Other_Drawing A1.01.pdf
PDF 438 KB Posted
- Attached to
- Automatic Watering System for Large Animal Housing Area Federal contract opportunity
- Solicitation number
- FDA-SSN-123260
About this file
This document is a demolition plan for renovations to Building 62 at the FDA Jefferson Laboratories facility in Jefferson, Arkansas.
The demolition plan outlines the scope of demolition work required, including the removal of metal stud framed walls, epoxy wall base, CMU partitions, doors and frames, gypsum ceilings, existing floor coatings, and other building components. The plan also specifies that contractor shall verify existing conditions prior to demolition, protect items to remain, dispose of demolition materials properly, and coordinate the demolition scope with other trades. Structural steel columns are to be protected. The plan references other drawing sheets for additional detail on existing conditions and materials to be demolished.
This demolition plan supports the federal contract opportunity for an Automatic Watering System for the Large Animal Housing Area at the FDA Jefferson Laboratories facility.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Other_Drawing A4.02.pdf | ||
| FDA-SSN-123260.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F.E .C
TLT JAN TLT TLT UTILITY STOR
ELEVW/DSTAIR
NH - PRIMATE
FOOD STORAGE
DIRTY PROCESSING
CLEAN PRCESSING
OPEN PIT
DOSING
OFFICE
OFFICE
OFFICE
OFFICE
NECROPSY
TREATMENT SURGERY
RECOVERY SURGERY PREP
CLEAN CORRIDOR
CORRIDOR
DIRTY
CLEAN
CLEAN
BEHAVIOR LAB
PET LAB
WET LAB
RECYLCING
CORRIDOR
CLEAN
CLEAN
DIRTY
AIR LOCK
A B C D EX
TLT OFFICE
DIRTY WASH
CLEAN WASH
DIRTY CORR VESTIBULE
NH-PRIMATE
CLEAN CORR
NH - PRIMATE
NH - PRIMATE
NH - PRIMATE
NH - PRIMATE
NH - PRIMATE
NH - PRIMATE (2ND
BEHAVIOR LAB)
LAB GEN
LAB SUPT
LAB SUPT
LAB SUPT
LAB CIRC
LAB GEN
FEED/BED
GOWN
NH-PRIMATE
NH-PRIMATE
STOR STOR
SHORE UP EXISTING FRAMING AS NECESSARY SEE REFERENCE DRAWINGS. A9.01,A9.02
27'-6 5/8" 27'-2 1/2"
EXISTING CMU WALLS TO
REMAIN - PROTECT
1. DEMOLITION SCOPE IS DESCRIBED IN CIVIL, ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS, CONTRACTOR SHALL REFER TO ALL DRAWINGS TO
DETERMINE THE COMPLETE DEMOLITION SCOPE REQUIRED.
2. CONTRACTOR SHALL VERIFY ALL CONDITIONS PRIOR TO COMMENCING DEMOLITION AND
NOTIFY THE ARCHITECT AND OWNER OF ANY MAJOR DISCREPANCIES BETWEEN DEMOLITION
DRAWINGS AND EXISTING CONDITIONS.
3. REMOVE DEMOLITION MATERIALS PROMPTLY AND DISPOSE OF LEGALLY OFF SITE. DEBRIS TO
BE REMOVED FROM WORK AREA TO A DUMPSTER. PROTECT ROUTE AS REQUIRED. REMOVE AND
TRANSPORT DEBRIS IN A MANNER THAT WILL PREVENT SPILLAGE ON ADJACENT SURFACES AND
AREAS. CONTRACTOR TO VERIFY PROPOSED LOCATION OF DUMPSTER WITH FACILITIES.
4. ITEMS ON THE DEMOLITION PLANS SHOWN DASHED ARE INTENDED TO BE DEMOLISHED.
5. REMOVAL OF FINISHES SHALL INCLUDE REMOVAL OF ADHESIVES, BACKINGS, FASTENINGS, ETC.
ASSOCIATED WITH THE FINISHED MATERIAL TO BE REMOVED.
6. DEMOLISH ALL ELECTRICAL DEVICES, CONDUIT AND CONDUCTORS IN WALLS TO BE REMOVED.
ALL FEEDER CIRCUIT CONDUCTORS SHALL BE DEMOLISHED BACK TO PANEL UNLESS OTHERWISE
NOTED. CONDUIT ABOVE CEILING BACK TO PANEL MAY BE REUSED AS COORDINATED WITH WORK
FROM OTHER TRADES.
7. EXISTING MATERIALS TO REMAIN SHALL BE PROTECTED FROM DAMAGE AT ALL TIMES. EXISTING
BUILDING MATERIALS AND/OR FINISHES THAT ARE DAMAGED SHALL BE REPAIRED AND/OR
REPLACED TO SATISFACTION OF THE OWNER AND ARCHITECT AT NO ADDITIONAL COST TO THE
OWNER.
8. ANY HIDDEN STRUCTURAL COLUMNS OR SUPPORT IS TO BE BROUGHT TO THE ATTENTION OF
THE ARCHITECT PRIOR TO REMOVAL. ANY BUILDING SUPPORT WHICH DEVIATES FROM THAT
SHOWN OR IS IN QUESTION IS TO BE BROUGHT TO ARCHITECT'S ATTENTION IMMEDIATELY.
9. ERECT AND MAINTAIN TEMPORARY BRACING, SHORING, LIGHTS, BARRICADES, WARNING SIGNS
AND GUARDS NECESSARY TO PROTECT THE PUBLIC AND ADJOINING PROPERTY FROM DAMAGE,
ALL IN ACCORDANCE WITH APPLICABLE REGULATION
10. PROVIDE FINAL CLEANING THROUGHOUT.
11. REFERENCE SHEETS A9.00 THROUGH A9.03 FOR INFORMATION ON EXISTING CONDITIONS AND
MATERIALS
DEMOLITION - GENERAL NOTES:
A B C D EX
4" CONCRETE TOPPING
AND EPOXY FINISH -
REMOVE COMPONENETS
DOWN TO EXISTING
BUILDING SLAB
SLAB ON GRADE.
REMOVE FLOORING
DOWN TO EXISTING
SLAB
TLT JAN TLT TLT UTILITY STOR
NH - PRIMATE
FOOD STORAGE
DIRTY PROCESSING
CLEAN PRCESSING
OPEN PIT
DOSING
NECROPSY
TREATMENT SURGERY
RECOVERY SURGERY PREP
CLEAN CORRIDOR
DIRTY
CLEAN
CLEAN
BEHAVIOR LAB
PET LAB
WET LAB
RECYLCING
CLEAN
CLEAN
DIRTY
AIR LOCK
CLEAN WASH
CLEAN CORR
NH - PRIMATE
NH - PRIMATE
NH - PRIMATE
NH - PRIMATE
NH - PRIMATE
NH - PRIMATE (2ND BEHAVIOR LAB)
FEED/BED
STOR STOR
CMU CONSTRUCTION CMU CONSTRUCTION
METAL STUD FRAME
CONSTRUCTION
DOUBLE WYTHE 6" CMU
CONSTRUCTION
Copyright
Date
Title
Sheet No.
901 West Third Street Little Rock, Arkansas 72201 501.374.5300
Seal
Job No.
www.WERarch.com
SRQPNMLKJHGFEDCBA
A B C D E F G H J K L M N P Q R S
ARCHITECT
WER Architects/Planners
/1
/2
:0
:0
A
M
C U s e rs
\a s a n d e rs o n
\D o c u m e n ts \F
D A
ID
I2
.0
-F
D A
B u ild in g
C o n s t D o c s v a s a n d e rs o n
W E
.r v t
FDA Jefferson
Laboratories
BLDG. 62
RENOVATIONS
3900 NCTR Road, HFT_324
Jefferson, AR 72079
MEPFP ENGINEERS
Energy Engineering Consultants, Inc 10 Corporate Hill Dr Little Rock, AR 72205 501-244-0511
A1.01
DEMOLITION PLAN
03/24/22
FDAIDI21.01
OWNER
FDA
Jefferson Laboratories
OAGS - Field Operations Branch 3900 NCTR Road Jefferson, AR 72079
P ro je c t
N a m e
ISSUE FOR CONSTRUCTION
1/8" = 1'-0"
GROUND FLOOR DEMOLITION
KEYNOTE - DEMOLITION
01 METAL STUD FRAMED WALLS IDENTIFIED WITH DASH - REMOVE
02 EPOXY WALL BASE TO 48" AFF - REMOVE
03 SAW CUT TRENCH AT CONCRETE FLOOR SLAB AS REQUIRED FOR PLUMBING EXTENT
04 DOOR AND FRAME - REMOVE
06 GYPSUM CEILING AND ACOUSTIC INSULATION - REMOVE. COORDINATE WITH REFERENCE
DRAWINGS A9.02
07 CMU PARTITION AND SPLAYED FLOOR BASE - REMOVE CMU AND PORTION AS REQUIRED FOR
INSTALLATION OF NEW DOOR.COORDINATE NEW LINTEL INSTALLATION AT CMU
08 VERIFY IN FIELD LOCATION OF NEW DOOR - REMOVE DOUBLE WYTHE CMU PORTION AS REQUIRED
FOR INSTALLATION OF NEW DOOR AND LINTEL.
09 STRUCTURAL STEEL COLUMNS - PROTECT - TYP.
11 SWITCHGEAR AND ENCLOSURE - COORDINATE WITH MCC PROJECT SCOPE
12 GENERATOR AND GENERATOR ACCESS- COORDINATE WITH MCC PROJECT SCOPE
13 REMOVE EXISTING WALL COATINGS AND PREP FOR NEW FINISHES
14 EXISTING FLOOR EPOXY COATING ON CONCRETE UNDERLAYMENT - REMOVE AS NECESSARY
DOWN TO ORIGINAL CONCRETE SLAB SURFACE AND AS REQUIRED TO MEET DESIGN IN NEW
CONSTRUCTION. SEE LOCATIONS OF 4" CONCRETE TOPPING SLAB ON
15 WALLS TO REMAIN - REMOVE FINISHES DOWN TO SUBSTRATE. COORDINATE PATCHING LOCATIONS
WITH MEP SCOPE OF DEMOLISHING WALL MOUNTED EQUIPMENT
16 FABRICATED POST SUPPORTED CANOPY, STEEL RAILING AND CONCRETE SLAB - REMOVE
1" = 10'-0" M10
EXISTING CONDITIONS
No. Issue Date
File details come from the government source that posted it. Updated .