OR780_Oakland University_Issued04.03.24.pdf
PDF 336 KB Posted
- Attached to
- RFP CAS Annex Demo
- Solicitation number
- 00081
- Issued by
- Oakland County, Riverview City, Michigan
About this file
This document is an Official Road Builder and Commercial Prevailing Wage Rates document for State Funded Projects, issued by the State of Michigan on 4/3/2024 for Oakland University's Demo CAS Annex Building project in Oakland County. The document provides detailed prevailing wage rates for multiple trade classifications including laborers, operators, truck drivers, electricians, plumbers, pipefitters, and other construction-related workers. The contract must be awarded by 7/2/2024, and the document comprehensively lists straight hourly, time and a half, and double time rates for journeymen and apprentice levels across numerous job classifications, with most recent updates ranging from late 2021 to early 2024.
The wage rates document includes specific overtime provisions for each trade, with most classifications allowing overtime at time and a half for hours worked beyond standard rates and double time for hours exceeding certain thresholds. The rates are specifically tailored for state-funded projects and include detailed apprenticeship progression rates. Each trade's listing includes the last update date, indicating ongoing maintenance of wage standards. The document mandates that every contractor and subcontractor must post these wage rates conspicuously at the construction site, ensuring transparency and compliance with prevailing wage regulations for the demolition project at Oakland University.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
State of Michigan
Requestor: Oakland University
Project Description: Demo CAS Annex Building
Oakland County
Official Request #: 780
Project Number: 00081
Straight Hourly
Time and a Half
Double Time
Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024
Name
Classification Overtime ProvisionDescription
Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
A Operator (0-6 months)
H H H X X X X D$38.27 $52.09 $65.91
IBEW 876 & IBEW 17 -
Teledata
Y
12/14/2023
Apprentice Rates:
Lineman (6th - 6 months) $35.61 $49.90 $64.18
Lineman (5th - 6 months) $33.06 $46.07 $59.08
Lineman (4th - 6 months) $30.53 $42.27 $54.02
Lineman (3rd - 6 months) $27.99 $38.47 $48.94
Lineman (2nd - 6 months) $25.45 $34.66 $43.86
Lineman (1st - 6 months) $22.91 $30.85 $38.78
A Operator (7-12 months)
H H H X X X X D$40.95 $55.96 $70.96
IBEW 876 & IBEW 17 -
Teledata
Y
12/14/2023
Apprentice Rates:
Lineman (6th - 6 months) $35.61 $49.90 $64.18
Lineman (5th - 6 months) $33.06 $46.07 $59.08
Lineman (4th - 6 months) $30.53 $42.27 $54.02
Lineman (3rd - 6 months) $27.99 $38.47 $48.94
Project Description: Demo CAS Annex Building
Oakland CountyCounty:
780 Official Request #:
Project Number: 00081
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .
Straight Hourly
Time and a Half
Double Time
Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024
Name
Classification Overtime ProvisionDescription
Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
A Operator (over 1 yr)
H H H X X X X D$45.81 $62.97 $80.12
IBEW 876 & IBEW 17 -
Teledata
Y
12/14/2023
Apprentice Rates:
Lineman (6th - 6 months) $35.61 $49.90 $64.18
Lineman (5th - 6 months) $33.06 $46.07 $59.08
Lineman (4th - 6 months) $30.53 $42.27 $54.02
Lineman (3rd - 6 months) $27.99 $38.47 $48.94
B Operator (0-6 months)
H H H X x X X D$34.25 $46.29 $58.33
IBEW 876 & IBEW 17 -
Teledata
Y
12/14/2023
Apprentice Rates:
Lineman (6th - 6 months) $35.61 $49.90 $64.18
Lineman (5th - 6 months) $33.06 $46.07 $59.08
Lineman (4th - 6 months) $30.53 $42.27 $54.02
Lineman (3rd - 6 months) $27.99 $38.47 $48.94
Project Description: Demo CAS Annex Building
Oakland CountyCounty:
780 Official Request #:
Project Number: 00081
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024
Name
Classification Overtime ProvisionDescription
Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
B Operator (over 6 months)
H H H X X X X D$39.35 $53.65 $67.94
IBEW 876 & IBEW 17 -
Teledata
Y
12/14/2023
Apprentice Rates:
Lineman (6th - 6 months) $35.61 $49.90 $64.18
Lineman (5th - 6 months) $33.06 $46.07 $59.08
Lineman (4th - 6 months) $30.53 $42.27 $54.02
Lineman (3rd - 6 months) $27.99 $38.47 $48.94
Boilermaker
H H H H H H H D$72.47 $107.55 $142.63
BO169
Boilermaker Y
12/13/2021
Apprentice Rates:
1st Period $53.53 $79.15 $104.75
2nd Period $55.14 $81.56 $107.97
3rd Period $56.73 $83.94 $111.15
4th Period $58.31 $86.31 $114.31
5th Period $59.85 $88.62 $117.39
6th Period $63.03 $93.39 $123.75
7th Period $66.17 $98.10 $130.03
8th Period $69.32 $102.83 $136.33
Project Description: Demo CAS Annex Building
Oakland CountyCounty:
780 Official Request #:
Project Number: 00081
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024
Name
Classification Overtime ProvisionDescription
Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Bricklayer
H H H H H H H D$61.93 $92.90 $123.86
BR2-B
Bricklayer Y
12/3/2021
Apprentice Rates:
1st Period $40.60 $60.90 $81.20
2nd Period $42.47 $63.71 $84.94
3rd Period $44.33 $66.49 $88.66
4th Period $46.19 $69.29 $92.38
5th Period $48.05 $72.07 $96.10
6th Period $49.91 $74.87 $99.82
7th Period $51.78 $77.67 $103.56
8th Period $53.64 $80.46 $107.28
Cable spicer or COE foreman
H H H X X X X D$42.53 $58.24 $73.94
IBEW 876 & IBEW 17 -
Teledata
Y
1/10/2024
Apprentice Rates:
Lineman (6th - 6 months) $35.61 $49.90 $64.18
Lineman (5th - 6 months) $33.06 $46.07 $59.08
Lineman (4th - 6 months) $30.53 $42.27 $54.02
Lineman (3rd - 6 months) $27.99 $38.47 $48.94
Project Description: Demo CAS Annex Building
Oakland CountyCounty:
780 Official Request #:
Project Number: 00081
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024
Name
Classification Overtime ProvisionDescription
Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Cable spicer, Central Office Employee
H H H X X X X D$40.71 $55.61 $70.51
IBEW 876 & IBEW 17 -
Teledata
Y
1/10/2024
Apprentice Rates:
Lineman (6th - 6 months) $35.61 $49.90 $64.18
Lineman (5th - 6 months) $33.06 $46.07 $59.08
Lineman (4th - 6 months) $30.53 $42.27 $54.02
Lineman (3rd - 6 months) $27.99 $38.47 $48.94
Carpenter
X X H H H H H D$59.04 $82.42 $105.80
CA1045
Carpet and Resilient Floor Layer, (does not include installation of prefabricated formica & parquet flooring which is to be paid carpenter rate)
N
8/4/2023
Apprentice Rates:
1st 6 months $30.46 $41.20 $51.93
2nd 6 months $34.04 $45.73 $57.44
3rd 6 months $36.52 $50.29 $64.05
4th 6 months $39.02 $54.04 $69.05
5th 6 months $41.52 $57.75 $74.05
6th 6 months $44.02 $61.54 $79.05
7th 6 months $46.53 $65.31 $84.07
8th 6 months $49.02 $67.72 $86.42
X X H H H H H D$65.99 $83.94 $101.89
CA-687-C-Z1
Journeyman-Diver Tender Y
3/14/2024
Project Description: Demo CAS Annex Building
Oakland CountyCounty:
780 Official Request #:
Project Number: 00081
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024
Name
Classification Overtime ProvisionDescription
Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
X X H X X H H D$65.99 $83.94 $101.89
CA687Z1
Carpenter 4-10s allowed Mon-Sat; double time due when over 12 hours worked per day
Y
8/4/2023
Apprentice Rates:
1st year $40.39 $50.27 $60.14
3rd 6 months $43.23 $54.00 $64.77
4th 6 months $46.08 $57.75 $69.42
5th 6 months $48.92 $61.49 $74.05
6th 6 months $51.78 $65.25 $78.71
7th 6 months $54.61 $68.97 $83.33
8th 6 months $57.47 $72.73 $87.99
Saturdays make up day allowedcomment
X X H X h
H H H D$65.99 $83.94 $101.89
CA687Z1P
Piledriver 4- 10s allowed Monday-Saturday; double time due when over 12 hours worked per day
Y
8/4/2023
Apprentice Rates:
1st 6 months $40.39 $50.27 $60.14
2nd 6 months $46.08 $57.75 $69.42
3rd 6 months $51.78 $65.25 $78.71
4th 6 months $57.47 $72.73 $87.99
Subdivision of county .
Saturday make up day allowedcomment
Cell Tower Tech
H H H X X X X D$38.78 $52.83 $66.87
IBEW 876 & IBEW 17 -
Teledata
Y
12/14/2023
Apprentice Rates:
Lineman (6th - 6 months) $35.61 $49.90 $64.18
Lineman (5th - 6 months) $33.06 $46.07 $59.08
Lineman (4th - 6 months) $30.53 $42.27 $54.02
Lineman (3rd - 6 months) $27.99 $38.47 $48.94
Lineman (2nd - 6 months) $25.45 $34.66 $43.86
Lineman (1st - 6 months) $22.91 $30.85 $38.78
Requestor: Oakland University
Project Description: Demo CAS Annex Building
Oakland CountyCounty:
780 Official Request #:
Project Number: 00081
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024
Name
Classification Overtime ProvisionDescription
Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Cement Mason
X X H H H H H D$58.90 $84.12 $109.33
BR2-CM
Cement Mason Y
12/3/2021
Apprentice Rates:
1st Period $39.26 $54.86 $70.45
2nd Period $41.72 $58.55 $75.37
3rd Period $44.22 $62.30 $80.37
4th Period $46.73 $66.06 $85.39
5th Period $49.19 $69.75 $90.31
6th Period $51.71 $73.53 $95.35
H H D H H H H D$52.82 $74.60 $96.37
CE514-W
Cement Mason Y
11/29/2021
Apprentice Rates:
1st 6 Months $34.23 $46.71 $59.19
2nd 6 Months $36.30 $49.82 $63.33
3rd 6 Months $38.39 $52.95 $67.51
4th 6 Months $40.47 $56.07 $71.67
5th 6 Months $42.54 $59.18 $75.81
6th 6 Months $44.63 $62.31 $79.99
Communication Technician
H H H H H H H D$67.89 $98.24 $128.58
IBEW 876 & IBEW 17 -
Roadway
Y
12/14/2023
Project Description: Demo CAS Annex Building
Oakland CountyCounty:
780 Official Request #:
Project Number: 00081
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024
Name
Classification Overtime ProvisionDescription
Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Diver
X X H X X H H D$76.40 $98.48 $120.55
CA 687 D
Diver 4-10s allowed M-Sat; double time due when over 12 hours worked per day
Y
8/3/2023
Apprentice Rates:
5th 6 mo $25.13
4th 6 mo $46.08 $57.75 $69.42
3rd 60 mo $43.23 $54.00 $64.77
1st/2nd 6 mo $40.39 $50.27 $60.14
Saturday make up day allowedcomment
Drywall
H H H H H H H D$51.86 $67.66 $83.46
CE514-DF
Drywall Finishers Y
12/9/2021
Apprentice Rates:
1st period $39.22 $48.70 $58.18
2nd period $40.80 $51.07 $61.34
3rd period $43.96 $55.81 $67.66
4th period $48.70 $62.92 $77.14
H H D H D D D D$45.91 $59.74 $73.56
PT-22-D
Drywall Taper Four 10s allowed Monday-Thursday Y
8/25/2016
Apprentice Rates:
First 3 months $32.08 $38.99 $45.90
Second 3 months $34.85 $43.14 $51.44
Second 6 months $37.62 $47.30 $56.98
Third 6 months $40.38 $51.44 $62.50
4th 6 months $41.76 $53.51 $65.26
Friday make-up day for bad weather or holidays make up day allowedcomment
Requestor: Oakland University
Project Description: Demo CAS Annex Building
Oakland CountyCounty:
780 Official Request #:
Project Number: 00081
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024
Name
Classification Overtime ProvisionDescription
Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Electrician
H H H H H H H D$71.28 $98.14 $121.40
EC-58-IW
Inside Wireman N
10/25/2016
Apprentice Rates:
1st Period $45.69 $59.77 $70.23
2nd Period $48.01 $63.24 $74.87
3rd Period $50.34 $66.74 $79.53
4th Period $52.66 $70.22 $84.17
5th Period $54.99 $73.71 $88.83
6th Period $59.65 $80.70 $98.15
H H H H H H H D$44.79 $60.31 $75.82
EC-58-SC
Sound and Communication Installer Y
11/12/2021
Apprentice Rates:
Period 1 $29.28 $37.04 $44.79
Period 2 $30.84 $39.99 $48.72
Period 3 $32.38 $41.68 $50.99
Period 4 $33.94 $44.03 $54.11
Period 5 $35.48 $46.34 $57.19
Period 6 $37.04 $48.67 $60.31
H H H H H H H D$52.52 $71.89 $91.27
EC-58-SCT
Sound and Communication Technician I Y
11/12/2021
Elevator Constructor
D D D D D D D D$96.27 $151.73
EL 36
Elevator Constructor Mechanic Y
8/7/2007
Apprentice Rates:
1st Year Apprentice $70.42 $100.92
2nd Year Apprentice $75.97 $112.02
3rd Year Apprentice $78.74 $117.56
4th Year Apprentice $84.29 $128.66
Requestor: Oakland University
Project Description: Demo CAS Annex Building
Oakland CountyCounty:
780 Official Request #:
Project Number: 00081
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024
Name
Classification Overtime ProvisionDescription
Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects
Last Updated make up day allowed
Equipment Operator (line truck & man lifts)
H H H X X X X D$38.78 $52.83 $66.87
IBEW 876 & IBEW 17 -
Teledata
Y
12/14/2023
Apprentice Rates:
Lineman (6th - 6 months) $35.61 $49.90 $64.18
Lineman (5th - 6 months) $33.06 $46.07 $59.08
Lineman (4th - 6 months) $30.53 $42.27 $54.02
Lineman (3rd - 6 months) $27.99 $38.47 $48.94
Fiber Optic Splicer
H H H H H H H D$67.89 $98.24 $128.58
IBEW 876 & IBEW 17 -
Roadway
Foreman
H H H H H H H D$75.47 $109.61 $143.74
IBEW 876 & IBEW 17 -
Roadway
Project Description: Demo CAS Annex Building
Oakland CountyCounty:
780 Official Request #:
Project Number: 00081
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024
Name
Classification Overtime ProvisionDescription
Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
H H H X X X X D$41.34 $56.52 $71.69
IBEW 876 & IBEW 17 -
Teledata
Y
1/10/2024
Apprentice Rates:
Lineman (6th - 6 months) $35.61 $49.90 $64.18
Lineman (5th - 6 months) $33.06 $46.07 $59.08
Lineman (4th - 6 months) $30.53 $42.27 $54.02
Lineman (3rd - 6 months) $27.99 $38.47 $48.94
Lineman (2nd - 6 months) $25.45 $34.66 $43.86
Lineman (1st - 6 months) $22.91 $30.85 $38.78
Apprentice Rates:
Lineman (6th - 6 months) $35.61 $49.90 $64.18
Lineman (5th - 6 months) $33.06 $46.07 $59.08
Lineman (4th - 6 months) $30.53 $42.27 $54.02
Lineman (3rd - 6 months) $27.99 $38.47 $48.94
Glazier
H H H H H H H D$53.55 $70.10 $86.65
GL-357
Glazier If 4 10 hour day workweek is scheduled, four 10s must be consecutive, M-F.
Y
12/9/2021
Apprentice Rates:
1st 6 months $37.00 $45.27 $53.55
2nd 6 months $37.75 $46.40 $55.05
3rd 6 months $41.97 $52.73 $63.49
4th 6 months $43.62 $55.21 $66.79
5th 6 months $45.27 $57.68 $70.09
6th 6 months $46.93 $60.17 $73.41
7th 6 months $48.59 $62.66 $76.73
8th 6 months $51.89 $67.61 $83.33
Project Description: Demo CAS Annex Building
Oakland CountyCounty:
780 Official Request #:
Project Number: 00081
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024
Name
Classification Overtime ProvisionDescription
Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Heat and Frost Insulator
H H H H H H H D$62.65 $78.41 $94.16
AS25
Heat and Frost Insulators and Asbestos Workers 4-10s must be worked a minimum of 2 weeks consecutively, Monday thru Thursday. Hours worked in excess of 10 will be paid at double time. Hours worked on the fifth day, Monday thru Friday @ time and half
Y
8/7/2023
Apprentice Rates:
1st Year $46.90 $54.78 $62.66
2nd Year $50.05 $59.50 $68.96
3rd Year $53.20 $64.23 $75.26
4th Year $56.35 $68.96 $81.56
Four 10s must be worked for a minimum of 2 consecutive weeks. OVERTIME is different on a four 10 week. OT is 2x for hours beyond 10. All hours on fifth day, M-F require time and one half. Sat first 8 hours, 1.5, all hours after 8 require double time.
comment
X X X H H H H H$25.29 $36.51
AS25S
Spray Insulation N
6/2/2016
Installer - Repairman
H H H X X X X D$38.78 $52.83 $66.87
IBEW 876 & IBEW 17 -
Teledata
Y
12/14/2023
Apprentice Rates:
Lineman (6th - 6 months) $35.61 $49.90 $64.18
Lineman (5th - 6 months) $33.06 $46.07 $59.08
Lineman (4th - 6 months) $30.53 $42.27 $54.02
Lineman (3rd - 6 months) $27.99 $38.47 $48.94
Project Description: Demo CAS Annex Building
Oakland CountyCounty:
780 Official Request #:
Project Number: 00081
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024
Name
Classification Overtime ProvisionDescription
Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Ironworker
H H D H H D D D$69.51 $85.85 $102.19
IR-25-RF
Reinforced Iron Work N
8/15/2023
Apprentice Rates:
Level 8 $66.76 $82.48 $98.19
Level 7 $66.76 $82.48 $98.19
Level 1 $52.63 $64.23 $75.83
Level 2 $54.68 $66.77 $78.86
Level 3 $56.56 $68.98 $81.40
Level 4 $59.41 $72.65 $85.88
Level 5 $62.27 $76.32 $90.37
Level 6 $66.76 $82.48 $98.19 make up day allowed
H H D H H H D D$76.08 $92.93 $109.78
IR-25-RIG
Rigging Work N
8/15/2023
Apprentice Rates:
Level 8 $69.43 $84.94 $100.45
Level 1 $51.75 $62.38 $73.01
Level 2 $52.56 $63.54 $74.52
Level 3 $54.83 $66.33 $77.83
Level 4 $57.51 $69.71 $81.91
Level 5 $60.60 $73.67 $86.74
Level 6 $63.27 $77.04 $90.80
Level 7 $66.35 $80.99 $95.62
Project Description: Demo CAS Annex Building
Oakland CountyCounty:
780 Official Request #:
Project Number: 00081
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024
Name
Classification Overtime ProvisionDescription
Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
H H D H H H D D$76.21 $102.75 $129.29
IR-25-STR
Structural, ornamental, welder and pre-cast If bad weather, Friday may be a make up day. If holiday celebrated on a Monday, 4 10s may be worked Tuesday thru Friday.
Y
8/15/2023
Apprentice Rates:
Level 8 $69.43 $84.94 $100.45
Level 1 $51.25 $61.88 $72.51
Level 2 $52.56 $63.54 $74.52
Level 3 $54.83 $66.33 $77.83
Level 4 $57.51 $70.34 $83.17
Level 5 $60.60 $73.67 $86.74
Level 6 $63.27 $77.04 $90.80
Level 7 $66.35 $80.98 $95.62 make up day allowed
Journeyman Signal Technician
H H H H H H H D$67.89 $98.24 $128.58
IBEW 876 & IBEW 17 -
Roadway
Journeyman Specialist
H H H H H H H D$76.98 $111.87 $146.76
IBEW 876 & IBEW 17 -
Roadway
Labor Crew Foreman
H H H H H H H D$61.86 $89.19 $116.52
IBEW 876 & IBEW 17 -
Roadway
Project Description: Demo CAS Annex Building
Oakland CountyCounty:
780 Official Request #:
Project Number: 00081
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024
Name
Classification Overtime ProvisionDescription
Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Laborer
H H H H H H H D$50.40 $64.93 $79.45
L1076-A-B
Signal man (on sewer & caisson work); air,electric or gasoline tool operator (including concrete vibrator operator,acetylene torch & air hammer operator); scaffold builder, caisson worker
Y
8/15/2023
Saturday make up day allowedcomment
H H H H H H H D$50.96 $65.77 $80.57
L1076-A-C
Lansing Burner, Blaster & Powder Man; Air, electric Gasoline Tool Operator (Blast furnace work or battery work)
Y
8/15/2023
Saturday, If conditions beyond the employer/employee's control prevent one or more hours of working during Mon-Fri, the employer may choose to work up to 10 hour straight time weekdays.
make up day allowedcomment
H H H H H H H D$50.67 $65.33 $79.99
L1076-A-D
Furnance battery heater tender, burning bar & oxy-acetylene gun Y
8/15/2023
Saturday make up day allowedcomment
H H H H H H H D$44.65 $56.30 $67.95
L1076-A-E
Cleaner/sweeper laborer, furniture laborer Y
8/15/2023
Saturday make up day allowedcomment
H H H H H H H D$51.51 $66.69 $81.87
L1076-A-F
Expediter man, topman and/or bottom man (blast furnace work or battery work)
Y
8/15/2023
Saturday comment
H H H H H H H D$46.90 $59.78 $72.65
L1076-A-W
Laborer -Wall and ceiling material handler, plasterer tender, mortar mixer and plastering machine operator
Y
7/28/2023
Apprentice Rates:
0-1,000 Hours $40.46 $55.20 $69.93
1,001-2,000 Hours $41.75 $57.13 $72.50
2,001-3,000 Hours $43.04 $59.06 $75.08
3,001-4,000 Hours $45.61 $62.92 $80.23
Requestor: Oakland University
Project Description: Demo CAS Annex Building
Oakland CountyCounty:
780 Official Request #:
Project Number: 00081
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024
Name
Classification Overtime ProvisionDescription
Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Saturday make up day due to conditions beyond control or holiday make up day allowedcomment
H H H H H H H D$47.44 $61.38 $75.31
MITA-RZ1-C1
Laborer Road Class 1: asphalt shoveler or loader, yard man, fence erector tender, dumper, joint filling, form setting, form stripper, pavement reinforcing, waterproofing, seal coating, bridge painting, sandblasting, pressure grouting, RC equipment
Y
8/9/2023
Apprentice Rates:
3,001-4,000 hours $46.05 $59.29 $72.53
2,001-3,000 $43.26 $55.11 $66.95
1,001-2,000 hours $41.87 $53.02 $64.17
0-1,000 hours $40.47 $50.92 $61.37
Apprentice Rates:
3,001-4,000 hours $46.05 $59.29 $72.53
2,001-3,000 $43.26 $55.11 $66.95
1,001-2,000 hours $41.87 $53.02 $64.17
0-1,000 hours $40.47 $50.92 $61.37
H H H H H H H D$47.57 $61.57 $75.57
MITA-RZ1-C2
Laborer Road Class 2: mixer operator, air or electric tool operator, spreader, boxman, concreter paddler, power chain saw operator, paving patch truck dumper, tunnel mucker, concrete saw operator, dry pack macine and roto-mill grounds person
Y
1/5/2022
Apprentice Rates:
3,001-4,000 hours $46.17 $59.47 $72.77
2,001-3,000 hours $43.37 $55.27 $67.17
1,001-2,000 hours $41.97 $53.17 $64.37
0-1,000 hours $40.57 $51.07 $61.57
Apprentice Rates:
3,001-4,000 hours $46.17 $59.47 $72.77
2,001-3,000 hours $43.37 $55.27 $67.17
1,001-2,000 hours $41.97 $53.17 $64.37
0-1,000 hours $40.57 $51.07 $61.57
Project Description: Demo CAS Annex Building
Oakland CountyCounty:
780 Official Request #:
Project Number: 00081
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024
Name
Classification Overtime ProvisionDescription
Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
H H H H H H H D$47.75 $61.84 $75.93
MITA-RZ1-C3
Laborer Road Class 3: tunnel miner, finish tenders, guard rail builder, median barrier installer, earth retention barrier and wall installer, fence erector, bottom man, powder man, wagon drill and air track operator, curb and side rail setter
Y
8/9/2023
Apprentice Rates:
3,001-4,000 hours $46.34 $59.73 $73.11
2,001-3,000 hours $43.52 $55.49 $67.47
1,001-2,000 hours $42.11 $53.38 $64.65
0-1,000 hours $40.71 $51.28 $61.85
Apprentice Rates:
3,001-4,000 hours $46.34 $59.73 $73.11
2,001-3,000 hours $43.52 $55.49 $67.47
1,001-2,000 hours $42.11 $53.38 $64.65
0-1,000 hours $40.71 $51.28 $61.85
H H H H H H H D$47.83 $61.46 $75.59
MITA-RZ1-C4
Laborer Road Class 4: asphalt raker Y
8/9/2023
Apprentice Rates:
3,001-4,000 hours $46.42 $59.35 $72.77
2,001-3,000 hours $43.59 $55.10 $67.11
1,001-2,000 hours $42.18 $52.99 $64.29
0-1,000 hours $40.77 $50.87 $61.47
Apprentice Rates:
3,001-4,000 hours $46.42 $59.35 $72.77
2,001-3,000 hours $43.59 $55.10 $67.11
1,001-2,000 hours $42.18 $52.99 $64.29
0-1,000 hours $40.77 $50.87 $61.47
Project Description: Demo CAS Annex Building
Oakland CountyCounty:
780 Official Request #:
Project Number: 00081
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024
Name
Classification Overtime ProvisionDescription
Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
H H H H H H H D$48.04 $62.28 $76.51
MITA-RZ1-C5
Laborer Road Class 5: pipe layers, oxy-gun Y
8/9/2023
Apprentice Rates:
3,001-4,000 hours $46.62 $60.15 $73.67
2,001-3,000 hours $43.77 $55.87 $67.97
1,001-2,000 hours $42.35 $53.74 $65.13
0-1,000 hours $40.92 $51.59 $62.27
Apprentice Rates:
3,001-4,000 hours $46.62 $60.15 $73.67
2,001-3,000 hours $43.77 $55.87 $67.97
1,001-2,000 hours $42.35 $53.74 $65.13
0-1,000 hours $40.92 $51.59 $62.27
H H H H H H H D$48.34 $62.73 $77.11
MITA-RZ1-C6
Laborer Road Class 6: line form setter for curb or pavement, asphalt screed checker/screw man on asphalt paving machines
Y
8/9/2023
Apprentice Rates:
3,001-4,000 hours $46.90 $60.57 $74.23
2,001-3,000 hours $44.02 $56.25 $68.47
1,001-2,000 hours $42.59 $54.10 $65.61
0-1,000 hours $41.15 $51.94 $62.73
Apprentice Rates:
3,001-4,000 hours $46.90 $60.57 $74.23
2,001-3,000 hours $44.02 $56.25 $68.47
1,001-2,000 hours $42.59 $54.10 $65.61
0-1,000 hours $41.15 $51.94 $62.73
Project Description: Demo CAS Annex Building
Oakland CountyCounty:
780 Official Request #:
Project Number: 00081
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024
Name
Classification Overtime ProvisionDescription
Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
H H H H H H H D$49.41 $64.33 $79.25
MITA-RZ1-C7
Laborer Road Class 7: concrete specialist - including finishing and trowling, cast in place or precast by any method
Y
8/9/2023
Apprentice Rates:
2,001-3,000 hours $44.93 $57.61 $70.29
3,001-4,000 hours $46.70 $63.10 $79.50
1,001-2,000 hours $43.44 $55.37 $67.31
0-1,000 hours $41.95 $53.14 $64.33
Apprentice Rates:
2,001-3,000 hours $44.93 $57.61 $70.29
3,001-4,000 hours $46.70 $63.10 $79.50
1,001-2,000 hours $43.44 $55.37 $67.31
0-1,000 hours $41.95 $53.14 $64.33
H H H H H H H D$45.39 $58.38 $71.36
MITA-RZ2-C1
Laborer Road Class 1: asphalt shoveler or loader, yard man, fence erector tender, dumper, joint filling, form setting, form stripper, pavement reinforcing, waterproofing, seal coating, bridge painting, sandblasting, pressure grouting, RC equipment
Y
8/9/2023
Apprentice Rates:
3,001-4,000 hours
2,001-3,000 hours
1,001-2,000 hours
0-1,000 hours
3,001-4,000 hours $44.09 $56.42 $68.76
2,001-3,000 hours $41.49 $52.52 $63.56
1,001-2,000 hours $40.20 $50.59 $60.98
0-1,000 hours $38.90 $48.64 $58.38
Project Description: Demo CAS Annex Building
Oakland CountyCounty:
780 Official Request #:
Project Number: 00081
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024
Name
Classification Overtime ProvisionDescription
Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
H H H H H H H D$45.59 $58.18 $71.26
MITA-RZ2-C2
Laborer Road Class 2: mixer operator, air or electric tool operator, spreader, boxman, concreter paddler, power chain saw operator, paving patch truck dumper, tunnel mucker, concrete saw operator, dry pack macine and roto-mill grounds person
Y
8/9/2023
Apprentice Rates:
3,001-4,000 hours $44.28 $56.21 $68.64
2,001-3,000 hours $41.66 $52.28 $63.40
1,001-2,000 hours $40.36 $50.33 $60.80
0-1,000 hours $39.05 $48.36 $58.18
H H H H H H H D$45.43 $58.64 $71.84
MITA-RZ2-C3
Laborer Road Class 3: tunnel miner, finish tenders, guard rail builder, median barrier installer, earth retention barrier and wall installer, fence erector, bottom man, powder man, wagon drill and air track operator, curb and side rail setter
Y
1/5/2022
Apprentice Rates:
3,001-4,000 hours $44.11 $56.66 $69.20
2,001-3,000 hours $41.47 $52.70 $63.92
1,001-2,000 hours $40.15 $50.72 $61.28
0-1,000 hours $38.83 $48.74 $58.64
H H H H H H H D$46.18 $59.56 $72.94
MITA-RZ2-C4
Laborer Road Class 4: asphalt raker Y
8/9/2023
Apprentice Rates:
3,001-4,000 hours $44.84 $57.55 $70.26
2,001-3,000 hours $42.17 $53.54 $64.92
1,001-2,000 hours $40.83 $51.54 $62.24
0-1,000 hours $39.49 $49.52 $59.56
Project Description: Demo CAS Annex Building
Oakland CountyCounty:
780 Official Request #:
Project Number: 00081
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024
Name
Classification Overtime ProvisionDescription
Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
H H H H H H H D$46.05 $59.37 $72.68
MITA-RZ2-C5
Laborer Road Class 5: pipe layers, oxy-gun Y
8/9/2023
Apprentice Rates:
3,001-4,000 hours $44.72 $57.37 $70.02
2,001-3,000 hours $42.06 $53.38 $64.70
1,001-2,000 hours $40.72 $51.37 $62.02
0-1,000 hours $39.39 $49.38 $59.36
H H H H H H H D$46.39 $59.88 $73.36
MITA-RZ2-C6
Laborer Road Class 6: line form setter for curb or pavement, asphalt screed checker/screw man on asphalt paving machines
Y
8/9/2023
Apprentice Rates:
3,001-4,000 hours $45.04 $57.85 $70.66
2,001-3,000 hours $42.34 $53.80 $65.26
1,001-2,000 hours $41.00 $51.79 $62.58
0-1,000 hours $39.65 $49.76 $59.88
H H H H H H H D$48.96 $63.73 $78.50
MITA-RZ2-C7
Laborer Road Class 7: concrete specialist - including finishing and trowling, cast in place or precast by any method
Y
1/5/2022
Apprentice Rates:
3,001-4,000 hours $47.48 $61.51 $75.54
2,001-3,000 hours $44.53 $57.08 $69.64
1,001-2,000 hours $43.05 $54.86 $66.68
0-1,000 hours $41.58 $52.66 $63.74
Project Description: Demo CAS Annex Building
Oakland CountyCounty:
780 Official Request #:
Project Number: 00081
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024
Name
Classification Overtime ProvisionDescription
Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
H H H H H H H D$44.64 $57.20 $69.76
MITA-RZ3-C1
Laborer Road Class 1: asphalt shoveler or loader, yard man, fence erector tender, dumper, joint filling, form setting, form stripper, pavement reinforcing, waterproofing, seal coating, bridge painting, sandblasting, pressure grouting, RC equipment
Y
8/9/2023
Apprentice Rates:
3,001-4,000 hours $43.38 $55.31 $67.24
2,001-3,000 hours $40.87 $51.54 $62.22
1,001-2,000 hours $39.62 $49.67 $59.72
0-1,000 hours $38.36 $47.78 $57.20
H H H H H H H D$44.85 $57.02 $69.68
MITA-RZ3-C2
Laborer Road Class 2: mixer operator, air or electric tool operator, spreader, boxman, concreter paddler, power chain saw operator, paving patch truck dumper, tunnel mucker, concrete saw operator, dry pack macine and roto-mill grounds person
Y
8/9/2023
Apprentice Rates:
3,001-4,000 hours $43.58 $55.11 $67.14
2,001-3,000 hours $41.05 $51.32 $62.08
1,001-2,000 hours $39.78 $49.41 $59.54
0-1,000 hours $38.52 $47.52 $57.02
H H H H H H H D$45.14 $57.95 $70.76
MITA-RZ3-C3
Laborer Road Class 3: tunnel miner, finish tenders, guard rail builder, median barrier installer, earth retention barrier and wall installer, fence erector, bottom man, powder man, wagon drill and air track operator, curb and side rail setter
Y
1/5/2022
Apprentice Rates:
3,001-4,000 hours $43.86 $56.03 $68.20
2,001-3,000 hours $41.30 $52.19 $63.08
1,001-2,000 hours $40.02 $50.27 $60.52
0-1,000 hours $38.74 $48.35 $57.96
Project Description: Demo CAS Annex Building
Oakland CountyCounty:
780 Official Request #:
Project Number: 00081
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024
Name
Classification Overtime ProvisionDescription
Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
H H H H H H H D$45.58 $58.61 $71.64
MITA-RZ3-C4
Laborer Road Class 4: asphalt raker Y
8/9/2023
Apprentice Rates:
3,001-4,000 hours $44.28 $56.66 $69.04
2,001-3,000 hours $41.67 $52.74 $63.82
1,001-2,000 hours $40.37 $50.80 $61.22
0-1,000 hours $39.07 $48.84 $58.62
H H H H H H H D$45.20 $58.04 $70.88
MITA-RZ3-C5
Laborer Road Class 5: pipe layers, oxy-gun Y
8/9/2023
Apprentice Rates:
3,001-4,000 hours $43.92 $56.12 $68.32
2,001-3,000 hours $41.35 $52.26 $63.18
1,001-2,000 hours $40.06 $50.33 $60.60
0-1,000 hours $38.78 $48.41 $58.04
H H H H H H H D$45.63 $58.69 $71.74
MITA-RZ3-C6
Laborer Road Class 6: line form setter for curb or pavement, asphalt screed checker/screw man on asphalt paving machines
Y
8/9/2023
Apprentice Rates:
3,001-4,000 hours $44.32 $56.72 $69.12
2,001-3,000 hours $41.71 $52.80 $63.90
1,001-2,000 hours $40.41 $50.86 $61.30
0-1,000 hours $39.10 $48.89 $58.68
H H H H H H H D$48.96 $63.18 $77.90
MITA-RZ3-C7
Laborer Road Class 7: concrete specialist - including finishing and trowling, cast in place or precast by any method
Y
1/5/2022
Apprentice Rates:
3,001-4,000 hours $47.49 $60.98 $74.96
2,001-3,000 hours $44.54 $56.55 $69.06
1,001-2,000 hours $43.07 $54.34 $66.12
0-1,000 hours $41.60 $52.14 $63.18
Requestor: Oakland University
Project Description: Demo CAS Annex Building
Oakland CountyCounty:
780 Official Request #:
Project Number: 00081
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024
Name
Classification Overtime ProvisionDescription
Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects
H H H H H H H D$44.64 $57.75 $70.86
MITA-RZ4-C1
Laborer Road Class 1: asphalt shoveler or loader, yard man, fence erector tender, dumper, joint filling, form setting, form stripper, pavement reinforcing, waterproofing, seal coating, bridge painting, sandblasting, pressure grouting, RC equipment
Y
8/15/2023
Apprentice Rates:
3,001-4,000 hours $43.33 $55.78 $68.24
2,001-3,000 hours $40.71 $51.86 $63.00
1,001-2,000 hours $39.40 $49.89 $60.38
0-1,000 hours $38.08 $47.91 $57.74
H H H H H H H D$44.75 $57.97 $71.18
MITA-RZ4-C2
Laborer Road Class 2: mixer operator, air or electric tool operator, spreader, boxman, concreter paddler, power chain saw operator, paving patch truck dumper, tunnel mucker, concrete saw operator, dry pack macine and roto-mill grounds person
Y
8/15/2023
Apprentice Rates:
3,001-4,000 hours $41.53 $53.14 $64.74
2,001-3,000 hours $39.09 $49.48 $59.86
1,001-2,000 hours $37.86 $47.63 $57.40
0-1,000 hours $36.64 $45.80 $54.96
H H H H H H H D$45.14 $58.50 $71.86
MITA-RZ4-C3
Laborer Road Class 3: tunnel miner, finish tenders, guard rail builder, median barrier installer, earth retention barrier and wall installer, fence erector, bottom man, powder man, wagon drill and air track operator, curb and side rail setter
Y
8/15/2023
Apprentice Rates:
3,001-4,000 hours $43.80 $56.49 $69.18
2,001-3,000 hours $41.13 $52.48 $63.84
1,001-2,000 hours $38.68 $51.32 $63.96
0-1,000 hours $38.46 $48.48 $58.50
Project Description: Demo CAS Annex Building
Oakland CountyCounty:
780 Official Request #:
Project Number: 00081
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024
Name
Classification Overtime ProvisionDescription
Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
H H H H H H H D$45.58 $59.16 $72.74
MITA-RZ4-C4
Laborer Road Class 4: asphalt raker Y
8/15/2023
Apprentice Rates:
3,001-4,000 hours $44.22 $57.12 $70.02
2,001-3,000 hours $41.51 $53.06 $64.60
1,001-2,000 hours $40.15 $51.02 $61.88
0-1,000 hours $38.79 $48.98 $59.16
H H H H H H H D$45.20 $58.59 $71.98
MITA-RZ4-C5
Laborer Road Class 5: pipe layers, oxy-gun Y
8/15/2023
Apprentice Rates:
3,001-4,000 hours $43.86 $56.58 $69.30
2,001-3,000 hours $41.18 $52.56 $63.94
1,001-2,000 hours $39.84 $50.55 $61.26
0-1,000 hours $38.50 $48.54 $58.58
H H H H H H H D$45.53 $59.14 $72.74
MITA-RZ4-C6
Laborer Road Class 6: line form setter for curb or pavement, asphalt screed checker/screw man on asphalt paving machines
Y
8/15/2023
Apprentice Rates:
3,001-4,000 hours $44.17 $57.10 $70.02
2,001-3,000 hours $41.45 $53.02 $64.58
1,001-2,000 hours $40.09 $50.98 $61.86
0-1,000 hours $38.73 $48.94 $59.14
H H H H H H H D$48.86 $64.13 $79.40
MITA-RZ4-C7
Laborer Road Class 7: concrete specialist - including finishing and trowling, cast in place or precast by any method
Y
8/15/2023
Apprentice Rates:
3,001-4,000 hours $47.33 $61.84 $76.34
2,001-3,000 hours $44.28 $57.26 $70.24
1,001-2,000 hours $42.75 $54.96 $67.18
0-1,000 hours $41.22 $52.67 $64.12
Requestor: Oakland University
Project Description: Demo CAS Annex Building
Oakland CountyCounty:
780 Official Request #:
Project Number: 00081
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024
Name
Classification Overtime ProvisionDescription
Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects
H H H X X X X D$50.60 $65.37 $80.13
MLDC
Asbestos & Lead Abatement Laborer 4 ten hour days @ straight time allowed Monday-Saturday, must be consecutive calendar days
Y
12/12/2023
Apprentice Rates:
Trainee 600 hours +1 year $34.07
Laborer - Hazardous
H H H H H H H D$46.90 $64.85 $82.80
LHAZ-Z2-A
Class A Laborer - performing work in conjunction with site preparation and other preliminary work prior to actual removal, handling, or containment of hazardous waste substances not requiring use of personal protective equipment required by state or feder
Y
8/9/2023
Apprentice Rates:
0-1,000 work hours $40.46 $55.19 $69.92
1,001-2,000 work hours $41.75 $57.13 $72.50
2,001-3,000 work hours $43.04 $59.07 $75.08
3,001-4,000 work hours $45.61 $62.92 $80.22
4 10s allowed M-Th or T-F; inclement weather makeup day Friday make up day allowedcomment
H H H H H H H D$47.90 $66.35 $84.80
LHAZ-Z2-B
Class B Laborer - performing work in conjunction with the removal, handling, or containment of hazardous waste substances when the use of personal protective equipment levels "A", "B" or "C" is required.
Y
8/9/2023
Apprentice Rates:
0-1,000 work hours $41.21 $56.32 $71.42
1,001-2,000 work hours $42.55 $58.33 $74.10
2,001-3,000 work hours $43.89 $60.34 $76.78
3,001-4,000 work hours $46.56 $64.35 $82.12
4 10s allowed M-Th or T-F; inclement weather makeup day Friday make up day allowedcomment
Requestor: Oakland University
Project Description: Demo CAS Annex Building
Oakland CountyCounty:
780 Official Request #:
Project Number: 00081
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024
Name
Classification Overtime ProvisionDescription
Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Laborer - Landscape
X X H X X X H D$32.40 $42.43 $52.95
LLAN-Z1-A
Class B1: Landscape Operator includes air, gas, and diesel equipment operator, lawn sprinkler installer,skidsteer, mini excavators, backhoe loaders, ride and walk behind trenchers, off road dump vehicle, articulated haulers, hydroseeder, wheel loaders
8/9/2023
X X H X X X H D$30.40 $39.93 $49.45
LLAN-Z1-B
Class B2: Skilled Landscape Laborer: small power tool operator, lawn sprinkler installers' tender, irrigation installers' tender, material mover
Laborer Underground - Tunnel, Shaft & Caisson
X X X X X X X D$41.17 $51.66 $62.14
LAUCT-Z1-1
Class I - Tunnel, shaft and caisson laborer, dump man, shanty man, hog house tender, testing man (on gas), and watchman.
Y
8/8/2023
Apprentice Rates:
0-1,000 work hours $34.45 $43.16 $51.85
1,001-2,000 work hours $36.54 $46.29 $56.03
2,001-3,000 work hours $37.57 $47.84 $58.09
3,001-4,000 work hours $39.64 $50.94 $62.23
X X X X X X X D$41.28 $51.82 $62.36
LAUCT-Z1-2
Class II - Manhole, headwall, catch basin builder, bricklayer tender, mortar man, material mixer, fence erector, and guard rail builder.
Y
8/8/2023
Apprentice Rates:
0-1,000 work hours $35.58 $44.85 $54.11
1,001-2,000 work hours $36.62 $46.41 $56.19
2,001-3,000 work hours $37.66 $47.97 $58.27
3,001-4,000 work hours $39.74 $51.09 $62.43
Project Description: Demo CAS Annex Building
Oakland CountyCounty:
780 Official Request #:
Project Number: 00081
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024
Name
Classification Overtime ProvisionDescription
Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
X X X X X X X D$41.34 $51.91 $62.48
LAUCT-Z1-3
Class III - Air tool operator (jack hammer man, bush hammer man and grinding man), first bottom man, second bottom man, cage tender, car pusher, carrier man, concrete man, concrete form man, concrete repair man, cement invert laborer, cement finisher, con
Y
8/8/2023
Apprentice Rates:
0-1,000 work hours $35.63 $44.92 $54.21
1,001-2,000 work hours $36.67 $46.48 $56.29
2,001-3,000 work hours $37.71 $48.04 $58.37
3,001-4,000 work hours $39.80 $51.18 $62.55
X X X X X X X D$41.52 $52.18 $62.84
LAUCT-Z1-4
Class IV - Tunnel, shaft and caisson mucker, bracer man, liner plate man, long haul dinky driver and well point man.
Y
8/8/2023
Apprentice Rates:
0-1,000 work hours $35.76 $45.12 $54.47
1,001-2,000 work hours $36.82 $46.71 $56.59
2,001-3,000 work hours $37.87 $48.28 $58.69
3,001-4,000 work hours $39.97 $51.44 $62.89
X X X X X X X D$41.77 $52.56 $63.34
LAUCT-Z1-5
Class V - Tunnel, shaft and caisson miner, drill runner, keyboard operator, power knife operator, reinforced steel or mesh man (e.g. wire mesh, steel mats, dowel bars)
Y
8/8/2023
Apprentice Rates:
0-1,000 work hours $35.95 $45.40 $54.85
1,001-2,000 work hours $37.02 $47.01 $56.99
2,001-3,000 work hours $38.08 $48.60 $59.11
3,001-4,000 work hours $40.21 $51.80 $63.37
Project Description: Demo CAS Annex Building
Oakland CountyCounty:
780 Official Request #:
Project Number: 00081
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024
Name
Classification Overtime ProvisionDescription
Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
X X X X X X X D$41.90 $54.33 $66.75
LAUCT-Z1-6
Class VI - Dynamite man and powder man. Y
8/8/2023
Apprentice Rates:
0-1,000 work hours $36.20 $45.78 $55.35
1,001-2,000 work hours $37.28 $47.40 $57.51
2,001-3,000 work hours $38.36 $49.02 $59.67
3,001-4,000 work hours $40.52 $52.26 $63.99
X X X X X X X D$35.58 $43.17 $50.76
LAUCT-Z1-7
Class VII - Restoration laborer, seeding, sodding, planting, cutting, mulching and topsoil grading and the restoration of property such as replacing mail boxes, wood chips, planter boxes and flagstones.
Y
8/8/2023
Apprentice Rates:
0-1,000 work hours $31.39 $38.56 $45.73
1,001-2,000 work hours $32.15 $39.70 $47.25
2,001-3,000 work hours $32.91 $40.84 $48.77
3,001-4,000 work hours $34.43 $43.12 $51.81
Laborer -Underground Open Cut, Class I
X X X X X X X D$36.91 $47.01 $57.10
LAUC-Z1-1
Construction Laborer Y
8/8/2023
Apprentice Rates:
0-1,000 work hours $35.39 $44.56 $53.73
1,001-2,000 work hours $36.42 $46.11 $55.79
2,001-3,000 work hours $37.44 $47.64 $57.83
3,001-4,000 work hours $39.49 $50.72 $61.93
Project Description: Demo CAS Annex Building
Oakland CountyCounty:
780 Official Request #:
Project Number: 00081
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024
Name
Classification Overtime ProvisionDescription
Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Laborer -Underground Open Cut, Class II
X X X X X X X D$37.05 $47.22 $57.38
LAUC-Z1-2
Mortar and material mixer, concrete form man, signal man, well point man, manhole, headwall and catch basin builder, guard rail builders, headwall, seawall, breakwall, dock builder and fence erector.
Y
8/8/2023
Apprentice Rates:
0-1,000 work hours $35.47 $44.68 $53.89
1,001-2,000 work hours $36.50 $46.23 $55.95
2,001-3,000 work hours $37.54 $47.79 $58.03
3,001-4,000 work hours $39.60 $50.88 $62.15
Laborer -Underground Open Cut, Class III
X X X X X X X D$40.68 $52.50 $64.31
LAUC-Z1-3
Air, gasoline and electric tool operator, vibrator operator, drillers, pump man, tar kettle operator, bracers, rodder, reinforced steel or mesh man (e.g. wire mesh, steel mats, dowel bars, etc.), cement finisher, welder, pipe jacking and boring man, wagon
Y
1/4/2022
Apprentice Rates:
0-1,000 work hours $35.51 $44.74 $53.97
1,001-2,000 work hours $36.54 $46.29 $56.03
2,001-3,000 work hours $37.58 $47.85 $58.11
3,001-4,000 work hours $39.65 $50.96 $62.25
Laborer -Underground Open Cut, Class IV
X X X X X X X D$40.76 $52.62 $64.47
LAUC-Z1-4
Trench or excavating grade man. Y
1/4/2022
Apprentice Rates:
0-1,000 work hours $35.57 $44.84 $54.09
1,001-2,000 work hours $36.61 $46.40 $56.17
2,001-3,000 work hours $37.65 $47.96 $58.25
3,001-4,000 work hours $39.72 $51.06 $62.39
Project Description: Demo CAS Annex Building
Oakland CountyCounty:
780 Official Request #:
Project Number: 00081
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024
Name
Classification Overtime ProvisionDescription
Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Laborer -Underground Open Cut, Class V
X X X X X X X D$40.82 $52.71 $64.59
LAUC-Z1-5
Pipe Layer (including crock, metal pipe, mulitplate or other conduits) Y
1/4/2022
Apprentice Rates:
0-1,000 work hours $35.62 $44.91 $54.19
1,001-2,000 work hours $36.66 $46.47 $56.27
2,001-3,000 work hours $37.70 $48.03 $58.35
3,001-4,000 work hours $39.78 $51.15 $62.51
Laborer -Underground Open Cut, Class VI
X X X X X X X D$38.27 $48.88 $59.49
LAUC-Z1-6
Grouting man, top man assistant, audio visual television operations and all other operations in connection with closed circuit television inspection, pipe cleaning and pipe relining work and the installation and repair of water service pipe and appurtenan
Y
1/4/2022
Apprentice Rates:
0-1,000 work hours $33.70 $42.03 $50.35
1,001-2,000 work hours $34.62 $43.41 $52.19
2,001-3,000 work hours $35.53 $44.78 $54.01
3,001-4,000 work hours $37.36 $47.52 $57.67
Laborer -Underground Open Cut, Class VII
X X X X X X X D$34.89 $43.81 $52.73
LAUC-Z1-7
Restoration laborer, seeding, sodding, planting, cutting, mulching and topsoil grading and the restoration of property such as replacing mail boxes, wood chips, planter boxes, flagstones etc.
Y
1/4/2022
Apprentice Rates:
0-1,000 work hours $31.17 $38.24 $45.29
1,001-2,000 work hours $31.91 $39.34 $46.77
2,001-3,000 work hours $32.66 $40.47 $48.27
3,001-4,000 work hours $34.15 $42.70 $51.25
Project Description: Demo CAS Annex Building
Oakland CountyCounty:
780 Official Request #:
Project Number: 00081
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024
Name
Classification Overtime ProvisionDescription
Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Landscape Laborer x H
X H X X x H D$34.62 $46.26 $57.89
LLAN-Z1-A
Class A: Irrigation Foremen and Construction Foremen. Y
1/10/2024
Lanscape Laborer
X X H X X X X D$34.62 $46.26 $57.89
LLAN-Z1
Class A: Irrigation Foremen and Construction Foremen. Y
Subdivision of county Zones 1 & 2
Lineman, Teledata Wireman
H H H X X X X D$38.78 $52.83 $66.87
IBE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .