Bid Tabs_OR FLAP DOT 26(4).pdf

PDF 79 KB Posted

Attached to
OR FLAP DOT 26(4), Summit Highway Safety Rest Stop and Snow Park
Solicitation number
69056723B000017
Issued by

About this file

This document is a Tabulation of Bids report for federal contract solicitation 69056723B000017, titled "OR FLAP DOT 26(4), Summit Highway Safety Rest Stop and Snow Park". The project is located in Clackamas County, Oregon on the Mt. Hood National Recreation Area, and involves construction work such as asphalt paving, pavement markings, traffic control, and erosion control. The solicitation was opened at the FHWA office in Vancouver, WA on 05/14/24. Seven bids were received, ranging from $431,822.51 to $866,199.65, with the lowest bid submitted by Yorkshire Industries. The engineer's estimate for the project was $839,645.00. Key bid items include mobilization, survey/staking, quality control, asphalt paving, pavement markings, and temporary traffic control measures. The contract was awarded on 05/15/2024, but the specific awardee is not provided in the document.

View the file

Other files

File Type Posted
BidSum_OR FLAP DOT 26(4).pdf PDF
Amendment A003.pdf PDF
Amendment A002.pdf PDF
Amendment A001.pdf PDF
ora-dot26-4_existing-ground-surface.zip ZIP file
IFB_69056723B000017_OR FLAP DOT 26(4).pdf PDF
ora-dot26-4_plans.pdf PDF
ora-dot26-4_control-points.xlsx XLSX spreadsheet
WFLHD Construction Contract Administration_2.2.2023.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 05/14/24

1 out of 9

Project No: OR FLAP DOT 26(4)

Project Name: Summit Highway Safety Rest Stop and Snow Park

Schedule: A

Schedule Type: Base

Solcitation No: 69056723B000017

Division: Western Federal Lands

State: OR County: Clackamas

Federal Land: Mt. Hood National Recreation Area Opened at: FHWA Vancouver, WA Office

Opened by: Marino Chea

Date: 05/14/24

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Yorkshire Industries $431,822.51 420 Lexington Ave Suite 300 New York, NY 10170

Elk Mountain $504,868.00 22735 SE Firwood Sandy, OR 97055

Construction Solutions Group, LLC $511,440.00 425 Highland Ave St. Louis, MO 63122

Conway Construction, Inc. $623,135.25 6620 NW Whitney Rd. Suite 100 Vancouver, WA 98665

Crowley Holdings LLC $675,652.80 3727 Canal St. Suite 3 New Orleans, LA 70119

C.R Contracting, LLC $852,395.00

64435 STRICKLER AVE, STE 100

Bend, OR 97703

Central Southern Construction Corp. $866,199.65 119 Sewald Street Jacksonville, FL 32204

Engineer's Estimate $839,645.00

Contracting Officer 05/15/2024

2 out of 9

Project No: OR FLAP DOT 26(4)

Project Name: Summit Highway Safety Rest Stop and Snow Park

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0020 15101-0000 MOBILIZATION

Yorkshire Industries Lump Sum $10,775.83 Elk Mountain Lump Sum $67,900.00 Construction Solutions Group, LLC Lump Sum $116,000.00 Conway Construction, Inc. Lump Sum $106,975.00 Crowley Holdings LLC Lump Sum $62,400.00 C.R Contracting, LLC Lump Sum $125,000.00 Central Southern Construction Corp. Lump Sum $182,120.77 Engineer's Estimate ALL LPSM Lump Sum $75,000.00

A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING

Yorkshire Industries Lump Sum $9,000.00 Elk Mountain Lump Sum $21,000.00 Construction Solutions Group, LLC Lump Sum $22,500.00 Conway Construction, Inc. Lump Sum $30,000.00 Crowley Holdings LLC Lump Sum $22,750.00 C.R Contracting, LLC Lump Sum $35,000.00 Central Southern Construction Corp. Lump Sum $65,000.00 Engineer's Estimate ALL LPSM Lump Sum $24,000.00

A0060 15301-0000 CONTRACTOR QUALITY CONTROL

Yorkshire Industries Lump Sum $4,800.00 Elk Mountain Lump Sum $10,000.00 Construction Solutions Group, LLC Lump Sum $25,000.00 Conway Construction, Inc. Lump Sum $60,000.00 Crowley Holdings LLC Lump Sum $28,600.00 C.R Contracting, LLC Lump Sum $45,000.00 Central Southern Construction Corp. Lump Sum $70,000.00 Engineer's Estimate ALL LPSM Lump Sum $21,000.00

A0080 15401-0000 CONTRACTOR TESTING

Yorkshire Industries Lump Sum $7,200.00 Elk Mountain Lump Sum $4,000.00 Construction Solutions Group, LLC Lump Sum $5,000.00 Conway Construction, Inc. Lump Sum $30,000.00 Crowley Holdings LLC Lump Sum $6,500.00 C.R Contracting, LLC Lump Sum $35,000.00 Central Southern Construction Corp. Lump Sum $76,837.00 Engineer's Estimate ALL LPSM Lump Sum $14,000.00

3 out of 9

Project No: OR FLAP DOT 26(4)

Project Name: Summit Highway Safety Rest Stop and Snow Park

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0100 15501-0000 CONSTRUCTION SCHEDULE

Yorkshire Industries Lump Sum $100.00 Elk Mountain Lump Sum $4,000.00 Construction Solutions Group, LLC Lump Sum $10,500.00 Conway Construction, Inc. Lump Sum $15,000.00 Crowley Holdings LLC Lump Sum $3,900.00 C.R Contracting, LLC Lump Sum $7,000.00 Central Southern Construction Corp. Lump Sum $8,000.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00

A0120 15705-0100 SOIL EROSION CONTROL, SILT FENCE

Yorkshire Industries $5.81 $1,801.10 Elk Mountain $10.00 $3,100.00 Construction Solutions Group, LLC $15.00 $4,650.00 Conway Construction, Inc. $8.00 $2,480.00 Crowley Holdings LLC $6.50 $2,015.00 C.R Contracting, LLC $20.00 $6,200.00 Central Southern Construction Corp. $10.17 $3,152.70 Engineer's Estimate 310 LNFT $10.00 $3,100.00

A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

Yorkshire Industries $8.57 $1,799.70 Elk Mountain $10.00 $2,100.00 Construction Solutions Group, LLC $15.00 $3,150.00 Conway Construction, Inc. $10.00 $2,100.00 Crowley Holdings LLC $6.50 $1,365.00 C.R Contracting, LLC $20.00 $4,200.00 Central Southern Construction Corp. $13.13 $2,757.30 Engineer's Estimate 210 LNFT $15.00 $3,150.00

A0160 15706-1300 SOIL EROSION CONTROL, INLET PROTECTION TYPE C

Yorkshire Industries $600.00 $1,800.00 Elk Mountain $200.00 $600.00 Construction Solutions Group, LLC $1,000.00 $3,000.00 Conway Construction, Inc. $150.00 $450.00 Crowley Holdings LLC $78.00 $234.00 C.R Contracting, LLC $200.00 $600.00 Central Southern Construction Corp. $447.30 $1,341.90 Engineer's Estimate 3 EACH $300.00 $900.00

4 out of 9

Project No: OR FLAP DOT 26(4)

Project Name: Summit Highway Safety Rest Stop and Snow Park

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0180 20301-2400 REMOVAL OF SIGN

Yorkshire Industries $75.00 $300.00 Elk Mountain $400.00 $1,600.00 Construction Solutions Group, LLC $600.00 $2,400.00 Conway Construction, Inc. $65.00 $260.00 Crowley Holdings LLC $130.00 $520.00 C.R Contracting, LLC $300.00 $1,200.00 Central Southern Construction Corp. $687.89 $2,751.56 Engineer's Estimate 4 EACH $230.00 $920.00

A0200 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1

Yorkshire Industries $216.00 $265,680.00 Elk Mountain $190.00 $233,700.00 Construction Solutions Group, LLC $170.00 $209,100.00 Conway Construction, Inc. $140.00 $172,200.00 Crowley Holdings LLC $253.50 $311,805.00 C.R Contracting, LLC $285.00 $350,550.00 Central Southern Construction Corp. $205.12 $252,297.60 Engineer's Estimate 1,230 TON $200.00 $246,000.00

A0220 41301-0600 ASPHALT PAVEMENT MILLING, 2-INCH DEPTH

Yorkshire Industries $5.16 $38,184.00 Elk Mountain $5.50 $40,700.00 Construction Solutions Group, LLC $4.30 $31,820.00 Conway Construction, Inc. $7.50 $55,500.00 Crowley Holdings LLC $6.44 $47,656.00 C.R Contracting, LLC $13.00 $96,200.00 Central Southern Construction Corp. $8.23 $60,902.00 Engineer's Estimate 7,400 SQYD $20.00 $148,000.00

A0240 41501-0000 PAVING GEOTEXTILE

Yorkshire Industries $5.40 $39,960.00 Elk Mountain $4.50 $33,300.00 Construction Solutions Group, LLC $4.50 $33,300.00 Conway Construction, Inc. $6.00 $44,400.00 Crowley Holdings LLC $6.83 $50,542.00 C.R Contracting, LLC $5.00 $37,000.00 Central Southern Construction Corp. $4.62 $34,188.00 Engineer's Estimate 7,400 SQYD $25.00 $185,000.00

5 out of 9

Project No: OR FLAP DOT 26(4)

Project Name: Summit Highway Safety Rest Stop and Snow Park

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0260 41801-3000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 3

Yorkshire Industries $48.00 $7,200.00 Elk Mountain $50.00 $7,500.00 Construction Solutions Group, LLC $40.00 $6,000.00 Conway Construction, Inc. $120.00 $18,000.00 Crowley Holdings LLC $59.80 $8,970.00 C.R Contracting, LLC $220.00 $33,000.00 Central Southern Construction Corp. $94.24 $14,136.00 Engineer's Estimate 150 SQYD $75.00 $11,250.00

A0280 60405-0000 MANHOLE ADJUSTMENT

Yorkshire Industries $200.00 $200.00 Elk Mountain $4,000.00 $4,000.00 Construction Solutions Group, LLC $500.00 $500.00 Conway Construction, Inc. $1,800.00 $1,800.00 Crowley Holdings LLC $11,050.00 $11,050.00 C.R Contracting, LLC $2,000.00 $2,000.00 Central Southern Construction Corp. $1,600.00 $1,600.00 Engineer's Estimate 1 EACH $3,000.00 $3,000.00

A0300 60406-0000 INLET ADJUSTMENT

Yorkshire Industries $66.66 $199.98 Elk Mountain $4,000.00 $12,000.00 Construction Solutions Group, LLC $500.00 $1,500.00 Conway Construction, Inc. $1,800.00 $5,400.00 Crowley Holdings LLC $9,750.00 $29,250.00 C.R Contracting, LLC $3,000.00 $9,000.00 Central Southern Construction Corp. $1,000.00 $3,000.00 Engineer's Estimate 3 EACH $1,600.00 $4,800.00

A0320 61108-1000 ADJUST WATER VALVE

Yorkshire Industries $200.00 $200.00 Elk Mountain $1,000.00 $1,000.00 Construction Solutions Group, LLC $500.00 $500.00 Conway Construction, Inc. $850.00 $850.00 Crowley Holdings LLC $6,500.00 $6,500.00 C.R Contracting, LLC $600.00 $600.00 Central Southern Construction Corp. $779.93 $779.93 Engineer's Estimate 1 EACH $900.00 $900.00

6 out of 9

Project No: OR FLAP DOT 26(4)

Project Name: Summit Highway Safety Rest Stop and Snow Park

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0340 63302-0000 SIGN SYSTEM

Yorkshire Industries $315.80 $8,400.28 Elk Mountain $250.00 $6,650.00 Construction Solutions Group, LLC $140.00 $3,724.00 Conway Construction, Inc. $340.00 $9,044.00 Crowley Holdings LLC $260.00 $6,916.00 C.R Contracting, LLC $350.00 $9,310.00 Central Southern Construction Corp. $526.65 $14,008.89 Engineer's Estimate 26.6 SQFT $350.00 $9,310.00

A0360 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE)

Yorkshire Industries $1.43 $12,012.00 Elk Mountain $2.50 $21,000.00 Construction Solutions Group, LLC $0.60 $5,040.00 Conway Construction, Inc. $2.75 $23,100.00 Crowley Holdings LLC $3.25 $27,300.00 C.R Contracting, LLC $1.25 $10,500.00 Central Southern Construction Corp. $2.50 $21,000.00 Engineer's Estimate 8,400 LNFT $1.00 $8,400.00

A0380 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW)

Yorkshire Industries $2.12 $6,010.20 Elk Mountain $2.80 $7,938.00 Construction Solutions Group, LLC $0.60 $1,701.00 Conway Construction, Inc. $2.75 $7,796.25 Crowley Holdings LLC $3.38 $9,582.30 C.R Contracting, LLC $2.00 $5,670.00 Central Southern Construction Corp. $2.60 $7,371.00 Engineer's Estimate 2,835 LNFT $1.00 $2,835.00

A0400 63405-0050 PAVEMENT MARKINGS, SYMBOLS

Yorkshire Industries $1,200.00 $1,200.00 Elk Mountain $200.00 $200.00 Construction Solutions Group, LLC $150.00 $150.00 Conway Construction, Inc. $215.00 $215.00 Crowley Holdings LLC $260.00 $260.00 C.R Contracting, LLC $1,000.00 $1,000.00 Central Southern Construction Corp. $200.00 $200.00 Engineer's Estimate 1 EACH $450.00 $450.00

7 out of 9

Project No: OR FLAP DOT 26(4)

Project Name: Summit Highway Safety Rest Stop and Snow Park

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0420 63405-0550 PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW

Yorkshire Industries $342.86 $2,400.02 Elk Mountain $100.00 $700.00 Construction Solutions Group, LLC $125.00 $875.00 Conway Construction, Inc. $105.00 $735.00 Crowley Holdings LLC $130.00 $910.00 C.R Contracting, LLC $300.00 $2,100.00 Central Southern Construction Corp. $100.00 $700.00 Engineer's Estimate 7 EACH $200.00 $1,400.00

A0440 63405-0600 PAVEMENT MARKINGS, TYPE B, STRAIGHT/TURN ARROW COMBINATION

Yorkshire Industries $1,200.00 $1,200.00 Elk Mountain $200.00 $200.00 Construction Solutions Group, LLC $125.00 $125.00 Conway Construction, Inc. $215.00 $215.00 Crowley Holdings LLC $260.00 $260.00 C.R Contracting, LLC $900.00 $900.00 Central Southern Construction Corp. $200.00 $200.00 Engineer's Estimate 1 EACH $550.00 $550.00

A0460 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL

Yorkshire Industries $300.00 $1,200.00 Elk Mountain $500.00 $2,000.00 Construction Solutions Group, LLC $125.00 $500.00 Conway Construction, Inc. $425.00 $1,700.00 Crowley Holdings LLC $520.00 $2,080.00 C.R Contracting, LLC $600.00 $2,400.00 Central Southern Construction Corp. $400.00 $1,600.00 Engineer's Estimate 4 EACH $500.00 $2,000.00

A0480 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

Yorkshire Industries $127.50 $1,530.00 Elk Mountain $200.00 $2,400.00 Construction Solutions Group, LLC $500.00 $6,000.00 Conway Construction, Inc. $185.00 $2,220.00 Crowley Holdings LLC $650.00 $7,800.00 C.R Contracting, LLC $500.00 $6,000.00 Central Southern Construction Corp. $735.62 $8,827.44 Engineer's Estimate 12 EACH $250.00 $3,000.00

8 out of 9

Project No: OR FLAP DOT 26(4)

Project Name: Summit Highway Safety Rest Stop and Snow Park

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0500 63502-1000 TEMPORARY TRAFFIC CONTROL, CONE, TYPE 36-INCH

Yorkshire Industries $91.80 $1,836.00 Elk Mountain $20.00 $400.00 Construction Solutions Group, LLC $50.00 $1,000.00 Conway Construction, Inc. $50.00 $1,000.00 Crowley Holdings LLC $195.00 $3,900.00 C.R Contracting, LLC $60.00 $1,200.00 Central Southern Construction Corp. $108.06 $2,161.20 Engineer's Estimate 20 EACH $30.00 $600.00

A0520 63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C

Yorkshire Industries $144.50 $1,734.00 Elk Mountain $100.00 $1,200.00 Construction Solutions Group, LLC $100.00 $1,200.00 Conway Construction, Inc. $35.00 $420.00 Crowley Holdings LLC $65.00 $780.00 C.R Contracting, LLC $70.00 $840.00 Central Southern Construction Corp. $147.52 $1,770.24 Engineer's Estimate 12 EACH $90.00 $1,080.00

A0540 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

Yorkshire Industries $765.00 $1,530.00 Elk Mountain $1,750.00 $3,500.00 Construction Solutions Group, LLC $1,000.00 $2,000.00 Conway Construction, Inc. $7,500.00 $15,000.00 Crowley Holdings LLC $4,290.00 $8,580.00 C.R Contracting, LLC $4,000.00 $8,000.00 Central Southern Construction Corp. $2,376.16 $4,752.32 Engineer's Estimate 2 EACH $20,000.00 $40,000.00

A0560 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE

Yorkshire Industries $1.35 $1,836.00 Elk Mountain $3.00 $4,080.00 Construction Solutions Group, LLC $3.00 $4,080.00 Conway Construction, Inc. $7.50 $10,200.00 Crowley Holdings LLC $6.50 $8,840.00 C.R Contracting, LLC $5.00 $6,800.00 Central Southern Construction Corp. $8.47 $11,519.20 Engineer's Estimate 1,360 LNFT $10.00 $13,600.00

9 out of 9

Project No: OR FLAP DOT 26(4)

Project Name: Summit Highway Safety Rest Stop and Snow Park

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0580 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

Yorkshire Industries $12.84 $1,733.40 Elk Mountain $60.00 $8,100.00 Construction Solutions Group, LLC $75.00 $10,125.00 Conway Construction, Inc. $45.00 $6,075.00 Crowley Holdings LLC $32.50 $4,387.50 C.R Contracting, LLC $75.00 $10,125.00 Central Southern Construction Corp. $97.96 $13,224.60 Engineer's Estimate 135 SQFT $40.00 $5,400.00

Total Schedule - All Items

Yorkshire Industries $431,822.51 Elk Mountain $504,868.00 Construction Solutions Group, LLC $511,440.00 Conway Construction, Inc. $623,135.25 Crowley Holdings LLC $675,652.80 C.R Contracting, LLC $852,395.00 Central Southern Construction Corp. $866,199.65 Engineer's Estimate $839,645.00

2024-05-15T09:35:55-0700
ANDRES ARREDONDO