OMB-MJ1002000067-ad1.pdf
PDF 1 MB Posted
- Solicitation number
- OMB-MJ1002000067
- Issued by
- Kent County, Delaware
About this file
This is an Addendum No. 1 issued by Davis, Bowen & Friedel, Inc. on behalf of the State of Delaware, Office of Management and Budget, Division of Facilities Management, for the Delaware State Police Headquarters Parking Lot Complex Rehabilitation project in Dover, Delaware. The scope of work includes mill and overlay of the existing parking lot, addition of paved areas, installation of an underground stormwater management system with 14 drainage inlets or manholes, installation of 322 linear feet of 24-inch reinforced concrete pipe, 266 linear feet of 18-inch reinforced concrete pipe, and 280 linear feet of 15-inch reinforced concrete pipe, parking lot striping, installation of conduit and quazite boxes, removal of an underground storage tank and gas pumps, installation of a combined above-ground storage tank with gas pump, modification of three existing entrances, signal modification, addition of a right-turn lane, and miscellaneous concrete work. The mandatory pre-bid meeting was held on October 20, 2026 at 8:37 a.m., with attendance required for bid qualification. Sealed bids are due on November 4, 2026 at 1:00 p.m., either through the Bonfire Portal or hand-delivered to the Office of Management and Budget at 122 Martin Luther King Jr. Boulevard South, Dover, Delaware 19901, with public bid opening at 2:00 p.m. in Conference Room 133. Bid documents are available from Davis, Bowen & Friedel, Inc. for a non-refundable fee of $50.00 per electronic set. The contract will be awarded to the lowest responsive and responsible bidder.
Bid security equal to 10 percent of the bid amount is required, and performance and payment bonds equal to 100 percent of the contract amount will be required upon contract execution. The project is state-funded and subject to prevailing wage requirements as certified by the Delaware Department of Labor. Contractors and subcontractors must implement mandatory drug testing programs for all employees working on the jobsite and comply with OMB Regulation 4104. Bidders must submit a completed subcontractor list identifying one contractor for each required trade category: Site Work, Asphalt, Striping, Underground SWM, Concrete, Maintenance of Traffic, Petroleum, and Electrical. All subcontractors and sub-subcontractors must hold valid Delaware licenses prior to contract execution. Two allowances are included in the bid: Allowance No. 1 for "Unforeseen Conditions" in the amount of $30,000.00 and Allowance No. 2 for "Downspout tie-in and testing" in the amount of $10,000.00. One alternate is available requiring bidders to either add or deduct costs for installation of 17,000 square feet of additional parking lot. The contractor must obtain a dewatering permit and assist with utility permit applications. Work hours are Monday through Friday, 7:00 a.m. to 5:00 p.m., with off-hours work allowed by pre-arrangement. The contractor is responsible for providing its own toilet facility, electricity, and water, maintaining maintenance of traffic, and providing a supervisor on site during all subcontractor work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| OMB-MJ1002000067-Exemp..pdf | ||
| OMB-MJ1002000067-rfp.pdf | ||
| OMB-MJ1002000067-Exemption.pdf | ||
| OMB-MJ1002000067-specs.pdf | ||
| OMB-MJ1002000067-wages.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
601 E. MAIN STREET, SUITE 100, SALISBURY, MD 21804 • 410-543-9091
1 PARK AVENUE, MILFORD, DE 19963 • 302-424-1441
106 N. WASHINGTON STREET, SUITE 103, EASTON, MD 21601• 410-770-4744
207 E. WATER STREET, SUITE 100, CENTREVILLE, MD 21617 • 443.262.9130
www.dbfinc.com
Ring W. Lardner, P.E.
W. Zachary Crouch, P.E.
Michael E. Wheedleton, AIA, LEED GA Jason P. Loar, P.E.
Jamie L. Sechler, P.E.
DELAWARE STATE POLICE HQ PARKING REHAB
SITE IMPROVEMENTS
DOVER, DELAWARE
DBF #0586B059.A01 OMB/DFM MJ1002000067
OCTOBER 21, 2026
ADDENDUM NO. 1
The following items shall become a part of the contract documents. Contractor must acknowledge receipt of this addendum on the Bid Form. Failure to do so may subject the Bidder to disqualification.
Item No. 1 The pre-bid meeting minutes and sign-in sheet are attached to this addendum.
Item No. 2 The revised Bid Form is attached to this addendum.
END OF ADDENDUM
W. Zachary Crouch, P.E.
Michael E. Wheedleton, AIA, LEED GA
Jason P. Loar, P.E.
Jamie L. Sechler, P.E.
601 E. MAIN STREET, SUITE 100, SALISBURY, MD 21804 • 410-543-9091
1 PARK AVENUE, MILFORD, DE 19963 • 302-424-1441
106 N. WASHINGTON STREET, SUITE 103, EASTON, MD 21601• 410-770-4744
207 E. WATER STREET, SUITE 100, CENTREVILLE, MD 21617 • 443.262.9130
www.dbfinc.com
PRE-BID MEETING MINUTES
DSP HEADQUARTERS
PARKING LOT COMPLEX REHABILITATION
DOVER, DELAWARE 19901
DBF #0586B059.B01 OMB/DFM# MJ1002000067
OCTOBER 21, 2026
1. A sign-in sheet was provided, and roll call took place prior to starting the meeting. A copy of the sign-in sheet is attached to these minutes.
2. The mandatory pre-bid meeting was held at 8:37 A.M. on Tuesday, October 20, 2026. Ring Lardner
(DBF) and Glenn Lowman (DFM Project Manager) reviewed the project. This pre-bid meeting is mandatory to submit a qualifying bid.
3. Bids are due Wednesday, November 4, 2026, at 1:00 P.M. by way of the Bonfire Portal or hand delivered at the Office of Management and Budget, Division of Facilities Management at 122 Martin Luther King Jr. Boulevard South, Dover, DE 19901. Allow time to park and sign in at the desk. Bids will be publicly opened in Conference Room 133 on the bottom floor at 2:00 PM. Late bids will not be accepted.
4. Work to be accomplished in accord with this contract includes mill and overlay existing parking lot, add additional paving areas, install underground SWM system, install 14 drainage inlets or manholes, install 322 LF of 24 inch reinforced concrete pipe (RCP), install 266’ of 18” RCP, install 280’ of 15” RCP, parking lot striping, installation of conduit and quazite boxes, downspout tie-in verification, removal of an underground storage tank and gas pumps, installation of a combined above ground storage tank with gas pump, modification of three existing entrances, signal modification, add right-turn lane, and miscellaneous concrete work.
5. Portions of the instructions to bidders were reviewed including the following:
a. Article 3: Bid Documents to be obtained from Davis, Bowen & Friedel, Inc.
b. Article 3: If you wish to make a substitution request, it must be submitted and received by
DBF on or before 5:00 PM on Monday, October 26, 2026.
c. Article 3: Final addendum, if required will be issued on or before 5:00 PM on October 30, 2026.
d. Article 4: A bid security in the amount of 10% is required.
e. Article 7: A performance bond and payment bond is required.
6. The writer reminded all bidders to carefully review Article 4 of the Instructions to Bidders to ensure they submit a qualified bid. There have been numerous bids rejected because these instructions were not followed, or blanks were left on bid forms.
Minutes: DSP HQ Parking Lot Complex Rehabilitation Pre-Construction October 21, 2026
a. One (1) original of the bid forms must be submitted along with one (1) original of the bid bond equal to 10% of the bid price, allowances and alternates. All bid submission documents, including the bid bond, must be completed on the forms provided in the specifications. A copy of the contractor’s Delaware business license is required with the bid submittal. Subcontractor Delaware business licenses shall be submitted within 30 days after project award.
b. A performance bond and payment bond equal to 100% of the contract amount will be required upon execution of the contract. Construction schedules are not required with the bid.
c. The non-collusion statement must be included with the bid form.
d. The signed Affidavit for the Bidder certifying compliance with OMB Regulation 4104 –
“Regulations for the Drug Testing of Contractor and Subcontractor Employees Working on “Large Public Works Projects”.
e. The signed Affidavit of Contractor Qualifications.
f. The bid form was reviewed. All blanks must be completed. Please review Section 01 21
00 Allowances and 01 23 00 Alternates when completing the bid form.
g. The subcontractor list was reviewed and must accompany the Bid Forms and be fully completed to submit a qualifying bid. The subcontractor categories are Site Work, Asphalt, Striping, Underground SWM, Concrete, Maintenance of Traffic, Petroleum, and Electrical.
The third-party subcontractor list (i.e. A-C under Site Work) may be left blank; however, a contractor’s name must be listed for the category. All subcontractors and sub-subcontractors must be licensed to practice their trade in the State of Delaware prior to execution of the contract. If changes are needed, they shall be submitted to DBF in writing.
7. Contractors who wish to be on the bidding list and are considered a responsive bidder must have purchased a minimum of one (1) set of electronic bid documents from Davis, Bowen & Friedel, Inc. for $50.00.
8. This project is state funded. Prevailing wage rates are required. A certified copy of the prevailing wage rates is included in the specifications, and the contractor should refer to these for bidding.
The contractor will be responsible for sending wage reports to the Department of Labor.
9. The area of work will be occupied during construction. Work hours will be Monday - Friday 7:00
A.M. - 5:00 P.M. Weekend, Holiday, or off-hours work will be allowed but must be pre-arranged.
The campus will provide a staging area for material and equipment, and location will be identified during the pre-construction meeting. All spoils will be removed from the campus. Any worker, delivery driver, etc. must complete a background check. The awarded contractor will be required to submit names and other supporting documentation to DSP for processing. If an employee is denied access, we only know they were denied and not the reason for denial. Please factor this process into your schedule.
10. The contractor is required to obtain a dewatering permit. The state has obtained approvals from
City of Dover, DNREC Detailed Plan, DelDOT LONOR, and DelDOT Entrance Plan. The State of Delaware will initiate the entrance permit but the contractor will need to supply all remaining information necessary to issue the permit and schedule the DelDOT Pre-Construction Meeting. The
Minutes: DSP HQ Parking Lot Complex Rehabilitation Pre-Construction October 21, 2026
State of Delaware will initiate the utility permit needed for the utility work and contractor will need to assist with any required information.
11. The contractor will be responsible for always having a supervisor on site during the work of any subcontractors or their own forces, including punch list work.
12. The contractors shall provide their own toilet facility, electricity and water.
13. The contractor will be required to provide Maintenance of Traffic (MOT) and maintain a safe site at end of each day. A phasing plan will be reviewed with DSP staff as part of the pre-construction meeting or soon thereafter.
14. The last day for questions will be Monday, October 26, 2026 at 5:00 P.M. All questions shall be submitted directly to Ring Lardner (DBF) via email (rwl@dbfinc.com) or fax ((302) 424-0430).
Responses to questions that are clarifications and do not change the bid documents will only be sent to the requestor.
15. Contractors are not permitted to complete a self-guided walkthrough of the project. A site visit was completed after the mandatory pre-bid meeting.
16. The mandatory pre-bid meeting was concluded at 8:57 A.M. A final roll call was conducted and all those present at the beginning were also present at the conclusion of the meeting.
Any changes, additions or deletions to these minutes should be submitted in writing to Davis, Bowen & Friedel, Inc., within ten (10) days.
Respectfully Submitted, DAVIS, BOWEN & FRIEDEL, INC.
Principal
Attachment
STATE OF DELAWARE
OFFICE OF MANAGEMENT AND BUDGET
DELAWARE STATE POLICE HEADQUARTERS
PARKING LOT COMPLEX REHABILITATION
DOVER, DELAWARE
CONTRACT #MJ1002000067
0586B059.A01 Addendum 1 (10/21/26) Bid Form / 00 41 13
SECTION 00 41 13
BID FORM
For Bids Due: ____________ To: State of Delaware Division of Facilities Management 122 Martin Luther King Jr. Blvd South Dover, DE 19901
Name of Bidder:
Delaware Business License No.: Taxpayer ID No.:
(Other License Nos.):
Phone No.: ( ) - Fax No.: ( ) -
The undersigned, representing that he has read and understands the Bidding Documents and that this bid is made in accordance therewith, that he has visited the site and has familiarized himself with the local conditions under which the Work is to be performed, and that his bid is based upon the materials, systems and equipment described in the Bidding Documents without exception, hereby proposes and agrees to provide all labor, materials, plant, equipment, supplies, transport and other facilities required to execute the work described by the aforesaid documents for the lump sum itemized below:
ALLOWANCES
Allowances conform to applicable project specification section. Refer to specifications section 01 21 00 – Allowances for a complete description of the following Allowances.
ALLOWANCE NO. 1: Include an allowance entitled “Unforeseen Conditions” in the amount of $30,000.00
Acknowledged/initialed:________________________
ALLOWANCE NO. 2: Include an allowance entitled “Downspout tie-in and testing” in the amount of $10,000.00
Acknowledged/initialed:________________________
ALTERNATES
Alternates conform to applicable project specification section. Refer to specifications section 01 23 00 – Alternates for a complete description of the following Alternates. BIDDER MUST CHOOSE TO “ADD” or “DEDUCT”. (Do not submit for both.)
Alternate No. 1: Cost associated to install 17,000 SF parking lot. Add $_________________.
OR
Deduct $________________.
DELAWARE STATE POLICE HEADQUARTERS
PARKING LOT COMPLEX REHABILITATION
00 41 13 \ Bid Form Addendum 1 (10/21/26) 0586B059.A01
BID FORM
I/We acknowledge Addendums numbered and the price(s) submitted include any cost/schedule impact they may have.
This bid shall remain valid and cannot be withdrawn for thirty (30) days from the date of opening of bids (60 days for School Districts and Department of Education), and the undersigned shall abide by the Bid Security forfeiture provisions. Bid Security is attached to this Bid.
The Owner shall have the right to reject any or all bids, and to waive any informality or irregularity in any bid received.
This bid is based upon work being accomplished by the Sub-Contractors named on the list attached to this bid.
Should I/We be awarded this contract, I/We pledge to achieve substantial completion of all the work within calendar days of the Notice to Proceed.
The undersigned represents and warrants that he has complied and shall comply with all requirements of local, state, and national laws;
that no legal requirement has been or shall be violated in making or accepting this bid, in awarding the contract to him or in the prosecution of the work required; that the bid is legal and firm; that he has not, directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken action in restraint of free competitive bidding.
Upon receipt of written notice of the acceptance of this Bid, the Bidder shall, within twenty (20) calendar days, execute the agreement in the required form and deliver the Contract Bonds, and Insurance Certificates, required by the Contract Documents.
I am / We are an Individual / a Partnership / a Corporation
By Trading as (Individual’s / General Partner’s / Corporate Name)
(State of Corporation)
Business Address:
Witness: By:
( Authorized Signature )
(SEAL)
( Title ) Date:
ATTACHMENTS
Sub-Contractor List Non-Collusion Statement Affidavit of Employee Drug Testing Program Affidavit of Contractor Qualifications Bid Security (Others as Required by Project Manuals)
DELAWARE STATE POLICE HEADQUARTERS
PARKING LOT COMPLEX REHABILITATION
0586B059.A01 Addendum 1 (10/21/26) Bid Form / 00 41 13
SUBCONTRACTOR LIST
In accordance with Title 29, Chapter 69, Section 6962(d)(10)b of the Delaware Code, the following subcontractor listing must accompany any bid submittal. The bidder must list in each category the full name and address (City & State) of the sub-contractor that the bidder will be using to perform the work and provide material for that subcontractor category. Should the bidder’s listed subcontractor intend to provide any of their subcontractor category of work through a third-tier contractor, the bidder shall list that third-tier contractor’s full name and address (City & State). If the bidder intends to perform any category of work itself, it must list its full name and address. For clarification, if the bidder intends to perform the work themselves, the bidder may not insert “not applicable”, “N/A”, “self” or anything other than its own full name and address (City & State). To do so shall cause the bid to be rejected. In addition, the failure to produce a completed subcontractor list with the bid submittal shall cause the bid to be rejected. If you have more than three (3) third-tier contractors to report in any subcontractor category, print out additional page(s) containing the appropriate category, complete the rest of your list of third-tier contractors for that category, notate the addition in parentheses as (CONTINUATION) next to the subcontractor category and an asterisk (*) next to any additional third-tier contractors, and submit it with your bid.
Subcontractor Category Subcontractor Address (City & State) Subcontractors tax-payer ID # or Delaware Business license #
1. Site Work
A.
B.
C.
2. Asphalt
A.
DELAWARE STATE POLICE HEADQUARTERS
PARKING LOT COMPLEX REHABILITATION
00 41 13 \ Bid Form Addendum 1 (10/21/26) 0586B059.A01
BID FORM (Continued)
3. Striping
A.
4. Underground SWM
5. Concrete
DELAWARE STATE POLICE HEADQUARTERS
PARKING LOT COMPLEX REHABILITATION
0586B059.A01 Addendum 1 (10/21/26) Bid Form / 00 41 13
6. Maintenance of Traffic
7. Petroleum
8. Electrical
DELAWARE STATE POLICE HEADQUARTERS
PARKING LOT COMPLEX REHABILITATION
0586B059.A01 Addendum 1 (10/21/26) Bid Form / 00 41 13
NON-COLLUSION STATEMENT
This is to certify that the undersigned bidder has neither directly nor indirectly entered into any agreement, participated in any collusion or otherwise taken any action in restraint of free competitive bidding in connection with this proposal submitted this date (to the Office of Management and Budget, Division of Facilities Management).
All the terms and conditions of MJ1002000067 have been thoroughly examined and are understood.
NAME OF BIDDER:
AUTHORIZED REPRESENTATIVE
(TYPED):
AUTHORIZED REPRESENTATIVE
(SIGNATURE):
TITLE:
ADDRESS OF BIDDER:
E-MAIL: ______________________________________________________________
PHONE NUMBER:
Sworn to and Subscribed before me this day of 20 .
My Commission expires . NOTARY PUBLIC .
THIS PAGE MUST BE SIGNED AND NOTARIZED FOR YOUR BID TO BE CONSIDERED.
DELAWARE STATE POLICE HEADQUARTERS
PARKING LOT COMPLEX REHABILITATION
00 41 13 \ Bid Form Addendum 1 (10/21/26) 0586B059.A01
AFFIDAVIT
OF
EMPLOYEE DRUG TESTING PROGRAM
4104 Regulations for the Drug Testing of Contractor and Subcontractor Employees Working on Large Public Works Projects requires that Contractors and Subcontractors implement a program of mandatory drug testing for Employees who work on Large Public Works Contracts funded all or in part with public funds.
We hereby certify that we have in place or will implement during the entire term of the contract a Mandatory Drug Testing Program for our employees on the jobsite, including subcontractors, that complies with this regulation:
Contractor/Subcontractor Name:
Contractor/Subcontractor Address:
Authorized Representative (typed or printed):
Authorized Representative (signature):
Title:
AFFIDAVIT
DELAWARE STATE POLICE HEADQUARTERS
PARKING LOT COMPLEX REHABILITATION
0586B059.A01 Addendum 1 (10/21/26) Bid Form / 00 41 13
OF
CONTRACTOR QUALIFICATIONS
We hereby certify that we will abide by the contractor’s qualifications outlined in the construction bid specifications for the duration of the contract term.
In accordance with Title 29, Chapter 69, Section 6962(d)(10)b.3 of the Delaware Code, after a contract has been awarded the successful bidder shall not substitute another subcontractor whose name was submitted on the Subcontractor Form except for the reasons in the statute and not without written consent from the awarding agency. Failure to utilize the subcontractors on the list will subject the successful bidder to penalties as outlined in the General Requirements Section 5.2 of the contract.
Contractor Name:
Contractor Address:
Authorized Representative (typed or printed):
Authorized Representative (signature):
Title:
Delaware State Police Headquarters Parking Lot Complex Rehabilitation Dover, Delaware MJ1002000067
0586B059.A01 Addendum No. 1 (10/21/22) Allowances / 01 21 00
SECTION 01 21 00
ALLOWANCES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division - 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section specifies administrative and procedural requirements for Allowances.
B. Types of Allowances may include the following (Refer to “Schedule of Allowances” include at the end of this Section):
1. Lump-sum Allowances.
C. Selection and Purchase:
1. Purchase products, systems and labor specifically selected (in writing) by the Owner and/or as indicated in the Schedule of Allowances.
D. Submittals:
1. Submit invoices or delivery slips to show the actual quantities of materials delivered to the site and labor executed for use in fulfillment of each Allowance.
E. Coordinate Allowance work with related work to ensure that each selection is completely integrated and interfaced with related work.
F. Lump-Sum Allowances:
1. These Allowances shall cover the cost to the Contractor, less any applicable trade discount, of the materials, labor and equipment required by the Allowance delivered at the site, and all applicable taxes.
2. The Contractor's costs for unloading and handling on the site, labor, installation costs, overhead, profit and other expenses contemplated for the original Allowance shall be included separately in the Contract Sum and not in the Allowance.
3. Whenever the cost is more than or less than the Allowance, the Contract Sum shall be adjusted accordingly by Change Order.
a. Change Order Mark-up: The amount of each change order resulting from final selection of products and systems covered by an Allowance shall be the difference between the Contractor’s purchase price amount and the Allowance, and shall not
Parking Lot Complex Rehabilitation Delaware State Police Headquarters MJ1002000067 Dover, Delaware
01 21 00 \ Allowances Addendum No. 1 (10/21/22) 0586B059.A01 include Contractor's mark-up (or subcontractor's mark-up) except to the extent clearly demonstrated (by Contractor) that either scope of installation or nature of work required was changed from that which could have been foreseen from description of Allowance and other information in contract documents. No mark-up is permitted for selection of higher or lower priced materials or systems, of same scope and nature as originally indicated.
b. Change Order Data: Where applicable, include in each change order proposal both the quantities of products being purchased and unit costs, along with total amount of purchase to be made. Where requested, furnish survey-of-requirements data to substantiate quantities. Indicate applicable taxes, delivery charges, and amounts of applicable trade discounts.
G. Unused Materials:
1. Return unused materials to the manufacturer or supplier for credit to the Owner, after installation has been completed and accepted.
a. When requested by the Owner, prepare unused material for storage by Owner where it is not economically practical to return the material for credit. When directed by the Owner, deliver unused material to the Owner's storage space. Otherwise, disposal of unused material is the Contractor's responsibility.
PART 2 - PRODUCTS (Not Applicable)
PART 3 – EXECUTION
3.1 EXAMINATION
A. Examine products covered by an Allowance promptly upon delivery for damage or defects.
3.2 PREPARATION
A. Coordinate materials and their installation for each Allowance with related materials and installations to ensure that each Allowance item is completely integrated and interfaced with related work. The general contractor shall be responsible for any necessary work that is not covered in each vendor’s proposal indicated in the Schedule of Allowances.
3.3 SCHEDULE OF ALLOWANCES
A. Allowance No. 1: Include an allowance entitled “Unforeseen Conditions” in the amount of
$30,000.00. This allowance will be utilized by the owner for owner elected changes to the work.
Any or all unused allowance monies shall be returned to the owner via a credit change order at the end of the project. This allowance shall be carried as an individual line item on the Application for Payment. (Include in base bid.)
B. Allowance No. 2: Include an allowance entitled “Downspout tie-in and testing” in the amount of
$10,000.00. For existing downspouts that are connected to a closed drainage system the contractor will flush the downspout to verify positive drainage into the collection system. For downspouts not properly draining, the downspout will be exposed and repaired as necessary.
Delaware State Police Headquarters Parking Lot Complex Rehabilitation Dover, Delaware MJ1002000067
0586B059.A01 Addendum No. 1 (10/21/22) Allowances / 01 21 00
Contractor will also connect up to 5 downspouts that surface drain and tie them into the underground system.
END OF SECTION