Optional Bid Form Contractor 0120-24-0320 2025 Concrete Maintenance.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- 2025 Concrete Maintenance
- Solicitation number
- CAH-05-29-2025-002
- Issued by
- Macomb County, Ann Arbor City, Michigan
About this file
This document is an Optional Bid Form for the 2025 Concrete Maintenance project for the City of Auburn Hills in Oakland County, Michigan, with OHM Job Number 0120-24-0320. The bid form is divided into four distinct categories covering concrete maintenance and infrastructure improvements: Squirrel Road, Bloomfield Village Boulevard, Bloomfield Orchards Subdivision, and DPW & Miscellaneous Repairs. The project encompasses various construction and maintenance activities including sidewalk removal and replacement, concrete overlay, pavement repair, curb and gutter work, traffic markings, irrigation line replacements, and turf establishment. Each category includes detailed line items with specific quantities for tasks such as mobilization, soil erosion control, project cleanup, traffic control, and miscellaneous infrastructure repairs.
The bid form indicates unit pricing and quantities for each line item, with a standard crew day rate of $780.00, though in this document all unit prices are currently listed as $0.00, suggesting this is a template or preliminary document. The project covers extensive concrete work across multiple locations within Auburn Hills, with significant quantities including 4,541 square yards of concrete overlay, 49,797 square feet of 4-inch sidewalk, and 12,548 square feet of 6-inch sidewalk. The comprehensive scope suggests a substantial municipal infrastructure maintenance initiative targeting various public spaces and transportation-related infrastructure throughout the city.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Book 0120-24-0320 2025 Concrete Maintenance.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Bid Form for |
| 2025 Concrete Maintenance |
| City of Auburn Hills, Oakland County, State of Michigan |
| OHM Job Number: 0120-24-0320 |
| Item | Description | Quantity | Unit | Unit Price | Amount |
| CATEGORY 1 - Squirrel Rd | |||||
| 1 | Mobilization, Max 5% | 1 | LSUM | $0.00 | |
| 2 | Curb and Gutter, Rem | 458 | Ft | $0.00 | |
| 3 | Soil Erosion Control | 1 | LSUM | $0.00 | |
| 4 | Project Cleanup | 1 | LSUM | $0.00 | |
| 5 | Dr Structure Repair, Additional Depth | 10 | Ft | $0.00 | |
| 6 | Dr Structure Repair, Inclusive | 4 | Ea | $0.00 | |
| 7 | Replace Frame and Cover | 4 | Ea | $0.00 | |
| 8 | Structure, Point Up | 23 | Ea | $0.00 | |
| 9 | Reset Frame and Cover | 20 | Ea | $0.00 | |
| 10 | Underdrain, Subgrade, 6 inch | 150 | Ft | $0.00 | |
| 11 | Hand Patching | 121 | Ton | $0.00 | |
| 12 | Expansion Joint | 200 | Ft | $0.00 | |
| 13 | Concrete Overlay, Remove and Replace | 4,541 | Syd | $0.00 | |
| 14 | Pavt Repair, Conc, Full Depth, Remove and Replace | 47 | Syd | $0.00 | |
| 15 | Curb and Gutter, Conc, Match Existing | 458 | Ft | $0.00 | |
| 16 | Pavt Mrkg, Ovly Cold Plastic, Lt Turn Arrow Sym | 20 | Ea | $0.00 | |
| 17 | Pavt Mrkg, Ovly Cold Plastic, Only | 17 | Ea | $0.00 | |
| 18 | Pavt Mrkg, Polyurea, 4 inch, White | 6,825 | Ft | $0.00 | |
| 19 | Minor Traf Devices | 1 | LSUM | $0.00 | |
| 20 | Traffic Maintenance & Control | 1 | LSUM | $0.00 | |
| 21 | Irrigation Line, Any Size Pipe | 250 | Ft | $0.00 | |
| 22 | Turf Establishment, Performance | 153 | Syd | $0.00 | |
| 23 | Irrigation Head, Replace | 25 | Ea | $0.00 | |
| 24 | Crew Days | Cday | $780.00 | $0.00 | |
| Subtotal for Category 1 (Items 1-24) | $0.00 | ||||
| CATEGORY 2 - Bloomfield Village Blvd | |||||
| 25 | Mobilization, Max 5% | 1 | LSUM | $0.00 | |
| 26 | Sidewalk, Rem | 342 | Syd | $0.00 | |
| 27 | Soil Erosion Control | 1 | LSUM | $0.00 | |
| 28 | Project Cleanup | 1 | LSUM | $0.00 | |
| 29 | Sidewalk, Conc, 4 inch | 3,072 | Sft | $0.00 | |
| 30 | Minor Traf Devices | 1 | LSUM | $0.00 | |
| 31 | Traffic Maintenance & Control | 1 | LSUM | $0.00 | |
| 32 | Irrigation Line, Any Size Pipe | 100 | Ft | $0.00 | |
| 33 | Turf Establishment, Performance | 26 | Syd | $0.00 | |
| 34 | Irrigation Head, Replace | 10 | Ea | $0.00 | |
| 35 | Crew Days | Cday | $780.00 | $0.00 | |
| Subtotal for Category 2 (Items 25-35) | $0.00 | ||||
| CATEGORY 3 - Bloomfield Orchards Sub | |||||
| 36 | Mobilization, Max 5% | 1 | LSUM | $0.00 | |
| 37 | Sidewalk, Rem | 6,928 | Syd | $0.00 | |
| 38 | Soil Erosion Control | 1 | LSUM | $0.00 | |
| 39 | Project Cleanup | 1 | LSUM | $0.00 | |
| 40 | Sidewalk, Conc, 4 inch | 49,797 | Sft | $0.00 | |
| 41 | Sidewalk, Conc, 6 inch | 12,548 | Sft | $0.00 | |
| 42 | Minor Traf Devices | 1 | LSUM | $0.00 | |
| 43 | Traffic Maintenance & Control | 1 | LSUM | $0.00 | |
| 44 | Irrigation Line, Any Size Pipe | 500 | Ft | $0.00 | |
| 45 | Turf Establishment, Performance | 422 | Syd | $0.00 | |
| 46 | Irrigation Head, Replace | 50 | Ea | $0.00 | |
| 47 | Crew Days | Cday | $780.00 | $0.00 | |
| Subtotal for Category 3 (Items 36-47) | $0.00 | ||||
| CATEGORY 4 - DPW & MISC Repairs | |||||
| 48 | Mobilization, Max 5% | 1 | LSUM | $0.00 | |
| 49 | Curb and Gutter, Rem | 10 | Ft | $0.00 | |
| 50 | Sidewalk, Rem | 9 | Syd | $0.00 | |
| 51 | Pavt, Rem, Modified | 116 | Syd | $0.00 | |
| 52 | Excavation, Earth | 182 | Cyd | $0.00 | |
| 53 | Subgrade Undercut, 21AA | 91 | Cyd | $0.00 | |
| 54 | Subgrade Undercut, 1 by 3 | 91 | Cyd | $0.00 | |
| 55 | Soil Erosion Control | 1 | LSUM | $0.00 | |
| 56 | Project Cleanup | 1 | LSUM | $0.00 | |
| 57 | Aggregate Base, Modified | 120 | Ton | $0.00 | |
| 58 | Conc Pavt, Nonreinf, 9 inch | 272 | Syd | $0.00 | |
| 59 | Curb and Gutter, Conc, Match Existing | 10 | Ft | $0.00 | |
| 60 | Sidewalk, Conc, 4 inch | 75 | Sft | $0.00 | |
| 61 | Fence, Remove and Replace | 90 | Ft | $0.00 | |
| 62 | Minor Traf Devices | 1 | LSUM | $0.00 | |
| 63 | Traffic Maintenance & Control | 1 | LSUM | $0.00 | |
| 64 | Irrigation Line, Any Size Pipe | 30 | Ft | $0.00 | |
| 65 | Turf Establishment, Performance | 2 | Syd | $0.00 | |
| 66 | Irrigation Head, Replace | 3 | Ea | $0.00 | |
| 67 | Crew Days | Cday | $780.00 | $0.00 | |
| Subtotal for Category 4 (Items 48-67) | $0.00 | ||||
| Total Bid Amount (Items 1-67) | $0.00 |
File details come from the government source that posted it. Updated .