This document outlines specifications for tree removal services on two properties in support of the San Joaquin River Restoration Program. The contractor will be required to remove all above-ground irrigation lines and cap underground pipes on the Lehman and Lopes properties totaling approximately 222 acres, knocking down and removing trees and stumps. All woody material must be chipped on-site and piled accordingly. Remaining roots and stump holes must be smoothed to prevent vehicle obstacles. Tree removal should commence within 60 days of contract award and be completed within 120 days. The related federal contract opportunity is solicitation number 140R2024Q0028 for SJPP Tree Removal services through the Department of the Interior Bureau of Reclamation.

View the file

Other files for this federal contract opportunity

Other files attached to SJPP Tree Removal, newest first.
File Type Posted
Attachment_1_Questions_and_Answers_3.pdf PDF
Attachment_2_Lopes__Lehman_Property_Location_3.pdf PDF
Attachment_1_Questions_and_Answers_2.pdf PDF
Attachment_2_Lopes__Lehman_Property_Location_2.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Needs Statement: The SJRRP needs to remove the orchards on the Lopes and Lehman properties.

Objective: To remove the trees to prevent unwanted pests on the property and to neighboring land owners, allow for easier maintenance till construction and pre-construction work.

Step 1 is to remove all above ground irrigation lines and disposal of material off site. All access to underground pipes should be capped.

Step 2 is tree removal – Knock down tree and remove stump Step 3 is to chip all woody material (limbs, truck and stump) see picture below.

Step 4 is to put all the chips into pills on the property Step 5 is to smooth ground to remove vehicle obstacles and/or tripping hazards. Remaining tree roots should not be sticking out of the ground and stump holes should be smoothed out so not to cause vehicle obstructions. This can be done by hand or with a small excavator.

Lehman Property is approximately ____ acres in total with 200 acres that require tree removal Lops Property is approximately ____ acres in total with 22 acres that require tree removal

Tree removal should start with 60 days of awarding the contract can be completed within 120 from award of the contract.

Step 2: Knock trees/stumps over

Step 3: Chip woody material

Step 4: Pile up chippings