This file is Addendum No. 1 issued by the State of Delaware Office of Management and Budget, Division of Facilities Management, for the JP Court 4 Lobby Expansion project (Contract MJ0213000001A) located at 408 E. Stein Highway, Seaford, Delaware. The addendum includes pre-bid meeting minutes and a revised bid form dated August 19, 2026. The project scope involves demolition of the existing lobby area and construction of a new 900-square-foot addition with ADA-accessible toilet rooms and office space, along with updated mechanical, electrical, plumbing, and security systems. A mandatory pre-bid meeting was held on August 19, 2026, with attendance required for bid eligibility. Sealed bids are due by 1:00 p.m. local time on September 3, 2026, via the Bonfire Portal, with bids to be opened publicly at 2:00 p.m. at the Haslet Armory in Dover. All questions must be submitted in writing to Davis, Bowen & Friedel, Inc. by close of business on August 24, 2026, and substitution requests must be submitted by August 21, 2026. The contractor must achieve substantial completion within the calendar days specified on the bid form from the Notice to Proceed, with normal work hours from 8:00 a.m. to 4:00 p.m., Monday through Friday, excluding state holidays.
Bid security equal to ten percent of the base bid plus all additive alternates is required, with performance and payment bonds equal to 100 percent of the contract price required upon contract execution. The project is state-funded and subject to Delaware prevailing wage rates effective March 15, 2026, with contractors responsible for all permits and costs. General contractors and all subcontractors must be licensed to practice in the State of Delaware and City of Seaford prior to contract execution. A completed subcontractor list identifying one subcontractor per trade (site work, carpentry, flooring, roofing, mechanical, electrical, and fire alarm) must accompany the bid, and the failure to provide a fully completed list will result in bid rejection. Contractors must implement mandatory drug testing programs for all employees and provide Affidavits of Employee Drug Testing and Contractor Qualifications, each notarized. The allowance for unforeseen conditions is $75,000, with an alternate for removal and replacement of existing exterior windows. Addendum No. 1 clarifies that the contractor is responsible for building security, while the state's vendor is responsible for structured cabling, card readers, and security cameras, with the contractor responsible for back boxes, conduit, and coordination.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| OMB-MJ0213000001A-wages.pdf | ||
| OMB-MJ0213000001A-rfp.pdf | ||
| OMB-MJ0213000001A-Exemption From Plan Publication.docx | DOCX document | |
| OMB-MJ0213000001A-specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
601 E. MAIN STREET, SUITE 100, SALISBURY, MD 21804 • 410-543-9091
1 PARK AVENUE, MILFORD, DE 19963 • 302-424-1441
106 N. WASHINGTON STREET, SUITE 103, EASTON, MD 21601• 410-770-4744
207 E. WATER STREET, SUITE 100, CENTREVILLE, MD 21617 • 443.262.9130
www.dbfinc.com
Ring W. Lardner, P.E.
W. Zachary Crouch, P.E.
Michael E. Wheedleton, AIA, LEED GA Jason P. Loar, P.E.
Jamie L. Sechler, P.E.
JP COURT 4 LOBBY EXPANSION
408 E. STEIN HIGHWAY
SEAFORD, DELAWARE
DBF #0586B065.A01 OMB/DFM #MJ0213000001A
AUGUST 19, 2026
ADDENDUM NO. 1
The following items shall become a part of the contract documents. Contractor must acknowledge receipt of this addendum on the Bid Form. Failure to do so may subject the Bidder to disqualification.
Item No. 1 The pre-bid meeting minutes and sign-in sheet are attached to this addendum.
Item No. 2 The revised Bid Form is attached to this addendum.
Item No. 3 The contractor is responsible to secure the building each night.
Item No. 4 State’s vendor shall be responsible for structured cabling, card readers, and security cameras.
Contractor shall be responsible for back boxes, conduit, and coordination with State’s vendor.
END OF ADDENDUM
601 E. MAIN STREET, SUITE 100, SALISBURY, MD 21804 • 410-543-9091
1 PARK AVENUE, MILFORD, DE 19963 • 302-424-1441
106 N. WASHINGTON STREET, SUITE 103, EASTON, MD 21601• 410-770-4744
207 E. WATER STREET, SUITE 100, CENTREVILLE, MD 21617 • 443.262.9130
www.dbfinc.com
Ring W. Lardner, P.E.
W. Zachary Crouch, P.E.
Michael E. Wheedleton, AIA, LEED GA Jason P. Loar, P.E.
Jamie L. Sechler, P.E.
PREBID MEETING MINUTES
SEAFORD, DELAWARE
DBF #0586B065.A01 OMB/DFM #MJ0213000001A
AUGUST 19, 2026
In Attendance
OMB/DFM: Dean Seely jospeh.seely@delaware.gov Sean Gooden sean.gooden@delaware.gov
JP Court: Roger Roof roger.roof@delaware.gov Stephanie Parker stephanie.parker@delaware.gov
Davis, Bowen & Friedel, Inc.: Alicia Carter arc@dbfinc.com
Contractor attendees: See attached sign-in sheet.
Items Discussed
1. Attendance at the pre-bid is mandatory for general contractors to submit a bid. An attendance list is attached. A brief project description was given by DBF.
2. Bids will be accepted until 1:00 p.m. local time on September 3, 2026, on Bonfire Portal. Bids will be read in the conference room at the Haslet Armory, 122 Martin Luther King Jr. Blvd South, Dover, DE 19901, at 2:00 p.m. If the bid date and time change, the revised bid date and time will be issued via written Addendum. Please allow extra time when submitting bids to account for possible delays. No late bids will be considered. Sealed bids are not accepted.
3. All questions during the bidding shall be submitted in writing to Davis, Bowen & Friedel, Inc., attention: Michael Bauman, via email mpb@dbfinc.com no later than close of business on August 24, 2026. All substitution requests need to be submitted by August 21, 2026. No addenda will be issued 2 days prior to the date for receipt of bids except an addendum withdrawing the request for bids or one which extends the time or changes the location for the opening of bids.
4. Bid forms must be submitted along with a Bid Bond equal to ten percent of the bid price and all add alternates. All bid submission documents, including the bid bond, must be completed on the forms provided in the specifications. A Performance and Payment Bonds equal to 100 percent of the contract amount must also be posted upon execution of the contract. Bonds must also cover
Pre-Bid Meeting Minutes JP Court 4 Lobby Expansion August 19, 2026 the allowance and alternates. No construction schedules are required with the bid.
5. Contractor shall note the projected contract duration on the Bid Form. Contract duration is the time from issuance of the Purchase Order to Substantial Completion.
6. The subcontractor list must accompany the Bid Form and be fully completed in order to submit a qualifying bid. The subcontractor list shall include the following trades: site work, carpentry, flooring, roofing, mechanical, electrical, and fire alarm.
7. The prime general contractor and all subcontractors must be licensed to practice their trade in the
State of Delaware and the City of Seaford prior to execution of the contract.
8. General Contractors who wish to receive addenda directly and be on the bidders list must purchase one (1) set of bid documents from Davis, Bowen & Friedel, Inc. An electronic set can be purchased for $25.00.
9. A walkthrough of the areas of work will take place after today’s meeting.
10. Funding: The project is state funded. Prevailing Wage Rates will be required. For bidding purposes, contractors should refer to the rates and benefits for Building Construction effective March 15, 2026. The contractor will be responsible for sending wage reports to the Department of Labor.
11. Submissions: All permits and costs are the responsibility of the contractor. DBF shall review impact fee responsibility.
12. The contractor will be responsible for having a supervisor on-site at all times during work of any subcontractors or their own forces, including punch-list work.
13. Normal business hours are 8:00 a.m. to 4:00 p.m., Monday through Friday, except State holidays.
14. The Owner will provide water service and power. Contractor shall provide their own toilet facility.
15. The contractor shall be responsible for the means and methods required to complete the scope of work.
16. The Affidavit of Craft Training Compliance and the Affidavit of Employee Drug testing for the
General Contractor and all Subcontractors shall be required prior to Contract execution.
17. The electrical contractor shall install conduits and backboxes for security cameras/card readers.
Pre-Bid Meeting Minutes JP Court 4 Lobby Expansion August 19, 2026
18. Construction cannot start until materials are obtained by the contractor to limit the time frame the building is shut down to a minimum.
19. The mechanical system will be tied back into the existing BAS system.
20. The building will be partially occupied during construction by administrative staff.
21. The State notes that the project is FOIA and requests that contractor’s control and limit exposure in terms of electronic drawing circulation where possible.
22. Facility BAS contractor is Modern Controls.
23. Contractor owns temporary fencing. It is anticipated that the majority of the public parking lot could be fenced for laydown area.
Any changes, additions or deletions to these minutes should be submitted in writing to Davis, Bowen & Friedel, Inc., within ten (10) days.
Respectfully submitted, DAVIS, BOWEN & FRIEDEL, INC.
Alicia R. Carter Architectural Designer cc: All attendees
STATE OF DELAWARE
OFFICE OF MANAGEMENT AND BUDGET
DIVISION OF FACILITIES MANAGEMENT
CONTRACT #MJ0213000001A
SEAFORD, DELAWARE
0586B065.A01 Addendum No. 1 (8/19/26) Bid Form / 00 41 13
SECTION 00 41 13
BID FORM
For Bids Due: To: State of Delaware Division of Facilities Management 122 Martin Luther King Jr. Blvd South Dover, DE 19901
Name of Bidder:
Delaware Business License No.: Taxpayer ID No.:
(Other License Nos.):
Phone No.: ( ) - Fax No.: ( ) -
The undersigned, representing that he has read and understands the Bidding Documents and that this bid is made in accordance therewith, that he has visited the site and has familiarized himself with the local conditions under which the Work is to be performed, and that his bid is based upon the materials, systems and equipment described in the Bidding Documents without exception, hereby proposes and agrees to provide all labor, materials, plant, equipment, supplies, transport and other facilities required to execute the work described by the aforesaid documents for the lump sum itemized below:
ALLOWANCES
Allowances conform to applicable project specification section. Refer to specifications for a complete description.
Allowance No. 1: Provide an allowance of $75,000.00 for unforeseen conditions. _______ acknowledged
ALTERNATES
Alternates conform to applicable project specification section. Refer to specifications for a complete description.
Alternate No. 1: Remove and replace existing exterior windows. Add/Deduct: $______________________________
DIVISION OF FACILITIES MANAGEMENT
CONTRACT #MJ0213000001A
00 41 13 \ Bid Form Addendum No. 1 (8/19/26) 0586B065.A01
I/We acknowledge Addendums numbered and the price(s) submitted include any cost/schedule impact they may have.
This bid shall remain valid and cannot be withdrawn for thirty (30) days from the date of opening of bids (60 days for School Districts and Department of Education), and the undersigned shall abide by the Bid Security forfeiture provisions. Bid Security is attached to this Bid.
The Owner shall have the right to reject any or all bids, and to waive any informality or irregularity in any bid received.
This bid is based upon work being accomplished by the Sub-Contractors named on the list attached to this bid.
Should I/We be awarded this contract, I/We pledge to achieve substantial completion of all the work within calendar days of the Notice to Proceed.
The undersigned represents and warrants that he has complied and shall comply with all requirements of local, state, and national laws;
that no legal requirement has been or shall be violated in making or accepting this bid, in awarding the contract to him or in the prosecution of the work required; that the bid is legal and firm; that he has not, directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken action in restraint of free competitive bidding.
Upon receipt of written notice of the acceptance of this Bid, the Bidder shall, within twenty (20) calendar days, execute the agreement in the required form and deliver the Contract Bonds, and Insurance Certificates, required by the Contract Documents.
I am / We are an Individual / a Partnership / a Corporation
By Trading as (Individual’s / General Partner’s / Corporate Name)
(State of Corporation)
Business Address:
Witness: By:
( Authorized Signature )
(SEAL)
( Title ) Date:
ATTACHMENTS
Sub-Contractor List Non-Collusion Statement Affidavit of Employee Drug Testing Program Affidavit of Contractor Qualifications Bid Security (Others as Required by Project Manuals)
DIVISION OF FACILITIES MANAGEMENT
CONTRACT #MJ0213000001A
SUBCONTRACTOR LIST
In accordance with Title 29, Chapter 69, Section 6962(d)(10)b of the Delaware Code, the following subcontractor listing must accompany any bid submittal. The bidder must list in each category the full name and address (City & State) of the sub-contractor that the bidder will be using to perform the work and provide material for that subcontractor category. Should the bidder’s listed subcontractor intend to provide any of their subcontractor category of work through a third-tier contractor, the bidder shall list that third-tier contractor’s full name and address (City & State). If the bidder intends to perform any category of work itself, it must list its full name and address. For clarification, if the bidder intends to perform the work themselves, the bidder may not insert “not applicable”, “N/A”, “self” or anything other than its own full name and address (City & State). To do so shall cause the bid to be rejected. In addition, the failure to produce a completed subcontractor list with the bid submittal shall cause the bid to be rejected. If you have more than three (3) third-tier contractors to report in any subcontractor category, print out additional page(s) containing the appropriate category, complete the rest of your list of third-tier contractors for that category, notate the addition in parentheses as (CONTINUATION) next to the subcontractor category and an asterisk (*) next to any additional third-tier contractors, and submit it with your bid.
Subcontractor Category Subcontractor Address (City & State) Subcontractors tax-payer ID # or Delaware Business license #
1. Site Work
A.
B.
C.
2. Carpentry
A.
DIVISION OF FACILITIES MANAGEMENT
CONTRACT #MJ0213000001A
3. Flooring
4. Roofing
5. Mechanical
DIVISION OF FACILITIES MANAGEMENT
CONTRACT #MJ0213000001A
6. Electrical
7. Fire Alarm
DIVISION OF FACILITIES MANAGEMENT
CONTRACT #MJ0213000001A
NON-COLLUSION STATEMENT
This is to certify that the undersigned bidder has neither directly nor indirectly, entered into any agreement, participated in any collusion or otherwise taken any action in restraint of free competitive bidding in connection with this proposal submitted this date (to the Office of Management and Budget, Division of Facilities Management).
All the terms and conditions of MJ0213000001A have been thoroughly examined and are understood.
NAME OF BIDDER:
AUTHORIZED REPRESENTATIVE
(TYPED):
AUTHORIZED REPRESENTATIVE
(SIGNATURE):
TITLE:
ADDRESS OF BIDDER:
E-MAIL: ______________________________________________________________
PHONE NUMBER:
Sworn to and Subscribed before me this day of 20 .
My Commission expires . NOTARY PUBLIC .
THIS PAGE MUST BE SIGNED AND NOTARIZED FOR YOUR BID TO BE CONSIDERED.
DIVISION OF FACILITIES MANAGEMENT
CONTRACT #MJ0213000001A
AFFIDAVIT
OF
EMPLOYEE DRUG TESTING PROGRAM
4104 Regulations for the Drug Testing of Contractor and Subcontractor Employees Working on Large Public Works Projects requires that Contractors and Subcontractors implement a program of mandatory drug testing for Employees who work on Large Public Works Contracts funded all or in part with public funds.
We hereby certify that we have in place or will implement during the entire term of the contract a Mandatory Drug Testing Program for our employees on the jobsite, including subcontractors, that complies with this regulation:
Contractor/Subcontractor Name:
Contractor/Subcontractor Address:
Authorized Representative (typed or printed):
Authorized Representative (signature):
Title:
DIVISION OF FACILITIES MANAGEMENT
CONTRACT #MJ0213000001A
AFFIDAVIT
OF
CONTRACTOR QUALIFICATIONS
We hereby certify that we will abide by the contractor’s qualifications outlined in the construction bid specifications for the duration of the contract term.
In accordance with Title 29, Chapter 69, Section 6962(d)(10)b.3 of the Delaware Code, after a contract has been awarded the successful bidder shall not substitute another subcontractor whose name was submitted on the Subcontractor Form except for the reasons in the statute and not without written consent from the awarding agency. Failure to utilize the subcontractors on the list will subject the successful bidder to penalties as outlined in the General Requirements Section 5.2 of the contract.
Contractor Name:
Contractor Address:
Authorized Representative (typed or printed):
Authorized Representative (signature):
Title:
File details come from the government source that posted it. Updated .