near the west stair and elevator.
b. Alternate 1 adds (4) extra posts and panels.
c. Fencing Elevation – Alternate Bid 1 was added to sheet.
END OF ADDENDUM NO. 1
Addenda 1 Page 4 of 37
Addenda 1 Page 5 of 37
Addenda 1 Page 6 of 37
OVERPARK PROTECTIVE FENCING SECTION 00 11 13
ADVERTISEMENT TO BID
SECTION 00 11 13
ADVERTISEMENT TO BID NO. 2027-2018
INVITATION TO BID
Pursuant to ORS 279C.365 and City of Eugene Public Contracting Rule (City Rule) 137-049- 0200, sealed bids for Overpark Protective Fencing, City Project Number GJN 51332, for the City of Eugene will be accepted by the Facility Management Division until November 3 at 2.00.00pm. Bids will be opened immediately thereafter and publicly read aloud in an electronic bid opening meeting: COE ITB 20272018 Overpark Protective Fencing | Meeting- Join | Microsoft Teams (Meeting ID: 215 000 682 838 677 / Passcode: vf6CF99v).
First-Tier Subcontractor Disclosure Statements are due no later than two (2) hours after bid opening. First-Tier Subcontractor Disclosure Statements should be emailed to:
eugene.facilities@eugene-or.gov. Bids will not be accepted after the bid closing time and date. Bids shall be valid for 60 days after opening unless otherwise specified in the bid specifications. This Invitation to Bid (ITB 2027-2018) does not commit the City to pay any costs incurred by any bidder in the submission of a bid.
Vendors will upload bids to the OregonBuys portal prior to the due date and time indicated in the ITB or any extension thereof made by addendum. The documented PDF upload must read: ITB 2027-2018 Overpark Protective Fencing (bid date). The City is not responsible for the premature opening of or the failure to open a bid not properly identified or addressed.
Bidder is responsible for submitting their bid prior to the closing time and date. Late bids will not be accepted. Bids received after the scheduled closing time will not be considered.
PROJECT DESCRIPTION
Installation of fencing at Overpark Garage, 5th floor.
PRE-BID C0NFERENCE
Attending the pre-bid conference is mandatory for Prime Bidders. The Pre-Bid Conference will be held on Tuesday October 13, 2026 at 10:30am. Attendees are to meet on the top level of the parking garage. Free 1-hour parking is available in the garage. Interested Contractors, Subcontractors, and Suppliers are invited to attend. Statements made by the City’s representatives at the pre-bid conference are not binding upon the City unless confirmed by written Addendum.
CONSTRUCTION DOCUMENTS
Bidding Documents, including Project Manual, specifications, drawings, bidding forms, and sample form of agreement are available for downloading in pdf format and may be examined electronically by logging in to OregonBuys.
Bidders will submit their bids through OregonBuys before the due date and time specified.
Bidders who need assistance with OregonBuys can contact the Supplier Help Desk at support.oregonbuys@oregon.gov or 1-855-800-5046 or contact the City of Eugene Project Manager listed for this Solicitation.
All Plans Centers currently registered under the appropriate commodity codes on the State of Oregon OregonBuys site will be notified that documents are available to download from the website and, if they view this solicitation, will become a Bidding Documents Holder on
Addenda 1 Page 7 of 37 this project. Plans Centers currently registered in OregonBuys include, but are not limited to:
Eugene Builders Exchange, Eugene, OR, 541-484-5331;
Daily Journal of Commerce Plan Center, Portland, OR, 503-274-0624;
McGraw-Hill Dodge, Portland, OR, 800-503-5676;
Contractor Plan Center, Clackamas, OR, 503-650-0148;
Premier Builders Exchange, Bend, OR, 541-389-0123;
Salem Contractor’s Exchange, Salem, OR; 503-362-7957;
Douglas County Plan Center, Roseburg, OR; 541-440-9030.
Notice of available addenda will be issued only to those who are a Bidding Documents Holders in the State of Oregon OregonBuys system. Those acquiring documents are responsible to obtain all addenda.
PREVAILING WAGE
This project is a public works project subject to ORS 279C.800 to 279C.870.
BID SECURITY
Bidders shall submit a Bid Security for ten percent (10%) of the Bid amount, plus any additive alternates, by one of the following methods:
Attach a scanned version of a paper bid bond, Certified Check, Cashier’s Check, Savings and Loan Secured Check, or irrevocable Letter of Credit issued by a financial institution;
the validity of which will be verified after the bid opening.
Alternatively, use an electronic bid bond service to submit a link which includes verification of the bid bond.
NON-RESIDENT BIDDERS
In accordance with ORS 279A.120, Bidders will be required to indicate on the Bid Form whether the Bidder is an Oregon resident.
CONTRACTOR’S REGISTRATION
The City will not consider Bids unless the Bidder (Contractor) is registered with the Construction Contractors Board as required by ORS 701.
ASBESTOS ABATEMENT
Asbestos work is not anticipated. If asbestos conditions are discovered by Contractor, Contractor shall immediately notify City.
OWNER'S RIGHT TO REJECT PROPOSALS
The City of Eugene may hold Bids for a period not to exceed sixty (60) days from date bids are due for the purpose of reviewing bid documents and investigating qualifications of Bidders prior to awarding Contract. The City of Eugene reserves the right to reject any Bid for good cause upon finding that it is in the best interest of the City to do so.
BY INVITATION OF:
Jenni Rogers Project Manager jlroger@eugene-or.gov 513-682-5321 210 Cheshire Ave, Eugene, OR 97401
Addenda 1 Page 8 of 37
PUBLISHED:
Daily Journal of Commerce; https://djcoregon.com, OregonBuys; https://oregonbuys.gov/bso/
Dated:
October 7, 2026
END OF ADVERTISEMENT
Addenda 1 Page 9 of 37
OVERPARK PROTECTIVE FENCING 00 41 10
BID FORM
Revised 10/20/2026
PROJECT INFORMATION
Project Title: Overpark Protective Fencing Project Location: 99 East 10th Avenue, Eugene OR 97401
Owner's Name: City of Eugene, Facility Management
Owner's Address: 210 Cheshire Avenue, Eugene, Oregon 97401
RECEIPT OF BIDS AND FIRST-TIER SUBCONTRACTOR DISCLOSURE STATEMENT
Location for Receipt of Bids and First-Tier Subcontractor Disclosure Statements:
OregonBuys online portal, as outlined in Advertisement to Bid
Bids Due: As outlined in Advertisement to Bid
(Bids open immediately after receipt of Bids)
First-Tier Subcontractor Disclosure Statement due: As outlined in Advertisement to Bid
BIDDER’S NAME:
Bidder’s Address:
Telephone: FAX:
Oregon CCB # CCB Expiration date:
REQUIREMENTS:
Bid Bond w/Power of Attorney or Certified Check Full-Time Superintendent Disclosure Evidence of Responsibility Form First-Tier Subcontractor Disclosure (to be submitted separately)
ADDENDA:
The undersigned acknowledges receipt of and agrees to be bound by addenda numbered _________ through _________, inclusive.
Addenda 1 Page 10 of 37
PROPOSAL
BASE BID
The undersigned is (check one of the following and insert information requested):
_____ a. A Corporation organized and existing under the laws of the State of
_____________; or
_____ b. A Partnership registered under the laws of the State of _____________; or
_____ c. An individual doing business under an assumed name registered under the laws of the State of ___________________________; or
_____ d. An individual doing business under his or her own name;
and hereby proposes to furnish all material and labor and perform all Work as hereinafter indicated for Overpark Protective Fencing in strict accordance with
Drawings and Specifications prepared by Engineer for a Base Bid of
__________________________________________________________________________ Dollars and the Undersigned agrees to be bound by the following documents:
Advertisement for Bids Instructions to Bidders Bid Security Certificate of Bidder/Contractor of Employee Drug Testing Policy Evidence of Responsibility Form First-Tier Subcontractor Disclosure Full-Time Superintendent Disclosure Statement
Form of Agreement Performance & Payment Bonds General Conditions Drawings Specifications Listed in Project Manual Table of Contents City of Eugene Standard Contract Provisions Prevailing Wage Rates
ALTERNATE BIDS
In addition to the Base Bid indicated above, the Undersigned proposes to furnish all labor and material and perform all Work relating to the following alternates as designated in Section 01 23 00.
Addenda 1 Page 11 of 37
NO. DESCRIPTION ADD DEDUCT
Alt. 1: ___________________________ $__________ $___________
It is understood that the Base Bid may be adjusted for any Alternates in determining the amount of the Contract. Any or all of the Alternates may be accepted or reinstated by the Owner at any time within[(60) (sixty)] calendar days after date of the Contract Award by the Owner, and if accepted or reinstated, payment shall be made therefore at the respective amounts named herein. If, prior to acceptance of any Alternate Bid, other Work is undertaken which affects the Alternate Bid Work, the Alternate Bid Sum will be adjusted accordingly.
OVERHEAD AND PROFIT
The above Bid Price includes all fees, taxes, profit, overhead, and similar items, except those fees identified in the Project Manual to be paid by Owner. It is understood that the sum of the Bid items shall constitute complete compensation for construction of the projects and all appurtenances complete and ready for operation as shown on the plans and specifications.
TIME OF COMPLETION
Work will be completed within the time stipulated and specified in Summary of Work, Section 01 11 00.
BIDDER'S RESIDENCY
____ The Bidder is a resident of the State of Oregon.
____ The Bidder is a non-resident of the State of Oregon as defined below.
A non-resident of Oregon is one who has neither paid unemployment taxes nor income taxes in Oregon during the 12 calendar months immediately preceding submission of this Bid, nor has a business address in Oregon.
If a nonresident, the Bidder shall indicate the state in which the Bidder resides and the Preference, if any, by that state.
Bidder's State of Residence: ________________________________
Preference given by Bidder's Residence State: __________________%
In determining the lowest responsible Bidder for this Work, the above stated percentage will be added to the Bid of nonresident Bidders for purposes of determining the low Bidder, but the percentage will not be added to the Contract Sum appearing in the Agreement.
BIDDER'S STATEMENT
The bidder represents that bidder is properly licensed and adequately experienced, equipped, organized and financed to furnish and deliver the equipment specified and perform the services required.
Addenda 1 Page 12 of 37
The bidder has carefully checked the figures entered in the Form, has carefully reviewed for accuracy all statements in this bid and attachments, and agrees that the City will not be responsible for any errors or omissions of the bidder in preparing this bid. The bidder agrees that this bid may not be revoked or withdrawn as outlined in 00 21 13 Instructions to Bidders.
Bidder hereby agrees to comply with all applicable Oregon public contracting code provisions, as more specifically described in 00 73 01 Standard Contract Provisions.
Bidder attests that it complied with the applicable state and local tax laws including, but not limited to, ORS 305.385, ORS 305.620, ORS chapters 316, 317, and 318 for no fewer than six years into the past from signature and will continue to comply with the tax laws during the term of this contract.
________(initial)
BID SECURITY
Accompanying herewith is Bid Security; which is not less than 10 percent of the total amount of the Base Bid plus Additive Alternate Bids, if any.
BID SECURITY FORFEITURE
The undersigned further agrees that the Bid Security accompanying this Bid is left in escrow with the Owner; that the amount thereof is the measure of liquidated damages which the Owner will sustain by the failure of the undersigned to execute and deliver the above-named Agreement, and Performance and Payment Bonds, and that if the undersigned defaults in either executing the Agreement or providing the Performance and Payment Bonds within 10 days after receiving the contract forms, then the full value of the Bid Security may, at the Owner's option, become the property of the Owner; but if the Bid is not accepted within 60 calendar days after the time set for the opening of the Bids or if the undersigned executes and timely delivers the said Agreement and Performance and Payment Bonds, the Security will be returned.
CONTRACT AND BOND
The undersigned agrees, if awarded the Contract, to provide proof that the Contractor and all Subcontractors have Public Works bonds filed with the Construction Contractor Board or are exempt under ORS 279C.800 to 279C.870, as amended by SB477. This shall be available to the City before starting Work.
The undersigned agrees, if awarded the Contract, to deliver to the Owner within 10 days after receiving the Contract forms an executed Agreement together with satisfactory Performance and Payment Bonds in an amount equal to 100 percent of the Contract Sum.
The Surety requested to issue the Performance and Payment Bonds will be:
Name of Surety Company: ________________________________________________________.
Addenda 1 Page 13 of 37
The undersigned hereby authorizes said Surety Company to disclose any information to the Owner concerning the Undersigned's ability to supply Performance and Payment Bonds in the amount of the Contract Sum.
EMPLOYEE DRUG TESTING PROGRAM
The undersigned certifies to have in-place a Qualifying Employee Drug Testing Program, pursuant to ORS 279C.505(2).
FULL-TIME ON-SITE SUPERINTENDENT
The undersigned agrees, if awarded the Contract, to: 1) provide a full-time on-site project superintendent as stated in the Full-Time Superintendent Disclosure Statement, and; 2) to obtain the Owner’s written permission prior to changing superintendents during the course of the project.
PREVAILING WAGE RATE ACKNOWLEDGEMENT
The contract is subject to BOLI Prevailing Wage Requirements and ORS 279C.800 through ORS 279C.870. The contractor and every subcontractor on the project shall pay at a minimum the BOLI prevailing wage as specified for this project. The contractor certifies compliance with BOLI concerning the payment and certification of payment of prevailing wage rates and has considered this when preparing this bid.
__________ (initial)
REQUIRED ATTACHMENTS TO BID FORM
- Bid Security with Power of Attorney
- Full-Time Superintendent Disclosure Statement
- Evidence of Responsibility Form
CERTIFICATION OF NONDISCRIMINATION
Bidder has not and will not discriminate against a subcontractor in the awarding of a subcontract because a subcontractor is a minority, woman, or emerging small business enterprise certified under ORS 200.055, or against a business enterprise that is owned or controlled by or that employs a disabled veteran as defined in ORS 408.225.
NONCOLLUSION
The bidder certifies that the bid has been arrived at by the bidder, independently, and has been submitted without collusion with, and without any agreement, understanding or planned course of action with, any other contractor, bidder, or vendor on materials, supplies, equipment or services, described in the solicitation documents, designed to limit independent bids or competition. The contents of the bid herein presented and made have not been communicated by the bidder or their employees or agents to any person not an employee or agent of the bidder or its surety on any bond furnished
Addenda 1 Page 14 of 37 with the solicitation, and will not be communicated to any such person prior the closing time of the solicitation.
CONTRACTORS' REGISTRATION
As a condition to submitting this Bid, a Contractor must be registered with the Oregon Construction Contractors Board in accordance with ORS 701.035 to 701.055, and the Contractor must disclose the Registration Number. Failure to register and disclose the Number, will make this a non-responsive Bid and the Bid will be rejected, unless contrary to Federal Law.
Contractor's Registration Number: _____________________________________
Expiration Date: _____________________________
Addenda 1 Page 15 of 37
The undersigned hereby certifies that all Subcontractors performing construction work as described in ORS 701.005(2) will be registered with the Construction Contractors Board prior to commencing work under this Contract.
BID FORM SIGNATURES
Firm Name: ____________________________________________________________________
Address: _______________________________________________________________________
Phone: _____________________________ Fax: _____________________________
By: ___________________________________________________________________________ (Sole Individual)
Type or Print Name: _____________________________________________________________ or
By: ___________________________________________________________________________ (Partner)
Type or Print Name: _____________________________________________________________ or
By: ___________________________________________________________________________ (Authorized Officer of Corporation)
Type or Print Name: _____________________________________________________________
Attested By: ____________________________________________________________________ (Secretary of Corporation)
Type or Print Name: _____________________________________________________________
END OF BID FORM
Addenda 1 Page 16 of 37
EVIDENCE OF RESPONSIBILITY FORM
Solicitation No. 2027-2018
Prior to award of the Contract, the City will evaluate whether the apparent successful Bidder meets the applicable standards of responsibility identified in ORS 279C.375(3) and OAR 137-049-0390. In doing so, City may investigate Bidder and request information in addition to that already required in this ITB.
Failure to provide this information shall result in Bid rejection. The City may postpone the notice of intent to award the Contract after bid opening to complete its investigation and evaluation. Failure of the apparent successful Bidder to demonstrate responsibility as required under OAR 137-049-0390 shall render the Bidder non-responsible and shall constitute grounds for bid rejection, as required under OAR 137-049-0440.
Bidder may add additional pages to this form as needed to provide the required information.
Name of Bidder: _______________________________________________________________________
Primary Office Address: _______________________________________________________________________
1. Does Bidder have available the appropriate financial, material, equipment, facility, and personnel resources and expertise, or ability to obtain the resources and expertise necessary to meet all contractual responsibilities?
Yes ☐ / No ☐
2. Does Bidder hold current licenses that businesses or service professionals operating in this state must hold in order to undertake or perform the work specified in the contract?
3. Is Bidder covered by liability insurance and other insurance in amounts the contracting agency requires in the solicitation documents?
4. Within the last 3 years has the Bidder been criminally or civilly charged, indicted, or convicted in connection with:
a. Offenses related obtaining, attempting to obtain, or performing a public (federal, state, or local) contract or subcontract,
b. Violation of federal or state antitrust statutes relating to the submission of Bids or Proposals, or
c. Embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, tax evasion, or receiving stolen property?
If yes, indicate the jurisdiction, date of indictment, charge or judgment, and names and summary of charges below:
Does Bidder have any outstanding or pending judgments against it? Yes ☐ / No ☐
If yes, please provide an explanation:
Addenda 1 Page 17 of 37
5. Pay Equity Certificate. This certificate is required if Bidder employs 50 or more full-time workers and the resulting Contract price is estimated to exceed $500,000. Does a current authorized representative of Bidder possess an unexpired Pay Equity Certificate issued by the Department of Administrative Services?
Yes ☐ / No ☐ / Not Applicable ☐
6. Within the last 3 years has the Bidder, or any officer, partner, agent or employee of Bidder been found to have violated any state or federal prevailing wage statute or regulation (including the federal Davis-Bacon and related Acts and ORS 279C.800 – ORS 279C.870) in any Final Order of the Oregon Bureau of Labor and Industries or the United States Department of Labor, or by any court of competent jurisdiction?
If yes, provide copies of the final order(s) or judgment in which this occurred and explain in detail:
(a) The circumstances behind any violation, including the amount(s) not paid
(b) Whether the amount(s) have now been paid
(c) The reasons for the violation
(d) All efforts undertaken to ensure that future violations will not occur
RECORD OF SATISFACTORY PERFORMANCE
Bidder must demonstrate successful completion of previous contracts of a similar nature that include right-of-way closures, and provide evidence of a satisfactory performance record. Bidder shall provide information for three (3) different projects completed within the last five (5) years that reflect experience with work comparable in size, scope, and complexity to the Project covered by this ITB. For each project, the Bidder must provide contact information for an individual who can speak to the quality of the Bidder’s workmanship and services on that project.
The same person may not serve as the project contact for more than one project. This requirement ensures that the Owner receives three independent project references.
Bidder may add additional lines to this form as needed to provide the required information.
Project #1
Description of Project:
Project Location:
Project Date:
Contract Amount:
Project Owner:
Project Contact Information (Name/Phone/Email):
Did the project owner ever find that you were materially deficient in contract performance?
If yes, (i) was the deficient performance expressly excused under the terms of the contract, or (ii) did you take appropriate corrective action? Please provide an explanation:
Did you stay within the contract time and budget to the extent the costs associated with and time available to perform a previous contract were within your control? Yes ☐ / No ☐
Addenda 1 Page 18 of 37
Project #2
Description of Project:
Project Location:
Project Date:
Contract Amount:
Project Owner:
Project Contact (Name/Phone/Email):
If yes, (i) was the deficient performance expressly excused under the terms of the contract, or (ii) did you take
Did you stay within the contract time and budget to the extent the costs associated with and time available to perform
Project #3
Description of Project:
Project Location:
Project Date:
Contract Amount:
Project Owner:
Project Contact (Name/Phone/Email):
If yes, (i) was the deficient performance expressly excused under the terms of the contract, or (ii) did you take
Did you stay within the contract time and budget to the extent the costs associated with and time available to perform
The undersigned is a duly authorized representative of the Bidder, has been authorized by Bidder to make all representations, attestations, and certifications contained in this Evidence of Responsibility Form.
Signature: ____________________________________________________________________________________
Printed Name: _________________________________________________________ Date: __________________
Addenda 1 Page 19 of 37
Overpark Protective Fencing 01 11 00 - 1 SUMMARY OF WORK
SECTION 01 11 00
SUMMARY OF WORK
PART 1 - GENERAL
1.01 WORK COVERED BY CONTRACT DOCUMENTS
A. Installation of fencing around top level of Overpark Garage.
1.02 CONTRACT
A. If Work described herein is awarded, successful Bidder and Owner shall execute AIA Document A101 “Owner-Contractor Agreement, Stipulated Sum”
B. See Section 00 52 13 for Contract example.
1.03 TIME OF COMPLETION
A. Work shall be Substantially Complete by March 31, 2027.
1.04 WORK SEQUENCE
A. Sequence work to allow continuous access to facility and minimize impacts to public right-of-way.
1.05 OWNER’S USE OF PREMISES
A. Owner will occupy Premises during construction period for the conduct of normal operations.
B. Cooperate with Owner during construction operations to minimize conflicts and to facilitate
Owner’s use of facilities.
C. Schedule Work to maintain Owner’s continuous operations. Include in Contract Sum sufficient funds as may be required for any “overtime” work caused by this requirement. No additional payment to Contractor will be authorized because of Contractor’s failure to anticipate required “overtime” work.
1.06 CONTRACTOR’S USE OF PREMISES
A. Except as otherwise stipulated above, Contractor will have complete and exclusive use of the
Premises for the execution of the Work.
B. Contractor shall limit use of the Premises for work and storage to allow for:
1. Work by other Contractors
2. Owner’s occupancy
3. Public use
4. Coordinate use of Premises as directed by Owner.
C. If and when necessary and if and when directed, move any stored Products, which are under Contractor’s control, and which interfere with operations of Owner.
D. Obtain and pay for any necessary additional Storage or Work Areas.
1. Contractor shall conduct operations as to insure the least reasonable inconvenience to the
General Public.
1.07 EXCESSIVE NOISE
A. Contractor is prohibited from making excessive noise such as that caused by Jack Hammers, Air Compressors, Electricity Generators, Rivet Guns, and other similar Devices during the hours between 6pm and 7am.
B. If and when such noise is unavoidable, notify Owner’s Representative at least 24 hours prior to such noise, and comply with Owner’s instructions.
1.08 OVERTIME WORK
A. To permit arrangements for inspections, the Contractor shall notify the Owner at least 48 hours in advance of any overtime work, including nights, weekends, and holidays. Do no overtime without notifying Owner.
Addenda 1 Page 20 of 37
Overpark Protective Fencing 01 11 00 - 2 SUMMARY OF WORK
B. The Contractor shall reimburse the Engineer and Owner for any expense incurred by them because of Contractor’s overtime work.
1.09 WORK IN PUBLIC RIGHT-OF-WAY
A. The Contractor shall obtain any required Right-Of-Way Work Permits, pay Permit Fees, and comply with governing Regulatory Agency requirements.
B. When blocking or closing accissible pedestrian routes, Contractor shall errect and furnish closure notifications per Oregon Standard Drawings, Temporary Pedestrian Accessible Routes TM844 and TM844(A).
1.10 SURVEYING EXISTING CONDITIONS (REMODELING PROJECTS)
A. Prior to commencement of Work, Contractor, Engineer, and Owner, shall jointly survey existing conditions, noting and recording any existing damage. Before Work begins, Owner and Contractor shall both sign Record.
B. Record will serve as a basis for determining any subsequent damage to existing facilities caused by Contract Work.
1.11 EXISTING CONDITIONS UNACCEPTABLE TO CONTRACTOR, IF ANY
A. Exposed to View:
1. Repair or, where necessary, replace at no additional cost to Owner.
B. Concealed:
1. Repair or, where necessary, replace.
C. Upon notification from Contractor, and if Owner concurs, Owner will issue a Change Order authorizing Contractor to perform this Work, and Contract Sum will be adjusted accordingly.
1.12 PROTECTING EXISTING UTILITIES
A. Drawings indicate approximate location of any known, concealed Utility Lines. Before starting work, Contractor shall determine exact location of any of these Lines that could be damaged by Contract Work.
B. Contractor shall assume that other unknown Utility Lines do exist, and Contractor shall proceed with caution when working in areas that could conceal unknown Utilities. If such Utility Lines are encountered, immediately request disposition instructions from Architect.
C. If Utility Lines are damaged, remove, repair, or replace Lines as directed. Additional compensation and/or extensions of time, if any, caused by removing, repairing, or replacing Lines will be determined in accordance with General Conditions.
1.13 USE OF OWNER’S PROPERTY & EQUIPMENT
A. Do not use Owner’s Property, Facilities, or Equipment such as Tools, Ladders, Furniture, Janitorial Equipment, Supplies, etc. unless approved in writing by Owner.
1.14 CORRECTION PERIOD FOR NON-COMPLYING WORK
A. Contractor’s response to notice of Work to be Corrected shall be accomplished during the following time periods:
1. Emergency Work:
a. Failures or deficiencies constituting immediate danger or health hazard to People or likely damage to Property.
b. Response Time: 24 hours per day 7 days per week
2. Urgent Work:
a. Failures or deficiencies which do not immediately endanger Persons or Property, but would soon do so if not corrected.
b. Response Time: Between 7 AM & 4 PM on Mondays thru Fridays and within 3 calendar days following receipt of Notice.
3. Routine Work:
Addenda 1 Page 21 of 37
Overpark Protective Fencing 01 11 00 - 3 SUMMARY OF WORK
a. Failures or deficiencies of less importance that do not meet criteria of Emergency or Urgent Work.
b. Response Time: Between 7 AM & 4 PM on Mondays thru Fridays and within 5 calendar days following receipt of Notice.
1.15 PERMITS AND INSPECTIONS
A. Owner will submit plans for permit application and pay cost of City required building permit, plan review and systems development charges.
B. Contractor shall pick up City permits, arrange for and attend required inspections and tests per
01 45 23 and as required by regulatory agencies.
1.16 TESTING AND INSPECTION
A. Comply with testing requirements as specified and required by authority having jurisdiction.
B. Notify Owner’s Testing Agency at least 24 hours prior to commencement of work requiring testing or special inspection.
C. Cost of sampling and testing to be paid by Owner to extend noted in each Specification Section and required by IBC. Results of tests will be binding on the Contractor. Retesting for unsatisfactory work to be paid by the Contractor.
1.17 USE OF RESTROOMS AND PARKING FACILITIES
A. Contractor will be allowed the use of the existing restroom facilities on the ground level.
Contractor responsible to maintain restroom facilities.
B. No on-site parking spots will be designated for use by the Contractor during execution of the
Work. Paid parking is allowed in the parking garage.
C. Construction vehicle parking is allowed within the limits of the work area, if specifically approved by the Owner’s Representative in writing. No personal vehicles or construction vehicles not in use at this project are allowed overnight in the parking lot/staging area. Other parking is to be coordinated at the expense of the Contractor, off-site.
PART 2 - NOT USED
PART 3 - NOT USED
END OF SECTION
Addenda 1 Page 22 of 37
Overpark Protective Fencing 01 23 00 - 1 ALTERNATES
SECTION 01 23 00
ALTERNATES
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Alternate submission procedures.
B. Documentation of changes to Contract Sum/Price and Contract Time.
1.02 RELATED SECTIONS
A. Section 00 52 13 - Form of Agreement: Incorporating monetary value of accepted Alternates.
B. Section 00 21 13 - Instructions to Bidders, Section 00 41 13 - Bid Form: Requirements for
Alternates.
C. Section 01 33 00 – Submittal Procedures: Work schedule affected by Alternates.
D. Section 01 60 00 – Product Requirements: Product options.
1.03 SUBMISSION REQUIREMENTS
A. Submit alternatives identifying the effect on adjacent or related components.
B. Alternates quoted on Bid Forms will be reviewed and accepted or rejected at the Owner's option. Accepted alternates will be identified in the Owner-Contractor Agreement.
C. Coordinate related work and modify surrounding work to integrate the Work of each alternate.
1.04 SCHEDULE OF ALTERNATES
A. Alternate No. 1 – Install Decorative Metal Fencing:
1. Base Bid Item: Install Chain Link Fencing.
2. Alternate Item: Install Decorative Metal Fencing.
PART 2 - PRODUCTS
NOT USED.
PART 3 - EXECUTION
NOT USED.
Addenda 1 Page 23 of 37
Overpark Protective Fencing 01 31 00 - 1 PROJECT MANAGEMENT &
COORDINATION
SECTION 01 31 00
PROJECT MANAGEMENT & COORDINATION
PART 1 - GENERAL
1.01 WORK INCLUDES
A. Contractor shall schedule and administer Preconstruction Meeting, periodic Progress Meetings, and specially called Meetings throughout the progress of the Work.
1. Prepare Meeting Agenda.
2. Distribute Notice of each Meeting four days in advance of Meeting date.
3. Make physical arrangements for Meetings.
4. Preside at Meetings.
5. Record the Minutes; include all significant proceedings and decisions.
6. Reproduce and distribute copies of Minutes within 3 days after each Meeting to each of the following:
a. All Meeting participants
b. All parties affected by decisions made at Meeting
c. Engineer
d. Owner’s Representative
B. Representatives of Contractor, Subcontractors, and Suppliers attending Meetings shall be qualified and authorized to act on behalf of entity each represents.
C. Engineer and Owner’s Representative may attend Meetings to ascertain that Work is expedited consistent with Contract Documents and Construction Schedules.
D. Site Logistics Plan Submittal
1.02 RELATED REQUIREMENTS SPECIFIED IN OTHER SECTIONS
A. Section 00 11 13 – Advertisement for Bids: Pre-Bid Conference B. Section 01 11 00 - Summary of Work C. Section 01 32 00 – Construction Progress Documentation
1.03 PRE-CONSTRUCTION MEETING
A. Schedule within 15 days after day of Notice-to-Proceed.
B. Location: Atrium Building Conference Room, 99 W 10th Ave, Eugene, OR 97401.
C. Required Attendance:
1. Owner’s Representative
2. Engineer and Professional Consultants
3. Contractor’s Superintendent
4. Major Subcontractors
5. Major Suppliers
6. Others as appropriate
D. Minimum Agenda:
1. Distribution and discussion of:
a. List of major Subcontractors and Suppliers
b. Projected Construction Schedules
2. Critical work sequencing
3. Anticipated shutdowns and closures
4. Major Equipment deliveries and priorities
5. Project coordination
6. Designation of responsible personnel
7. Procedures and processing of:
a. Field decisions
b. Proposal requests
Addenda 1 Page 24 of 37
Overpark Protective Fencing 01 31 00 - 2 PROJECT MANAGEMENT &
c. Submittals
d. Change Orders
e. Applications for Payment
8. Adequacy of Contract Documents distribution
9. Procedures for maintaining Record Documents
10. Use of premises:
a. Office, Staging, Storage, and Work areas
b. Owner’s requirements
11. Construction Facilities, Controls, and Construction Aids
12. Temporary Utilities
13. Safety and First-aid procedures
14. Hazardous Materials
15. Security procedures
16. Housekeeping procedures
1.04 PROGRESS MEETINGS
A. Weekly meetings shall be held at the Jobsite to coordinate the Work, answer questions, and resolve problems.
B. The following shall attend:
1. General Contractor’s Superintendent C. Other with interest in Project may attend and shall attend when invited.
D. Minimum Agenda:
1. Review and approval of previous meeting minutes.
2. Review Work and progress since previous meeting.
3. Field observations, problems, and conflicts.
4. Problems which impede construction schedule.
5. Review off-site fabrication and delivery schedules.
6. Corrective measures and procedures to regain projected schedule.
7. Revisions to Construction Schedule.
8. Progress, schedule, during succeeding work period.
9. Coordination of schedules.
10. Review submittal schedules; expedite as required.
11. Maintenance of quality standards.
12. Pending changes and substitutions.
13. Review proposed changes for effect on Construction Schedule and on completion date.
14. Review proposed changes for effect on other Project Contracts.
15. Other Business.
1.05 PRE-INSTALLATION CONFERENCES
A. When specified in individual Specification Section, convene Pre-installation Conference at
Project site prior to commencing Work.
B. Require attendance of those specified.
1. Notify Owner at least 4 working days in advance of meeting date.
C. Prepare Agenda, preside at Conference and record and distribute Minutes.
D. Minimum Agenda: Edit per project
1. Contract Documents
2. Options
3. Related Change Orders
4. Product purchase, delivery, storage and handling
5. Shop Drawings, Product Data, and Stamps, when required
6. Compatibility of Products
7. Possible conflicts
Addenda 1 Page 25 of 37
Overpark Protective Fencing 01 31 00 - 3 PROJECT MANAGEMENT &
8. Effects of Work on Progress Schedule
9. Weather limitations
10. Manufacturer’s instructions and recommendations
11. Acceptability of Substrate
12. Temporary Facilities
13. Work space and access
14. Governing regulations
15. Safety
16. Inspection and testing requirements
17. Maintenance requirements
18. Protection
1.06 SITE LOGISTICS PLAN
A. Submittals: Within 14 days of Notice to Proceed, Contractor shall submit Site Logistics Plan in
PDF format outlining:
1. Sequence of work.
2. Anticipated closures and methods.
3. Signage plans.
4. Safety measures.
PART 2 - PRODUCTS
NOT USED.
PART 3 - EXECUTION
NOT USED.
Addenda 1 Page 26 of 37
Overpark Protective Fencing 05 50 00 - 1 Metal Fabrications
SECTION 05 50 00
METAL FABRICATIONS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Shop fabricated steel items.
B. Flanges C. Brackets
1.02 RELATED REQUIREMENTS
A. Section 32 31 13 - Chain Link Fences and Gates
1.03 REFERENCE STANDARDS
A. ASTM A53/A53M - Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless; 2024.
B. ASTM A123/A123M - Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products; 2024.
C. ASTM A283/A283M - Standard Specification for Low and Intermediate Tensile Strength Carbon
Steel Plates; 2024.
D. AWS A2.4 - Standard Symbols for Welding, Brazing, and Nondestructive Examination; 2020.
E. AWS B2.1/B2.1M - Specification for Welding Procedure and Performance Qualification; 2026.
F. AWS D1.1/D1.1M - Structural Welding Code - Steel; 2020, with Errata (2023).
G. AWS D1.2/D1.2M - Structural Welding Code - Aluminum; 2014, with Errata (2020).
H. IAS AC172 - Accreditation Criteria for Fabricator Inspection Programs for Structural Steel
AC172; 2019, with Editorial Revision (2025).
1.04 SUBMITTALS
A. See Section 01 30 00 - Administrative Requirements, for submittal procedures.
B. Shop Drawings: Indicate profiles, sizes, connection attachments, reinforcing, anchorage, size and type of fasteners, and accessories. Include erection drawings, elevations, and details where applicable.
1. Indicate welded connections using standard AWS A2.4 welding symbols. Indicate net weld lengths.
C. Welders' Qualification Statement: Welders' certificates in accordance with AWS B2.1/B2.1M and dated no more than 12 months before start of scheduled welding work.
D. Fabricator's Qualification Statement: Provide documentation showing steel fabricator is accredited under IAS AC172.
1.05 QUALITY ASSURANCE
A. Welder Qualifications: Welding processes and welding operators qualified in accordance with AWS D1.1/D1.1M and AWS D1.2/D1.2M and dated no more than 12 months before start of scheduled welding work.
B. Fabricator Qualifications: A qualified steel fabricator that is accredited by IAS AC172.
PART 2 PRODUCTS
2.01 MATERIALS - STEEL
A. Plates: ASTM A283/A283M.
B. Pipe: ASTM A53/A53M, Grade B Schedule 40.
2.02 FABRICATION
A. Fabricate items with joints tightly fitted and secured.
Addenda 1 Page 27 of 37
Overpark Protective Fencing 05 50 00 - 2 Metal Fabrications
B. Grind exposed joints flush and smooth with adjacent finish surface. Make exposed joints butt tight, flush, and hairline. Ease exposed edges to small uniform radius.
C. Furnish components required for anchorage of fabrications. Fabricate anchors and related components of same material and finish as fabrication, except where specifically noted otherwise.
2.03 FABRICATED ITEMS
A. Brackets, Base Plates, Flanges: As Detailed; hot-dipped galvanized after fabrication.
B. Alternate 1, Brackets, Base Plates, Flanges: Fabricated to fit around square posts and similar to details on drawings; hot-dipped galvanized after fabrication.
2.04 FINISHES - STEEL
A. Galvanizing of Steel Members: Galvanize after fabrication to ASTM A123/A123M requirements. Provide minimum 1.7 oz/sq ft galvanized coating. (Provide minimum 530 g/sq m galvanized coating.)
2.05 FABRICATION TOLERANCES
A. Squareness: 1/8 inch (3 mm) maximum difference in diagonal measurements.
B. Maximum Offset Between Faces: 1/16 inch (1.5 mm).
C. Maximum Misalignment of Adjacent Members: 1/16 inch (1.5 mm).
D. Maximum Bow: 1/8 inch (3 mm) in 48 inches (1.2 m).
E. Maximum Deviation From Plane: 1/16 inch (1.5 mm) in 48 inches (1.2 m).
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that field conditions are acceptable and are ready to receive work.
B. Verify outside dimension of vinyl coated posts
3.02 INSTALLATION
A. Install items plumb and level, accurately fitted, free from distortion or defects.
B. Provide for erection loads, and for sufficient temporary bracing to maintain true alignment until completion of erection and installation of permanent attachments.
C. Obtain approval prior to site cutting or making adjustments not scheduled.
3.03 TOLERANCES
A. Maximum Variation From Plumb: 1/4 inch (6 mm) per story, non-cumulative.
B. Maximum Offset From True Alignment: 1/4 inch (6 mm).
C. Maximum Out-of-Position: 1/4 inch (6 mm).
Addenda 1 Page 28 of 37
Overpark Protective Fencing 32 31 13 - 1 Chain Link Fences and Gates
SECTION 32 31 13
CHAIN LINK FENCES AND GATES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Posts, rails, and frames.
B. Wire fabric.
C. Concrete.
D. Finishes.
E. Accessories.
1.02 REFERENCE STANDARDS
A. ASTM A392 - Standard Specification for Zinc-Coated Steel Chain-Link Fence Fabric; 2011a
(Reapproved 2022).
B. ASTM A1011/A1011M - Standard Specification for Steel, Sheet and Strip, Hot-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, and Ultra-High Strength; 2025.
C. ASTM F567 - Standard Practice for Installation of Chain-Link Fence; 2023.
D. ASTM F1043 - Standard Specification for Strength and Protective Coatings on Steel…