Old State Capitol SHS Scope Concrete Reapirs .docx
DOCX document 27 MB Posted
- Attached to
- EMA - Sandbag Machines
- Solicitation number
- 26-588IEMA-MGMTA-B-50617
- Issued by
- St. Clair County, Illinois
About this file
This is a Scope of Work document for the Old State Capitol State Historic Site Concrete Repair Project managed by the Illinois Department of Natural Resources (IDNR). The project encompasses concrete repair work in the west underground garage pedestrian stairwell, including scraping and repairing spalled and broken concrete on ceilings and walls, followed by priming and painting with masonry paint designed for water repellency in high-moisture environments. Additional work includes removing and replacing a broken door frame on the lower level of the pedestrian hallway with a steel fire-rated left-swing door equipped with a closer and code-compliant hardware, and repairing broken ceiling concrete while replacing a missing bracket that supports a sewer line. A minimum of 51 percent of the work must be completed by the Prime Contractor as required under Illinois Compiled Statutes (30 ILCS 500/1-15.17).
The contractor must comply with all applicable licensing requirements from local, county, state, and federal agencies and is prohibited from performing services or incurring expenses exceeding the contract amount without prior written authorization from the state. IDNR reserves the right to suspend work at any time if the Primary Job Coordinator determines that work has not met desired project goals. The document includes reference images depicting examples of the desired concrete repair quality and completion standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sandbag Machine Q and A.docx | DOCX document | |
| Sandbag Machine Contract 2.docx | DOCX document | |
| B-50617 Sandbag Machines IFB Vendor Instructions and Requirements-v26-1.docx | DOCX document | |
| IPG Active Registered Vendor Disclosure - Formerly Forms B~2.docx | DOCX document | |
| IL Standard Terms and Conditions~7.pdf | ||
| Vendor Disclosure - Formerly Forms A~2.docx | DOCX document | |
| IIS ipg active registered vendor disclosure form.docx | DOCX document | |
| Offer to State of Illinois~1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Old State Capitol SHS Concrete Repair Project Scope of Work:
1. Scrape (and remove as necessary) and repair spalled and broken concrete on ceiling and walls in west underground garage pedestrian stairwell. Prime and paint repaired surfaces with masonry paint designed for water repellency and formulated for high-moisture environments.
2. Remove broken door frame on lower level of pedestrian hallway and install steel fire-rated door (left swing) with closer and code compliant hardware.
3. Repair broken concrete in ceiling and replace missing bracket supporting sewer line. Remove loose concrete and repair.
4. A minimum of fifty-one percent (51%) of the work shall be completed by the Prime Contractor on this project. Pursuant to (30 ILCS 500/1-15.17) the Contractor is the person having a contract with the Illinois Department of Natural Resources.
5. Contractor shall be responsible for compliance with all applicable contractor and trades person licensing requirements with the appropriate local, County, State and Federal agencies
6. Contractor shall not perform services, provide supplies or incur expenses in amount exceeding the amount shown in this contract, unless the State has authorized a higher amount in writing prior to the Vendor performing the services, providing the supplies, or incurring the expenses.
7. Work may be suspended at any time if IDNR Primary Job Coordinator determines that work has met, or falls short of, desired project goals.
Example of how it should look.
Remove loose concrete and repair.
image6.png image7.png image1.png image2.png image3.png image4.png image5.png
File details come from the government source that posted it. Updated .