This earthwork report details excavation and fill quantities for the OR FLAP POLK MITCHELL(1) project to reconstruct Mitchell Street and Black Rock Road. The project involves road reconstruction and retaining walls from station 49+04.470 to 66+45.460. The report lists cut and fill volumes by material and station along the project alignment. It includes component surface areas and volumes for various design elements such as pavement, shoulders, walls, and grading. The quantities are broken out by material type and design component to support project cost estimating and construction planning for the Mitchell Street and Black Rock Road reconstruction under solicitation number 69056723B000022 awarded by the Department of Transportation Federal Highway Administration.

View the file

Other files

File Type Posted
Bid Tabulation_OR FLAP POLK MITCHELL(1).pdf PDF
BidSum_OR FLAP POLK MITCHELL(1).pdf PDF
QA_11-02-2023.pdf PDF
Amendment A005.pdf PDF
Amendment A004.pdf PDF
QA_10-31-2023.pdf PDF
Amendment A003.pdf PDF
QA_10-27-2023.pdf PDF
Amendment A002.pdf PDF
A001_ora-polk-mitchell1_MSBR_XS.pdf PDF
Amendment A001.pdf PDF
A001_ora-polk-mitchell1_MSB_TempBrd_HA-VA.pdf PDF
A001_ora-polk-mitchell1_MSB_TempBrd_EW.pdf PDF
A001_ora-polk-mitchell1_Wall01_HA-VA.pdf PDF
A001_ora-polk-mitchell1_MSB_TempBrd_XS.pdf PDF
A001_ora-polk-mitchell1_MSBR_EW_cor1a.pdf PDF
A001_Physical Data.zip ZIP file
A001_ora-polk-mitchell1_MSBR_EW_cor1b.pdf PDF
QA_10-18-2023.pdf PDF
QA_10-16-2023.pdf PDF
QA_10-11-2023.pdf PDF
ora-polk-mitchell1_MSBR_Horizontal Alignment Report.pdf PDF
ora-polk-mitchell1_PLAN.pdf PDF
ora-polk-mitchell1_MSBR_Superelevation Report.pdf PDF
ora-polk-mitchell1_Little Luckiamute Creek Bridge Inspection Report - 2022.pdf PDF
OR FLAP POLK MITCHELL_CompiledESCP_Final_signed.pdf PDF
ora-polk-mitchell1_GR11-21 Final Geotech Report OR Polk 2016(1) Mitchell St to Black Rock.pdf PDF
ora-polk-mitchell1_MSBR_Vertical Alignment Report.pdf PDF
WFLHD Construction Contract Administration_2.2.2023.pdf PDF
ora-polk-mitchell1_MSBR_Earthwork Report_COR01C.pdf PDF
ora-polk-mitchell1_MSBR_Earthwork Report_COR01B.pdf PDF
ora-polk-mitchell1_BLM Oversized-Overweight Permit Load Request.pdf PDF
ora-polk-mitchell1_MSBR_Earthwork Report_COR02.pdf PDF
ora-polk-mitchell1_GR 7-20 Final Foundation Report OR Polk 2016(1) Little Luckiamute Bridge.pdf PDF
IFB_69056723B0000022_OR FLAP POLK MITCHELL(1).pdf PDF
ora-polk-mitchell1_Bridge_TSL_Hydraulics_Memo-combined-v1.pdf PDF
ora-polk-mitchell1_MSBR_Earthwork Report_COR01A.pdf PDF
Physical Data.zip ZIP file
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PHYSICAL DATA

for

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

PROJECT

OR FLAP POLK MITCHELL(1)

Mitchell Street and Black Road Reconstruction

EARTHWORK DATA LISTING

MSBR_COR3

49+04.470 to 66+45.460

Earthwork Report Page 1 of 168

Corridor Name:

Alignment Name:

Input Grid Factor: 1 Note: All units in this report are in feet, square feet and cubic feet unless specified otherwise.

Station Material Area Volume Length Area

4904.47 89.211

11.567 8.463

3.444

6.356

10.754

35.41

4.699

15.926

12.695

34.888

2.25

4906.163

88.609 150.546

12.05 19.994

8.656 14.493

3.444 5.832

6.356 10.762

10.754 18.21

34.998 59.609

4.699 7.956

15.892 26.938

12.695 21.496

32.287 56.871

2.25 3.81

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

MSBR_COR3

Component End Area Component Surface

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Corridor Model Component Quantities Report

Report Created: Sunday, September 10, 2023 Time: 5:06:52 PM

9/10/2023

Earthwork Report Page 2 of 168

83.746 330.641

12.018 46.17

3.661 23.627

3.444 13.215

6.356 24.385

10.754 41.262

34.066 132.491

4.699 18.028

15.814 60.824

12.695 48.709

27.096 113.918

2.25 8.633

4913.687

86.794 314.384

0 0.001

12.653 45.479

0.055 6.849

3.444 12.699

6.356 23.432

10.754 39.65

33.17 123.946

4.699 17.324

15.74 58.169

12.695 46.807

25.508 96.973

2.25 8.296

94.431 572.047

0.002

12.99 80.94

0.687 2.34

3.444 21.745

6.356 40.123

10.754 67.893

31.635 204.56

Cut Volume:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Earthwork Report Page 3 of 168

4.699 29.664

15.613 98.967

12.695 80.147

30.279 176.092

2.25 14.204

4921.211

95.58 115.012

12.999 15.731

0.941 0.985

3.444 4.17

6.356 7.694

10.754 13.019

31.341 38.119

4.699 5.688

15.588 18.886

12.695 15.369

31.25 37.242

2.25 2.724

4928.734

100.295 736.849

12.853 97.251

2.539 13.091

3.444 25.915

6.356 47.817

10.754 80.912

29.512 228.921

4.699 35.352

15.437 116.711

12.695 95.515

37.7 259.378

2.25 16.928

101.1 127.458

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Earthwork Report Page 4 of 168

12.792 16.23

2.83 3.398

3.444 4.36

6.356 8.045

10.754 13.612

29.205 37.161

4.699 5.947

15.411 19.523

12.695 16.069

38.888 48.471

2.25 2.848

4934.47

106.343 463.635

12.499 56.526

3.81 14.841

3.444 15.397

6.356 28.409

10.754 48.072

28.118 128.117

4.699 21.003

15.321 68.687

12.695 56.748

42.985 182.986

2.25 10.057

4936.258

107.281 190.971

12.372 22.233

3.902 6.894

3.444 6.158

6.356 11.363

10.754 19.228

28.118 50.273

4.699 8.401

15.321 27.393

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Earthwork Report Page 5 of 168

12.695 22.698

43.438 77.259

2.25 4.023

108.63 403.979

12.101 45.789

4.14 15.048

3.444 12.889

6.356 23.783

10.754 40.244

28.118 105.221

4.699 17.583

15.321 57.333

12.695 47.507

44.313 164.186

2.25 8.42

4943.782

109.212 411.895

11.739 45.077

4.212 15.792

3.444 13.025

6.356 24.034

10.754 40.668

28.118 106.332

4.699 17.769

15.321 57.938

12.695 48.008

44.715 168.332

2.25 8.509

108.812 677.882

10.951 70.548

4.195 26.137

3.444 21.419

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Earthwork Report Page 6 of 168

6.356 39.521

10.754 66.875

28.118 174.852

4.699 29.219

15.321 95.273

12.695 78.945

44.953 278.795

2.25 13.991

4951.305

108.534 141.845

10.755 14.166

4.173 5.461

3.444 4.496

6.356 8.296

10.754 14.037

28.118 36.702

4.699 6.133

15.321 19.998

12.695 16.571

44.937 58.665

2.25 2.937

4958.829

106.07 807.302

9.821 77.404

3.919 30.441

3.444 25.915

6.356 47.817

10.754 80.912

28.118 211.553

4.699 35.352

15.321 115.271

12.695 95.515

43.763 333.675

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Earthwork Report Page 7 of 168

2.25 16.928

105.914 124.125

10.055 11.638

4.175 4.74

3.444 4.034

6.356 7.443

10.754 12.594

28.118 32.929

4.699 5.503

15.321 17.942

12.695 14.867

43.89 51.324

2.25 2.635

4966.353

107.339 677.354

11.472 68.375

3.71 25.048

3.444 21.881

6.356 40.374

10.754 68.318

28.118 178.625

4.699 29.849

15.321 97.328

12.695 80.648

42.185 273.397

2.25 14.293

104.77 386.823

11.824 42.485

2.669 11.634

3.444 12.563

6.356 23.181

10.754 39.225

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Earthwork Report Page 8 of 168

28.118 102.559

4.699 17.138

15.321 55.882

12.695 46.305

39.856 149.619

2.25 8.207

4973.876

105.791 408.093

12.111 46.389

1.476 8.033

3.444 13.352

6.356 24.636

10.754 41.687

28.118 108.994

4.699 18.214

15.321 59.388

12.695 49.21

38.307 151.491

2.25 8.722

107.733 653.782

12.382 74.993

1.677 9.653

3.444 21.093

6.356 38.92

10.754 65.857

28.118 172.19

4.699 28.774

15.321 93.822

12.695 77.743

39.458 238.107

2.25 13.778

4981.4

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Earthwork Report Page 9 of 168

107.903 150.937

12.412 17.355

1.705 2.367

3.444 4.822

6.356 8.897

10.754 15.055

28.118 39.364

4.699 6.578

15.321 21.448

12.695 17.772

39.599 55.337

2.25 3.15

4988.924

107.049 808.614

12.468 93.596

1.937 13.699

3.444 25.915

6.356 47.817

10.754 80.912

28.118 211.553

4.699 35.352

15.321 115.271

12.695 95.515

39.653 298.133

2.25 16.928

106.718 115.05

12.471 13.423

2.099 2.172

3.444 3.708

6.356 6.841

10.754 11.576

28.118 30.267

4.699 5.058

Cut Volume:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Earthwork Report Page 10 of 168

15.321 16.492

12.695 13.665

39.934 42.834

2.25 2.422

4995.002

104.718 528.826

12.4 62.206

2.772 12.182

3.444 17.23

6.356 31.792

10.754 53.796

28.118 140.655

4.699 23.504

15.321 76.64

12.695 63.505

41.02 202.478

2.25 11.255

4996.447

104.018 150.813

12.355 17.886

2.907 4.103

3.444 4.977

6.356 9.184

10.754 15.54

28.118 40.631

4.699 6.79

15.321 22.139

12.695 18.345

41.23 59.426

2.25 3.251

102.223 366.361

12.205 43.628

3.214 10.874

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Earthwork Report Page 11 of 168

3.444 12.237

6.356 22.58

10.754 38.207

28.118 99.897

4.699 16.693

15.321 54.432

12.695 45.103

41.558 147.061

2.25 7.994

5003.971

99.978 401.463

11.971 48.002

3.158 12.651

3.444 13.678

6.356 25.237

10.754 42.705

28.118 111.656

4.699 18.658

15.321 60.839

12.695 50.412

40.787 163.492

2.25 8.935

92.616 580.583

11.497 70.744

2.224 16.223

3.444 20.767

6.356 38.318

10.754 64.839

28.118 169.528

4.699 28.329

15.321 92.372

12.695 76.541

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Earthwork Report Page 12 of 168

37.69 236.572

2.25 13.565

5011.495

91.391 137.508

11.421 17.126

1.635 2.884

3.444 5.148

6.356 9.499

10.754 16.073

28.118 42.026

4.699 7.023

15.321 22.899

12.695 18.974

36.774 55.647

2.25 3.363

5019.018

94.193 698.136

12.104 88.497

1.569 12.053

3.444 25.915

6.356 47.817

10.754 80.912

28.118 211.553

4.699 35.352

15.321 115.271

12.695 95.515

37 277.525

2.25 16.928

94.679 92.711

12.18 11.92

1.577 1.544

3.444 3.382

6.356 6.239

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Earthwork Report Page 13 of 168

10.754 10.558

28.118 27.605

4.699 4.613

15.321 15.041

12.695 12.463

37.032 36.34

2.25 2.209

5026.542

97.727 629.354

13.08 82.626

1.561 10.262

3.444 22.533

6.356 41.578

10.754 70.354

28.118 183.949

4.699 30.739

15.321 100.229

12.695 83.052

36.889 241.795

2.25 14.719

99.087 340.299

13.506 45.968

1.505 5.3

3.444 11.911

6.356 21.978

10.754 37.189

28.118 97.235

4.699 16.249

15.321 52.981

12.695 43.901

36.554 126.986

2.25 7.781

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Earthwork Report Page 14 of 168

5034.066

100.397 405.51

13.946 55.805

1.397 5.898

3.444 14.004

6.356 25.839

10.754 43.723

28.118 114.318

4.699 19.103

15.321 62.289

12.695 51.614

35.955 147.398

2.25 9.148

101.649 599.511

14.47 84.318

1.158 7.58

3.444 20.441

6.356 37.716

10.754 63.82

28.118 166.866

4.699 27.884

15.321 90.921

12.695 75.339

34.712 209.684

2.25 13.352

5041.589

101.837 161.697

14.587 23.089

1.077 1.776

3.444 5.474

6.356 10.101

10.754 17.091

28.118 44.688

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Earthwork Report Page 15 of 168

4.699 7.468

15.321 24.349

12.695 20.176

34.309 54.847

2.25 3.576

5049.113

97.964 751.619

13.947 107.337

0.806 7.085

3.444 25.915

6.356 47.817

10.754 80.912

28.118 211.553

4.699 35.352

15.321 115.271

12.695 95.515

32.697 252.067

2.25 16.928

96.195 86.116

13.611 12.223

0.804 0.714

3.444 3.055

6.356 5.638

10.754 9.54

28.118 24.943

4.699 4.168

15.321 13.591

12.695 11.262

32.884 29.087

2.25 1.996

5056.637

90.053 618.027

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Fill Volume:

Earthwork Report Page 16 of 168

11.383 82.94

0.887 5.612

3.444 22.859

6.356 42.179

10.754 71.372

28.118 186.611

4.699 31.184

15.321 101.68

12.695 84.254

34.225 222.689

2.25 14.932

92.317 306.692

11.622 38.689

1.012 3.193

3.444 11.585

6.356 21.376

10.754 36.171

28.118 94.573

4.699 15.804

15.321 51.531

12.695 42.699

34.907 116.259

2.25 7.568

5064.16

95.455 390.591

11.934 49.001

1.123 4.44

3.444 14.33

6.356 26.441

10.754 44.741

28.118 116.98

4.699 19.548

15.321 63.74

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Earthwork Report Page 17 of 168

12.695 52.816

35.541 146.54

2.25 9.361

5065.596

96.459 137.736

12.107 17.255

1.15 1.631

3.444 4.944

6.356 9.123

10.754 15.437

28.118 40.361

4.699 6.745

15.321 21.992

12.695 18.223

35.703 51.131

2.25 3.23

99.508 431.554

12.694 54.616

1.16 5.087

3.444 15.171

6.356 27.992

10.754 47.365

28.137 123.884

4.726 20.755

15.232 67.284

12.695 55.914

35.742 157.334

2.25 9.91

5071.684

100.528 168.424

12.892 21.543

1.15 1.945

3.444 5.8

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Earthwork Report Page 18 of 168

6.356 10.702

10.754 18.109

28.144 47.387

4.737 7.967

15.198 25.622

12.695 21.378

35.682 60.136

2.25 3.789

105.381 856.176

13.721 110.66

1.127 9.466

3.444 28.644

6.356 52.853

10.754 89.43

28.18 234.197

4.789 39.608

15.031 125.694

12.695 105.575

35.524 296.076

2.25 18.711

111.495 1084.377

14.523 141.224

1.099 11.13

3.444 34.444

6.356 63.556

10.753 107.536

28.224 282.02

4.854 48.218

14.829 149.298

12.695 126.953

35.423 354.733

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Earthwork Report Page 19 of 168

2.25 22.5

5098.237

131.509 1000.842

15.086 121.95

0.531 6.715

3.444 28.373

6.356 52.352

10.753 88.577

28.262 232.643

4.91 40.214

14.662 121.463

12.695 104.574

34.127 286.45

2.25 18.534

135.536 235.368

18.121 29.268

0.577 0.977

3.444 6.072

6.356 11.203

10.753 18.955

28.27 49.825

4.922 8.665

14.662 25.846

12.695 22.379

34.382 60.383

2.25 3.966

193.196 1643.656

61.275 396.977

0.839 7.081

3.444 34.444

6.356 63.556

10.755 107.543

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Earthwork Report Page 20 of 168

28.316 282.928

4.991 49.563

14.662 146.623

12.695 126.953

35.856 351.191

2.25 22.5

199.741 1964.684

63.241 622.58

1.101 9.697

3.444 34.444

6.356 63.556

10.757 107.559

28.364 283.399

5.063 50.268

14.662 146.623

12.695 126.953

37.375 366.154

2.25 22.5

153.283 1765.123

32.807 480.24

1.362 12.313

3.444 34.444

6.356 63.556

10.758 107.576

28.413 283.885

5.137 50.996

14.662 146.623

12.695 126.953

38.976 381.755

2.25 22.5

5134.506

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Earthwork Report Page 21 of 168

147.596 677.831

16.204 110.413

1.48 6.403

3.444 15.52

6.356 28.636

10.759 48.476

28.436 128.072

5.171 23.22

14.662 66.063

12.695 57.201

39.784 177.434

2.25 10.138

145.962 806.452

14.326 83.871

1.843 9.129

3.444 18.925

6.356 34.92

10.76 59.118

28.464 156.315

5.213 28.526

14.662 80.559

12.695 69.752

41.264 222.653

2.25 12.362

137.954 1419.579

12.755 135.402

3.027 24.35

3.444 34.444

6.356 63.556

10.762 107.611

28.517 284.908

5.292 52.525

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Earthwork Report Page 22 of 168

14.662 146.623

12.695 126.953

45.744 435.042

2.25 22.5

138.988 1384.71

8.087 104.206

3.825 34.259

3.444 34.444

6.356 63.556

10.764 107.629

28.572 285.446

5.374 53.329

14.662 146.623

12.695 126.953

49.59 476.672

2.25 22.5

145.635 1423.114

8.217 81.517

4.622 42.236

3.444 34.444

6.356 63.556

10.766 107.647

28.629 286.003

5.458 54.16

14.662 146.623

12.695 126.953

53.197 513.934

2.25 22.5

5170.774

146.16 112.938

8.227 6.364

4.684 3.602

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Earthwork Report Page 23 of 168

3.444 2.666

6.356 4.92

10.766 8.334

28.633 22.163

5.465 4.228

14.662 11.35

12.695 9.827

53.386 41.252

2.25 1.742

152.182 1376.241

9.492 81.736

5.42 46.611

3.444 31.778

6.356 58.636

10.766 99.324

28.633 264.167

5.465 50.42

14.662 135.273

12.695 117.126

55.657 503.014

2.25 20.758

176.487 1643.348

15.929 127.106

6.218 58.19

3.444 34.444

6.356 63.556

10.766 107.658

28.633 286.332

5.465 54.65

14.662 146.623

12.695 126.953

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Earthwork Report Page 24 of 168

58.141 568.99

2.25 22.5

340.612 2585.495

65.218 405.735

6.158 61.88

3.444 34.444

6.356 63.556

10.766 107.658

28.633 286.332

5.465 54.65

14.662 146.623

12.695 126.953

58.182 581.615

2.25 22.5

324.993 3328.026

58.714 619.657

6.102 61.3

3.444 34.444

6.356 63.556

10.766 107.658

28.633 286.332

5.465 54.65

14.662 146.623

12.695 126.953

57.999 580.904

2.25 22.5

287.406 3061.995

49.326 540.198

5.082 55.919

3.444 34.444

6.356 63.556

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Earthwork Report Page 25 of 168

10.766 107.658

28.633 286.332

5.465 54.65

14.662 146.623

12.695 126.953

54.407 562.03

2.25 22.5

258.863 2731.341

41.131 452.282

3.985 45.331

3.444 34.444

6.356 63.556

10.766 107.658

28.633 286.332

5.465 54.65

14.662 146.623

12.695 126.953

51.871 531.393

2.25 22.5

225.757 2423.097

34.503 378.166

3.932 39.582

3.444 34.444

6.356 63.556

10.766 107.658

28.633 286.332

5.465 54.65

14.662 146.623

12.695 126.953

49.617 507.44

2.25 22.5

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Excavation:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Foundation:

Cut Volume:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Parkway\XS_TC_Parkway:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 4:

Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Foreslope:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 1:

Mesh\Modeling\Components\Wall - MSE\XS_TC_MSE Wall Backfill 5:

Cut Volume:

Fill Volume:

Mesh\Modeling\Components\Grading\XS_TC_Cut:

Mesh\Modeling\Components\Grading\XS_TC_Fill:

Mesh\Modeling\Components\Guardrail\XS_TC_Guardrail:

Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .