OMD COUTES 2023-05-05 FINAL PLNS Part-2 - revised.pdf

PDF 13 MB Posted

Attached to
COUTES Wash Rack & Oil/Water Separator and Storm Water Improvements
Solicitation number
S-24800-00014420
Issued by
Deschutes County, Oregon

About this file

The document appears to be a comprehensive set of architectural and engineering design plans for the Oregon Military Department (OMD) for the Coutes Wash Building and Stormwater Improvements project located at the Redmond Municipal Airport. The plans, prepared by Keller Associates, Inc., detail the construction of a new facility with electrical, structural, and architectural specifications covering site layout, electrical systems, foundation and slab plans, wall and roof framing, and detailed construction elements. The project includes designing a building with a mechanical room, electrical infrastructure, fencing, and associated site improvements.

The technical drawings provide intricate details about electrical distribution panels (HVP-100 480V and LVP-100 208/120V), site utilities, stormwater management, and specific construction methodologies. The plans indicate coordination with Pacific Power for electrical service installation and include provisions for underground conduits, junction boxes, and comprehensive site electrical and structural specifications. The project appears to be funded by the Oregon Military Department, with design completed in May 2021 and likely prepared for competitive bidding or direct procurement, though specific budget and procurement details are not explicitly stated in the technical drawings.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG

EN

C Y

PR

O

JE

C

T D

ET

AI

LS

C-551J:

\2

O

M D

C O

U

TE

S\ C

_D

ES

N

C

AD

\3 _D

ES

IG

N \W

AS

H

-S

TO

R M

\D _P

LA

N

S- 1\

C

IV

IL

\C -5

A

G

EN

C Y

D

ET

.D W

G

LA

ST

S

AV

ED

: 4 /2

7/

1:

A M

PR

IN

TE

D

: 6 /4

/2

:2

AM

Co m m er ci al

S t.

SE

, S ui te

Sa le m , O re go n

(5

) 3

-2

PROJECT NO.

SHEET NO.

221127-000

CHECK:DRAWN:

VERIFY SCALE: Scales based on 22"x34" prints.

1-1/2 Inches

PAGE

C O

U

TE

S

- W

AS

H

B U

IL

D

IN

G

A N

D

ST

O R

M W

AT

ER

IM

PR

O

VE

M

EN

TS

N

O

R

EV

IS

IO

N S

D

AT

E Th is d oc um en t o r a ny p ar t t he re of in d et ai l o r d es ig n co nc ep t i s th e pe rs on al p ro pe rty o f K el le r A ss oc ia te s, In c.

a nd s ha ll no t b e co pi ed in a ny fo rm w ith ou t t he w rit te n au th or iz at io n of K el le r A ss oc ia te s, In c.

O R

EG

O

N M

IL

IT

AR

Y

D

EP

AR

TM

EN

T

O O

O

OOOOOOOO

O O

O O

O O

O O

O O

O O

O O

O O O O O O O O

O

O

O

O O

O

CONC.

GRAVEL

MOVABLE STRUCTURE

CONEX

PERM. STRUCTURE

CONEX

GRAVEL

SWALE

CONC.

CONEX

TRENCH DRAIN

SHEDS

TP-03

TP-03

SEPTIC

CLEANOUT

UTIL BOX

CONC.

SEPTIC DRAIN FIELD

SSSSSS

SS

SS

SS

SS

SS

SS

SS

SS

SS

O H

P O

H P

O H

P O

H P

OHP

OHP

OHP

OHP

PROPANE TANK

CONC.

E E

E

E E

E E

E E

E E

E E

E

E

E

E E

E

E

E

E

E

E E E E E

U G

P

SHED

W WW

W

W

W

W

SD

SD

SD

SD

SD

SD

SD

SD

SD

<SD

N G

PI PI

PI

EXISTING WASH WATER DISPOSAL SPRINKLER

CP9

CP1CP2

CP3

CP4

CP5

CP10

CP11

O

O

O

O O

O O

O O

O

O

O

O

O

E E

E

E

E

U G

P U

G P

E E E

E

O

VE

R

AL

L

EL

EC

TR

IC

AL

S

IT

E

PL

AN

E-120J:

\2

O

M D

C O

U

TE

S\ C

_D

ES

N

C

AD

\3 _D

ES

IG

N \W

AS

H

-S

TO

R M

\D _P

LA

N

S- 1\

E

LE

C

\E -1

E

LE

C

S

IT

E.

D

W G

LA

ST

S

AV

ED

: 5

/3 /2

:4

PM

PR

IN

TE

D

: 5 /3

/2

1:

P

M

GENERAL SHEET NOTES

BMCACM

0 40 80

1. EXISTING UTILITIES ARE SHOWN IN AN

APPROXIMATE LOCATION, CONTRACTOR TO

VERIFY EXISTING UNDERGROUND UTILITIES

PRIOR TO CONSTRUCTION. SEE UTILITY PLANS

FOR MORE INFORMATION.

2. ELECTRICAL WORK SHALL BE PERFORMED IN

ACCORDANCE WITH THE NATIONAL

ELECTRICAL CODE AND ANY OTHER STATE OR

LOCAL REQUIREMENTS.

3. CABLE AND CONDUIT RUNS ARE

DIAGRAMMATICALLY SHOWN ON THE

DRAWING. FINAL ROUTING SHALL BE

DETERMINED BY THE ELECTRICAL

CONTRACTOR AND APPROVED BY THE OWNER.

4. ALL OUTDOOR EQUIPMENT, CONSTRUCTION

MATERIALS, AND METHODS OF INSTALLATION

SHALL BE RATED FOR OUTDOOR/

WEATHERPROOF INSTALLATION AND

PROTECTED FROM PHYSICAL DAMAGE.

5. ALL UNDERGROUND CABLE RUNS SHALL BE

INSTALLED IN CONDUIT.

6. UNDERGROUND ELECTRICAL CONDUITS SHALL

BE MARKED WITH RED PLASTIC MARKING TAPE

INSTALLED IN THE TRENCH ONE FOOT BELOW

SURFACE. RE: E-002.

7. COORDINATE NEW ELECTRICAL SERVICE

INSTALLATION WITH PACIFIC POWER FOR

CONSTRUCTION REQUIREMENTS AND

RESPONSIBILITIES, CLEARANCES, APPROVED

EQUIPMENT, AND SCHEDULING.

Co m m er ci al

S t.

SE

, S ui te

Sa le m , O re go n

(5

) 3

-2

PROJECT NO.

SHEET NO.

221127-000

CHECK:DRAWN:

VERIFY SCALE: Scales based on 22"x34" prints.

1-1/2 Inches

PAGE

C O

U

TE

S

- W

AS

H

B U

IL

D

IN

G

A N

D

ST

O R

M W

AT

ER

IM

PR

O

VE

M

EN

TS

N

O

R

EV

IS

IO

N S

D

AT

E Th is d oc um en t o r a ny p ar t t he re of in d et ai l o r d es ig n co nc ep t i s th e pe rs on al p ro pe rty o f K el le r A ss oc ia te s, In c.

a nd s ha ll no t b e co pi ed in a ny fo rm w ith ou t t he w rit te n au th or iz at io n of K el le r A ss oc ia te s, In c.

O R

EG

O

N M

IL

IT

AR

Y

D

EP

AR

TM

EN

T

OREGON

EXPIRES: 12-31-2023

97265PERE

GISTERED PROFESSIONALENGINEER

MA Y 11, 2021BRA DLEY M. CULVER

SHEET KEYNOTES

1. MEDIUM VOLTAGE UTILITY SECTOR SWITCH

LOCATED OUTSIDE OF FENCE/PROPERTY

BOUNDARY. COORDINATE ACCESS WITH

PACIFIC POWER AND REDMOND MUNICIPAL

AIRPORT.

2. EXISTING UTILITY TRANSFORMER CURRENTLY

NOT CONNECTED, COORDINATE WITH PACIFIC

POWER FOR UPSIZE REPLACEMENT PER

SHEET E-601.

3. REFER TO POWER PLAN FOR BUILDING

DETAILS. RE: E-101

P001

FI

N

AL

E

LE

C

TR

O

N

IC

D O

C U

M

EN

T

AV

AI

LA

BL

E

U

PO

N R

EQ

U

ES

TP-03

CONC.

W W

W W

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

<SD

<SD <SD <SD <SD <SD <SD <SD <SD

PI

PI

PI

PI

E

E

E

E

E

E

E

E

E

E

IR

R

IR

R

IR

R

IR

R

IR

R

IR

R

IR

R

S

P018

LVP-100:8

WP

LVP-100

HVP-100

E E E

E

EN

LA

R G

ED

E

LE

C

TR

IC

AL

S

IT

E

PL

AN

E-121J:

\2

O

M D

C O

U

TE

S\ C

_D

ES

N

C

AD

\3 _D

ES

IG

N \W

AS

H

-S

TO

R M

\D _P

LA

N

S- 1\

E

LE

C

\E -1

E

LE

C

S

IT

E.

D

W G

LA

ST

S

AV

ED

: 5

/3 /2

:4

PM

PR

IN

TE

D

: 5 /3

/2

1:

P

M

GENERAL SHEET NOTES

BMCACM

0 5 10

Co m m er ci al

S t.

SE

, S ui te

Sa le m , O re go n

(5

) 3

-2

PROJECT NO.

SHEET NO.

221127-000

CHECK:DRAWN:

VERIFY SCALE: Scales based on 22"x34" prints.

1-1/2 Inches

PAGE

C O

U

TE

S

- W

AS

H

B U

IL

D

IN

G

A N

D

ST

O R

M W

AT

ER

IM

PR

O

VE

M

EN

TS

N

O

R

EV

IS

IO

N S

D

AT

E Th is d oc um en t o r a ny p ar t t he re of in d et ai l o r d es ig n co nc ep t i s th e pe rs on al p ro pe rty o f K el le r A ss oc ia te s, In c.

a nd s ha ll no t b e co pi ed in a ny fo rm w ith ou t t he w rit te n au th or iz at io n of K el le r A ss oc ia te s, In c.

O R

EG

O

N M

IL

IT

AR

Y

D

EP

AR

TM

EN

T

OREGON

EXPIRES: 12-31-2023

97265PERE

GISTERED PROFESSIONALENGINEER

MA Y 11, 2021BRA DLEY M. CULVER

1. EXISTING UTILITIES ARE SHOWN IN AN APPROXIMATE

LOCATION, CONTRACTOR TO VERIFY EXISTING

UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION. SEE

UTILITY PLANS FOR MORE INFORMATION.

2. ELECTRICAL WORK SHALL BE PERFORMED IN ACCORDANCE

WITH THE NATIONAL ELECTRICAL CODE AND ANY OTHER

STATE OR LOCAL REQUIREMENTS.

3. CABLE AND CONDUIT RUNS ARE DIAGRAMMATICALLY SHOWN

ON THE DRAWING. FINAL ROUTING SHALL BE DETERMINED BY

THE ELECTRICAL CONTRACTOR AND APPROVED BY THE

OWNER.

4. ALL OUTDOOR EQUIPMENT, CONSTRUCTION MATERIALS, AND

METHODS OF INSTALLATION SHALL BE RATED FOR OUTDOOR/

WEATHERPROOF INSTALLATION AND PROTECTED FROM

PHYSICAL DAMAGE.

5. ALL UNDERGROUND CABLE RUNS SHALL BE INSTALLED IN

CONDUIT.

6. UNDERGROUND ELECTRICAL CONDUITS SHALL BE MARKED

WITH RED PLASTIC MARKING TAPE INSTALLED IN THE TRENCH

ONE FOOT BELOW SURFACE.

SHEET KEYNOTES

01 SEE FIXTURE 'D' ON LUMINAIRE SCHEDULE FOR IN-RAMP

LIGHTING. RE: E-102, AND DETAIL E006

02 INSTALL UNDERGROUND JUNCTION BOX. RE: DETAIL E009

EQUIPMENT KEYNOTES

HVP-100 480V DISTRIBUTION PANEL

LVP-100 208/120V DISTRIBUTION PANEL

FI

N

AL

E

LE

C

TR

O

N

IC

D O

C U

M

EN

T

AV

AI

LA

BL

E

U

PO

N R

EQ

U

ES

N

AL

E

LE

C

TR

O

N

IC

D O

C U

M

EN

T

AV

AI

LA

BL

E

U

PO

N R

EQ

U

ES

AL

E

LE

C

TR

O

N

IC

D O

C U

M

EN

T

AV

AI

LA

BL

E

U

PO

N R

EQ

U

ES

AL

E

LE

C

TR

O

N

IC

D O

C U

M

EN

T

AV

AI

LA

BL

E

U

PO

N R

EQ

U

ES

AL

E

LE

C

TR

O

N

IC

D O

C U

M

EN

T

AV

AI

LA

BL

E

U

PO

N R

EQ

U

ES

AL

E

LE

C

TR

O

N

IC

D O

C U

M

EN

T

AV

AI

LA

BL

E

U

PO

N R

EQ

U

ES

AL

E

LE

C

TR

O

N

IC

D O

C U

M

EN

T

AV

AI

LA

BL

E

U

PO

N R

EQ

U

ES

AL

E

LE

C

TR

O

N

IC

D O

C U

M

EN

T

AV

AI

LA

BL

E

U

PO

N R

EQ

U

ES

AL

E

LE

C

TR

O

N

IC

D O

C U

M

EN

T

AV

AI

LA

BL

E

U

PO

N R

EQ

U

ES

AL

E

LE

C

TR

O

N

IC

D O

C U

M

EN

T

AV

AI

LA

BL

E

U

PO

N R

EQ

U

ES

AL

E

LE

C

TR

O

N

IC

D O

C U

M

EN

T

AV

AI

LA

BL

E

U

PO

N R

EQ

U

ES

AL

E

LE

C

TR

O

N

IC

D O

C U

M

EN

T

AV

AI

LA

BL

E

U

PO

N R

EQ

U

ES

File details come from the government source that posted it. Updated .