ora-dot26-4_plans.pdf
PDF 3 MB Posted
- Solicitation number
- 69056723B000017
About this file
This document appears to be a project plan and associated drawings for the OR FLAP DOT 26(4), Summit Highway Safety Rest Stop and Snow Park contract opportunity. The project plan provides a detailed summary of quantities for the various construction elements, including asphalt pavement, erosion control, permanent and temporary traffic control, and other related items. The drawings provide layout plans, point tables, and details for the rest area and associated infrastructure.
The related federal contract opportunity is Solicitation Number 69056723B000017, issued by the Department of Transportation Federal Highway Administration. The solicitation is for the construction of the Summit Highway Safety Rest Stop and Snow Park project. The Invitation for Bidders (IFB), plans, physical data, and construction contract administration documents are provided as attachments to the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Tabs_OR FLAP DOT 26(4).pdf | ||
| BidSum_OR FLAP DOT 26(4).pdf | ||
| Amendment A003.pdf | ||
| Amendment A002.pdf | ||
| Amendment A001.pdf | ||
| ora-dot26-4_existing-ground-surface.zip | ZIP file | |
| IFB_69056723B000017_OR FLAP DOT 26(4).pdf | ||
| ora-dot26-4_control-points.xlsx | XLSX spreadsheet | |
| WFLHD Construction Contract Administration_2.2.2023.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRENT L COE Digitally signed by BRENT L COE Date: 2024.04.01 16:27:44 -07'00'
PROJECT
SHEET
NUMBER
OR FLAP DOT 26(4) A.2
SHEET INDEX
A.l
A.2
A.3
A.4
A.5
B.l
C.1
D.l
D.2
D.3
D.4
D.5
E.1
E.2
E.3
E.4-5
E.6
F.1
F.2
F.3
F.4
F.5
F.6
F.7
F.8
G.l
G.2
G.3
G.4
G.5
A. GENERAL INFORMATION
TITLE SHEET
INDEX TO SHEETS
PLAN SYMBOLS AND ABBREVIATIONS VICINITY
MAP
SURVEY CONTROL
B. SUMMARY OF QUANTITIES
SUMMARY OF QUANTITIES
C. TYPICAL SECTION
TYPICAL SECTION
D. SUMMIT REST AREA
TABULATION OF QUANTITIES
SUMMIT REST AREA PAVEMENT PLAN
SUMMIT REST AREA LAYOUT PLAN
LAYOUT POINT TABLE
ADJUSTMENT DETAILS
E. EROSION CONTROL
TABULATION OF QUANTITIES
EROSION CONTROL PLAN
SILT FENCE
TEMPORARY INLET PROTECTION
FIBER ROLL
F. PERMANENT TRAFFIC CONTROL
TABULATION OF QUANTITIES
SUMMIT REST AREA PERMANENT TRAFFIC
CONTROL PLAN
SUMMIT REST AREA PERMANENT TRAFFIC
CONTROL LAYOUT
SUMMIT REST AREA PERMANENT TRAFFIC
CONTROL POINT TABLE
SIGNING AND STRIPING DETAILS
REST AREA PARKING ONLY SIGN DETAIL
SIGN STRUCTURES
BREAKAWAY SIGN SUPPORT WOOD AND STEEL
POSTS
G. TEMPORARY TRAFFIC CONTROL
TABULATION OF QUANTITIES
TEMPORARY TRAFFIC CONTROL ADVANCE
WARNING LOCATION MAP
TEMPORARY TRAFFIC CONTROL PLAN
BIPARTISAN INFRASTRUCTURE LAW SIGN
TEMPORARY TRAFFIC CONTROL SIGN
INSTALLATION WOOD POSTS
INDEX TO SHEETS
PROJECT UNITS : US SURVEY FOOT
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
SUMMIT1 598747.965 7881586.958 3973.034 45°18'07.989451"N 121°44'44.722569"W 3904.615 0.999710754 5/8" ir w/fhwa alum cap 1.
SUMMIT2 598700.345 7881981.750 3986.143 45°18'07.579368"N 121°44'39.189120"W 3917.7336 0.999710123 5/8" ir w/fhwa alum cap
SUMMIT3 598892.273 7881445.161 3967.553 45°18'09.392610"N 121°44'46.737473"W 3899.1325 0.999711032 5/8" ir w/fhwa alum cap
PROJECT : Summit Highway Safety Rest Stop and Snow Park
DATE OF FIELD WORK : 10/2022
DATE OF FINAL ADJUSTMENT : 12/5/2022
COORDINATE SYSTEM : Oregon North SPCS NAD83 2011 VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID18
EPOCH DATE : 2010.000
CADD COORDINATE SYSTEM : OR83/2011-NIF NSRS11(NAD83/2011) Oregon, North Zone, Intn'l Foot
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
c:
\p w -w or k\ d0 m t_ ho od _s um m it_ re st _a re a_ co nt ro ls he et
.x ls x] S he et
-M ar
-2
9:
P
M A
D es ig ne r
D
C he ck er
D es ig ne d by
C he ck ed b y:
STATE PROJECT
A.5
SHEET
NUMBER
FLAP DOT 26(4)OR
SURVEY CONTROL
Sheet and Description
D E F G
Summit Rest Area Erosion Control Permanent
Traffic Control Temporary
Traffic Control Allowance Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 290 20 310
A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 200 10 210
A0160 15706-1300 SOIL EROSION CONTROL, INLET PROTECTION TYPE C EACH 3 3
A0180 20301-2400 REMOVAL OF SIGN EACH 4 4
A0200 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 1,196 34 1,230
A0220 41301-0600 ASPHALT PAVEMENT MILLING, 2-INCH DEPTH SQYD 7,400 7,400 Contract Quantity
A0240 41501-0000 PAVING GEOTEXTILE SQYD 7,400 7,400 Contract Quantity
A0260 41801-3000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 3 SQYD 150 150
A0280 60405-0000 MANHOLE ADJUSTMENT EACH 1 1
A0300 60406-0000 INLET ADJUSTMENT EACH 3 3
A0320 61108-1000 ADJUST WATER VALVE EACH 1 1
A0340 63302-0000 SIGN SYSTEM SQFT 26.6 26.6
A0360 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE) LNFT 8,000 400 8,400
A0380 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW) LNFT 2,700 135 2,835
A0400 63405-0050 PAVEMENT MARKINGS, SYMBOLS EACH 1 1
A0420 63405-0550 PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW EACH 7 7
A0440 63405-0600 PAVEMENT MARKINGS, TYPE B, STRAIGHT/TURN ARROW COMBINATION EACH 1 1
A0460 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL EACH 4 4
A0480 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 12 12
A0500 63502-1000 TEMPORARY TRAFFIC CONTROL, CONE, TYPE 36-INCH EACH 20 20
A0520 63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C EACH 12 12
A0540 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN EACH 2 2
A0560 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE LNFT 1,290 70 1,360
A0580 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 135 135
MileStone: 100% PS&E Date Completed: 03/31/24 Report Date: 04/01/24
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES
1-
A pr
-2
:2
A M
Remarks and/or Determination of Estimated QuantityPay Item Description Unit
Estimated Quantities
C
M yF ile s\
D es ig n\
S um m it
R es t A re a\
PO
S T
Q A \S ig no ff F ol de r S tu ff \S
O Q su m m ar y2
0.
xl sm
]S he et
PROJECT
B.1OR FLAP DOT 26(4)
SHEET
NUMBER
concrete
N
I
PAY ITEM NUMBER
15705-0100
15705-1400
15706-1300
63503-1000
SOIL EROSION CONTROL QUANTITIES
PAY ITEM DESCRIPTION QUANTITY
SOIL EROSION CONTROL, SILT FENCE 290
SOIL EROSION CONTROL, FIBER ROLL 200
SOIL EROSION CONTROL, INLET PROTECTION TYPE C 3
TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE 1290
PROJECT
SHEET
NUMBER
OR FLAP DOT 26(4) E.1
UNIT
LNFT
LNFT
EACH
LNFT
TABULATION OF
QUANTITIES
OR FLAP DOT 24(1)