OCPW_&_GM-SD-DD_REV_ARCH_-_PLAN_UPDATE_-_3-18-2026.pdf
PDF 25 MB Posted
- Attached to
- Construction Management at Risk (CMR) Services for the new Public Works & Growth Management Facility
- Solicitation number
- RFQ PW 39-26
- Issued by
- Okaloosa County, Florida
About this file
This document comprises architectural plan updates dated March 18, 2026, for the Okaloosa County Public Works & Growth Management Complex in Pensacola, Florida, prepared in conjunction with a Construction Management at Risk (CMR) services procurement. The project involves the design and construction of a comprehensive public works and growth management facility featuring multiple buildings and support structures across approximately 56,000 square feet of developed area. Building A serves as the administration complex for both Growth Management and Public Works departments, containing approximately 40,800 square feet with 34 offices, training and dining facilities, supply warehouses, and specialized spaces including a mosquito control truck bay. Building B is designated for fleet maintenance with 19,657 enclosed gross square feet and two open vehicle bays, including service bays, welding facilities, and equipment storage. Building C provides equipment storage totaling 13,350 square feet with designated parking for multiple pieces of heavy equipment and machinery. The facility also includes Building D for mosquito control storage, Building F as a fuel station with four pump islands, a Household Hazardous Waste (HHW) building of 1,530 square feet, and various support structures including vehicle wash areas, equipment lay-down yards, and parking facilities accommodating approximately 150 parking spaces across two parking lots.
The plans indicate the complex includes detailed floor plans with room-by-room specifications, dimensional accuracy to the nearest eighth inch, and comprehensive site planning with drive-thru access, outdoor covered areas, dumpster pads, and fencing. The facility design accommodates specialized equipment including bridge cranes, monorail lifts, fuel storage tanks, electrical equipment, and mechanical systems. The county is seeking CMR services divided into two contract parts: Part A covering pre-construction services and Part B addressing construction performance phase services. Selection will follow the Florida Consultants Competitive Negotiation Act (Chapter 287.055, Florida Statutes) with anticipated award of services to a single firm or qualified individual licensed to practice in Florida, subject to negotiations and potential modifications to the proposed draft agreement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date
Drawn By
Checked By
325 S. PALAFOX STREET
PENSACOLA, FL 32502
T (850) 433-7842 F (850) 433-0510
REVISIONS
SEAL
A000
COVER SHEET
P U
B L
IC
W O
R K
S
G R
O W
T H
M A
N A
G E
M E
N T
C O
M P
L E
X
O K
A L
O O
S A
C O
U N
T Y
F
L
Checker
Author
03/18/26
No. Description Date
OKALOOSA COUNTY PUBLIC WORKS & GROWTH MANAGEMENT
COMPLEX
03/18/2026 - PLAN UPDATES
P1
S U
P P
L Y
D R
IV
E
T H
R U
B
C
G
E
POND
A
PIPE YARD
56,000 SF
MOSQUITO
CHEMICAL
STORAGE
UNIT.
140' - 0"
STOR.
F
MOSQUITO
CONTROL
POND W/
POND LIGHTS
(FUTURE)
100' - 0"
400' - 0"
382' - 0"
24' - 0"
402' - 0"
60' - 0"
60' - 0"
82' - 0"
131' - 0"
40' - 0"24' - 0"40' - 0"
13' - 5 5/8" 120' - 0"
50' - 0"
15' - 0" 24' - 0"
275' - 0"
40' - 0" 43' - 0" 24' - 0"
21' - 0"40' - 0"24' - 0"40' - 0"
40' - 0"
61' - 0"
26' - 0" 40' - 0"
/4
/8
/4
8' - 0"
32' - 0"
24' - 0"
/4
10' - 0"
40' - 0"
26' - 0"
28' - 0"
DRIVE-THRU
20' - 0" 24' - 0"
/8
EXPANSION
AREA
EXPANSION
AREA
OUTDOOR COVERED
AREA
8' - 0"
LOADING ACCESS
(NO DOCK)
ELECTRICAL
EQUIP. /
TRANSFORMER
/ GENERATOR
/8
P2
18' - 0"
FUTURE CONNECTOR ROAD
/8
1056' - 6"
/8
20' - 0"
24' - 0"
280' - 0"
DUMPSTER PAD
& ENCLOSURE
362' - 0"
100' - 0"
FUTURE HHW
BUILD-OUT
"2
36' - 0"50' - 0"
114' - 0"
76' - 0"
AREA FOR LIFT STATION
18' - 10 1/2"
/2
108' - 0"
LARGE VEHCILE /
EQUIPMENT PARKING
(GRAVEL PARKING)
20' - 0"20' - 0" 28' - 0" 20' - 0"20' - 0"
DUMPSTER PAD & ENCLOSURE
100' - 7 7/8"
/4
/4
25' - 0"
10' - 0"
FENCE
FENCE &
SECURE GATE
402' - 0"19' - 10 3/8"
EQUIPMENT / VEHICLE
WASH DOWN AREA.
HIGH PRESSURE HOSE.
PROTECT POND FROM
WASH RUNOFF.
PROVIDE EXTERIOR
EYE WASH STATION,
HOSE BIBB, AND POWER.
D
E
LAY DOWN AREA
(40,000 SF)
FENCE &
MANUAL GATE
SECURE GATE
FENCE
19' - 10 3/8"
PARKING LOT TYPE 2
APPROXIMATELY 40
PARKING SPACES
P2
210' - 0"
PARKING LOT TYPE 1
APPROXIMATELY 110
PARKING SPACES
P1
B
BUILDING B
FLEET MAINTENANCE
C
BUILDING C
EQUIPMENT STORAGE (14,200 SF)
D
BUILDING D (REUSE EXISTING UNIT)
MOSQUITO CONTROL
STORAGE COOLER
VARIES
V A
R
IE
S
E
AREA E
EQUIPMENT LAY DOWN
& PIPE YARD AREAS
F
BUILDING F
FUEL STORAGE AREA
(4 GAS PUMPS)
82' - 0"
STOR.
MATERIAL STORAGE STRUCTURE / AREA
30' - 0"
362' - 0"
275' - 0"
G
BUILDING G
VEHICLE WASH AREA
FENCE
85' - 0"
HHW BUILDING HHW
HOUSEHOLD WASTE (1,530 SF)
360' - 0"
BUILDING A ADMINISTRATION
(GROWTH MANAGEMENT &
PUBLIC WORKS) (40,800 SF)
(25,000 SF)
TOTAL BUILDING SF=
93,837 SF
MOSQUITO CONTROL
SPACE IS INCORPORATED
INTO BUILDING 'A'.
VEHICLES TO BE STORED
IN BUILDING 'B' OR 'C'.
263' - 0"
A
139' - 0"
402' - 0"
GMPW
POND
EXPANSION
AREA EXPANSION
AREA
60' - 0"
60' - 0"
VARIES
50' - 0"
20' - 0"
Date
Drawn By
Checked By
325 S. PALAFOX STREET
PENSACOLA, FL 32502
T (850) 433-7842 F (850) 433-0510
REVISIONS
SEAL
A100.2
SITE PLAN -
DIMENTIONED
P U
B L
IC
W O
R K
S
G R
O W
T H
M A
N A
G E
M E
N T
C O
M P
L E
X
O K
A L
O O
S A
C O
U N
T Y
F
L
Checker
Author
03/18/26
No. Description Date
1" = 50'-0"
SITE PLAN - SCHEMATIC - DIMENSIONED
1" = 100'-0"
SITE PLAN - SCHEMATIC LEGEND - DIMENTIONED PLAN
A.11
A.10
A.10
A.9
A.9
A.8
A.8
A.6
A.6
A.5
A.5
A.4
A.4
A.3
A.3
A.1
A.1
A.7
A.7
A.18A.17A.16A.15A.14A.13
A.AA.A
A.C
A.E
61 SF
RR
A84
241 SF
WOMEN
A94
210 SF
MEN
A95
343 SF
BREAK ROOM
A96
478 SF
KITCHEN
A98
135 SF
ADMIN. COORD.
A99
69 SF
LACTATION RM
A100
153 SF
OFFICE
A110
154 SF
OFFICE
A111
151 SF
OFFICE
A112
158 SF
OFFICE
A113
242 SF
COPY - SUPPLIES
A116
294 SF
OFFICE
A117
167 SF
OFFICE
A119
637 SF
STORAGE
A120
167 SF
OFFICE
A121
162 SF
OFFICE
A122
150 SF
OFFICE
A123
238 SF
OFFICE
A124
244 SF
OFFICE - (SCOTT)
A125
150 SF
OFFICE
A126
290 SF
OFFICE - SCOTT
A127
218 SF
OFFICE - ROB
A128
216 SF
OFFICE - (ST)
A129
240 SF
OFFICE - (MA)
A130
250 SF
SURVEY
A132
139 SF
OFFICE
A139
150 SF
OFFICE
A141
170 SF
STORAGE
A146
2409 SF
TRAINING / DINING
A147
212 SF
OFFICE
A150
150 SF
OFFICE
A159
167 SF
RECEPT.
A162
142 SF
OFFICE
A163
131 SF
OFFICE
A164
209 SF
OFFICE
A165
140 SF
OFFICE
A166
140 SF
OFFICE
A167
140 SF
OFFICE
A168
140 SF
OFFICE
A169
2723 SF
PERMIT TECH
A172
461 SF
CONFERENCE RM
A174
140 SF
OFFICE
A176
207 SF
CONFERENCE
A179105 SF
ELEC RM
A180
309 SF
MECH RM
A181
149 SF
OFFICE
A183
146 SF
OFFICE
A184
182 SF
OFFICE
A185
64 SF
CUST. CL.
A189
32 SF
CLOSET
A190
494 SF
GM WAITING
A196
142 SF
OFFICE
A199
178 SF
OFFICE (PATTY)
A200
241 SF
STORM -OFFICE
A237
235 SF
BR - OFFICE
A238
218 SF
ASPHALT - OFFICE
A239
216 SF
MAINT - OFFICE
A240
164 SF
TELCOM
A251
1129 SF
MECHANICAL RM.
A252
194 SF
ELEC RM
A255
COVERED
ENTRY
PORCH
234 SF
CONFERENCE
A264
BULL PEN
SCANNER
P R
IN
T
E R
P L A
T S
NORTH AREA
SOUTH AREA
139 SF
OFFICE
A140
A201.1
48 SF
M SHOWER
A268
4090 SF
SUPPLY WAREHOUSE
A144
132 SF
OFFICE
A273
134 SF
OFFICE
A317
101 SF
TELCOM
A188
253 SF
M RR
A323
96 SF
W RR
A324
72 SF
W SHOWER
A325
44 SF
CUSTODIAL
A246
794 SF
WEST CORRIDOR
A334
262' - 9 7/8" 139' - 2 1/8"
402' - 0 1/8"
/8
/4
A200.1
A.2
A.2
A.DA.D
A.B
A.G
A.H
A.F
A.12
A.12
A200.12
A200.1
A200.1 4
132 SF
OFFICE
A286
180 SF
VESTIBULE
A346
142 SF
OFFICE
A114
3856 SF
CORRIDOR PW EAST
A97
556 SF
RECEPTION
A347
1124 SF
MOSQUITO CONTROL TRUCK
BAY
A342
172 SF
MOSQUITO OFFICE 1
A340
A.11A.10A.9A.8A.6A.5A.4A.3A.1 A.7
A.18A.17A.16A.15A.14A.13
A.A
A.C
A.E
A.2
A.D
A.B
A.G
A.H
A.F
A.12
915 SF
SUPPLY STORAGE
A379
575 SF
SUPPLY WORK AREA
A241
624 SF
SIGN SHOP
A378
472 SF
SMALL ENGINE
A388
164 SF
OFFICE
A377
164 SF
OFFICE
A376
144 SF
OFFICE
A375
144 SF
OFFICE
A373
333 SF
STORAGE
A374
331 SF
BREAK RM.
A370
47 SF
RR
A372
48 SF
RR
A371
2723 SF
PERMIT TECH
A172
48 SF
RR
A364
47 SF
RR
A363
170 SF
LAB
A393
83 SF
HALL
A394
457 SF
WEST SUPPLY CORRIDOR
A386
Date
Drawn By
Checked By
325 S. PALAFOX STREET
PENSACOLA, FL 32502
T (850) 433-7842 F (850) 433-0510
REVISIONS
SEAL
A101.1
OCPW & GM -
BLDG A
OVERALL KEY
FLOOR PLAN -
1/16"=1'-0"
P U
B L
IC
W O
R K
S
G R
O W
T H
M A
N A
G E
M E
N T
C O
M P
L E
X
O K
A L
O O
S A
C O
U N
T Y
F
L
Checker
Author
03/18/26
1/16" = 1'-0"
BLDG A OCPW & GM- REF FLOOR PLAN - 1-16"
No. Description Date
A.10
A.10
A.9
A.9
A.8
A.8
A.6
A.6
A.5
A.5
A.4
A.4
A.3
A.3
A.1
A.1
A.7
A.7
A.15A.14A.13
A.AA.A
A.C
A.E
A201.1
A200.1
A.2
A.2
A.D
A.B
A.G
A.H
A.F
A.12
A.12
A200.1
A200.1 4
61 SF
RR
A84
/4
9' - 7 7/8"
25' - 5"
12' - 3 7/8"12' - 10 3/8"
60' - 0 3/4"15' - 0 3/8"
11' - 7 1/4"
262' - 9 7/8"
135 SF
ADMIN. COORD.
A99
/8
/4
7' - 6 3/4"
69 SF
LACTATION RM
A100
5' - 8 5/8"
153 SF
OFFICE
A110
154 SF
OFFICE
A111
151 SF
OFFICE
A112
158 SF
OFFICE
A113
242 SF
COPY - SUPPLIES
A116
294 SF
OFFICE
A117
167 SF
OFFICE
A119
637 SF
STORAGE
A120
167 SF
OFFICE
A121
162 SF
OFFICE
A122
150 SF
OFFICE
A123
238 SF
OFFICE
A124
244 SF
OFFICE - (SCOTT)
A125
150 SF
OFFICE
A126
290 SF
OFFICE - SCOTT
A127
218 SF
OFFICE - ROB
A128
216 SF
OFFICE - (ST)
A129
240 SF
OFFICE - (MA)
A130
250 SF
SURVEY
A132
139 SF
OFFICE
A139
139 SF
OFFICE
A140
150 SF
OFFICE
A141
4090 SF
SUPPLY WAREHOUSE
A144
170 SF
STORAGE
A146
2409 SF
TRAINING / DINING
A147
478 SF
KITCHEN
A98
5' - 5 1/8"
/8
21' - 6 3/4"16' - 1 7/8"
/4
5' - 0"
212 SF
OFFICE
A150
150 SF
OFFICE
A159
9' - 7 7/8"
19' - 4 1/2"
/8
12' - 0"12' - 3 1/8"
/8
4' - 9 5/8"12' - 3 1/8"
12' - 0"
27' - 8"
/8
167 SF
RECEPT.
A162
142 SF
OFFICE
A163
131 SF
OFFICE
A164
209 SF
OFFICE
A165
140 SF
OFFICE
A166
140 SF
OFFICE
A167
140 SF
OFFICE
A168
140 SF
OFFICE
A169
2723 SF
PERMIT TECH
A172
12' - 0"12' - 0"
/4
461 SF
CONFERENCE RM
A174
/4
343 SF
BREAK ROOM
A96
/8
12' - 0"
/8
140 SF
OFFICE
A176
101 SF
TELCOM
A188
32 SF
CLOSET
A190
494 SF
GM WAITING
A196
11' - 7"
142 SF
OFFICE
A199
178 SF
OFFICE (PATTY)
A200
26' - 0"26' - 0"24' - 0"31' - 0"18' - 3"23' - 5"30' - 4"
OFFICE STAFFFIELD STAFF
COVERED SALLY PORT
NORTH AREA
SOUTH AREA
BULL PEN
OFFICE STAFFFIELD STAFF
COVERED
PORCH
COVERED
ENTRY
PORCH
TOOLS
DOCK
S H
E L F
FORK LIFTS (2)
MIXERS (4)
METAL BLANKS
HOSES
SIGN POSTES
S A
W S
PALLETS
P L A
T S
P R
IN
T
E R
SCANNER
GROWTH MANAGEMENT
GROWTH MANAGEMENTPUBLIC WORKS
PUBLIC WORKS
/8
235 SF
BR - OFFICE
A238
218 SF
ASPHALT - OFFICE
A239
216 SF
MAINT - OFFICE
A240
11' - 11 3/4"
/2
/8
/8
164 SF
TELCOM
A251
SUPPLY
WORK AREA
194 SF
ELEC RM
A255
/4
PLOTTER COPIER
PLAN TABLE
FLAT FILES
132 SF
OFFICE
A273
/8
/4
132 SF
OFFICE
A286
C A
B
IN
E T
S
12' - 6"134 SF
OFFICE
A317
234 SF
CONFERENCE
A264
24' - 2 1/2" 2
/4
12' - 0 1/4" 5' - 3 3/4"
19' - 10 7/8"
/8
5' - 6 3/8"
12' - 0 1/4"17' - 0 7/8"5' - 6 3/8"9' - 11 5/8"
44 SF
CUSTODIAL
A246
48 SF
M SHOWER
A268
253 SF
M RR
A323
96 SF
W RR
A324
72 SF
W SHOWER
A325
1129 SF
MECHANICAL RM.
A252
11' - 11 3/4"18' - 4 7/8"
/4
23' - 10 7/8"
/8
3856 SF
CORRIDOR PW EAST
A97
887 SF
BULL PEN
A336
12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0"
/8
/4
24' - 0"
12' - 6 1/8" 12' - 6"
241 SF
STORM -OFFICE
A237
30' - 1 7/8"28' - 8 1/4"
7' - 6 3/4"
/4
/8
/8
/2
8' - 4 5/8"
210 SF
MEN
A95
241 SF
WOMEN
A94
24' - 0" 24' - 0" 28' - 3"
16' - 7 3/4"
5' - 6 3/8"
12' - 9 1/8"
/8
BUILDING EXPANSION JOINT
28' - 0"
/4
/4
172 SF
MOSQUITO OFFICE 1
A340
1124 SF
MOSQUITO CONTROL TRUCK
BAY
A342
36' - 11 1/8"
/4
14' - 6"
142 SF
OFFICE
A114
16' - 11 3/4"
TOOLS
PUBLIC WORKS - BUILDING 'A'
(34) OFFICES NOT INCLUDING THE ENGINEERING BULLPEN,
OPEN SUPPLY WORK AREA, AND ADMIN COORDINATOR OFFICE.
120' X 254' = 30,480 GROSS SF = PUBLIC WORKS
65'-0" x 139'-0" = 9,035 GROSS SF + VESTIBULE = GROWTH MANAGEMENT
39,515 SF TOTAL
GROWTH MANAGEMENT - BUILDING 'A'
(20) DESK LOCATIONS WITH (4) LARGER OFFICES AND (1) OPEN
CUBICLE SPACE WITH (4) DESKS.
16' - 0 3/4"17' - 10 1/8"
A.11A.10A.9A.8A.6A.5A.4A.3A.1 A.7
A.15A.14A.13
A.A
A.C
A.E
A.2
A.D
A.B
A.G
A.H
A.F
A.12
915 SF
SUPPLY STORAGE
A379
575 SF
SUPPLY WORK AREA
A241
472 SF
SMALL ENGINE
A388
624 SF
SIGN SHOP
A378
794 SF
WEST CORRIDOR
A334
Date
Drawn By
Checked By
325 S. PALAFOX STREET
PENSACOLA, FL 32502
T (850) 433-7842 F (850) 433-0510
REVISIONS
SEAL
A101.4
BLDG A -
OVERALL
DIMENSIONED
PLAN
P U
B L
IC
W O
R K
S
G R
O W
T H
M A
N A
G E
M E
N T
C O
M P
L E
X
O K
A L
O O
S A
C O
U N
T Y
F
L
Checker
Author
03/18/26
No. Description Date
3/32" = 1'-0"
BLDG A OCPW & GM - DIMENSIONED FLOOR PLAN - ENLARGED
O V
E R
A L
L
61 SF
RR
A84
/4
9' - 7 7/8"
25' - 5"
12' - 3 7/8"12' - 10 3/8"
60' - 0 3/4"15' - 0 3/8"
11' - 7 1/4"
135 SF
ADMIN. COORD.
A99
7' - 6 3/4" 69 SF
LACTATION RM
A100
153 SF
OFFICE
A110
154 SF
OFFICE
A111
151 SF
OFFICE
A112
158 SF
OFFICE
A113
242 SF
COPY - SUPPLIES
A116
294 SF
OFFICE
A117
238 SF
OFFICE
A124
290 SF
OFFICE - SCOTT
A127
170 SF
STORAGE
A146
2409 SF
TRAINING / DINING
A147
478 SF
KITCHEN
A983
/4
5' - 0"
9' - 7 7/8" 1
12' - 0"12' - 3 1/8"
/8
4' - 9 5/8"12' - 3 1/8"
12' - 0"
27' - 8"
/8
167 SF
RECEPT.
A162
142 SF
OFFICE
A163
131 SF
OFFICE
A164
209 SF
OFFICE
A165
140 SF
OFFICE
A166
140 SF
OFFICE
A167
140 SF
OFFICE
A168
140 SF
OFFICE
A169
2723 SF
PERMIT TECH
A172
12' - 0"12' - 0"
O U
T S
ID
E
F A
C E
T O
O U
T S
ID
E
F A
C E
/4
461 SF
CONFERENCE RM
A174
/4
343 SF
BREAK ROOM
A96
/8
12' - 0"
/8
/8
140 SF
OFFICE
A176
207 SF
CONFERENCE
A179
105 SF
ELEC RM
A180
309 SF
MECH RM
A181
149 SF
OFFICE
A183
146 SF
OFFICE
A184
182 SF
OFFICE
A185
101 SF
TELCOM
A188
5' - 6"
64 SF
CUST. CL.
A189
9' - 0" 12' - 1 5/8"
12' - 1 5/8"
/8
/8
/8
/8
A.11 TO EDGE OF SLAB
139' - 1 5/8"
32 SF
CLOSET
A190
494 SF
GM WAITING
A196
11' - 7"
142 SF
OFFICE
A199
A.11A.10A.9A.8
26' - 0"26' - 0"24' - 0"
PUBLIC WORKS - BUILDING 'A'
(34) OFFICES NOT INCLUDING THE ENGINEERING BULLPEN,
OPEN SUPPLY WORK AREA, AND ADMIN COORDINATOR OFFICE.
COVERED
PORCH
COVERED
ENTRY
PORCH
GROWTH MANAGEMENT
GROWTH MANAGEMENTPUBLIC WORKS
PUBLIC WORKS
120' X 254' = 30,480 GROSS SF = PUBLIC WORKS
65'-0" x 139'-0" = 9,035 GROSS SF + VESTIBULE = GROWTH MANAGEMENT
39,515 SF TOTAL
GROWTH MANAGEMENT - BUILDING 'A'
(20) DESK LOCATIONS WITH (4) LARGER OFFICES AND (1) OPEN
CUBICLE SPACE WITH (4) DESKS.
A.18A.17A.16A.15A.14A.13
A.A
A.C
A.E
A201.1
/8
PLOTTER
COPIER
PLAN TABLE
FLAT FILES
132 SF
OFFICE
A273
/8
/4
/8
12' - 6"
134 SF
OFFICE
A317
24' - 2 1/2"
8' - 8" 26' - 6"
/4
/4
3856 SF
CORRIDOR PW EAST
A97
A201.1
12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0"
12' - 6 1/8" 12' - 6"
A200.1
7' - 6 3/4"
A.D
A.B
8' - 4 5/8"
210 SF
MEN
A95
241 SF
WOMEN
A94
A.G
A.H
22' - 8"
/2
A.F
/4
24' - 0" 28' - 3" 19' - 7 1/2" 24' - 9 1/2" 18' - 1 3/4"
12' - 9 1/8"
/8
BUILDING EXPANSION JOINT
AT A.11
A.12
A200.12
A200.1
A201.2
142 SF
OFFICE
A114
48 SF
RR
A36447 SF
RR
A363
4' - 0"
13' - 9 5/8"
6' - 3 3/4"
331 SF
BREAK RM.
A370
6' - 4 1/8"
48 SF
RR
A371
47 SF
RR
A372
12' - 0"
144 SF
OFFICE
A373
333 SF
STORAGE
A374
/8
12' - 0"
144 SF
OFFICE
A375
/8
164 SF
OFFICE
A376
164 SF
OFFICE
A377
/4
132 SF
OFFICE
A286
12' - 3 7/8" 12' - 4"
/8
PLOTTER
COPIER
/2
COPIER
/8
CENTER OF COLUMNN TO OUTSIDE EDGE OF SLAB
0' - 4"
CENTER OF COLUMN TO OUTSIDE EDGE OF SLAB
0' - 4"
SLAB EDGE-TO-EDEGE
138' - 9 5/8"
CENTER OF COLUMN TO EDGE OF SLAB
0' - 4"
C L
C O
L T
O E
D G
E O
F S
L A
B
C L
O F
C O
L T
O E
D G
E O
F S
L A
B
S L
A B
O U
T -T
O -O
U T
/4
556 SF
RECEPTION
A347
3856 SF
CORRIDOR PW EAST
A97
1' - 4"
EXISTING "LAVERTE ROGERS" PLAQUE
1' - 1 1/4"
4' - 11 1/4"
6' - 8"6' - 10 1/4"7' - 4"
57 SF
RR
A448
55 SF
RR
A449
932 SF
LOBBY
A450
1' - 4"
5' - 0"
5' - 0"
5' - 0"
0' - 5 3/4"
11' - 6 3/4"
Date
Drawn By
Checked By
325 S. PALAFOX STREET
PENSACOLA, FL 32502
T (850) 433-7842 F (850) 433-0510
REVISIONS
SEAL
A101.5
BLDG A - EAST
DIMENSIONED
FLOOR PLAN
P U
B L
IC
W O
R K
S
G R
O W
T H
M A
N A
G E
M E
N T
C O
M P
L E
X
O K
A L
O O
S A
C O
U N
T Y
F
L
Checker
Author
03/18/26
1/8" = 1'-0"
BLDG A - E DIMENSIONED FLOOR PLAN
38' - 1 1/2"
/8
/4
7' - 6 3/4"
5' - 8 5/8"
167 SF
OFFICE
A119
637 SF
STORAGE
A120
167 SF
OFFICE
A121
162 SF
OFFICE
A122
150 SF
OFFICE
A123
238 SF
OFFICE
A124
244 SF
OFFICE - (SCOTT)
A125
150 SF
OFFICE
A126
290 SF
OFFICE - SCOTT
A127
218 SF
OFFICE - ROB
A128
216 SF
OFFICE - (ST)
A129
240 SF
OFFICE - (MA)
A130
250 SF
SURVEY
A132
139 SF
OFFICE
A139
139 SF
OFFICE
A140
150 SF
OFFICE
A141
4090 SF
SUPPLY WAREHOUSE
A144
5' - 5 1/8"
/8
21' - 6 3/4"16' - 1 7/8"
/4
212 SF
OFFICE
A150
150 SF
OFFICE
A159
19' - 4 1/2"
/8
142 SF
OFFICE
A199
178 SF
OFFICE (PATTY)
A200
A.8
A.8
A.6
A.6
A.5
A.5
A.4
A.4
A.3
A.3
A.1
A.1
A.7
A.7
31' - 0"18' - 3"23' - 5"30' - 4"
OFFICE STAFFFIELD STAFF
COVERED SALLY PORT
NORTH AREA
SOUTH AREA
BULL PEN
OFFICE STAFFFIELD STAFF
TOOLS
DOCK
S H
E L F
FORK LIFTS (2)
MIXERS (4)
METAL BLANKS
HOSES
SIGN POSTES
S A
W S
PALLETS
P L A
T S
P R
IN
T
E R
SCANNER
A.A
A.C
A.E
235 SF
BR - OFFICE
A238
218 SF
ASPHALT - OFFICE
A239
216 SF
MAINT - OFFICE
A240
11' - 11 3/4"
/2
/8
/8
164 SF
TELCOM
A251
194 SF
ELEC RM
A255
A201.1
234 SF
CONFERENCE
A264
12' - 0 1/4" 5' - 3 3/4"
19' - 10 7/8"
/8
5' - 6 3/8"
12' - 0 1/4"17' - 0 7/8"5' - 6 3/8"9' - 11 5/8"
44 SF
CUSTODIAL
A246
48 SF
M SHOWER
A268
253 SF
M RR
A323
96 SF
W RR
A324
72 SF
W SHOWER
A325 1129 SF
MECHANICAL RM.
A252
11' - 11 3/4"18' - 4 7/8"
/4
23' - 10 7/8"
/8
3856 SF
CORRIDOR PW EAST
A97
887 SF
BULL PEN
A336
"2
/8
A .A
T O
A .E
/4
24' - 0"
241 SF
STORM -OFFICE
A237
A.2
A.2
30' - 1 7/8"28' - 8 1/4"
7' - 6 3/4"
A.D
/4
/8
A.B
/8
/2
210 SF
MEN
A95
16' - 7 3/4"
O V
E R
A L L
5' - 6 3/8"
A200.1 4
28' - 0"
/4
/4
172 SF
MOSQUITO OFFICE 1
A340
1124 SF
MOSQUITO CONTROL TRUCK
BAY
A342
36' - 11 1/8"
A201.2
14' - 6"
16' - 11 3/4"
TOOLS
CENTER OF COLUMN TO EDGE OF SLAB
0' - 4"
C E
N T
E R
O F
C O
L U
M N
T O
E D
G E
O F
S L
A B
S L
A B
O U
T -T
O -O
U T
/4
C E
N T
E R
O F
C O
L T
O E
D G
E O
F S
L A
B
CENTER OF COLUMN TO EDGE OF SLAB
0' - 4"
5' - 1 1/8"
/8
624 SF
SIGN SHOP
A378
FUTURE EXTERIOR EXIT &
BUILDING EXPANSION
FUTURE EXTERIOR EXIT &
BUILDING EXPANSION
915 SF
SUPPLY STORAGE
A379
575 SF
SUPPLY WORK AREA
A241
119 SF
SUPPLY OFFICE
A380
3856 SF
CORRIDOR PW EAST
A97
6' - 4 3/8"
/8
/4
457 SF
WEST SUPPLY CORRIDOR
A386
P L O
T T
E R
10' H CHAIN LINK FENCE & GATE
AT SUPPLY SERVICE WINDOW
VAPOR BARRIER W/ METAL
LINER PANEL OVER
VAPOR BARRIER W/ METAL
LINER PANEL OVER
472 SF
SMALL ENGINE
A388
CHAIN LINK FENCE
794 SF
WEST CORRIDOR
A334
/8
/8
/8
/8
/2
2' - 4 1/4"
/4
14' - 3 5/8"
170 SF
LAB
A393
/4
DUMPSTER PAD
22' - 6 1/2"
126 SF
SIGN SHOP OFFICE
A446
13' - 1 1/2"
26' - 0"
52' - 7 1/2"
86 SF
SIGN STORAGE
A447
9' - 0"
/8
32' - 1 1/2"
16' - 0"
TABLES
10' - 1 3/8"
20' - 1 7/8"
27' - 1 5/8"
Date
Drawn By
Checked By
325 S. PALAFOX STREET
PENSACOLA, FL 32502
T (850) 433-7842 F (850) 433-0510
REVISIONS
SEAL
A101.6
BLDG A - W
DIMENSIONED
FLOOR PLAN
P U
B L
IC
W O
R K
S
G R
O W
T H
M A
N A
G E
M E
N T
C O
M P
L E
X
O K
A L
O O
S A
C O
U N
T Y
F
L
Checker
Author
03/18/26
1/8" = 1'-0"
BLDG A - W DIMENSIONED FLOOR PLAN
NORTH
Checked By
325 S. PALAFOX STREET
PENSACOLA, FL 32502
T (850) 433-7842 F (850) 433-0510
REVISIONS
SEAL
A101.8
BUILDING A
VIEWS
P U
B L
IC
W O
R K
S
G R
O W
T H
M A
N A
G E
M E
N T
C O
M P
L E
X
O K
A L
O O
S A
C O
U N
T Y
F
L
Checker
Author
03/18/26
Checked By
325 S. PALAFOX STREET
PENSACOLA, FL 32502
T (850) 433-7842 F (850) 433-0510
REVISIONS
SEAL
A101.9
BUILDING A
VIEWS
P U
B L
IC
W O
R K
S
G R
O W
T H
M A
N A
G E
M E
N T
C O
M P
L E
X
O K
A L
O O
S A
C O
U N
T Y
F
L
Checker
Author
03/18/26
A.38 A.39 A.40
A.41 A.42 A.43 A.44 A.45 A.46 A.47 A.48 A.49 A.50 A.51 A.52
A.53
A.54
A.55
LUBE PIT
FEC
OPEN BAY
WELDING
OIL CHANGE /
SIDE ENTRY PIT
11' - 8" 15' - 8"
16' - 0"
SERVICE
OFFICE (4)
DRIVE-THRU
/8
20' - 0"20' - 0"30' - 0"28' - 0"24' - 0"24' - 0"24' - 0"24' - 0"
- (4) SERVICE TRUCKS
- (2) FUEL TRUCKS
- BRIDGE CRANE
- 20-25 PARKING SPACES
- NUMBER OF BAYS IS EQUIVALENT TO CURRENT SHOP
- NORTH SOUTH ORIENTATION FOR AIR FLOW
30' - 0"
SLIDING GATE &
FENCE
15' - 3 1/4"
16' - 0"
ROLL-UP / BAY DOORS ON EACH SIDE SPACE FOR A
DRIVE AROUND
23' - 0 5/8"
5' - 0 1/4"
8' - 5 3/8"
CANOPY / AWNING
20' - 0"
CONCRETE APRON
NO LOADING DOCK
JUST ACCESS CONCRETE APRON
/8
14' - 4"
SPACE FOR A
DRIVE AROUND
S L
A B
O U
T -T
O -O
U T
S L
A B
O U
T -T
O -O
U T
S L A
B E
D G
E
S L A
B E
D G
E
/8
6' - 8"
/8
289' - 2 5/8" 39' - 5"
OVERALL
31' - 11"
361' - 9 1/8"
35' - 7" 28' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 28' - 0" 30' - 0" 20' - 0" 20' - 0"
35' - 7"30' - 0"
OVERALL
31' - 11"
16' - 0" 8' - 0"
6' - 6"
RATED WALLS
PORTAL FRAME
PORTAL FRAME
E.O.S.
1' - 4"
R
IG
ID
F
R A
M E
S
T E
E L L
IN
E
F
A C
E O
F G
IR
T
E
D G
E O
F S
L A
B
S T
E E
L L
IN
E
F
A C
E O
F G
IR
T
E
D G
E O
F S
L A
B
END WALL COLUMNS
PORTAL FRAME
PORTAL FRAME
0' - 10"0' - 10"
SLAB OUT-TO-OUT
31' - 8"
30' - 0"
P O
R T
A L F
R A
M E
/8
30' - 0"
65" TV
MINI-SPLIT
/8
50' WATER HOSE REEL
50' ELECTRICAL CORD REEL
50' 3/8" AIR HOSE REEL
50' 1/2" AIR HOSE REEL
" REF
ICE
NATURAL GAS
PRESSURE WASHER
NATURAL GAS
GENERATOR AIR COMPRESSOR SHED
28' - 0"
WASH BAY
CANOPY /
AWNING
OPEN BAY
EYE WASH
DESK / TV
3' - 0"
3 TON BRIDGE CRANE
ELECTRIC UP & DOWN
MANUAL BACK & FORTH
& SIDE TO SIDE
3 TON MONORAIL LIFT
ELECTRIC UP & DOWN
MANUAL BACK & FORTH
& SIDE TO SIDE
17' - 0"17' - 1 3/8"
/8
12' - 0" 10' - 9 5/8"10' - 2 1/4"
/4
/4
20' - 8"
7' - 11 3/4"
779 SF
PARTS
A421
122 SF
TELECOM
A432
220 SF
PARTS OFFICE
A433
55 SF
CUSTODIAL
A436
307 SF
LOCKER AREA
A439
94 SF
W RR
A438
63 SF
COED SHOWER
A428
72 SF
STOR.
A440
250 SF
M RR
A429
479 SF
BREAK ROOM
A420
476 SF
FOREMAN'S OFFICE
A437
13425 SF
ENCLOSED BAYS
A419
363 SF
MECHANICAL & ELECTRICAL
A422
341 SF
MANAGER'S OFFICE
A435
65 SF
RESTROOM
A427
65 SF
RESTROOM
A426
900 SF
SERVICE OFFICE
A434
468 SF
CORRIDOR
A423
990 SF
DRIVE-THRU
A424
275 SF
CUSTOMER WAITING
A425
51 SF
RR
A430
24 SF
CUSTODIAL CLOSET
A431
1521 SF
WELDING
A418
135 SF
WELDING OFFICE
A445
Date
Drawn By
Checked By
325 S. PALAFOX STREET
PENSACOLA, FL 32502
T (850) 433-7842 F (850) 433-0510
REVISIONS
SEAL
A102-B
OCPW
BUILDING B -
FLEET
P U
B L
IC
W O
R K
S
G R
O W
T H
M A
N A
G E
M E
N T
C O
M P
L E
X
O K
A L
O O
S A
C O
U N
T Y
F
L
Checker
Author
03/18/26
3/32" = 1'-0"
BLDG B - FLEET - FLOOR PLAN
NORTH
19,657 ENCLOSED GROSS SF
2,480 TWO OPEN VEHICLE BAYS SF
A.56 A.57 A.58 A.59 A.60 A.61 A.62 A.63 A.64 A.65
A.66
A.67
A.68 A.69
7 7 7
1111 11
11 11
24' - 0" 28' - 0" 28' - 0" 24' - 0"
16 16
66 6
24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0"
FECFEC
R
IG
ID
F
R A
M E
OPEN BAY EQUIPMENT STORAGEENCLOSED BAY EQUIPMENT STORAGE
24' - 0" 24' - 0"
E.O.S.
1' - 4"
PORTAL FRAME
PORTAL FRAME
PORTAL FRAME
S L
A B
O U
T -T
O -O
U T
1' - 4"
274' - 8"
Date
Drawn By
Checked By
325 S. PALAFOX STREET
PENSACOLA, FL 32502
T (850) 433-7842 F (850) 433-0510
REVISIONS
SEAL
A103-C
BLDG C - OCPW
- BLDG
EQUIPMENT
STORAGE
FLOOR PLAN
P U
B L
IC
W O
R K
S
G R
O W
T H
M A
N A
G E
M E
N T
C O
M P
L E
X
O K
A L
O O
S A
C O
U N
T Y
F
L
DNA
MM
03/18/26
ITEM QTY NAME SIZE DEPARTMENT
1 1 MINI EXCAVATOR 16X6
2 2 SKIDSTEER 12X7
3 1 ROLLER 6X4
4 1 MINI VAC 18X8
5 2 BACKHOE 23X8
6 2 WELL POINT PUMPS 13X7
7 3 AIR COMPRESSOR 13X5
8 3 CONCRETE MIXER 8X4
9 1 LARGE MINI EXCAVATOR 21X8
10 2 GENERATOR 15X7
11 5 GENERATOR 20X7
12 1 TRACTOR 8X12
13 2 LOADER 8X21
14 1 VAC TRUCKS 38X9.5
15 1 BUCKET TRUCK 30X9.5
16 2 FORK LIFTS 8X5
17 1 DOC TRAILER 7X18
13,350 SQ.FT.
1/8" = 1'-0"
BUILDING C - STORAGE - FLOOR PLAN
NORTH
18' - 0"
A105
/4
18' - 0"
DUMPSTER & LOADING PAD
(6" THICK REINF. CONCRETE PAD)
9' - 0"
/2
FT. WALTON BEACH HOUSEHOLD HAZARDOUS WASTE
BUILDING FOOTPRINT (FUTURE BUILD-OUT).
FT. WALTON BEACH HOUSEHOLD HAZARDOUS WASTE
BUILDING FOOTPRINT (FUTURE BUILD-OUT).
30' - 0"
100' - 0"
USED OIL TOTE, ANTIFREEZE TOTE, AND GAS TOTE
50 GALLON BARREL STORAGE DRUMS
STORAGE TANK
CHAIN LINK FENCE PERIMETER
WOOD PALLET STORAGE
HAZMAT STORAGE BUILDING
COLUMNS OF HHW POLE BARN
EXTERIOR EYE WASH
5' - 0"
PUBLIC ACCESS
BAY
PARTITION WALL BETWEEN OPEN PUBLIC BAY
AND CLOSED EMPLOYEE BAYS
12' - 0"1' - 0"5' - 0 1/4"
/2
Date
Drawn By
Checked By
325 S. PALAFOX STREET
PENSACOLA, FL 32502
T (850) 433-7842 F (850) 433-0510
REVISIONS
SEAL
A104
HOUSEHOLD
HAZARDOUS
WASTE FLOOR
PLAN
P U
B L
IC
W O
R K
S
G R
O W
T H
M A
N A
G E
M E
N T
C O
M P
L E
X
O K
A L
O O
S A
C O
U N
T Y
F
L
Checker
Author
03/18/26
No. Description Date
3/16" = 1'-0"
BLDG HHW - FLOOR PLAN
TOP OF POST -
HHW
14' - 0"
HAZMAT
STORAGE
BUILDING
18' - 9"
/8
18' - 0 1/2"
/4
39' - 4 1/8"
Date
Drawn By
Checked By
325 S. PALAFOX STREET
PENSACOLA, FL 32502
T (850) 433-7842 F (850) 433-0510
REVISIONS
SEAL
A105
HHW VIEWS
P U
B L
IC
W O
R K
S
G R
O W
T H
M A
N A
G E
M E
N T
C O
M P
L E
X
O K
A L
O O
S A
C O
U N
T Y
F
L
Checker
Author
03/18/26
No. Description Date
1/4" = 1'-0"
HHW SECTION 1
VIEW OF HOUSEHOLD HAZARDOUS WASTE BUILDING LOOKING SOUTHEAST.VIEW OF HOUSEHOLD HAZARDOUS WASTE BUILDING LOOKING NORTHEAST
VIEW OF HOUSEHOLD HAZARDOUS WASTE BUILDING WITH CLADDING AND SITE CONTEXT.
VIEW OF HOUSEHOLD HAZARDOUS WASTE BUILDING - ELEVATION.
A106.2
28' - 0" 36' - 0"
20' - 0"
50' - 0"
GRAVEL / SAND / ROCK STORAGE AREA
(REINFORCED CMU WALLS)
(4) FUEL TANKS
(TIE GENERATOR FUEL TANK INTO FUEL STORAGE)
6" THICK REINFORCED CONCRETE SLAB FOR
FUELING LARGE VEHICLES & EQUIPMENT
6" HIGH CONCRETE FUEL PUMP ISLAND
WITH BOLLARDS EACH SIDE OF CANOPY COLUMNS
(4) DOUBLE SIDED FUEL PUMPS
114' - 0"
76' - 0"
10' - 6"
Date
Drawn By
Checked By
325 S. PALAFOX STREET
PENSACOLA, FL 32502
T (850) 433-7842 F (850) 433-0510
REVISIONS
SEAL
A106.1
BLDG F - FUEL
STATION
P U
B L
IC
W O
R K
S
G R
O W
T H
M A
N A
G E
M E
N T
C O
M P
L E
X
O K
A L
O O
S A
C O
U N
T Y
F
L
Checker
Author
03/18/26
No. Description Date
1/8" = 1'-0"
BLDG F - FUEL STATION
BOTTOM OF FUEL
STATION ROOF
20' - 0"
31' - 0"
20' - 0"
(4) FUEL TANKS BEYOND
SAND / GRAVEL STORAGE STRUCTURE BEYOND
FUELING STATION ROOF
FUELING STATION COLUMNS
Date
Drawn By
Checked By
325 S. PALAFOX STREET
PENSACOLA, FL 32502
T (850) 433-7842 F (850) 433-0510
REVISIONS
SEAL
A106.2
BLDG F - FUEL
STATION -
SECTION /
VIEWS
P U
B L
IC
W O
R K
S
G R
O W
T H
M A
N A
G E
M E
N T
C O
M P
L E
X
O K
A L
O O
S A
C O
U N
T Y
F
L
Checker
Author
03/18/26
No. Description Date
1/4" = 1'-0"
BLDG F - SECTION 1
| Sheets |
| A000 - COVER SHEET |
| A100.2 - SITE PLAN - DIMENTIONED |
| A101.1 - OCPW & GM - BLDG A OVERALL KEY FLOOR PLAN - 1/16"=1'-0" |
| A101.4 - BLDG A - OVERALL DIMENSIONED PLAN |
| A101.5 - BLDG A - EAST DIMENSIONED FLOOR PLAN |
| A101.6 - BLDG A - W DIMENSIONED FLOOR PLAN |
| A101.8 - BUILDING A VIEWS |
| A101.9 - BUILDING A VIEWS |
| A102-B - OCPW BUILDING B - FLEET |
| A103-C - BLDG C - OCPW - BLDG EQUIPMENT STORAGE FLOOR PLAN |
| A104 - HOUSEHOLD HAZARDOUS WASTE FLOOR PLAN |
| A105 - HHW VIEWS |
| A106.1 - BLDG F - FUEL STATION |
| A106.2 - BLDG F - FUEL STATION - SECTION / VIEWS |
File details come from the government source that posted it. Updated .