This Performance Work Statement (PWS) establishes requirements for base operations and maintenance services at Rivanna Station, Virginia, a 75-acre Department of the Army installation located ten miles north of Charlottesville with approximately 2,300 military, government civilian, and contractor personnel across 15 facilities. The contract period runs from February 27, 2026, to June 26, 2026 (4 months base period), with regular hours of operation from 7:00 AM to 4:00 PM Monday through Friday, excluding federal holidays. The Contractor must provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and non-personal services necessary to perform base operations and maintenance consistent with original equipment manufacturer recommendations and all applicable federal, state, and local laws and regulations.
The PWS requires comprehensive facility maintenance encompassing eight Common Levels of Support (CLS) services: Facilities Maintenance Instructions, Grounds Maintenance, Snow and Ice Removal, Facility Maintenance (Vertical and Horizontal), Custodial Services, Refuse Removal, and Indoor/Outdoor Pest Management. Key contractor responsibilities include establishing a General Fund Enterprise Business System (GFEBS) Preventive Maintenance (PMO) program within 60 days of contract start; managing Demand Maintenance Orders (DMOs) with response times of 24 hours for Priority 1 emergencies, 7 days for Priority 2, and 30 days for Priority 3; executing Project Work Orders (PWOs) within scheduled delivery dates; maintaining a Quality Control Plan; and providing specialized personnel including a Project Manager with seven years' building operations experience, licensed electricians, plumbers, HVAC mechanics, and CDC custodians. The Contractor must obtain security clearances (TOP SECRET with Sensitive Compartmented Information eligibility for key personnel working in the Nicholson Building SCIF), comply with all security and environmental requirements, maintain comprehensive insurance, and submit to the Quality Assurance Surveillance Plan. All wage rates for construction-related work follow U.S. Department of Labor Wage Determinations, and the Contractor must report all labor hours via the Enterprise Contractor Manpower Reporting Application (ECMRA).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS)
Base Operations Rivanna Station, Virginia
05 January 2026
Table of Contents
1.0 INTRODUCTION
1.1 Background…………………………………………………………………………………..……4
1.2 Objective…………………………………………………………………………………………..5
1.3 Climatic Conditions……………………………………………………………..………………..6
1.4 Facility Access……………………………………………………………..……………………..6
1.5 Traffic Flow………………………………………………………………………………………6
1.6 Drainage………………………………………………………………………………………….6
1.7 Restoration of Landscape Damage……………………………………………………………6
1.8 Dust Suppression………………………………………………………………………………..6
1.9 Utility Location…………………………………………………………………..…………………6
1.10 Emergency Generator Fuels……………………………………………….……………………7
2.0 REQUIREMENTS
2.1 Description of Services
2.2 Work Management……………………………………………………………………………..14
2.2.2 Work Status
2.3 As-Builts and Geospatial Information System (GIS)
2.4 Network Access
2.5 Historic Property or Archaeological Site
2.6 Repair and Replacement
2.7 Salvage
2.8 Security Requirements………………………………………………………….…………22
2.9 Administrative Office Areas……………………………………………….…….………26
2.10 Motor Vehicle Operators……………………………………………………………….26
2.11 Parking…………………………………………………………………………………...26
2.12 Lost and Found…………………………………………………………………………..26
2.13 Staging Area……………………………………………………………………………26
2.14 Key Control……………………………………………………………………………..26
2.15 NOT USED
2.16 Security Training……………………………………………………………………….27
2.17 Safety…………………………………………………………………………………….28
2.18 Training, Physical Requirements, or other Expertise Required………………………….28
2.19 Qualifications/Certifications……………………………………………………………..29 ii
2.20 Environmental Requirements…………………………………………………………….32
2.22 Contingency Plans…
3.0 Performance Requirements and Standards
3.1 Quality Assurance………………………………………………………………………..34
3.2 Quality Control Files
3.3 Customer Feedback Program
4.0 Performance Requirements Summary (PRS) Matrix
5.0 Common Levels of Support (CLS)………………………………………………………38
6.0 Deliverables………………………………………………………………………………..39
7.0 Related Documents………………………………………………………………………..39
7.2 Technical Exhibit (TE) and Attachment Index………………………………………….58
7.3 Government-Furnished Material (GFM)/Property (GFP)/Equipment (GFE)………..58
7.4 Contractor-Furnished Material (CFM)/Property (CFP)/Equipment (CFE)
7.5 U.S. Department of Labor Wage Determination (DOL WD)
7.6 Enterprise Contractor Manpower Reporting Application (ECMRA)
1.0 INTRODUCTION. This is a non-personal services contract to provide Installation operations support services at Rivanna Station, Virginia (RSVA). The Government will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform base operations and maintenance as defined in this Performance Work Statement (PWS). The Contractor shall perform to the standards specified in this PWS. The Contractor is responsible for providing all parts required for PMOs and all repair parts required for DMOs (See TE WD1 for historical cost data).
1.1 Background. Rivanna Station is located in a semi-rural area ten miles north of Charlottesville, VA on US Route 29. The Station is located within the primary residential and commercial developmental zone for the Charlottesville, Albemarle County area.
1.1.1 Physical Description.
1.1.1.1 Population. The workforce population is approximately 2300 consisting of military, government civilians and Contractor personnel. There is no family or troop housing, and no leisure recreational facilities on RSVA. RSVA is approximately 75 acres and consists of 15 facilities.
1.1.1.2 Planned Buildings, structures and facilities. It is anticipated during the life of this contract that facilities will be added to the RSVA facility inventory. The Contractor will update TE BS1, TE BS2, and TE BS3 by October of each year to keep current. The Government will request from the Contractor pricing to perform the tasks within this PWS and associated common level of services for new facilities and equipment added. After negotiations a modification to the contract will be issued to include the additional items.
The following is a list of known planned buildings and structures:
• An addition to the Nicholson Building, Building 2000. The addition will be approximately 82,000 GSF and having a small standby generator.
• A 150,000 GSF multi-story parking garage built in the front parking lot of building 2000.
1.1.1.3 Electricity. Commercial power is provided to Rivanna Station by Rappahannock Electric Cooperative.
1.1.1.4 Backup Power. Government owned and operated auxiliary generators to provide emergency backup power.
• Nicholson Building: Two (2) 2.5 KVA Caterpillar, diesel generators.
• Nicholson Building: DISA generator. One (1) Olympia 40 KW, natural gas-fired.
• Access Control Point buildings and barriers: One (1) 100 KW Cummins, diesel fired.
1.1.1.5 Natural Gas. Transmission lines for natural gas are owned and operated by Charlottesville Gas. Gas serves office buildings and Security Access Control Point (ACP) buildings on Rivanna Station.
1.1.1.6 Water. The Albemarle County Service Authority own and operates the water system that supplies water system to and on Rivanna Station up to the meters. The Government owns and operates the water systems from the meter to the buildings.
1.1.1.7 Wastewater. The Albemarle County Service Authority supplies and operates the wastewater system to Rivanna Station. The Government owns the service laterals from the clean out into the building.
1.1.1.8 Roads and Grounds. Grounds improvements, including all access transportation facilities, roads and other paved areas, such as sidewalks and vehicular parking areas, cover an area of approximately 46 acres within the Rivanna Station Installation. There are approximately 1500 LF of improved 4-lane roads and approximately 3350 LF of improved 2-lane roads for an approximately total of 24,204 SY of roads. There are approximately 62,428 square yards of paved parking areas which include limited open storage areas at each facility. There are approximately 6,000 LF of sidewalk and steps with an average of 4 feet in width on the compound.
1.1.1.9 Earthen Dam. The dam is an earthen embankment approximately 130 feet long.
The spillway is lined in rip-rap and is approximately 10 feet wide and 6 feet deep. The outlet works of the dam consists of a 4'x4' concrete drop inlet approximately 9' tall. There is a low level inlet that is a 12" cast iron drain pipe and valve. The outlet of the dam is a 24" RCP that discharges into a rip-rap lined plunge pool.
1.2 Objectives. The Contractor shall ensure all work accomplished in the performance of this Performance Work Statement (PWS) meets all maintenance and repair standards consistent with the original equipment manufacturer’s recommendations, and all applicable federal, state, and local laws, regulations, and directives to include, but be not limited to, the applicable publications in Section 7. Without additional expense to the Government, the Contractor shall obtain/ensure subcontractors obtain all licenses, and permits required to perform this work under this contract. The Contractor shall compile historical data, prepare required reports, and submit information as specified by the Contract Data Requirements Lists (CDRLs) or Deliverables presented in the contract.
The Contractor shall ensure all work in support of mission requirements tendered to the Government for acceptance conform to the measurable performance standards of quality, timeliness, and quantity specified in the PWS of this contract. The intent is to establish work requirements that are performance-based and results oriented. This approach is intended to allow the Contractor to determine the best and most cost effective ways to fulfill Base Operations and their component needs, emphasizing innovation and commercial best practices.
1.3 Climatic Conditions. The average annual rainfall is 47.68 inches; with the wettest months being April through July. The average annual snowfall is 16 inches, with snowfall expected during the period of October through April. The average frost-free period (growing season) during the year is about 250 days. The first killing frost may be expected about October, and the last killing frost generally occurs in May. The average annual maximum and minimum temperatures are approximately 67.4 and 46.8 degrees Fahrenheit, respectively. Monthly normal temperatures ranged from a low of 27 degrees in January to a high of 87 degrees in July. Summer temperatures often reach 90+ degrees F, while sub-freezing weather is common during the winter months. The prevailing wind direction at Charlottesville Airport is northwest, followed by west, with an average annual wind speed of 9 miles per hour. Information pulled from https://www.usclimatedata.com.
1.4 Facility Access. The Contractor shall ensure access to all fire detection and suppression systems in case of emergencies or for other Fire Department purposes. The Contractor shall inform the COR and Fire Department point-of-contact (POC), prior to outages that will impact the function of the system, special problems or circumstances, which require Fire Department inspection. The Contractor will reset alarm systems to operational status once outage or other function is complete and inform the COR, and Fire Department point-of-contact (POC) by email once system is reset.
1.5 Traffic Flow. The Contractor shall maintain the free flow of traffic during surfaced area maintenance. The Contractor shall notify the Contracting Officer (KO), in writing, a minimum of fourteen (14) calendar days in advance of any scheduled closure of streets.
Emergency road closures shall be coordinated with the Contracting Officer Representative (COR).
1.6 Drainage. Maintenance work performed under this contract shall not impede drainage.
1.7 Restoration of Landscape Damage. Trees or other landscape features damaged by the Contractor’s operations shall be restored at no additional cost to the Government.
The COR will decide the method of restoration for trees or whether damaged tress will be removed.
1.8 Dust Suppression. The Contractor shall perform dust suppression as directed by the COR and by applicable codes.
1.9 Utility Location. The Contractor shall locate and stake out underground utility pipes/cables prior to digging operations required by any contract on RSVA property. The Contractor shall be responsible for having the proper equipment to locate all underground utilities or obtain subcontractor (vendor) services at no additional cost to the Government.
Mechanical digging shall not be permitted within ten (10) feet of identified underground utilities.
https://www.usclimatedata.com/
1.9.1 Excavation Permits. All excavation permits shall be initiated on a DPW Excavation Permit FB (DPW) FM75 identified at TE DIG1 and processed through the work control office in this Contract. The Government requires up to 5 business days to review and approve excavation permits and provide this approval to the Contractor so the permit can be finalized and returned to the requestor. The Contractor shall keep record of every permit, assign a unique number, provide locator and marking service, coordinate marking with the communications Contractor, etc. and provide status to the Government. The Contractor shall notify the requestor within 24 hours of receiving a processed excavation permit package.
1.10 Emergency Generator Fuels. The Contractor shall provide purchase and refueling of the NGIC and ACP diesel generators to maintain a 90 percent tank level. The Contractor shall also purchase and refuel the diesel and/or kerosene portable heaters used at the entrance gate guard booths. This work will be performed on a level III IJO as needed.
2.0 REQUIREMENTS.
2.1 Description of Services. See Section 5.0 for specific Common Level of Support
(CLS).
2.1.1 Non-Personal Services. The personnel rendering the services are not subject;
either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. Non-personal service contracts are authorized by the Government in accordance with FAR 37.104, under general contracting authority, and do not require specific statutory authorization.
2.1.2 General Information.
2.1.2.1 Transition (Phase In/Phase Out). The Contractor shall prepare and submit a Phase In/Phase Out Plan to be implemented by the Contractor to include IT/Network accounts and access with the appropriate Government organizations. The plan shall specify a training program and a date for transferring responsibilities for the work and shall be subject to the COR’s approval. The Contractor shall provide sufficient experienced personnel during the phase-in and phase-out period to ensure that the services are maintained at the required level of proficiency. During the 30 days prior to contract start, the Contractor's key personnel, as proposed and accepted in the solicitation, shall observe all operations pertinent to the requirements of the PWS, to include office functions, procedures, and operations, repair/maintenance operations, and any other operations as deemed necessary by the Contractor that will enable Contractor personnel to become both knowledgeable in, and familiar with, their assigned areas of responsibility.
2.1.2.1.1 Workforce. The Contractor shall commence all operations required by the contract as of the first day of the contract period. Therefore, on the initial day of performance, the Contractor shall provide a work force which is fully qualified and capable of performing all work required under this contract. During the thirty (30) calendar day period immediately prior to the end of the contract (if the current Contractor is not awarded the subsequent contract for this service), the Contractor shall permit the successor Contractor (and the successor Contractor's employees) to observe and become familiar with any and all operations under the contract. The Contractor shall not defer any needed repairs or maintenance for the purpose of transferring responsibility to the successor Contractor. The Contractor shall fully cooperate with the successor Contractor and the Government so as not to interfere with their work or duties.
2.1.2.2 Period of Performance. The period of performance (PoP) consists of 4 months.
The period of performance is as follows:
Base Period 27 February 2026 to 26 June 2026
2.1.3 Place of Performance and Hours of Operation.
2.1.3.1 Place of Performance. The work to be performed under this contract will be performed at the location referenced in paragraph 1.1 of this PWS. A map of Rivanna Station is at TE MAP1
2.1.3.2 Hours of Operation. The Government's regular (normal) hours are from 7:00AM to 4:00 PM, Monday through Friday, except Federal Holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall conduct business during/within regular hours. For some areas of the PWS an alternate work schedule may be submitted to the COR for approval. The Contractor shall provide personnel support within two (2) hours of notification outside the normal hours of operation as required, including holidays, to support the Directorate of Public Works’ (DPW) mission. Prior to performance of services outside the locally established hours of operation, the Contractor shall request and obtain, in writing, approval from the COR.
2.1.3.2.1 Installation Closures. When an unforeseen installation closure occurs on a regularly scheduled day of work, the Contractor shall:
a. Reschedule the work to be performed the following day unless the following day is a Saturday, Sunday, a legal public holiday, and when routine work is not scheduled for that day; or
b. Reschedule the work on any day mutually satisfactory with the COR.
2.1.3.2.2 Inclement Weather Delay. If the Contractor determines unsafe weather conditions for continued operations, then the Contractor shall request approval from the COR to suspend services. The Contractor shall suspend operations because of inclement weather only after receiving notification from the COR. The Contractor shall resume operations upon receipt of COR concurrence.
2.1.4 Federal Holidays. The Contractor’s performance shall not be required on the legal public holidays listed below. Holidays occurring on weekends will be observed as directed by the published Army calendar.
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day Juneteenth National Independence Day
2.1.5 Emergency Services.
2.1.5.1 Emergency Medical Treatment. The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor shall notify the COR immediately, not later than (NLT) two (2) hours of the incident. The Contractor shall be responsible for the emergency medical treatment services for Contractor personnel. However, the Government will provide, on an emergency basis, medical services for injuries incurred while an employee is performing under the contract. The Contractor shall reimburse the Government for emergency medical services provided, upon receipt of invoice from the medical facility.
Reimbursement shall be made to the US Government.
2.1.5.2 Accident Reporting. The Contractor shall comply with Operational Safety and Health Administration (OSHA) for record keeping and reporting of all accidents resulting in death, injury, occupational disease, or adverse environmental impact. The Contractor shall provide a verbal report to the COR within four (4) hours of each such occurrence. A completed typed original plus one (1) copy of ENG FORM 3394 United States Army Corps of Engineers Accident Investigation Report shall be delivered to the COR within five (5) calendar days of occurrence, whenever an accident involving personal injury or government owned vehicles occurs. See TE 3394 for form.
2.1.6 Contract Administration and Management.
2.1.6.1 Post Award Conference/Performance Evaluation Meetings. The Contractor shall attend the post award conference convened by the contracting activity or contract administration office IAW FAR Subpart 42.5. The KO and/or COR will meet monthly with the Contractor to review the Contractor's performance. Written minutes of meetings will be recorded by the Contractor and signed by both the Project Manager and the KO. The written minutes will be distributed within two (2) workdays after the meeting. If the
Government does not concur with any portion of the minutes, recorded by the Contractor, the non-concurrence shall be provided in writing to the KO within two (2) calendar days following receipt of the minutes. Notwithstanding the Contractor’s responsibility for total management during the performance of this contract, the administration of the contract requires maximum coordination and cooperation between the Government and the Contractor.
2.1.6.2 The following provides the roles and their respective authority during the performance of the contract:
2.1.6.2.1 Director, Directorate of Public Works (DPW). The DPW acts as the Garrison Commander's (GC) principal staff officer for all matters pertaining to facilities engineering and RPMA services required under the contract. The Director plans, programs, prioritizes, and coordinates all facilities engineering and RPMA services required under the contract.
2.1.6.2.2 Garrison Site Manager, Rivanna Station. The Garrison Site Manager coordinates with the Director for requirements at RS, and obtains support from the DPW Divisions and is also the COR on the RS BASOPS Contract.
2.1.6.2.3 Operations and Maintenance (O&M) Division. The Operations and Maintenance Division consists of the CORs/ACORs and the Quality Assurance Evaluators (QAEs) and in coordination with other DPW Divisions direct, supervise, and coordinate facilities engineering activities related to all RPMA services required under the contract.
2.1.6.2.4 Business and Operations Integration (BOID) Division. The BOID Division provides support to all internal Public Works customers in the areas of Information Technology, Administration, Budget, Training, Security, and Process Measurement and Improvement.
2.1.6.2.5 Contracting Officer (KO). The KO is the only person authorized to direct changes in any of the requirements under this contract, and, notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the KO.
In the event the Contractor makes any change at the direction of any person other than the KO, the change will be considered to have been made without authority and solely at the risk of the Contractor. All contract administration will be effected by the KO.
Communications pertaining to contractual administrative matters shall be addressed to the KO. No changes in or deviation from the terms and conditions shall be effected without a written modification to the contract, executed by the KO authorizing such changes. The KO will approve all submittals and plans required in this PWS.
2.1.6.2.6 Contracting Officer’s Representative (COR). The KO will appoint a COR during the performance of this contract. Additional Fort Belvoir Directorate of Public Works Government personnel may be assigned to assist in contract oversight IAW AR 70-13, Management and Oversight of Service Acquisitions. Other surveillance personnel may be designated as COR or ACOR, and shall be trained and appointed IAW DoDI
5000.72, DoD Standard for Contracting Officer’s Representative (COR) Certification and DFARS 201.602-2. The ACOR will serve as on-site representatives of the COR in performance of actual contract surveillance, if they meet all COR training, experience requirements, and are appointed by the KO as an ACOR. The COR will provide assistance in identification and resolution of problems, conflicts in priority, subtask requirement definitions, and other operations type problems. The COR will perform IAW the responsibilities and duties identified in the appointment letter. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements;
monitor, document, and report Contractor's performance and notify both the KO and Contractor of any deficiencies; coordinate availability of Government-furnished property, and coordinate site entry of Contractor personnel. The Contractor shall not in any way represent the United States (U.S.) Government, or that it has the authority to contract or procure supplies for the account of the United States of America (USA).
2.1.6.2.7 Organizational Conflict of Interest (OCI). Contractor and subcontractor personnel performing work under this contract may receive, have access to, or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.), or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO, and in the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the
OCI.
2.1.7 Contractor Key Personnel Requirements.
2.1.7.1 Key Personnel. The following are considered Key Personnel that shall be the minimum, but not necessarily the limit as part of this contract. There is no intent on the part of the Government to require large numbers of key personnel. The Government is looking for the most cost efficient and effective number of key personnel only. NOTE:
The Project Manager and any individuals designated as key personnel shall be able to understand, speak, read, and write the English language fluently.
a. Project Manager (PM). The Contractor shall provide a Project Manager who is responsible for the performance of the work. The Project Manager shall have full authority to act for the Contractor on all contract matters relating to daily operation of the contract.
The Project Manager shall have a minimum of seven (7) years’ experience in building(s) operations and maintenance and at least five (5) years of experience in base support service management or a contract similar in scope and breadth to this solicitation to include supervisory role. The name of the Project Manager shall be provided by the Contractor to the KO and COR. The Project Manager shall be available between 0700 - 1600 hours, Monday through Friday, except Federal holidays and when the Government facility is closed for administrative reasons. In the circumstances when the Project Manager is not available, the contractor shall designate an alternate who can perform the same duties during the absence of the Project Manager. The PM shall also have, as a minimum, three (3) years’ experience in providing Custodial Services for child care facilities. Documentation of experience shall be provided with the contract offer.
b. Deputy Project Manager (DPM). The DPM shall have at least 5 years demonstrated experience in building maintenance and operations, supervising building maintenance and operations, and knowledge of custodial services for child development centers. The DPM will have experience and demonstrated working knowledge of GFEBS.
The name of the DPM shall be provided by the Contractor to the KO and the COR. The DPM shall be available between 0700 - 1600 hours, Monday through Friday, except Federal holidays or when the Government facility is closed for administrative reasons.
The DPM shall have, as a minimum, three (3) years’ experience in supervision of personnel and services of maintenance and repairs of Government/commercial facilities, and providing pricing and estimates. The DPM should be familiar with the following roles in GFEBS, at a minimum:
• Real Property Viewer
• A76 master Data Maintainer
• A76 Material Requirement Planning Maintainer
• A76 Plant Maintenance Order Approver
• A76 Plant Maintenance Order maintainer
• A76 Plant Maintenance Reporter
• Goods Receipt Processor
c. Work Control Lead. The GFEBS Senior Work Control Lead shall have demonstrated experience in setting up a GFEBS PM Program on a military installation, and in responding to DMOs from customers on a daily basis. The Senior Work Control Lead shall demonstrate problem solving skills, conflict management, and customer service.
The GFEBS Senior Work Control Lead shall be available between 0700 - 1600 hours, Monday through Friday, except Federal holidays or when the Government facility is closed for administrative reasons. The GFEBS Work Control Lead shall have the following roles in GFEBS, at a minimum:
• Real Property Viewer
• A76 master Data Maintainer
• A76 Material Requirement Planning Maintainer
• A76 Plant Maintenance Order Approver
• A76 Plant Maintenance Order maintainer
• A76 Plant Maintenance Reporter
• Goods Receipt Processor
d. Building Automation System Controls Lead. The Controls lead shall have a minimum of 5 years’ experience in, but not limited to, Johnson Controls, Tridium Niagara, and LG HVAC systems and their perspective controls and sequencing functions. The Controls Lead shall have been certified in Tridium N4 and Johnson Controls systems for a minimum of 3 years. The Control Lead shall have minimum of five (5) years of demonstrated experience in maintaining all HVAC equipment, evaluating sequencing and logic issues and correcting them from the BAS control center and at each piece of equipment. The Controls Lead shall be responsible for the controls and hands on repairing equipment along with the HVAC Technician and shall provide demonstrated experiences for the controls and field work.
2.1.8 Contractor Requirements.
2.1.8.1 U.S. Residency. All Contractor employees shall be legal U.S. residents. The Contractor shall immediately remove any employee that is not a legal U.S. resident. The Contractor personnel shall be able to communicate clearly in the English language.
2.1.8.2 Certain administrative and technician personnel will require a Common Access Card (CAC) to access Government systems. CAC permits installation access to all contract employees. These persons shall have, at a minimum, a favorable National Agency Check (NAC).
2.1.8.3 Qualification Standards. The Contractor shall inspect, repair, and maintain systems and components associated with facilities listed in real property records as required throughout this contract utilizing properly trained, skilled, and qualified employees or subcontractor personnel.
2.1.8.4 Contractor Identification. The Contractor shall ensure that personnel be identified as a Contractor to distinguish themselves (e.g., badge, company logo, or uniform) from Government employees. The Contractor shall ensure all correspondence and reports produced are marked as Contractor products or that Contractor participation is disclosed.
(NOTE: Hats shall not be worn inside any facility on the Rivanna Station Compound)
2.1.8.5 Standards of Conduct. Contractor personnel’s conduct shall not reflect discredit upon the Government. The Contractor shall ensure all personnel present a professional appearance while working on the Government installation. The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance. The Contractor shall ensure all Contractor employees, providing services under this contract, conduct themselves and perform services in a professional, safe, and responsible manner. The Contractor shall remove, from the job site, any employee for reasons of misconduct or security. The Contractor shall ensure employee conduct complies with 41 USC 423, Procurement Integrity. The Contractor shall also ensure that no Contractor employees conduct political related activities or events on the installation. The removal of such a person shall not relieve the Contractor of the requirement to provide personnel to perform adequate and timely service.
2.1.8.6 Contractor Hiring Restrictions. The Contractor shall not hire or sub-contract with off-duty or former Government employees whose employment would result in a conflict with AR 600-50, Standards of Conduct.
2.1.9 Business Relations. Non-personal services. The FAR provides that each contract arrangement be judged in the light of its own facts and circumstances, with the key question always being whether the Government will exercise relatively continuous supervision and control over the Contractor personnel performing the contract. To ensure that services provided under this contract are non-personal in nature, employees performing services under this contract shall be controlled, directed and supervised at all times by management personnel of the Contractor. The Government will notify the Contractor’s management of all tasks that require completion and the Contractor’s management will assign those tasks to the appropriate Contractor personnel under this contract. The Contractor's management shall ensure that employees comply with the performance standards outlined in this PWS and as required by the contracting officer or the contracting officer's representative (COR). Contractor employees shall perform independent of and without the supervision of any Government official. Actions of Contractor employees may not be interpreted or implemented in any manner that results in any Contractor employee creating or modifying Federal policy, obligating the appropriated funds of the U.S. Government, overseeing the work of Federal employees, providing direct personal services to any Federal employee or otherwise violating the prohibitions set forth in Parts 7.5 and 37.1 of the Federal Acquisition Regulation (FAR).
The Government will control access to the facility and will perform the inspection and acceptance of completed work and tasks.
2.1.10. Personnel. The Contractor shall provide all necessary personnel to accomplish all contract work and services. All personnel shall be legal residents of the United States.
The Contractor shall submit an organization chart, which identifies personnel proposed to perform the contract requirements. The Contractor’s personnel shall be able to clearly communicate in the English language.
2.2 Work Management. Applicable to CLS 402, 403, 404, 408, 411, 420, and 510.
2.2.1 Coordination. The Contractor shall schedule and coordinate with the COR/ACOR to minimize disruptions to the facility mission.
2.2.1.1 Work Coordination. The Contractor shall prearrange and coordinate with the requestor for access to facilities. The Contractor shall report to the COR/ACOR instances where access could not be obtained to facilities because the requestor failed to be available at the prearranged time. The Contractor shall contact the COR/ACOR for resolution. When reporting such instances, the Contractor shall provide the COR/ACOR with a copy of the work document and pertinent facts related to the incident. If work requires scheduled or unscheduled interruption, disconnect or cut-off of any utility to or within the facility, or that a facility be vacated, the Contractor shall take action (five (5) work days in advance if interruption is scheduled) to (a) notify customers/facility users and the COR, (b) avoid damage to customer equipment, and (c) minimize disruption of the activity's operation. Historically, customers meet the scheduled appointment 90% of the time.
2.2.1.2 Work Clearance. For scheduled work involving disruption of any or all of the following: traffic flow, post utility services, protection provided by fire and intrusion alarm systems, routine activities of the installation, or for work involving digging operations, the Contractor shall provide the COR a DPW Excavation Permit FB (DPW) FM75, five working days prior to work commencement. For emergency situations involving digging operations in which prior written notification is not feasible, the Contractor shall locate and stake out all utility pipes/cables prior to commencing excavation operations. The DPW Excavation Permit FB (DPW) FM 75 can be found at TE DIG1.1
2.2.1.3 Utility Location. The Contractor shall locate and stake out underground utility pipes/cables prior to digging operations required by any contract on Rivanna Station property. The Contractor shall be responsible for having the proper equipment to locate all underground utilities, or by vendor services. A Service Order will be issued to accomplish this service and the workload data presented for Service Orders includes locating utility lines.
2.2.2 Work Status. The status of all assigned work shall be available to the COR/ACOR within one (1) hour of Contractor receipt of request during normal working hours, and three
(3) hours at all other times.
2.2.3 General Fund Enterprise Business System (GFEBS). GFEBS is the web-based asset and accounting system that is used as the key component for work that is performed on the Garrison. The Government will use GFEBS as a production scheduling and monitoring system for determining the status of work, maintenance, and repair expenditures against individual facilities, as well as minor construction and alteration (New Work) project expenditures.
2.2.3.1 Facilities Maintenance Instruction (Attachment 1). This instruction addresses the Standard Operating Procedure for Maintenance & Repair in GFEBS to include scheduled tasks: PMOs and OWOs, unscheduled tasks: DMOs, and PWOs, and priority levels in GFEBS.
2.2.4 Demand Maintenance Orders (DMOs).
2.2.4.1 DMO Desk. The Contractor shall establish a DMO desk for the initiation and execution of all DMOs. The Contractor shall provide a GFEBS DMO Dispatcher(s) to input all DMO data into GFEBS on a daily basis. This individual(s) shall be on duty Monday through Friday from 0700 hours to 1600 hours. The contractor shall also produce upon request by the COR/ACOR the following reports: Installation Status Reports (ISR), Strategic Management System (SMS), Project Status, and Unfunded Requirements lists. The Contractor shall receive request for DMO (service order) work from the authorized facility manager (facilitator) of each tenant, this facilitator will be the only person authorized to call in for DMO work requests. The Facilitator will request a DMO by means of telephone call, or by e-mail. No other means will be acceptable. The Contractor will provide the Facilitator with the DMO ticket number, and the Facilitator will keep a log of all DMO tickets and track the completion. The Contractor shall establish a dedicated telephone number to be used exclusively for receipt of DMOs. The line shall be available to receive calls twenty-four (24) hours a day, seven (7) days a week, throughout the entire calendar year. During normal duty hours, the service call desk shall be manned. The person(s) performing work reception shall be fully familiar with the Contractor's organization and procedures as well as the terms and response factors specified herein. During non-duty hours, a voice messaging system shall be available to receive calls. The Contractor shall respond to voice messages the next business day.
The Contractor is authorized to execute DMOs that do not exceed 32 work hours in labor.
DMOs exceeding the Contractor’s authorized limit shall be executed IAW Attachment
400. The work control team shall have two years of experience entering maintenance orders into GFEBS, charging time and materials on the orders, and running/analyzing maintenance order reports.
2.2.4.2 DMO Call Receipt and Entry. The Contractor shall enter all DMOs into GFEBS in accordance with the priority timelines listed below. As part of the receipt process the Contractor shall take down all required customer Facilitator information: work/problem nature; location of service work requirement, including the facility number; name and telephone number of Facilitator, and priority level and enter it into GFEBS. Based on the Facilitator provided information and the criteria established in Attachment 400, the Contractor shall establish the priority and assign it to the appropriate shop. For life threatening emergencies (DMO priority 1), the service call desk shall notify the appropriate shop within five (5) minutes and complete the work in one calendar day.
Once the DMO has been completed by the appropriate technician, the contractor will charge hours and time against the order in GFEBS. The customer will request maintenance orders only through the Government group distribution NIPRNET email, by phone call to assigned phone number, or in person. All DMOs shall be entered into GFEBS within the following timelines:
• Priority 1 (Emergency) DMOs shall be entered within 30 minutes of receipt of service call into GFEBS by the Contractor. Additionally, the Contractor shall notify the COR of the DMO within 30 minutes of receipt of the service call. DMOs are classified as Emergency (Priority 1) when immediate action is required to eliminate life threatening or serious injury hazards to personnel. These DMOs are responded to as soon as possible and no later than one (1) hour after the request.
Emergency/Critical DMOs are completed within twenty-four (24) hours of request, unless the urgency of the work has been reduced to a Priority 2 or 3, which will be by discussion and approval by the primary COR.
• Priority 2 (Urgent) DMOs shall be entered within 30 minutes into GFEBS by the contractor and completed within 7 calendar days from receipt, unless reduced to a Priority 3.
• Priority 3 (Routine) DMOs shall be entered within 30 minutes into GFEBS by the contractor and completed within 30 calendar days of receipt.
2.2.4.3 GFEBS DMO Number. The Contractor shall notify the Facilitator of the GFEBS-assigned unique number for each DMO. This GFEBS DMO number shall function as a reference number for customer Facilitator inquiries and Government surveillance purposes.
2.2.4.4 Completed Work. The Contractor, certifying the work was satisfactorily performed shall sign completed work authorizations as well as have the customer’s signature on the work ticket to verify as well the work has been completed. After the completion of each work order, the Contractor shall identify (using GFEBS T-CODE IW38) the total labor hours the technician worked and the fully burdened rate based on shop (e.g. - carpentry, electrical, plumbing, etc.). Within seven days of DMO issuance, the contractor shall TECO the DMO to close out the order.
2.2.5 Preventive Maintenance Orders (PMOs). T he Contractor shall perform all PMOs for the facilities and equipment listed in TE BS1 and TE BS2. The Contractor technicians shall complete scheduled PM work within five days for monthly PM’s, fourteen days for quarterly PM’s, and 30 days for semi-annual and annual PM’s. Until the PMO program as described in paragraph 2.2.5.1 below is complete, the Contractor shall execute PMOs in accordance with historical PM data provided in TE BS2. Within seven days of PMO completion, the contractor shall TECO the PMO in GFEBS.
2.2.5.1. PMO Program. The Contractor shall develop and execute a PMO program. The Contractor shall first verify the equipment in the buildings listed in TE BS1 and TE BS2.
During the equipment inventory assessment, the Contractor shall at a minimum, collect the equipment MCD (serial) number, equipment description, work center (shop), building number, frequency basis for that equipment (e.g.- monthly, quarterly, annually, etc.), maintenance plan and task list. Upon completion of the equipment verification, the PMO program shall be developed and entered into GFEBS. The PMO program shall be completed and fully operational in GFEBS no later than 90 days after contract start date.
Refer to TE CODES for a sample of commonly used GFEBS transaction codes that the Contractor shall have experience in utilizing to create and maintain the PMO Program.
2.2.5.2. PMO Schedules. Once the PMO Program is established in GFEBS, the contractor shall create a PM scheduler. The Contractor shall continually update the list as required with the Garrison Site Manager and/or DPW BOID PM Coordinator. The PM scheduler shall be MS Excel based and include work center, maintenance plan, equipment number, equipment description, building number, frequency, task list, date called/scheduled, and any additional notes pertinent to the PM (e.g.- date added, new building, etc.). Additionally, by close of business each week, the Contractor shall provide the primary COR in MS Excel, a project PM planning schedule of work to be accomplished in the following week.
2.2.5.3 Approved PM Schedule. The Contractor shall strictly adhere to the scheduled PM dates to facilitate verification of work by the COR/ACOR in GFEBS. If the Contractor finds it necessary to reschedule a PM, a written request shall be made to the COR/ACOR detailing the reasons for the proposed change at least five (5) working days prior to the originally scheduled PM date. No scheduled PM dates shall be changed without the prior written approval of the primary COR.
2.2.5.4 PMO Stickers/Log. Upon completion of the PM inspection, the Contractor shall attach a sticker to the equipment item (or in the immediate vicinity thereof) indicating the equipment Maintenance Control Designation (MCD) number, the date of maintenance, and the initials and identification number of the Contractor employee who performed the work. PM will not be considered performed unless the sticker is current and affixed and an L&E Utilization Preventive Maintenance (EHSC Form 4288-2) line entry is made to document the PM action. The PM sticker information which includes the MCD number, date of maintenance and warranty information will be added into GFEBS by GFEBS T-code “IE01.” In instances where a PMO sticker is not practicable, then the Contractor may elect to maintain a current PMO log in lieu of a sticker that will be kept at each piece of equipment where feasible or a log at the Contractors PM work space for review as needed by the COR/ACOR.
2.2.5.5 Warranty Program. The Contractor shall establish and maintain a Warranty Program to warrant all equipment, parts, components, where the manufacturer's provide a warranty and shall be exercised for the duration of this contract. The Contractor shall input the warranty information into GFEBS and provide the COR/ACOR & PM Coordinator with a copy of the warranty and manual for all equipment in an excel sheet format. The warranty excel sheet should be updated as warranty information changes for the equipment. The warranty information in the excel sheet should match exactly what is in GFEBS. The Contractor shall provide a plan for managing warranties with the technical proposal. All warranty data shall be returned to the Government at contract completion.
When Contractor personnel determine that a warranted item not installed by the Contractor requires service, the Contractor shall notify the COR in writing no later than 9:00 AM the next working day, or give telephone notification within fifteen (15) minutes of detection if the deficiency threatens damage to personnel or property. The COR/ACOR will direct the Contractor to: (1) repair the deficiency, if potential damage may result from deferring repairs; or (2) clean the work area and stop work. The Contractor shall not receive payment for work not authorized by the COR/ACOR which is performed on warranted equipment, unless the COR/ACOR concurs that such work was a legitimate response to a true emergency condition.
2.2.5.6 O&M Manual Digital Library. The Contractor shall create and maintain a current electronic and hard copy repository of all O&M Manuals from the manufacturer or supplier for all facilities and equipment delineated in the Contractor’s PMO program. The repository shall be organized by shop/work center.
2.2.6 Operations Work Orders (OWOs). The Contractor shall respond to and complete individual tasks related to OWOs. An OWO is recurring maintenance, cyclical in nature, outside of GFEBS scheduled PM, requested demand maintenance, or projects. Support for recurring OWOs are referenced in TE WD2. If a new OWO is required in addition to those identified in TE WD2, then a DA Form 4283, Facilities Engineering Work Requests, will be issued and shall serve as the authorization document for the initiation and execution of the OWO.
2.2.7 Project Work Orders (PWOs).
2.2.7.1. DA Form 4283, Facilities Engineering Work Requests, shall serve as the authorization document for the initiation and execution of PWOs. The DA Form 4283 shall be submitted to the Rivanna Station Garrison Site Manager/RS BASOPS COR for processing and approval. For DMO generated PWOs, a DA Form 4283 is not required.
These PWOs are included in the fixed price CLIN for maintenance services. TE WD1 provides historical data on the number of PWOs generated from DMOs. The PWO (4283 form) should cover the following parameters:
• Actual labor hours, materials and costs for items other than pre-expended bin materials expended.
• RSVA representative signature indicating work has been performed and date. If representative is not available, the Contractor shall so note on the DMO document.
• Maintenance Control Designator (MCD) number of equipment item and/or facility worked on under the DMO.
• As-built information for any utility infrastructure changes made during the course of the work, or operation and maintenance manuals for any installed equipment (as applicable).
• Site sketch indicating area where work was performed and schematic of activities (as applicable).
• Digital photos before and after work performance (as applicable). If photos are required, a request in email (NIPRNET) to the RS BASOPS COR requesting photos be taken. The RS BASOPS primary COR will arrange for a photographer as needed.
2.2.7.2 Cost Estimates for Non-DMO Generated PWOs. The Government will provide the Contractor with the DA Form 4283 that delineates the general scope of work (SOW) of the project. New Work is defined in attachment 400 (Facilities Maintenance Instruction) and results in the creation or addition to an existing facility or of a building component or system which did not exist prior to the work, irrespective of whether the work is funded from a construction or an operation and maintenance (O&M) account. New Work that exceeds $150,000 shall be accomplished through a separate contractual vehicle.
a. The OWO/PWO will be negotiated as follows:
• The Contractor shall provide the preliminary desktop (scoping) cost estimate and a more detailed SOW based on the DA Form 4283 to the COR within five (5) working days of receipt,
• When requested in writing by the primary COR, the Contractor will provide detailed estimates within ten (10) working days of receipt of the request,
• Negotiate the terms and conditions of the OWO/PWO, to include a scheduled completion date.
• KO will issue a…