olym01207_Staking Notes MAIN01 HR West.pdf

PDF 446 KB Posted

Attached to
WA NPS OLYM 12(7), Repair Slumps on Hurricane Ridge and Obstruction Point Road
Solicitation number
69056721B000025
Issued by

About this file

This document contains staking notes and cross section data for a federal highway project to repair slumps on Hurricane Ridge and Obstruction Point Road in Olympic National Park in Washington state. The project includes repairing slumps along Hurricane Ridge Road from station -16.198 to station 15.972, with elevations ranging from 5221.981 to 5226.787 feet. The staking notes provide station offsets and elevations for slope stakes, pavement shoulders, centerlines, and existing ground along this section of road. The related federal contract opportunity is solicitation number 69056721B000025 for the WA NPS OLYM 12(7) project. The solicitation is being issued by the Department of Transportation Federal Highway Administration to repair slumps on the two roads. No other details are provided on the terms, pricing, or response requirements for the contract opportunity.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PHYSICAL DATA

for

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

WA NPS OLYM 12(7)

REPAIR SLUMPS ON HURRICANE RIDGE AND

OBSTRUCTION POINT ROAD

STAKING REPORT

Hurricane Ridge Road (West)

Set Name:

Alignment Name:

Input Grid Factor:

Note: All units in this report are in feet unless specified otherwise.

Surface:

Station:

Feature Slope_Stake_Cut_L Pavt_Shdr_Layer2_L Pavt_CL_Layer2 Pavt_Shdr_Layer2_R Offset -16.198 -16.179 0 14.299 Elevation 5226.087 5226.049 5226.379 5226.786 Northing 364934.111 364934.093 364918.313 364904.367 Easting 988954.701 988954.706 988958.277 988961.433 Existing Ground 5226.087 5226.095 5227.209 Slope -2 0.02 0.028

Station:

Feature Slope_Stake_Cut_L Pavt_Shdr_Layer2_L Pavt_CL_Layer2 Pavt_Shdr_Layer2_R Slope_Stake_Cut_R Offset -14.842 -14.734 0 16.178 16.526 Elevation 5225.316 5225.102 5225.361 5225.779 5226.474 Northing 364945.187 364945.084 364930.962 364915.456 364915.123 Easting 989002.391 989002.422 989006.624 989011.238 989011.337 Existing Ground 5225.316 5225.351 5226.192 5226.486 5226.474 Slope -2 0.018 0.026 2

Station:

Feature Slope_Stake_Cut_L Pavt_Shdr_Layer2_L Pavt_CL_Layer2 Pavt_Shdr_Layer2_R Slope_Stake_Cut_R Offset -15.763 -15.538 0 15.663 16.055 Elevation 5224.244 5223.795 5224.111 5224.118 5224.903 Northing 364961.583 364961.373 364946.808 364932.127 364931.76 Easting 989048.545 989048.623 989054.037 989059.494 989059.631 Existing Ground 5224.244 5224.291 5224.832 5224.942 5224.903 Slope -2 0.02 0 2

Station:

Feature Slope_Stake_Cut_L Pavt_Shdr_Layer2_L Pavt_CL_Layer2 Pavt_Shdr_Layer2_R Slope_Stake_Fill_R Offset -16.08 -15.67 0 16.414 16.471 Elevation 5221.981 5221.161 5221.861 5220.802 5220.688 Northing 364979.381 364978.997 364964.319 364948.945 364948.891 Easting 989095.239 989095.382 989100.87 989106.619 989106.638 Existing Ground 5221.981 5221.836 5221.957 5220.722 5220.688 Slope -2 0.045 -0.065 -2

Station:

Feature Slope_Stake_Cut_L Pavt_Shdr_Layer2_L Pavt_CL_Layer2 Pavt_Shdr_Layer2_R Slope_Stake_Cut_R Offset -15.296 -15.186 0 15.94 15.972 Elevation 5219.772 5219.553 5219.787 5219.633 5219.908 Northing 364987.401 364987.299 364973.074 364958.144 364958.113 Easting 989118.93 989118.969 989124.287 989129.869 989129.881 Existing Ground 5219.772 5219.813 5220.555 5219.716 5219.698 Slope -2 0.015 -0.01 8.491

Cross Section Gradebook with Northing/Easting Report

Report Created: Wednesday, March 30, 2022 Time: 11:12:48 AM

HurricaneRidge1

MAIN01

MAIN01

File details come from the government source that posted it. Updated .