OR780_Oakland University_Issued04.03.24.pdf

PDF 336 KB Posted

Attached to
RFP CAS Annex Demo
Solicitation number
00081
Issued by
Oakland County, Riverview City, Michigan

About this file

This document is an Official Road Builder and Commercial Prevailing Wage Rates document for State Funded Projects, issued by the State of Michigan on 4/3/2024 for Oakland University's Demo CAS Annex Building project in Oakland County. The document provides detailed prevailing wage rates for multiple trade classifications including laborers, operators, truck drivers, electricians, plumbers, pipefitters, and other construction-related workers. The contract must be awarded by 7/2/2024, and the document comprehensively lists straight hourly, time and a half, and double time rates for journeymen and apprentice levels across numerous job classifications, with most recent updates ranging from late 2021 to early 2024.

The wage rates document includes specific overtime provisions for each trade, with most classifications allowing overtime at time and a half for hours worked beyond standard rates and double time for hours exceeding certain thresholds. The rates are specifically tailored for state-funded projects and include detailed apprenticeship progression rates. Each trade's listing includes the last update date, indicating ongoing maintenance of wage standards. The document mandates that every contractor and subcontractor must post these wage rates conspicuously at the construction site, ensuring transparency and compliance with prevailing wage regulations for the demolition project at Oakland University.

View the file

Other files

File Type Posted
Addendum 2 - CAS Demo.pdf PDF
WHD-9918 FEB 9 2024.pdf PDF
CAS ANNEX DEMO PLANS.pdf PDF
Addendum 1 - CAS Demo.pdf PDF
sign in sheet.pdf PDF
All Utilities Map main Aug 2019 11x17.pdf PDF
CAS ANNEX DEMO - SPECIFIICATIONS.pdf.pdf PDF
Front End CAS Annex Demo.pdf PDF
WHD-9917 Feb 9 2024.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

State of Michigan

Requestor: Oakland University

Project Description: Demo CAS Annex Building

Oakland County

Official Request #: 780

Project Number: 00081

Straight Hourly

Time and a Half

Double Time

Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024

Name

Classification Overtime ProvisionDescription

Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

A Operator (0-6 months)

H H H X X X X D$38.27 $52.09 $65.91

IBEW 876 & IBEW 17 -

Teledata

Y

12/14/2023

Apprentice Rates:

Lineman (6th - 6 months) $35.61 $49.90 $64.18

Lineman (5th - 6 months) $33.06 $46.07 $59.08

Lineman (4th - 6 months) $30.53 $42.27 $54.02

Lineman (3rd - 6 months) $27.99 $38.47 $48.94

Lineman (2nd - 6 months) $25.45 $34.66 $43.86

Lineman (1st - 6 months) $22.91 $30.85 $38.78

A Operator (7-12 months)

H H H X X X X D$40.95 $55.96 $70.96

IBEW 876 & IBEW 17 -

Teledata

Y

12/14/2023

Apprentice Rates:

Lineman (6th - 6 months) $35.61 $49.90 $64.18

Lineman (5th - 6 months) $33.06 $46.07 $59.08

Lineman (4th - 6 months) $30.53 $42.27 $54.02

Lineman (3rd - 6 months) $27.99 $38.47 $48.94

Project Description: Demo CAS Annex Building

Oakland CountyCounty:

780 Official Request #:

Project Number: 00081

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .

Straight Hourly

Time and a Half

Double Time

Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024

Name

Classification Overtime ProvisionDescription

Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

A Operator (over 1 yr)

H H H X X X X D$45.81 $62.97 $80.12

IBEW 876 & IBEW 17 -

Teledata

Y

12/14/2023

Apprentice Rates:

Lineman (6th - 6 months) $35.61 $49.90 $64.18

Lineman (5th - 6 months) $33.06 $46.07 $59.08

Lineman (4th - 6 months) $30.53 $42.27 $54.02

Lineman (3rd - 6 months) $27.99 $38.47 $48.94

B Operator (0-6 months)

H H H X x X X D$34.25 $46.29 $58.33

IBEW 876 & IBEW 17 -

Teledata

Y

12/14/2023

Apprentice Rates:

Lineman (6th - 6 months) $35.61 $49.90 $64.18

Lineman (5th - 6 months) $33.06 $46.07 $59.08

Lineman (4th - 6 months) $30.53 $42.27 $54.02

Lineman (3rd - 6 months) $27.99 $38.47 $48.94

Project Description: Demo CAS Annex Building

Oakland CountyCounty:

780 Official Request #:

Project Number: 00081

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024

Name

Classification Overtime ProvisionDescription

Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

B Operator (over 6 months)

H H H X X X X D$39.35 $53.65 $67.94

IBEW 876 & IBEW 17 -

Teledata

Y

12/14/2023

Apprentice Rates:

Lineman (6th - 6 months) $35.61 $49.90 $64.18

Lineman (5th - 6 months) $33.06 $46.07 $59.08

Lineman (4th - 6 months) $30.53 $42.27 $54.02

Lineman (3rd - 6 months) $27.99 $38.47 $48.94

Boilermaker

H H H H H H H D$72.47 $107.55 $142.63

BO169

Boilermaker Y

12/13/2021

Apprentice Rates:

1st Period $53.53 $79.15 $104.75

2nd Period $55.14 $81.56 $107.97

3rd Period $56.73 $83.94 $111.15

4th Period $58.31 $86.31 $114.31

5th Period $59.85 $88.62 $117.39

6th Period $63.03 $93.39 $123.75

7th Period $66.17 $98.10 $130.03

8th Period $69.32 $102.83 $136.33

Project Description: Demo CAS Annex Building

Oakland CountyCounty:

780 Official Request #:

Project Number: 00081

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024

Name

Classification Overtime ProvisionDescription

Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

Bricklayer

H H H H H H H D$61.93 $92.90 $123.86

BR2-B

Bricklayer Y

12/3/2021

Apprentice Rates:

1st Period $40.60 $60.90 $81.20

2nd Period $42.47 $63.71 $84.94

3rd Period $44.33 $66.49 $88.66

4th Period $46.19 $69.29 $92.38

5th Period $48.05 $72.07 $96.10

6th Period $49.91 $74.87 $99.82

7th Period $51.78 $77.67 $103.56

8th Period $53.64 $80.46 $107.28

Cable spicer or COE foreman

H H H X X X X D$42.53 $58.24 $73.94

IBEW 876 & IBEW 17 -

Teledata

Y

1/10/2024

Apprentice Rates:

Lineman (6th - 6 months) $35.61 $49.90 $64.18

Lineman (5th - 6 months) $33.06 $46.07 $59.08

Lineman (4th - 6 months) $30.53 $42.27 $54.02

Lineman (3rd - 6 months) $27.99 $38.47 $48.94

Project Description: Demo CAS Annex Building

Oakland CountyCounty:

780 Official Request #:

Project Number: 00081

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024

Name

Classification Overtime ProvisionDescription

Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

Cable spicer, Central Office Employee

H H H X X X X D$40.71 $55.61 $70.51

IBEW 876 & IBEW 17 -

Teledata

Y

1/10/2024

Apprentice Rates:

Lineman (6th - 6 months) $35.61 $49.90 $64.18

Lineman (5th - 6 months) $33.06 $46.07 $59.08

Lineman (4th - 6 months) $30.53 $42.27 $54.02

Lineman (3rd - 6 months) $27.99 $38.47 $48.94

Carpenter

X X H H H H H D$59.04 $82.42 $105.80

CA1045

Carpet and Resilient Floor Layer, (does not include installation of prefabricated formica & parquet flooring which is to be paid carpenter rate)

N

8/4/2023

Apprentice Rates:

1st 6 months $30.46 $41.20 $51.93

2nd 6 months $34.04 $45.73 $57.44

3rd 6 months $36.52 $50.29 $64.05

4th 6 months $39.02 $54.04 $69.05

5th 6 months $41.52 $57.75 $74.05

6th 6 months $44.02 $61.54 $79.05

7th 6 months $46.53 $65.31 $84.07

8th 6 months $49.02 $67.72 $86.42

X X H H H H H D$65.99 $83.94 $101.89

CA-687-C-Z1

Journeyman-Diver Tender Y

3/14/2024

Project Description: Demo CAS Annex Building

Oakland CountyCounty:

780 Official Request #:

Project Number: 00081

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024

Name

Classification Overtime ProvisionDescription

Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

X X H X X H H D$65.99 $83.94 $101.89

CA687Z1

Carpenter 4-10s allowed Mon-Sat; double time due when over 12 hours worked per day

Y

8/4/2023

Apprentice Rates:

1st year $40.39 $50.27 $60.14

3rd 6 months $43.23 $54.00 $64.77

4th 6 months $46.08 $57.75 $69.42

5th 6 months $48.92 $61.49 $74.05

6th 6 months $51.78 $65.25 $78.71

7th 6 months $54.61 $68.97 $83.33

8th 6 months $57.47 $72.73 $87.99

Saturdays make up day allowedcomment

X X H X h

H H H D$65.99 $83.94 $101.89

CA687Z1P

Piledriver 4- 10s allowed Monday-Saturday; double time due when over 12 hours worked per day

Y

8/4/2023

Apprentice Rates:

1st 6 months $40.39 $50.27 $60.14

2nd 6 months $46.08 $57.75 $69.42

3rd 6 months $51.78 $65.25 $78.71

4th 6 months $57.47 $72.73 $87.99

Subdivision of county .

Saturday make up day allowedcomment

Cell Tower Tech

H H H X X X X D$38.78 $52.83 $66.87

IBEW 876 & IBEW 17 -

Teledata

Y

12/14/2023

Apprentice Rates:

Lineman (6th - 6 months) $35.61 $49.90 $64.18

Lineman (5th - 6 months) $33.06 $46.07 $59.08

Lineman (4th - 6 months) $30.53 $42.27 $54.02

Lineman (3rd - 6 months) $27.99 $38.47 $48.94

Lineman (2nd - 6 months) $25.45 $34.66 $43.86

Lineman (1st - 6 months) $22.91 $30.85 $38.78

Requestor: Oakland University

Project Description: Demo CAS Annex Building

Oakland CountyCounty:

780 Official Request #:

Project Number: 00081

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024

Name

Classification Overtime ProvisionDescription

Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

Cement Mason

X X H H H H H D$58.90 $84.12 $109.33

BR2-CM

Cement Mason Y

12/3/2021

Apprentice Rates:

1st Period $39.26 $54.86 $70.45

2nd Period $41.72 $58.55 $75.37

3rd Period $44.22 $62.30 $80.37

4th Period $46.73 $66.06 $85.39

5th Period $49.19 $69.75 $90.31

6th Period $51.71 $73.53 $95.35

H H D H H H H D$52.82 $74.60 $96.37

CE514-W

Cement Mason Y

11/29/2021

Apprentice Rates:

1st 6 Months $34.23 $46.71 $59.19

2nd 6 Months $36.30 $49.82 $63.33

3rd 6 Months $38.39 $52.95 $67.51

4th 6 Months $40.47 $56.07 $71.67

5th 6 Months $42.54 $59.18 $75.81

6th 6 Months $44.63 $62.31 $79.99

Communication Technician

H H H H H H H D$67.89 $98.24 $128.58

IBEW 876 & IBEW 17 -

Roadway

Y

12/14/2023

Project Description: Demo CAS Annex Building

Oakland CountyCounty:

780 Official Request #:

Project Number: 00081

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024

Name

Classification Overtime ProvisionDescription

Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

Diver

X X H X X H H D$76.40 $98.48 $120.55

CA 687 D

Diver 4-10s allowed M-Sat; double time due when over 12 hours worked per day

Y

8/3/2023

Apprentice Rates:

5th 6 mo $25.13

4th 6 mo $46.08 $57.75 $69.42

3rd 60 mo $43.23 $54.00 $64.77

1st/2nd 6 mo $40.39 $50.27 $60.14

Saturday make up day allowedcomment

Drywall

H H H H H H H D$51.86 $67.66 $83.46

CE514-DF

Drywall Finishers Y

12/9/2021

Apprentice Rates:

1st period $39.22 $48.70 $58.18

2nd period $40.80 $51.07 $61.34

3rd period $43.96 $55.81 $67.66

4th period $48.70 $62.92 $77.14

H H D H D D D D$45.91 $59.74 $73.56

PT-22-D

Drywall Taper Four 10s allowed Monday-Thursday Y

8/25/2016

Apprentice Rates:

First 3 months $32.08 $38.99 $45.90

Second 3 months $34.85 $43.14 $51.44

Second 6 months $37.62 $47.30 $56.98

Third 6 months $40.38 $51.44 $62.50

4th 6 months $41.76 $53.51 $65.26

Friday make-up day for bad weather or holidays make up day allowedcomment

Requestor: Oakland University

Project Description: Demo CAS Annex Building

Oakland CountyCounty:

780 Official Request #:

Project Number: 00081

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024

Name

Classification Overtime ProvisionDescription

Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

Electrician

H H H H H H H D$71.28 $98.14 $121.40

EC-58-IW

Inside Wireman N

10/25/2016

Apprentice Rates:

1st Period $45.69 $59.77 $70.23

2nd Period $48.01 $63.24 $74.87

3rd Period $50.34 $66.74 $79.53

4th Period $52.66 $70.22 $84.17

5th Period $54.99 $73.71 $88.83

6th Period $59.65 $80.70 $98.15

H H H H H H H D$44.79 $60.31 $75.82

EC-58-SC

Sound and Communication Installer Y

11/12/2021

Apprentice Rates:

Period 1 $29.28 $37.04 $44.79

Period 2 $30.84 $39.99 $48.72

Period 3 $32.38 $41.68 $50.99

Period 4 $33.94 $44.03 $54.11

Period 5 $35.48 $46.34 $57.19

Period 6 $37.04 $48.67 $60.31

H H H H H H H D$52.52 $71.89 $91.27

EC-58-SCT

Sound and Communication Technician I Y

11/12/2021

Elevator Constructor

D D D D D D D D$96.27 $151.73

EL 36

Elevator Constructor Mechanic Y

8/7/2007

Apprentice Rates:

1st Year Apprentice $70.42 $100.92

2nd Year Apprentice $75.97 $112.02

3rd Year Apprentice $78.74 $117.56

4th Year Apprentice $84.29 $128.66

Requestor: Oakland University

Project Description: Demo CAS Annex Building

Oakland CountyCounty:

780 Official Request #:

Project Number: 00081

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024

Name

Classification Overtime ProvisionDescription

Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects

Last Updated make up day allowed

Equipment Operator (line truck & man lifts)

H H H X X X X D$38.78 $52.83 $66.87

IBEW 876 & IBEW 17 -

Teledata

Y

12/14/2023

Apprentice Rates:

Lineman (6th - 6 months) $35.61 $49.90 $64.18

Lineman (5th - 6 months) $33.06 $46.07 $59.08

Lineman (4th - 6 months) $30.53 $42.27 $54.02

Lineman (3rd - 6 months) $27.99 $38.47 $48.94

Fiber Optic Splicer

H H H H H H H D$67.89 $98.24 $128.58

IBEW 876 & IBEW 17 -

Roadway

Foreman

H H H H H H H D$75.47 $109.61 $143.74

IBEW 876 & IBEW 17 -

Roadway

Project Description: Demo CAS Annex Building

Oakland CountyCounty:

780 Official Request #:

Project Number: 00081

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024

Name

Classification Overtime ProvisionDescription

Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

H H H X X X X D$41.34 $56.52 $71.69

IBEW 876 & IBEW 17 -

Teledata

Y

1/10/2024

Apprentice Rates:

Lineman (6th - 6 months) $35.61 $49.90 $64.18

Lineman (5th - 6 months) $33.06 $46.07 $59.08

Lineman (4th - 6 months) $30.53 $42.27 $54.02

Lineman (3rd - 6 months) $27.99 $38.47 $48.94

Lineman (2nd - 6 months) $25.45 $34.66 $43.86

Lineman (1st - 6 months) $22.91 $30.85 $38.78

Apprentice Rates:

Lineman (6th - 6 months) $35.61 $49.90 $64.18

Lineman (5th - 6 months) $33.06 $46.07 $59.08

Lineman (4th - 6 months) $30.53 $42.27 $54.02

Lineman (3rd - 6 months) $27.99 $38.47 $48.94

Glazier

H H H H H H H D$53.55 $70.10 $86.65

GL-357

Glazier If 4 10 hour day workweek is scheduled, four 10s must be consecutive, M-F.

Y

12/9/2021

Apprentice Rates:

1st 6 months $37.00 $45.27 $53.55

2nd 6 months $37.75 $46.40 $55.05

3rd 6 months $41.97 $52.73 $63.49

4th 6 months $43.62 $55.21 $66.79

5th 6 months $45.27 $57.68 $70.09

6th 6 months $46.93 $60.17 $73.41

7th 6 months $48.59 $62.66 $76.73

8th 6 months $51.89 $67.61 $83.33

Project Description: Demo CAS Annex Building

Oakland CountyCounty:

780 Official Request #:

Project Number: 00081

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024

Name

Classification Overtime ProvisionDescription

Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

Heat and Frost Insulator

H H H H H H H D$62.65 $78.41 $94.16

AS25

Heat and Frost Insulators and Asbestos Workers 4-10s must be worked a minimum of 2 weeks consecutively, Monday thru Thursday. Hours worked in excess of 10 will be paid at double time. Hours worked on the fifth day, Monday thru Friday @ time and half

Y

8/7/2023

Apprentice Rates:

1st Year $46.90 $54.78 $62.66

2nd Year $50.05 $59.50 $68.96

3rd Year $53.20 $64.23 $75.26

4th Year $56.35 $68.96 $81.56

Four 10s must be worked for a minimum of 2 consecutive weeks. OVERTIME is different on a four 10 week. OT is 2x for hours beyond 10. All hours on fifth day, M-F require time and one half. Sat first 8 hours, 1.5, all hours after 8 require double time.

comment

X X X H H H H H$25.29 $36.51

AS25S

Spray Insulation N

6/2/2016

Installer - Repairman

H H H X X X X D$38.78 $52.83 $66.87

IBEW 876 & IBEW 17 -

Teledata

Y

12/14/2023

Apprentice Rates:

Lineman (6th - 6 months) $35.61 $49.90 $64.18

Lineman (5th - 6 months) $33.06 $46.07 $59.08

Lineman (4th - 6 months) $30.53 $42.27 $54.02

Lineman (3rd - 6 months) $27.99 $38.47 $48.94

Project Description: Demo CAS Annex Building

Oakland CountyCounty:

780 Official Request #:

Project Number: 00081

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024

Name

Classification Overtime ProvisionDescription

Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

Ironworker

H H D H H D D D$69.51 $85.85 $102.19

IR-25-RF

Reinforced Iron Work N

8/15/2023

Apprentice Rates:

Level 8 $66.76 $82.48 $98.19

Level 7 $66.76 $82.48 $98.19

Level 1 $52.63 $64.23 $75.83

Level 2 $54.68 $66.77 $78.86

Level 3 $56.56 $68.98 $81.40

Level 4 $59.41 $72.65 $85.88

Level 5 $62.27 $76.32 $90.37

Level 6 $66.76 $82.48 $98.19 make up day allowed

H H D H H H D D$76.08 $92.93 $109.78

IR-25-RIG

Rigging Work N

8/15/2023

Apprentice Rates:

Level 8 $69.43 $84.94 $100.45

Level 1 $51.75 $62.38 $73.01

Level 2 $52.56 $63.54 $74.52

Level 3 $54.83 $66.33 $77.83

Level 4 $57.51 $69.71 $81.91

Level 5 $60.60 $73.67 $86.74

Level 6 $63.27 $77.04 $90.80

Level 7 $66.35 $80.99 $95.62

Project Description: Demo CAS Annex Building

Oakland CountyCounty:

780 Official Request #:

Project Number: 00081

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024

Name

Classification Overtime ProvisionDescription

Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

H H D H H H D D$76.21 $102.75 $129.29

IR-25-STR

Structural, ornamental, welder and pre-cast If bad weather, Friday may be a make up day. If holiday celebrated on a Monday, 4 10s may be worked Tuesday thru Friday.

Y

8/15/2023

Apprentice Rates:

Level 8 $69.43 $84.94 $100.45

Level 1 $51.25 $61.88 $72.51

Level 2 $52.56 $63.54 $74.52

Level 3 $54.83 $66.33 $77.83

Level 4 $57.51 $70.34 $83.17

Level 5 $60.60 $73.67 $86.74

Level 6 $63.27 $77.04 $90.80

Level 7 $66.35 $80.98 $95.62 make up day allowed

Journeyman Signal Technician

H H H H H H H D$67.89 $98.24 $128.58

IBEW 876 & IBEW 17 -

Roadway

Journeyman Specialist

H H H H H H H D$76.98 $111.87 $146.76

IBEW 876 & IBEW 17 -

Roadway

Labor Crew Foreman

H H H H H H H D$61.86 $89.19 $116.52

IBEW 876 & IBEW 17 -

Roadway

Project Description: Demo CAS Annex Building

Oakland CountyCounty:

780 Official Request #:

Project Number: 00081

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024

Name

Classification Overtime ProvisionDescription

Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

Laborer

H H H H H H H D$50.40 $64.93 $79.45

L1076-A-B

Signal man (on sewer & caisson work); air,electric or gasoline tool operator (including concrete vibrator operator,acetylene torch & air hammer operator); scaffold builder, caisson worker

Y

8/15/2023

Saturday make up day allowedcomment

H H H H H H H D$50.96 $65.77 $80.57

L1076-A-C

Lansing Burner, Blaster & Powder Man; Air, electric Gasoline Tool Operator (Blast furnace work or battery work)

Y

8/15/2023

Saturday, If conditions beyond the employer/employee's control prevent one or more hours of working during Mon-Fri, the employer may choose to work up to 10 hour straight time weekdays.

make up day allowedcomment

H H H H H H H D$50.67 $65.33 $79.99

L1076-A-D

Furnance battery heater tender, burning bar & oxy-acetylene gun Y

8/15/2023

Saturday make up day allowedcomment

H H H H H H H D$44.65 $56.30 $67.95

L1076-A-E

Cleaner/sweeper laborer, furniture laborer Y

8/15/2023

Saturday make up day allowedcomment

H H H H H H H D$51.51 $66.69 $81.87

L1076-A-F

Expediter man, topman and/or bottom man (blast furnace work or battery work)

Y

8/15/2023

Saturday comment

H H H H H H H D$46.90 $59.78 $72.65

L1076-A-W

Laborer -Wall and ceiling material handler, plasterer tender, mortar mixer and plastering machine operator

Y

7/28/2023

Apprentice Rates:

0-1,000 Hours $40.46 $55.20 $69.93

1,001-2,000 Hours $41.75 $57.13 $72.50

2,001-3,000 Hours $43.04 $59.06 $75.08

3,001-4,000 Hours $45.61 $62.92 $80.23

Requestor: Oakland University

Project Description: Demo CAS Annex Building

Oakland CountyCounty:

780 Official Request #:

Project Number: 00081

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024

Name

Classification Overtime ProvisionDescription

Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

Saturday make up day due to conditions beyond control or holiday make up day allowedcomment

H H H H H H H D$47.44 $61.38 $75.31

MITA-RZ1-C1

Laborer Road Class 1: asphalt shoveler or loader, yard man, fence erector tender, dumper, joint filling, form setting, form stripper, pavement reinforcing, waterproofing, seal coating, bridge painting, sandblasting, pressure grouting, RC equipment

Y

8/9/2023

Apprentice Rates:

3,001-4,000 hours $46.05 $59.29 $72.53

2,001-3,000 $43.26 $55.11 $66.95

1,001-2,000 hours $41.87 $53.02 $64.17

0-1,000 hours $40.47 $50.92 $61.37

Apprentice Rates:

3,001-4,000 hours $46.05 $59.29 $72.53

2,001-3,000 $43.26 $55.11 $66.95

1,001-2,000 hours $41.87 $53.02 $64.17

0-1,000 hours $40.47 $50.92 $61.37

H H H H H H H D$47.57 $61.57 $75.57

MITA-RZ1-C2

Laborer Road Class 2: mixer operator, air or electric tool operator, spreader, boxman, concreter paddler, power chain saw operator, paving patch truck dumper, tunnel mucker, concrete saw operator, dry pack macine and roto-mill grounds person

Y

1/5/2022

Apprentice Rates:

3,001-4,000 hours $46.17 $59.47 $72.77

2,001-3,000 hours $43.37 $55.27 $67.17

1,001-2,000 hours $41.97 $53.17 $64.37

0-1,000 hours $40.57 $51.07 $61.57

Apprentice Rates:

3,001-4,000 hours $46.17 $59.47 $72.77

2,001-3,000 hours $43.37 $55.27 $67.17

1,001-2,000 hours $41.97 $53.17 $64.37

0-1,000 hours $40.57 $51.07 $61.57

Project Description: Demo CAS Annex Building

Oakland CountyCounty:

780 Official Request #:

Project Number: 00081

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024

Name

Classification Overtime ProvisionDescription

Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

H H H H H H H D$47.75 $61.84 $75.93

MITA-RZ1-C3

Laborer Road Class 3: tunnel miner, finish tenders, guard rail builder, median barrier installer, earth retention barrier and wall installer, fence erector, bottom man, powder man, wagon drill and air track operator, curb and side rail setter

Y

8/9/2023

Apprentice Rates:

3,001-4,000 hours $46.34 $59.73 $73.11

2,001-3,000 hours $43.52 $55.49 $67.47

1,001-2,000 hours $42.11 $53.38 $64.65

0-1,000 hours $40.71 $51.28 $61.85

Apprentice Rates:

3,001-4,000 hours $46.34 $59.73 $73.11

2,001-3,000 hours $43.52 $55.49 $67.47

1,001-2,000 hours $42.11 $53.38 $64.65

0-1,000 hours $40.71 $51.28 $61.85

H H H H H H H D$47.83 $61.46 $75.59

MITA-RZ1-C4

Laborer Road Class 4: asphalt raker Y

8/9/2023

Apprentice Rates:

3,001-4,000 hours $46.42 $59.35 $72.77

2,001-3,000 hours $43.59 $55.10 $67.11

1,001-2,000 hours $42.18 $52.99 $64.29

0-1,000 hours $40.77 $50.87 $61.47

Apprentice Rates:

3,001-4,000 hours $46.42 $59.35 $72.77

2,001-3,000 hours $43.59 $55.10 $67.11

1,001-2,000 hours $42.18 $52.99 $64.29

0-1,000 hours $40.77 $50.87 $61.47

Project Description: Demo CAS Annex Building

Oakland CountyCounty:

780 Official Request #:

Project Number: 00081

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024

Name

Classification Overtime ProvisionDescription

Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

H H H H H H H D$48.04 $62.28 $76.51

MITA-RZ1-C5

Laborer Road Class 5: pipe layers, oxy-gun Y

8/9/2023

Apprentice Rates:

3,001-4,000 hours $46.62 $60.15 $73.67

2,001-3,000 hours $43.77 $55.87 $67.97

1,001-2,000 hours $42.35 $53.74 $65.13

0-1,000 hours $40.92 $51.59 $62.27

Apprentice Rates:

3,001-4,000 hours $46.62 $60.15 $73.67

2,001-3,000 hours $43.77 $55.87 $67.97

1,001-2,000 hours $42.35 $53.74 $65.13

0-1,000 hours $40.92 $51.59 $62.27

H H H H H H H D$48.34 $62.73 $77.11

MITA-RZ1-C6

Laborer Road Class 6: line form setter for curb or pavement, asphalt screed checker/screw man on asphalt paving machines

Y

8/9/2023

Apprentice Rates:

3,001-4,000 hours $46.90 $60.57 $74.23

2,001-3,000 hours $44.02 $56.25 $68.47

1,001-2,000 hours $42.59 $54.10 $65.61

0-1,000 hours $41.15 $51.94 $62.73

Apprentice Rates:

3,001-4,000 hours $46.90 $60.57 $74.23

2,001-3,000 hours $44.02 $56.25 $68.47

1,001-2,000 hours $42.59 $54.10 $65.61

0-1,000 hours $41.15 $51.94 $62.73

Project Description: Demo CAS Annex Building

Oakland CountyCounty:

780 Official Request #:

Project Number: 00081

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024

Name

Classification Overtime ProvisionDescription

Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

H H H H H H H D$49.41 $64.33 $79.25

MITA-RZ1-C7

Laborer Road Class 7: concrete specialist - including finishing and trowling, cast in place or precast by any method

Y

8/9/2023

Apprentice Rates:

2,001-3,000 hours $44.93 $57.61 $70.29

3,001-4,000 hours $46.70 $63.10 $79.50

1,001-2,000 hours $43.44 $55.37 $67.31

0-1,000 hours $41.95 $53.14 $64.33

Apprentice Rates:

2,001-3,000 hours $44.93 $57.61 $70.29

3,001-4,000 hours $46.70 $63.10 $79.50

1,001-2,000 hours $43.44 $55.37 $67.31

0-1,000 hours $41.95 $53.14 $64.33

H H H H H H H D$45.39 $58.38 $71.36

MITA-RZ2-C1

Laborer Road Class 1: asphalt shoveler or loader, yard man, fence erector tender, dumper, joint filling, form setting, form stripper, pavement reinforcing, waterproofing, seal coating, bridge painting, sandblasting, pressure grouting, RC equipment

Y

8/9/2023

Apprentice Rates:

3,001-4,000 hours

2,001-3,000 hours

1,001-2,000 hours

0-1,000 hours

3,001-4,000 hours $44.09 $56.42 $68.76

2,001-3,000 hours $41.49 $52.52 $63.56

1,001-2,000 hours $40.20 $50.59 $60.98

0-1,000 hours $38.90 $48.64 $58.38

Project Description: Demo CAS Annex Building

Oakland CountyCounty:

780 Official Request #:

Project Number: 00081

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024

Name

Classification Overtime ProvisionDescription

Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

H H H H H H H D$45.59 $58.18 $71.26

MITA-RZ2-C2

Laborer Road Class 2: mixer operator, air or electric tool operator, spreader, boxman, concreter paddler, power chain saw operator, paving patch truck dumper, tunnel mucker, concrete saw operator, dry pack macine and roto-mill grounds person

Y

8/9/2023

Apprentice Rates:

3,001-4,000 hours $44.28 $56.21 $68.64

2,001-3,000 hours $41.66 $52.28 $63.40

1,001-2,000 hours $40.36 $50.33 $60.80

0-1,000 hours $39.05 $48.36 $58.18

H H H H H H H D$45.43 $58.64 $71.84

MITA-RZ2-C3

Laborer Road Class 3: tunnel miner, finish tenders, guard rail builder, median barrier installer, earth retention barrier and wall installer, fence erector, bottom man, powder man, wagon drill and air track operator, curb and side rail setter

Y

1/5/2022

Apprentice Rates:

3,001-4,000 hours $44.11 $56.66 $69.20

2,001-3,000 hours $41.47 $52.70 $63.92

1,001-2,000 hours $40.15 $50.72 $61.28

0-1,000 hours $38.83 $48.74 $58.64

H H H H H H H D$46.18 $59.56 $72.94

MITA-RZ2-C4

Laborer Road Class 4: asphalt raker Y

8/9/2023

Apprentice Rates:

3,001-4,000 hours $44.84 $57.55 $70.26

2,001-3,000 hours $42.17 $53.54 $64.92

1,001-2,000 hours $40.83 $51.54 $62.24

0-1,000 hours $39.49 $49.52 $59.56

Project Description: Demo CAS Annex Building

Oakland CountyCounty:

780 Official Request #:

Project Number: 00081

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024

Name

Classification Overtime ProvisionDescription

Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

H H H H H H H D$46.05 $59.37 $72.68

MITA-RZ2-C5

Laborer Road Class 5: pipe layers, oxy-gun Y

8/9/2023

Apprentice Rates:

3,001-4,000 hours $44.72 $57.37 $70.02

2,001-3,000 hours $42.06 $53.38 $64.70

1,001-2,000 hours $40.72 $51.37 $62.02

0-1,000 hours $39.39 $49.38 $59.36

H H H H H H H D$46.39 $59.88 $73.36

MITA-RZ2-C6

Laborer Road Class 6: line form setter for curb or pavement, asphalt screed checker/screw man on asphalt paving machines

Y

8/9/2023

Apprentice Rates:

3,001-4,000 hours $45.04 $57.85 $70.66

2,001-3,000 hours $42.34 $53.80 $65.26

1,001-2,000 hours $41.00 $51.79 $62.58

0-1,000 hours $39.65 $49.76 $59.88

H H H H H H H D$48.96 $63.73 $78.50

MITA-RZ2-C7

Laborer Road Class 7: concrete specialist - including finishing and trowling, cast in place or precast by any method

Y

1/5/2022

Apprentice Rates:

3,001-4,000 hours $47.48 $61.51 $75.54

2,001-3,000 hours $44.53 $57.08 $69.64

1,001-2,000 hours $43.05 $54.86 $66.68

0-1,000 hours $41.58 $52.66 $63.74

Project Description: Demo CAS Annex Building

Oakland CountyCounty:

780 Official Request #:

Project Number: 00081

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024

Name

Classification Overtime ProvisionDescription

Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

H H H H H H H D$44.64 $57.20 $69.76

MITA-RZ3-C1

Laborer Road Class 1: asphalt shoveler or loader, yard man, fence erector tender, dumper, joint filling, form setting, form stripper, pavement reinforcing, waterproofing, seal coating, bridge painting, sandblasting, pressure grouting, RC equipment

Y

8/9/2023

Apprentice Rates:

3,001-4,000 hours $43.38 $55.31 $67.24

2,001-3,000 hours $40.87 $51.54 $62.22

1,001-2,000 hours $39.62 $49.67 $59.72

0-1,000 hours $38.36 $47.78 $57.20

H H H H H H H D$44.85 $57.02 $69.68

MITA-RZ3-C2

Laborer Road Class 2: mixer operator, air or electric tool operator, spreader, boxman, concreter paddler, power chain saw operator, paving patch truck dumper, tunnel mucker, concrete saw operator, dry pack macine and roto-mill grounds person

Y

8/9/2023

Apprentice Rates:

3,001-4,000 hours $43.58 $55.11 $67.14

2,001-3,000 hours $41.05 $51.32 $62.08

1,001-2,000 hours $39.78 $49.41 $59.54

0-1,000 hours $38.52 $47.52 $57.02

H H H H H H H D$45.14 $57.95 $70.76

MITA-RZ3-C3

Laborer Road Class 3: tunnel miner, finish tenders, guard rail builder, median barrier installer, earth retention barrier and wall installer, fence erector, bottom man, powder man, wagon drill and air track operator, curb and side rail setter

Y

1/5/2022

Apprentice Rates:

3,001-4,000 hours $43.86 $56.03 $68.20

2,001-3,000 hours $41.30 $52.19 $63.08

1,001-2,000 hours $40.02 $50.27 $60.52

0-1,000 hours $38.74 $48.35 $57.96

Project Description: Demo CAS Annex Building

Oakland CountyCounty:

780 Official Request #:

Project Number: 00081

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024

Name

Classification Overtime ProvisionDescription

Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

H H H H H H H D$45.58 $58.61 $71.64

MITA-RZ3-C4

Laborer Road Class 4: asphalt raker Y

8/9/2023

Apprentice Rates:

3,001-4,000 hours $44.28 $56.66 $69.04

2,001-3,000 hours $41.67 $52.74 $63.82

1,001-2,000 hours $40.37 $50.80 $61.22

0-1,000 hours $39.07 $48.84 $58.62

H H H H H H H D$45.20 $58.04 $70.88

MITA-RZ3-C5

Laborer Road Class 5: pipe layers, oxy-gun Y

8/9/2023

Apprentice Rates:

3,001-4,000 hours $43.92 $56.12 $68.32

2,001-3,000 hours $41.35 $52.26 $63.18

1,001-2,000 hours $40.06 $50.33 $60.60

0-1,000 hours $38.78 $48.41 $58.04

H H H H H H H D$45.63 $58.69 $71.74

MITA-RZ3-C6

Laborer Road Class 6: line form setter for curb or pavement, asphalt screed checker/screw man on asphalt paving machines

Y

8/9/2023

Apprentice Rates:

3,001-4,000 hours $44.32 $56.72 $69.12

2,001-3,000 hours $41.71 $52.80 $63.90

1,001-2,000 hours $40.41 $50.86 $61.30

0-1,000 hours $39.10 $48.89 $58.68

H H H H H H H D$48.96 $63.18 $77.90

MITA-RZ3-C7

Laborer Road Class 7: concrete specialist - including finishing and trowling, cast in place or precast by any method

Y

1/5/2022

Apprentice Rates:

3,001-4,000 hours $47.49 $60.98 $74.96

2,001-3,000 hours $44.54 $56.55 $69.06

1,001-2,000 hours $43.07 $54.34 $66.12

0-1,000 hours $41.60 $52.14 $63.18

Requestor: Oakland University

Project Description: Demo CAS Annex Building

Oakland CountyCounty:

780 Official Request #:

Project Number: 00081

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024

Name

Classification Overtime ProvisionDescription

Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects

H H H H H H H D$44.64 $57.75 $70.86

MITA-RZ4-C1

Laborer Road Class 1: asphalt shoveler or loader, yard man, fence erector tender, dumper, joint filling, form setting, form stripper, pavement reinforcing, waterproofing, seal coating, bridge painting, sandblasting, pressure grouting, RC equipment

Y

8/15/2023

Apprentice Rates:

3,001-4,000 hours $43.33 $55.78 $68.24

2,001-3,000 hours $40.71 $51.86 $63.00

1,001-2,000 hours $39.40 $49.89 $60.38

0-1,000 hours $38.08 $47.91 $57.74

H H H H H H H D$44.75 $57.97 $71.18

MITA-RZ4-C2

Laborer Road Class 2: mixer operator, air or electric tool operator, spreader, boxman, concreter paddler, power chain saw operator, paving patch truck dumper, tunnel mucker, concrete saw operator, dry pack macine and roto-mill grounds person

Y

8/15/2023

Apprentice Rates:

3,001-4,000 hours $41.53 $53.14 $64.74

2,001-3,000 hours $39.09 $49.48 $59.86

1,001-2,000 hours $37.86 $47.63 $57.40

0-1,000 hours $36.64 $45.80 $54.96

H H H H H H H D$45.14 $58.50 $71.86

MITA-RZ4-C3

Laborer Road Class 3: tunnel miner, finish tenders, guard rail builder, median barrier installer, earth retention barrier and wall installer, fence erector, bottom man, powder man, wagon drill and air track operator, curb and side rail setter

Y

8/15/2023

Apprentice Rates:

3,001-4,000 hours $43.80 $56.49 $69.18

2,001-3,000 hours $41.13 $52.48 $63.84

1,001-2,000 hours $38.68 $51.32 $63.96

0-1,000 hours $38.46 $48.48 $58.50

Project Description: Demo CAS Annex Building

Oakland CountyCounty:

780 Official Request #:

Project Number: 00081

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024

Name

Classification Overtime ProvisionDescription

Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

H H H H H H H D$45.58 $59.16 $72.74

MITA-RZ4-C4

Laborer Road Class 4: asphalt raker Y

8/15/2023

Apprentice Rates:

3,001-4,000 hours $44.22 $57.12 $70.02

2,001-3,000 hours $41.51 $53.06 $64.60

1,001-2,000 hours $40.15 $51.02 $61.88

0-1,000 hours $38.79 $48.98 $59.16

H H H H H H H D$45.20 $58.59 $71.98

MITA-RZ4-C5

Laborer Road Class 5: pipe layers, oxy-gun Y

8/15/2023

Apprentice Rates:

3,001-4,000 hours $43.86 $56.58 $69.30

2,001-3,000 hours $41.18 $52.56 $63.94

1,001-2,000 hours $39.84 $50.55 $61.26

0-1,000 hours $38.50 $48.54 $58.58

H H H H H H H D$45.53 $59.14 $72.74

MITA-RZ4-C6

Laborer Road Class 6: line form setter for curb or pavement, asphalt screed checker/screw man on asphalt paving machines

Y

8/15/2023

Apprentice Rates:

3,001-4,000 hours $44.17 $57.10 $70.02

2,001-3,000 hours $41.45 $53.02 $64.58

1,001-2,000 hours $40.09 $50.98 $61.86

0-1,000 hours $38.73 $48.94 $59.14

H H H H H H H D$48.86 $64.13 $79.40

MITA-RZ4-C7

Laborer Road Class 7: concrete specialist - including finishing and trowling, cast in place or precast by any method

Y

8/15/2023

Apprentice Rates:

3,001-4,000 hours $47.33 $61.84 $76.34

2,001-3,000 hours $44.28 $57.26 $70.24

1,001-2,000 hours $42.75 $54.96 $67.18

0-1,000 hours $41.22 $52.67 $64.12

Requestor: Oakland University

Project Description: Demo CAS Annex Building

Oakland CountyCounty:

780 Official Request #:

Project Number: 00081

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024

Name

Classification Overtime ProvisionDescription

Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects

H H H X X X X D$50.60 $65.37 $80.13

MLDC

Asbestos & Lead Abatement Laborer 4 ten hour days @ straight time allowed Monday-Saturday, must be consecutive calendar days

Y

12/12/2023

Apprentice Rates:

Trainee 600 hours +1 year $34.07

Laborer - Hazardous

H H H H H H H D$46.90 $64.85 $82.80

LHAZ-Z2-A

Class A Laborer - performing work in conjunction with site preparation and other preliminary work prior to actual removal, handling, or containment of hazardous waste substances not requiring use of personal protective equipment required by state or feder

Y

8/9/2023

Apprentice Rates:

0-1,000 work hours $40.46 $55.19 $69.92

1,001-2,000 work hours $41.75 $57.13 $72.50

2,001-3,000 work hours $43.04 $59.07 $75.08

3,001-4,000 work hours $45.61 $62.92 $80.22

4 10s allowed M-Th or T-F; inclement weather makeup day Friday make up day allowedcomment

H H H H H H H D$47.90 $66.35 $84.80

LHAZ-Z2-B

Class B Laborer - performing work in conjunction with the removal, handling, or containment of hazardous waste substances when the use of personal protective equipment levels "A", "B" or "C" is required.

Y

8/9/2023

Apprentice Rates:

0-1,000 work hours $41.21 $56.32 $71.42

1,001-2,000 work hours $42.55 $58.33 $74.10

2,001-3,000 work hours $43.89 $60.34 $76.78

3,001-4,000 work hours $46.56 $64.35 $82.12

4 10s allowed M-Th or T-F; inclement weather makeup day Friday make up day allowedcomment

Requestor: Oakland University

Project Description: Demo CAS Annex Building

Oakland CountyCounty:

780 Official Request #:

Project Number: 00081

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024

Name

Classification Overtime ProvisionDescription

Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

Laborer - Landscape

X X H X X X H D$32.40 $42.43 $52.95

LLAN-Z1-A

Class B1: Landscape Operator includes air, gas, and diesel equipment operator, lawn sprinkler installer,skidsteer, mini excavators, backhoe loaders, ride and walk behind trenchers, off road dump vehicle, articulated haulers, hydroseeder, wheel loaders

8/9/2023

X X H X X X H D$30.40 $39.93 $49.45

LLAN-Z1-B

Class B2: Skilled Landscape Laborer: small power tool operator, lawn sprinkler installers' tender, irrigation installers' tender, material mover

Laborer Underground - Tunnel, Shaft & Caisson

X X X X X X X D$41.17 $51.66 $62.14

LAUCT-Z1-1

Class I - Tunnel, shaft and caisson laborer, dump man, shanty man, hog house tender, testing man (on gas), and watchman.

Y

8/8/2023

Apprentice Rates:

0-1,000 work hours $34.45 $43.16 $51.85

1,001-2,000 work hours $36.54 $46.29 $56.03

2,001-3,000 work hours $37.57 $47.84 $58.09

3,001-4,000 work hours $39.64 $50.94 $62.23

X X X X X X X D$41.28 $51.82 $62.36

LAUCT-Z1-2

Class II - Manhole, headwall, catch basin builder, bricklayer tender, mortar man, material mixer, fence erector, and guard rail builder.

Y

8/8/2023

Apprentice Rates:

0-1,000 work hours $35.58 $44.85 $54.11

1,001-2,000 work hours $36.62 $46.41 $56.19

2,001-3,000 work hours $37.66 $47.97 $58.27

3,001-4,000 work hours $39.74 $51.09 $62.43

Project Description: Demo CAS Annex Building

Oakland CountyCounty:

780 Official Request #:

Project Number: 00081

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024

Name

Classification Overtime ProvisionDescription

Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

X X X X X X X D$41.34 $51.91 $62.48

LAUCT-Z1-3

Class III - Air tool operator (jack hammer man, bush hammer man and grinding man), first bottom man, second bottom man, cage tender, car pusher, carrier man, concrete man, concrete form man, concrete repair man, cement invert laborer, cement finisher, con

Y

8/8/2023

Apprentice Rates:

0-1,000 work hours $35.63 $44.92 $54.21

1,001-2,000 work hours $36.67 $46.48 $56.29

2,001-3,000 work hours $37.71 $48.04 $58.37

3,001-4,000 work hours $39.80 $51.18 $62.55

X X X X X X X D$41.52 $52.18 $62.84

LAUCT-Z1-4

Class IV - Tunnel, shaft and caisson mucker, bracer man, liner plate man, long haul dinky driver and well point man.

Y

8/8/2023

Apprentice Rates:

0-1,000 work hours $35.76 $45.12 $54.47

1,001-2,000 work hours $36.82 $46.71 $56.59

2,001-3,000 work hours $37.87 $48.28 $58.69

3,001-4,000 work hours $39.97 $51.44 $62.89

X X X X X X X D$41.77 $52.56 $63.34

LAUCT-Z1-5

Class V - Tunnel, shaft and caisson miner, drill runner, keyboard operator, power knife operator, reinforced steel or mesh man (e.g. wire mesh, steel mats, dowel bars)

Y

8/8/2023

Apprentice Rates:

0-1,000 work hours $35.95 $45.40 $54.85

1,001-2,000 work hours $37.02 $47.01 $56.99

2,001-3,000 work hours $38.08 $48.60 $59.11

3,001-4,000 work hours $40.21 $51.80 $63.37

Project Description: Demo CAS Annex Building

Oakland CountyCounty:

780 Official Request #:

Project Number: 00081

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024

Name

Classification Overtime ProvisionDescription

Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

X X X X X X X D$41.90 $54.33 $66.75

LAUCT-Z1-6

Class VI - Dynamite man and powder man. Y

8/8/2023

Apprentice Rates:

0-1,000 work hours $36.20 $45.78 $55.35

1,001-2,000 work hours $37.28 $47.40 $57.51

2,001-3,000 work hours $38.36 $49.02 $59.67

3,001-4,000 work hours $40.52 $52.26 $63.99

X X X X X X X D$35.58 $43.17 $50.76

LAUCT-Z1-7

Class VII - Restoration laborer, seeding, sodding, planting, cutting, mulching and topsoil grading and the restoration of property such as replacing mail boxes, wood chips, planter boxes and flagstones.

Y

8/8/2023

Apprentice Rates:

0-1,000 work hours $31.39 $38.56 $45.73

1,001-2,000 work hours $32.15 $39.70 $47.25

2,001-3,000 work hours $32.91 $40.84 $48.77

3,001-4,000 work hours $34.43 $43.12 $51.81

Laborer -Underground Open Cut, Class I

X X X X X X X D$36.91 $47.01 $57.10

LAUC-Z1-1

Construction Laborer Y

8/8/2023

Apprentice Rates:

0-1,000 work hours $35.39 $44.56 $53.73

1,001-2,000 work hours $36.42 $46.11 $55.79

2,001-3,000 work hours $37.44 $47.64 $57.83

3,001-4,000 work hours $39.49 $50.72 $61.93

Project Description: Demo CAS Annex Building

Oakland CountyCounty:

780 Official Request #:

Project Number: 00081

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024

Name

Classification Overtime ProvisionDescription

Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

Laborer -Underground Open Cut, Class II

X X X X X X X D$37.05 $47.22 $57.38

LAUC-Z1-2

Mortar and material mixer, concrete form man, signal man, well point man, manhole, headwall and catch basin builder, guard rail builders, headwall, seawall, breakwall, dock builder and fence erector.

Y

8/8/2023

Apprentice Rates:

0-1,000 work hours $35.47 $44.68 $53.89

1,001-2,000 work hours $36.50 $46.23 $55.95

2,001-3,000 work hours $37.54 $47.79 $58.03

3,001-4,000 work hours $39.60 $50.88 $62.15

Laborer -Underground Open Cut, Class III

X X X X X X X D$40.68 $52.50 $64.31

LAUC-Z1-3

Air, gasoline and electric tool operator, vibrator operator, drillers, pump man, tar kettle operator, bracers, rodder, reinforced steel or mesh man (e.g. wire mesh, steel mats, dowel bars, etc.), cement finisher, welder, pipe jacking and boring man, wagon

Y

1/4/2022

Apprentice Rates:

0-1,000 work hours $35.51 $44.74 $53.97

1,001-2,000 work hours $36.54 $46.29 $56.03

2,001-3,000 work hours $37.58 $47.85 $58.11

3,001-4,000 work hours $39.65 $50.96 $62.25

Laborer -Underground Open Cut, Class IV

X X X X X X X D$40.76 $52.62 $64.47

LAUC-Z1-4

Trench or excavating grade man. Y

1/4/2022

Apprentice Rates:

0-1,000 work hours $35.57 $44.84 $54.09

1,001-2,000 work hours $36.61 $46.40 $56.17

2,001-3,000 work hours $37.65 $47.96 $58.25

3,001-4,000 work hours $39.72 $51.06 $62.39

Project Description: Demo CAS Annex Building

Oakland CountyCounty:

780 Official Request #:

Project Number: 00081

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024

Name

Classification Overtime ProvisionDescription

Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

Laborer -Underground Open Cut, Class V

X X X X X X X D$40.82 $52.71 $64.59

LAUC-Z1-5

Pipe Layer (including crock, metal pipe, mulitplate or other conduits) Y

1/4/2022

Apprentice Rates:

0-1,000 work hours $35.62 $44.91 $54.19

1,001-2,000 work hours $36.66 $46.47 $56.27

2,001-3,000 work hours $37.70 $48.03 $58.35

3,001-4,000 work hours $39.78 $51.15 $62.51

Laborer -Underground Open Cut, Class VI

X X X X X X X D$38.27 $48.88 $59.49

LAUC-Z1-6

Grouting man, top man assistant, audio visual television operations and all other operations in connection with closed circuit television inspection, pipe cleaning and pipe relining work and the installation and repair of water service pipe and appurtenan

Y

1/4/2022

Apprentice Rates:

0-1,000 work hours $33.70 $42.03 $50.35

1,001-2,000 work hours $34.62 $43.41 $52.19

2,001-3,000 work hours $35.53 $44.78 $54.01

3,001-4,000 work hours $37.36 $47.52 $57.67

Laborer -Underground Open Cut, Class VII

X X X X X X X D$34.89 $43.81 $52.73

LAUC-Z1-7

Restoration laborer, seeding, sodding, planting, cutting, mulching and topsoil grading and the restoration of property such as replacing mail boxes, wood chips, planter boxes, flagstones etc.

Y

1/4/2022

Apprentice Rates:

0-1,000 work hours $31.17 $38.24 $45.29

1,001-2,000 work hours $31.91 $39.34 $46.77

2,001-3,000 work hours $32.66 $40.47 $48.27

3,001-4,000 work hours $34.15 $42.70 $51.25

Project Description: Demo CAS Annex Building

Oakland CountyCounty:

780 Official Request #:

Project Number: 00081

Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit r a t e s p r e s c r i b e d i n a c o n t r a c t .

Time and a Half

Double Time

Contract must be awarded by: 7/2/2024 Issue Date: 4/3/2024

Name

Classification Overtime ProvisionDescription

Official Road Builder and Commercial Prevailing Wage Rates for State Funded Projects

Last Updated

Landscape Laborer x H

X H X X x H D$34.62 $46.26 $57.89

LLAN-Z1-A

Class A: Irrigation Foremen and Construction Foremen. Y

1/10/2024

Lanscape Laborer

X X H X X X X D$34.62 $46.26 $57.89

LLAN-Z1

Class A: Irrigation Foremen and Construction Foremen. Y

Subdivision of county Zones 1 & 2

Lineman, Teledata Wireman

H H H X X X X D$38.78 $52.83 $66.87

IBE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .