OMS Seismic Retrofit Addendum No. 2 - 250401-01.pdf
PDF 118 KB Posted
- Attached to
- Oliver MS Seismic Retrofit #250304-01
- Solicitation number
- S-P26028-00012823
- Issued by
- Multnomah County, Oregon
About this file
This document is Addendum No. Two (2) for the Oliver MS Seismic Retrofit Project (Project No. 250401-01), issued by the Centennial School District on March 28, 2025. The addendum clarifies technical specifications related to drawing notes, specifically addressing the placement of Python anchors in stud walls where brick occurs. The bid due date remains unchanged and is scheduled for Tuesday, April 1, 2025, at 2:00 PM. The addendum provides a specific clarification that Python anchors will be placed only at each double stud, spaced on a 12" horizontal and 16" vertical grid where studs are located.
The addendum contains no changes to specifications, general information, or attachments, and serves solely to provide technical clarification for potential bidders. The document maintains the original contract documents dated March 14, 2025, and requires notification to all subcontractors affected by this addendum. No pricing, funding sources, or additional contract details are modified in this document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OLIVER MS SEISMIC RETROFIT
PROJECT NO. 250401-01
March 28, 2025
ADDENDUM NO. TWO (2)
THE FOLLOWING CHANGES, ADDITIONS, AND DELETIONS TO THE CONTRACT DOCUMENTS
DATED MARCH 28, 2025, HEREBY BECOME A PART OF THE CONTRACT DOCUMENTS, PER THE
ORIGINAL CONTRACT DOCUMENTS DATED MARCH 14, 2025.
NOTIFY ALL SUBCONTRACTORS AFFECTED BY THIS ADDENDUM.
BID DUE UNCHANGED: Tuesday, April 1, 2025, 2:00 PM (the below information is only a clarification, not a change)
SPECIFICATIONS
1. No change.
DRAWINGS
1. Clarification: Note (1) on sheets S1.10 & S1.20, as well as note (8) on sheets S2.10 & S2.20 call out
“(2) 2x4 @12” o.c. stud wall, provide Python anchors 16”o.c. full height of each stud wall where brick occurs”. Please clarify if the intent is to have Python anchors in each stud at double stud or each double stud.
a. ANSWER: We only need to have them at each double stud. The python anchors will be spaced on a grid of 12” horizontally and 16” vertically where studs occur.
GENERAL INFORMATION
1. none.
Attachments
NONE
END OF ADDENDUM TWO (2)