olym01207_Clearing Limits MAIN01 HR West.pdf
PDF 321 KB Posted
- Solicitation number
- 69056721B000025
About this file
This document provides clearing limits and baseline alignment details for repair work on roads in Olympic National Park in Washington state. The Federal Highway Administration Western Federal Lands Highway Division is soliciting bids under number 69056721B000025 to repair slumps on Hurricane Ridge and Obstruction Point Road. The alignment details specify station points, offsets, northings and eastings to define the project scope and limits. The Department of Transportation will award a contract to perform repairs on the roads managed by the National Park Service within the specified project boundaries.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PHYSICAL DATA
for
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
WA NPS OLYM 12(7)
REPAIR SLUMPS ON HURRICANE RIDGE AND
OBSTRUCTION POINT ROAD
CLEARING LIMITS REPORT
Hurricane Ridge Road (West)
Project:
Description:
Baseline (Active) Alignment:
File Name:
Last Revised:
Input Grid Factor: Note: All units in this report are in feet unless specified otherwise.
Offset Alignment Baseline Alignment () (MAIN01) Baseline Alignment Offset Alignment Offset Alignment Point Name Station Offset Northing Easting
100.00 -18.199 364936.059 988954.244
125.00 -17.228 364940.9 988978.187
150.00 -16.842 364947.104 989001.821
175.00 -17.683 364955.261 989024.857
200.00 -17.739 364963.436 989047.856
225.00 -17.779 364972.217 989071.227
250.00 -18.102 364981.274 989094.531
275.00 -17.296 364989.275 989118.23
100.00 17.073 364901.657 988962.029
125.00 18.208 364906.617 988987.156
150.00 18.494 364913.236 989011.899
175.00 18.074 364921.348 989036.192
200.00 18.997 364929.002 989060.656
225.00 20.365 364936.489 989084.585
250.00 21.731 364943.964 989108.481
275.00 23.287 364951.262 989132.442
Station Offset Northing Easting Report
Report Created: Wednesday, March 30, 2022 Time: 8:13:50 AM
2D Design SurvFt
MAIN01
C:\Users\Jason.VanDyke\Desktop\Export From ProjectWise\Managed\olym01207_clearing.dgn 3/30/2022 7:54
File details come from the government source that posted it. Updated .