Other than Full and Open_Redacted.pdf
PDF 174 KB Posted
- Attached to
- Manitowoc Crane Training Federal contract opportunity
- Solicitation number
- N4215823QS020
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N4215823QS020 Questions and Answers.docx | DOCX document | |
| Combined Synopsis Solicitation.docx | DOCX document | |
| Statement of Work_Redacted.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MEMORANDUM TO THE FILE
(This is only applicable to acquisitions under the Simplified Acquisition Threshold. Acquisition using FAR Subpart 13.5 shall follow the special documentation requirements at FAR 13.501.)
Subj: USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN
ACQUISITION UNDER THE SIMPLIFIED ACQUISITION THRESHOLD
I. BACKGROUND:
1. FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contracting Officers may solicit from one source if the Contracting Officer determines that the circumstances of the contract action deem only one source reasonably available (e.g., urgency, exclusive licensing agreements, brand-name or industrial mobilization).
2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition, as only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.
II. DESCRIPTION OF ITEM OR SERVICE:
Contractor training for the maintenance and operation of Code 700’s newly procured GMK 5200 and GRT8100, GRT655L, GLD25 mobile cranes. GMK5200-1, GRT8100, GRT655L, GLD25 are multi-purpose cranes. Due to the vast and complexity of their control system, Code 700 must have this training. By having this training, it would help prevent delays and decrease the length of down time for maintenance. The cost of not having one of these mobile cranes in service per day can be approximately $100K. It is advantageous and critical to our mission to have these cranes running in support of the projects. Ship availabilities could be impacted tremendously if these cranes are out of service; therefore, the additional personnel training and the training on these new cranes is URGENT.
III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN
COMPETITION IS BASED ON THE FOLLOWING (select all that apply):
A. _X_ ONLY ONE RESPONSIBLE SOURCE (select all that apply):
1. _X__ RESTRICTIVE RIGHTS. The source has established proprietary rights, limited rights in data, patent rights, copyrights or secret processes in the item or service required.
Manitowoc Crane Care is the original equipment manufacturer (OEM) for Code 700’s new purchase of (1) GMK 5200 and (1) GRT8100, GRT655L, GLD25 mobile cranes. Manitowoc has specialized knowledge of a proprietary control system for the GMK 5200, GRT8100, GRT655L, GLD25 mobile crane.
2. ___ EXCLUSIVE LICENSING AGREEMENTS. The item or service is only available from the Original Equipment Manufacturer (OEM), or there is only one authorized distributor or technical representative for the OEM.
Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.
OR
Identify the distributor(s)/authorized technical representative(s) for the item or service. Provide evidence of the exclusive licensing agreement as an attachment to this document. NOTE: If there is more than one distributor/authorized technical representative for an OEM part, then Part B, BRAND NAME SOLE SOURCE, is applicable, and Part A, ONLY ONE RESPONSIBLE SOURCE, should be left blank).
3. ___ OTHER REASONS. Other reason not identified above. Provide details on mission impact if requirement is not solicited from only one source.
B. BRAND NAME. Item required must be a brand name product, or feature of a product, particular to one manufacturer. Discuss why you are precluding consideration of a product manufactured by another company. Describe how the particular brand name, product, or feature is essential to the Government’s requirements and why a “brand name or equal” purchase description cannot be used (see FAR 11.104). Describe how market research indicates other companies’ similar products or products lacking the particular feature do not meet, or cannot be modified to meet, the agency’s needs.
The requested material is a direct replacement part for existing shipyard equipment and Schneider Electric is the Original Equipment Manufacturer (OEM). The requested items are a “one for one” replacement and must be procured from the OEM (or authorized distributors) in order for the equipment to operate to the ship’s and OEM performance standards. Any other parts and/or accessories not from the OEM would cause malfunction of equipment thereby rendering the equipment inoperable and causing delay in the vessel’s scheduled work package.
C. ___UNUSUAL AND COMPELLING URGENCY. The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits bids or proposals.
Urgent requirements are supplies or services that will result in a work stoppage, or are mission critical and the routine processing time would result in injury to the Government. The determination that the procurement for the above item/service is an urgent and compelling requirement is based on the following:
1. Date on which the requirement was first identified:
2. Required delivery date/period of performance:
3. Explanation of why delivery/commencement of services by the date mentioned above is required: Explain the impact to the mission if the date above is not met, any special circumstances or conditions that exist which validate the requirement as “urgent,” estimated production lead time for the item, etc.
4. If appropriate, include any additional pertinent information.
IV. CERTIFICATIONS/APPROVALS:
A. Technical / Requirements Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.
Signature Name (Printed) / Phone # Date