OCAT OKC 2531_Tunnel_Garage MEP Upgrades_IFC (1).pdf

PDF 3 MB Posted

Attached to
Tunnel and Parking Garage MEP Upgrades
Solicitation number
OCAT-OKC-2531
Issued by
Ottawa County, Oklahoma

About this file

This is a comprehensive set of construction documents for the Tunnel and Parking Garage MEP (Mechanical, Electrical, and Plumbing) Upgrades at Will Rogers International Airport in Oklahoma City, Oklahoma, prepared by Guernsey Engineering for the Oklahoma City Airport Trust (OKC). The project involves selective demolition and replacement of mechanical, electrical, and plumbing systems in the airport's tunnel and parking garage, with work spanning multiple levels and mechanical equipment rooms. The documents, dated September 5, 2025, are issued for construction and include detailed architectural, mechanical, plumbing, and electrical plans for upgrades to air handling units, electrical panels, transformers, HVAC systems, refrigerant piping, and lighting fixtures.

The project scope includes replacing existing air handling units (AHU-1 and AHU-2), installing new variable refrigerant flow (VRF) systems with indoor and outdoor units, upgrading electrical distribution with new panels and transformers, replacing sump pumps, and updating lighting and power systems across ground through fifth levels of the parking garage. The estimated project budget is not explicitly stated, but the comprehensive nature of the upgrades suggests a significant capital investment. The electrical upgrades involve replacing multiple panels with new units from manufacturers like Reliagear and Square D, installing new transformers, and reconfiguring electrical distribution to improve system reliability and accommodate new mechanical equipment. The mechanical upgrades focus on improving climate control and ventilation efficiency through modern HVAC technologies and precise equipment replacement.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Maria Angelica

Prado-Diaz

No. 08228

A R C H I T

E C

T

OKLAHO

M

A

L

IC

E

N

SED

S T

A

T E

OF

guernsey

DATE:

OWNER:

CONTACT:

PHONE: (405)-316-3211

EMAIL: JOE.FRANA@OKC.GOV

ARCHITECT AND ENGINEER: GUERNSEY

CONTACT: STEVE SCOVEL

PHONE: (405)-416-8258

EMAIL: STEVE.SCOVEL@GUERNSEY.US

PROJECT #

OCAT OKC 2531

GUERNSEY PROJECT NO.: OK70486004

9/5/25

OKC WILL ROGERS INTERNATIONAL AIRPORT

70486000-004

5 SEP 2025

ISSUE FOR CONSTRUCTION

OKC WILL ROGERS INTERNATIONAL AIRPORT

JOE FRANA

TUNNEL AND PARKING GARAGE MEP UPGRADES

7100 Terminal Dr, Oklahoma City, OK 73159

SHEET INDEX

SHEET

NUMBER SHEET NAME

GENERAL

G-001 COVER SHEET

ARCHITECTURAL

A-101 TUNNEL SELECTIVE DEMOLITION FLOOR PLAN AND

TUNNEL NEW WORK FLOOR PLAN

A-102 PARKING GARAGE LOBBIES PLANS AND DETAILS

PLUMBING

P-001 LEGEND, ABBREVIATIONS, & SCHEDULES

P-100 PLUMBING COMPOSITE PLAN

PD101 ADD ALT #1 - GROUND LEVEL GARAGE PLUMBING DEMO

PLAN

PD102 ADD ALT #1 - 2ND THRU 4TH LEVEL GARAGE DRAINAGE

DEMO PLUMBING PLAN

PD401 TUNNEL DEMOLITION PLAN

P-101 ADD ALT #1 - GROUND FLOOR PLUMBING PLAN

P-102 ADD ALT #1 - SECOND THRU FOURTH FLOOR PLUMBING

PLAN

P-401 TUNNEL PLUMBING PLAN

MECHANICAL

M-001 LEGEND & ABBREVIATIONS

M-100 MECHANICAL COMPOSITE PLAN

MD101 PARKING GARAGE HVAC DEMOLITION PLAN

MD301 DEMO SECTIONS

MD401 TUNNEL MECHANICAL DEMOLITION ENLARGED PLAN

M-101 PARKING GARAGE HVAC PLAN

M-102 PARKING GARAGE HVAC PLAN

M-103 PARKING GARAGE HVAC PLAN

M-301 SECTIONS

M-401 LOWER LEVEL HVAC PLAN

M-601 SCHEDULES & DETAILS

M-801 CONTROLS

M-802 CONTROLS

ELECTRICAL

E-001 LEGEND & ABBREVIATIONS

EP101 ELECTRICAL OVERALL PLAN - TUNNEL

EP102 GROUND FLOOR OVERALL TYPICAL GARAGE PLAN

E-401 ENLARGED ELECTRICAL PLANS

E-402 ENLARGED ELECTRICAL PLANS

E-403 ENLARGED ELECTRICAL PLANS

E-404 ENLARGED ELECTRICAL PLANS

E-405 ENLARGED ELECTRICAL PLANS

E-601 ELECTRICAL RISER DIAGRAM

PROJECT LOCATION

UP UP

DEMO PLAN LEGEND

EXISTING

CONSTRUCTION

DEMO

GLGMGNGP

G1

MECHANICAL

EQUIPMENT ROOM

WALKWAY

PUMP ROOM

STORAGE

STATION #3

ELEV. EQUIP.

MECHANICAL /

EQUIPMENT ROOM

REMOVE AND RELOCATE

CABLES, CONDUIT,

PIPING AND FIRE

SUPRESSION IN NEW

DOOR OPENING AREA.

DEMOLISH AND REMOVE

SECTION OF WALL FOR

NEW SWING DOOR. WALL

IS A NON-RATED

PARTITION COMPOSED

OF METAL STUDS,

GYPSUM BOARD AND

TILE WALL BASE (ON

TUNNEL SIDE).

DEMOLISH AND REMOVE

DOORS, FRAME,

HARDWARE AND

PORTION OF PARTITION.

PREP OPENING FOR

NEW SINGLE DOOR,

RETURN GRILLE AND

WALL INFILL. COORD.

WITH MECH FOR SIZE

OF GRILLE

REMOVE AND

RELOCATE HOSE BIB

PLAN NORTH

AREA OF SCOPE

OF WORK

DEMOLISH AND

REMOVE DOORS,

FRAME, HARDWARE

AND PORTION OF

WALL. PREP OPENING

FOR NEW SINGLE

DOOR, LOUVER AND

WALL INFILL

AREA OF SCOPE

OF WORK

/ A

-1

AREA 2

AREA 3

CONTRACTOR SHALL

ERECT AND MAINTAIN

SECURE AND DUST

RESISTANT BARRIER

DURING CONSTRUCTION

OPERATIONS

CONTRACTOR SHALL

ERECT AND MAINTAIN

SECURE AND DUST

RESISTANT BARRIER

DURING CONSTRUCTION

OPERATIONS

GLGMGNGP

G1

MECHANICAL

EQUIPMENT ROOM

WALKWAY

PUMP ROOM

STORAGE

STATION #3

ELEV. EQUIP.

MECHANICAL /

EQUIPMENT ROOM

INFILL OPENINGS WITH 3 5/8" METAL

STUDS (.33MILS), 5/8" TYPE "X" GYPSUM

BOARD ON EACH SIDE AND 3" BATT

INSULATION BETWEEN THE STUDS.

PROVIDE TILE BASE ON TUNNEL SIDE TO

MATCH EXISTING. TEXTURE AND PAINT

WALL TO MATCH EXISTING ON TUNNEL

SIDE - TAPE AND BED ON MECHANICAL

ROOM SIDE.

AREA OF SCOPE

OF WORK

0003A

0003B

GENERAL NOTES:

1. PATCH AND REPAIR AROUND NEW OPENINGS

ON BOTH SIDES OF WALL TO BLEND AND

MATCH EXISTING CONDITIONS.

2. PROVIDE CONTROL JOINTS IN GYPSUM BOARD

AT EACH SIDE OF ALL NEW DOOR FRAMES.

3. IF WORK MUST BE PERFORMED BEYOND THE

AREA OF SCOPE OF WORK, CONTRACTOR

SHALL ENSURE THOSE AREAS ARE MINIMALLY

DISTRUBED AND LEFT IN LIKE NEW

CONDITIONS.

1000A

INFILL OPENINGS WITH 3 5/8" METAL

STUDS (.33MILS), 5/8" TYPE "X" GYPSUM

BOARD ON EACH SIDE AND BATT

INSULATION BETWEEN THE STUDS.

PROVIDE TILE BASE ON TUNNEL SIDE TO

MATCH EXISTING. TEXTURE AND PAINT

WALL TO MATCH EXISTING ON TUNNEL

SIDE - TAPE AND BED ON MECHANICAL

ROOM SIDE. COORDINATE WITH MECH

CONTRACTOR FOR LOCATION OF NEW RA

DUCT AND GRILLE.

EXISTING SPECIALTY

PAINT SCHEME AND WALL

GRAPHICS THAT SHALL BE

AFFECTED BY WORK

SHALL BE REMOVED AND

REPLACED BY THE GC.

PAINT AND GRAPHIC WALL

ARTWORK SHALL BE

COORDINATED WITH THE

OWNER.

SEAL ALL NEW AND EXISTING

PENETRATIONS IN ROOM

SEAL ALL NEW AND

EXISITNG

PENETRATIONS IN

ROOM

AREA 2

AREA 3

PLAN LEGEND

NEW

CONSTRUCTION

EXISTING

CONSTRUCTION

OVERHEAD

HM-1

1 1/2' HOLLOW METAL

DOUBLE RABBET

MITTER JOINT

CONTINOUS WELD

FRAME ELEVATION

FLUSH

F

DOOR ELEVATION

TUNNEL LEVEL

0"

4'-4"

7'-4"

1'-0"

DEMOLISH PORTION OF PARTITION

FOR NEW DOOR. COORDINATE

EXACT LOCATION WITH

MEP/DATA/COMM CONTRACTORS IN

FIELD TO ACCOMMODATE EXISTING

CONDITIONS

DEMOLISH DOORS,

FRAME AND HARDWARE

DEMOLISH PORTION OF

PARTITION FOR NEW DOOR

AND RETURN AIR GRILLE

V .I .F

B O

T T

O M

O F

S O

F F

IT

1. FACILITY WILL REMAIN OPERATIONAL DURING THE EXECUTION OF THIS WORK. GENERAL

CONTRACTOR SHALL COORDINATE WITH FACILITY USER FOR ALL ACCESS, STAGING,

TEMPORARY BARRIERS, CIRCULATION, STORAGE OF MATERIALS, ETC. BEFORE COMMENCING

WORK.

2. IN ADDITION TO THE DEMOLITION WORK DESCRIBED ON THIS ARCHITECTURAL SHEET, THE

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR PERFORMING ADDITIONAL DEMOLITION

WORK DESCRIBED IN THE MECHANICAL AND ELECTRICAL DRAWINGS CONTAINED WITHIN THIS

SET OF CONSTRUCTION DOCUMENTS.

3. ALL DEMOLITION WORK SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THE

SPECIFICATIONS, ALL APPLICABLE CODES AND STANDARDS FOR DEMOLITION WORK, OSHA

STANDARDS, DUST CONTROL REQUIREMENTS AND ANY OTHER APPLICABLE REQUIREMENTS.

4. THE GENERAL CONTRACTOR SHALL PROVIDE, ERECT, AND MAINTAIN TEMPORARY BARRIERS

AS REQUIRED.

5. THE GENERAL CONTRACTOR SHALL REPAIR OR REPLACE AT NO ADDITIONAL COST TO THE

OWNER ANY BUILDING ELEMENT OR APPURTENANCE TO THE FACILITY WHICH IS NOT

REQUIRED TO BE DEMOLISHED.

6. THE OWNER SHALL REMOVE ALL EQUIPMENT, MOVEABLE CABINETS, CHEMICALS, AND

PRODUCT PRIOR TO THE COMMENCEMENT OF THIS PROJECT. THE GENERAL CONTRACTOR

SHALL NOTIFY THE OWNER BEFORE REMOVING ANY EQUIPMENT OR CHEMICALS LEFT IN THE

DEMOLITION AREA.

7. GENERAL CONTRACTOR SHALL VERIFY EXISTING CONDITIONS, PRIOR TO ANY DEMOLITION

AND OR CONSTRUCTION.

8. GENERAL CONTRACTOR SHALL PROTECT ANY AND ALL ITEMS THAT ARE TO REMAIN OR

INDICATED TO BE ALTERED.

9. COORDINATE ALL DEMOLITION WORK WITH SEQUENCE OF CONSTRUCTION WITH OTHER

TRADES.

10. ALL EXISTING COLUMNS, BEAMS AND STRUCTURAL OR LOAD BEARING WALLS UNLESS NOTED

OTHERWISE SHALL REMAIN INTACT. IF ANY STRUCTURAL WALLS OR UNSEEN COLUMNS NOT

SEEN IN THESE DOCUMENTS ARE FOUND, THE CONTRACTOR SHALL STOP WORK IN THAT

AREA IMMEDIATELY AND CONTACT THE BUILDING MANAGER.

11. LOCATION OF TRASH CHUTES THROUGH EXTERIOR OPENINGS AND HAUL ROUTED FOR

DEMOLISHED BUILDING MATERIAL MUST BE APPROVED BY THE BUILDING MANAGER PRIOR TO

INSTALLATION AND USE.

12. CONTRACTOR MUST PROTECT THE GENERAL PUBLIC FROM DEMOLITION ACTIVITIES BY THE

USE OF BARRIERS, SIGNAGE ETC.

13. OWNER RESERVES THE RIGHT TO FIRST REFUSAL OF ALL ITEMS DEMOLISHED, INCLUDING

NOT LIMITED TO, DOORS, FIXTURES, AND APPLIANCES. GYPSUM, STUD FRAMING, AND ALL

FINISHES REQUIRED TO BE DESTROYED DURING DEMOLITION SHALL BE DISPOSED OF

PROPERLY IN ACCORDANCE WITH THE SPECIFICATIONS.

14. THE GENERAL CONTRACTOR IS TO PROVIDE ADEQUATE PROTECTION FOR ALL EXISTING

ELEMENTS TO REMAIN (I.E. WALLS, CEILING ELEMENTS, ETC.) WHICH ARE ADJACENT TO THE

CONSTRUCTION AREAS.

15. THE GENERAL CONTRACTOR IS RESPONSIBLE TO ENSURE THE SPACE AND ALL SURFACES

ARE COMPLETELY CLEAN UPON COMPLETION OF WORK. EXTENTS OF CLEANING SHALL

ENCOMPASS THE ENTIRE WORK ARE AND IS READY FOR FACILITY OWNER TO CONTINUE

OPERATIONS IMMEDIATELY ON DAY OF COMPLETION OF WORK. NO DEBRIS SHALL BE LEFT

BEHIND OR HIDDEN WITHIN CAVITIES. ALL DEBRIS REMOVED DURING DEMOLITION SHALL BE

DISPOSED OF IN A SAFE AND LEGAL MANNER.

16. GENERAL CONTRACTOR TO CONFER WITH OWNER REGARDING ANY DEMOLITION NOTED

AND/OR REQUIRED BEYOND THE WORK PERIMETER PRIOR TO START OF DEMOLITION.

17. GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING LOCATION OF ALL EXISTING

LIGHTING, HVAC EQUIPMENT, SPEAKERS, FIRE PROTECTION SYSTEMS, ELECTRICAL

SYSTEMS, SECURITY SYSTEMS, AND OTHER EQUIPMENT.

18. ALL DEMOLISHED PIPING, WIRING, EQUIPMENT, ETC. DISCONNECTED IN THE COURSE OF

CONSTRUCTION WITHIN THE WORK AREA SHALL BE REMOVED FROM THE SITE IN

ACCORDANCE WITH THE SPECIFICATIONS AND LOCAL AND STATE ORIDNANCES.

DEMOLITION GENERAL NOTES

EXISTING PAINTED

WALLS, DOORS AND

CELING

EXISTING WALL COVERING

WITH SPECIALTY GRAPHICS

A_DOOR SCHEDULE

MARK DESCRIPTION

DOORS FRAMES HARDWARE

SET COMMENTSDOOR FINISH WIDTH HEIGHT FRAME FINISH FRAME TYPE

0003B HOLLOW METAL

DOOR WITH

HOLLOW METAL

FRAME

SHOP

PRIME/FIELD

PAINT

4'-0" 6'-8" SHOP

PRIME/FIELD

PAINT

HM-1 1 INSULATED

CORE

0003A HOLLOW METAL

DOOR WITH

HOLLOW METAL

FRAME

SHOP

PRIME/FIELD

PAINT

3'-0" 6'-8" SHOP

PRIME/FIELD

PAINT

HM-1 1 INSULATED

CORE

1000A HOLLOW METAL

DOOR WITH

HOLLOW METAL

FRAME

SHOP

PRIME/FIELD

PAINT

3'-0" 6'-8" SHOP

PRIME/FIELD

PAINT

HM-1 1 INSULATED

CORE

Maria Angelica

Prado-Diaz

No. 08228

A R C H I T

E C

T

OKLAHO

M

A

L

IC

E

N

SED

S T

A

T E

OF

N

THE DRAWINGS AND ADDITIONAL DETAILS

CONTAINED WITHIN THIS SHEET ARE COPYRIGHTED

AND DESIGNATED FOR USE EXCLUSIVELY IN

ASSOCIATION WITH THE PROJECT LOCATED AT THE

SPECIFIED ADDRESS. THESE DRAWINGS REMAIN

THE EXCLUSIVE PROPERTY OF GUERNSEY.

REPRODUCTION OF THIS SHEET IS PROHIBITED

WITHOUT THE WRITTEN CONSENT OF GUERNSEY.

21 22

7 8

124 5 6 www.guernsey.us phone: 405.416.8100 fax: 405.416.8111 guernsey

KEY PLAN

DATE:

PROJECT:

SUBMITTAL:

PROJECT #:

9/5/25

A u to d e s k D o c s

/7 -0

W

R W

A T u n n e l M

E P

U p g ra d e s /2

-0

W

R W

A T u n n e l M

E P

U p g ra g e s A

.r v t

/5

/2

:4 :3

A

M

TUNNEL SELECTIVE

DEMOLITION FLOOR PLAN

AND TUNNEL NEW WORK

FLOOR PLAN

TUNNEL AND PARKING

GARAGE MEP UPGRADES

7100 Terminal Dr, Oklahoma City, OK 73159

OKC WILL ROGERS

INTERNATIONAL

AIRPORT

5 SEP 2025

A-101

ISSUE FOR

CONSTRUCTION

70486000-004

SCALE: 1/8" = 1'-0"

TUNNEL - SELECTIVE DEMO FLOOR PLAN

SCALE: 1/8" = 1'-0"

TUNNEL - NEW WORK FLOOR PLAN

HARDWARE SET #1:

MODEL FINISH MFR

1 GEARED CONTINUOUS HINGE 041XY 626 IV

1 STORAGE LOCK ND80 626 SC

1 GASKETING 303-PK 626 PE

NOTE: KEY CYLINDER TO MATCH OWNER'S EXISTING SCHEDULE

IV - IVES

SC - SCHLAGE (ASSA-ABLOY)

PE - PEMKO

SCALE: 3/8" = 1'-0"

ELEVATION - DEMOLITION AT TUNNEL SIDE OF MECH 0003

SCALE: 3/4" = 1'-0"

EXISTING CONDITION OF MECH ROOM 1000 ON TUNNEL SIDE

LOCATION OF NEW RETURN

AIR GRILLE R-1

REV

REVISION NAME ISSUE

DATE

GKGLGM

G1

G3

DEMO NOTES:

• DEMOLISH AND REMOVE ACT

CEILING GRID,PANELS AND

SUSPENSION SYSTEM

• REMOVE OR PROTECT ITEMS TO

REMAIN IN CEILING.

• PREP WALLS, HOLLOW METAL DOOR,

HOLLOW METAL FRAME AND

ELEVATOR FRAME FOR NEW PAINT.

DEMOLISH AND

REMOVE CHASE

WALLS

DEMO NOTES:

• DEMOLISH AND REMOVE ACT

CEILING

• REMOVE OR PROTECT ITEMS TO

REMAIN IN CEILING.

• PREP WALLS, HOLLOW METAL DOOR,

HOLLOW METAL FRAME AND

ELEVATOR FRAME FOR NEW PAINT.

DEMOLISH AND

REMOVE CHASE

WALLS

STATION #3

STATION #4

AREA 2

GKGLGM

G1

G3

8"

E Q

E Q

PROVE 18" X 18"

FLUSH ACCESS

DOOR. LOCATED 3'-0"

A.F.F TO CENTERLINE

OF DOOR. B.O.D:

ACUDOR DW-5040

SEE GENERAL NOTES FOR FINISHES

PROVE 18" X 18"

FLUSH ACCESS

DOOR. LOCATED 3'-0"

A.F.F TO CENTERLINE

OF DOOR. B.O.D:

ACUDOR DW-5040

SEE GENERAL NOTES FOR FINISHES

8"

E Q

E Q

3'-9"3'-6"

STEEL PIPE BOLLARDS WITH

COVER SLEEVE (TYP)

NEW UNIT ON

MECHANICAL PAD

ALIGN FINISH BOLLARD

FACE WITH DOOR JAMB

3'-2"3'-3"

STEEL PIPE BOLLARD WITH

COVER SLEEVE (TYP)

NEW UNIT ON

MECHANICAL PAD

STATION #3

STATION #4

AREA 2

REPAIR/PAINT WALL

AFTER PIPING

INSTALLATION IS

COMPLETE

PLAN LEGEND

NEW

CONSTRUCTION

EXISTING

CONSTRUCTION

OVERHEAD

DEMO PLAN LEGEND

EXISTING

CONSTRUCTION

DEMO

GENERAL NOTES

A. SCOPE OF WORK IS FOR LOBBIES ON LEVELS: GROUND, 2, 3, 4

AND 5.

B. PROVIDE NEW 2' X 2' ACOUSTIC PANEL CEILING. B.O.D:

ARMSTRONG 2 CLEAN ROOM, SYSTEM LINES. COLOR: WHITE

C. PAINT CONCRETE WALLS, HOLLOW METAL DOOR FRAME,

HOLLOW METAL DOOR AND ELEVATOR FRAME IN COLOR TO

MATCH EXISTING WARM GRAY.

D. PROVIDE NEW CHASE WALLS OUT OF 3 5/8" NON-STURCTURAL

METAL FRAMING @ 16" O.C. WITH 5/8" GYPSUM BOARD. TAPE,

BED AND FINISH GYPSUM BOARD TO LEVEL 4.

E. VERIFY IN FIELD DEPTH OF CHASE WITH MEP WORK.

F. VERIFY IN FIELD LOCATION OF ACCESS PANEL WITH REQUIRED

ACCESS TO MEP SYSTEMS IN WALL.

6" DIA. STD PIPE COVER - TYP

BASE PLATE 1/2"X11"X0'-11"

W/ (4) 1/2" DIA F1554 THREADED

ROD ANCHOR BOLTS @ 8" GA EW

DRILL & EPOXY (4" EMBED) TYP

3/16

WELD TO SEAL

Maria Angelica

Prado-Diaz

No. 08228

A R C H I T

E C

T

OKLAHO

M

A

L

IC

E

N

SED

S T

A

T E

OF

N

THE DRAWINGS AND ADDITIONAL DETAILS

CONTAINED WITHIN THIS SHEET ARE COPYRIGHTED

AND DESIGNATED FOR USE EXCLUSIVELY IN

ASSOCIATION WITH THE PROJECT LOCATED AT THE

SPECIFIED ADDRESS. THESE DRAWINGS REMAIN

THE EXCLUSIVE PROPERTY OF GUERNSEY.

REPRODUCTION OF THIS SHEET IS PROHIBITED

WITHOUT THE WRITTEN CONSENT OF GUERNSEY.

21 22

7 8

124 5 6 www.guernsey.us phone: 405.416.8100 fax: 405.416.8111 guernsey

KEY PLAN

DATE:

PROJECT:

SUBMITTAL:

PROJECT #:

9/5/25

A u to d e s k D o c s

/7 -0

W

R W

A T u n n e l M

E P

U p g ra d e s /2

-0

W

R W

A T u n n e l M

E P

U p g ra g e s A

.r v t

/5

/2

:4 :3

A

M

PARKING GARAGE

LOBBIES PLANS AND

DETAILS

TUNNEL AND PARKING

GARAGE MEP UPGRADES

7100 Terminal Dr, Oklahoma City, OK 73159

OKC WILL ROGERS

INTERNATIONAL

AIRPORT

5 SEP 2025

A-102

ISSUE FOR

CONSTRUCTION

70486000-004

SCALE: 1/4" = 1'-0"

BLUE GARAGE LOBBIES DEMO PLAN LEVELS GROUND THRU 5 - TYPICAL

SCALE: 1/4" = 1'-0"

BLUE GARAGE LOBBIES RENO PLAN LEVELS GROUND THRU 5 - TYPICAL

SCALE: 1" = 1'-0"

BOLLARD DETAIL

REV

ABV ABOVE

AC ABOVE CEILING

ACC ACCESS

AD AREA DRAIN

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

BFF BELOW FINISHED FLOOR

BLW BELOW

BV BALL VALVE

BWV BACK WATER VALVE

CD CONDENSATE DRAIN

CI CAST IRON

CLG CEILING

CO CLEAN OUT

COND CONDENSATE

CV CHECK VALVE

DCW DOMESTIC COLD WATER

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER

RETURN

DN DOWN

ECC ECCENTRIC

ELEC ELECTRIC

EXIST EXISTING

EXT EXTERNAL

FCU FAN COIL UNIT

FD FLOOR DRAIN

FL FLOW LINE

FLR FLOOR

FR FROM

FS FLOOR SINK

FT FEET

GC GENERAL CONTRACTOR

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GW GREASE WASTE

HP HORSEPOWER

IN INCHES

MAX MAXIMUM

MIN MINIMUM

MTD MOUNTED

NIC NOT IN CONTRACT

NPW NON-POTABLE WATER

OC ON CENTER

OS&Y OUTSIDE, SCREW AND YOKE

PD PRESSURE DROP

PRES PRESSURE

PRV PRESSURE RELIEF VALVE

PSI POUNDS PER SQUARE INCH

RPM REVOLUTIONS PER MINUTE

SD STORM DRAIN

SF SUPPLY FAN

SO SHUT OFF

SS SANITARY SEWER

TMV THERMOSTATIC MIXING

VALVE

TYP TYPICAL

UF UNDERFLOOR

UG UNDER GROUND

UH UNIT HEATER

W WASTE

WCO WALL CLEANOUT

WM WATER METER

PLUMBING VENT

CD CONDENSATE DRAIN LINE

NPW NON-POTABLE WATER (GRAY WATER)

D SUMP PUMP DISCHARGE

CHECK VALVE

BUTTERFLY VALVE

BALL VALVE

STRAINER

UNION

SHUT OFF VALVE IN DROP

A

COLD WATER OUTLETC

GAS OUTLETG

HOT WATER OUTLETH

OXYGEN OUTLETO

VACUUM INLETV

AIR OUTLET

ECCENTRIC REDUCER, WATER

CONCENTRIC REDUCER

DIRECTION OF FLOW

SLOPE DOWN

PRESSURE REDUCING VALVE

ANCHOR

EXPANSION JOINT

PIPE GUIDE

CONNECT TO EXISTING

WATER METER

GAS PRESSURE REGULATOR

FLOOR SINK

FLOOR DRAIN

B BREATHING AIR OUTLET

M

P-TRAP

BALANCING VALVE

GAS COCK

PLUG COCK

ABBREVIATIONS SYMBOLS

LEGEND & ABBREVIATIONS

ABV. DESCRIPTION ABV. DESCRIPTION

DISCONNECT

N

THE DRAWINGS AND ADDITIONAL DETAILS

CONTAINED WITHIN THIS SHEET ARE COPYRIGHTED

AND DESIGNATED FOR USE EXCLUSIVELY IN

ASSOCIATION WITH THE PROJECT LOCATED AT THE

SPECIFIED ADDRESS. THESE DRAWINGS REMAIN

THE EXCLUSIVE PROPERTY OF GUERNSEY.

REPRODUCTION OF THIS SHEET IS PROHIBITED

WITHOUT THE WRITTEN CONSENT OF GUERNSEY.

21 22

7 8

124 5 6 www.guernsey.us phone: 405.416.8100 fax: 405.416.8111 guernsey

KEY PLAN

DATE:

PROJECT:

SUBMITTAL:

PROJECT #:

A u to d e s k D o c s

/7 -0

W

R W

A T u n n e l M

E P

U p g ra d e s /2

-0

W

R W

A T u n n e l M

E P

U p g ra d e s M

.r v t

/5

/2

:0

:3

P

M

LEGEND, ABBREVIATIONS,

& SCHEDULES

TUNNEL AND PARKING

GARAGE MEP UPGRADES

7100 Terminal Dr, Oklahoma City, OK 73159

OKC WILL ROGERS

INTERNATIONAL

AIRPORT

5 SEP 2025

P-001

ISSUE FOR

CONSTRUCTION

70486-004

PROJECT NOTES

A. THE PLUMBING INSTALLATION SHALL COMPLY WITH THE

CURRENT LOCAL PLUMBING CODES.

B. PIPE ROUTING SHOWN IS SCHEMATIC AND IS NOT INTENDED TO

INDICATE EXACT ROUTING. CONTRACTOR SHALL PROVIDE ANY

ADDITIONAL OFFSETS AND FITTINGS REQUIRED FOR PROPER

INSTALLATION AND TO MAINTAIN CLEARANCES. COORDINATE

WITH OTHER DISCIPLINES TO AVOID WHEN ROUTING PIPING.

C. PROVIDE ACCESS PANELS FOR ALL VALVES CONCEALED IN

WALLS OR ABOVE NON-ACCESSIBLE CEILINGS.

D. PROVIDE CLEANOUTS IN ACCORDANCE WITH THE PLUMBING

CODE.

E. VERIFY IN FIELD LOCATIONS OF EXISTING FLOOR AND AREA

DRAINS.

F. COORDINATE PIPING WITH ELECTRICAL EQUIPMENT (PANELS ,

TRANSFORMERS, ETC) PRIOR TO ANY INSTALLATION. DO NOT

ROUTE ANY PIPING OVER ANY ELECTRICAL PANELS UNDER ANY

CIRCUMSTANCES. ANY PIPING ROUTED OVER PANELS SHALL

BE RE-ROUTED AT NO ADDITIONAL COST.

G. INSULATION SHALL COMPLY WITH THE SPECIFICATIONS.

H. INSTALL ALL CONDENSATE DRAIN PIPING WITH INSULATION

PER SPECIFICATIONS.

I. ANY DEVIATIONS IN ELECTRICAL REQUIREMENTS FROM THE

BASIS OF DESIGN FOR PLUMBING EQUIPMENT SHALL BE THE

RESPONSIBILITY OF THE PLUMBING CONTRACTOR TO ENSURE

COORDINATION WITH THE ELECTRICAL CONTRACTOR FOR

PROPER WIRE SIZE, CONDUITS, DISCONNECTS, FUSES,

STARTERS, VFD'S, ETC. AT NO ADDITIONAL COST.

J. THESE CONTRACT DOCUMENTS HAVE BEEN SUBMITTED FOR

CONTRACTOR DEVELOPMENT OF THE CONSTRUCTION WORK

PLAN. COORDINATION BETWEEN THE CONTRACTOR AND

SUBCONTRACTORS IS THE RESPONSIBILITY OF THE

CONTRACTOR. CHANGES TO THESE DRAWINGS AS A RESULT

OF THE CONSTRUCTION COORDINATION AND THE

DEVELOPMENT OF THE CONSTRUCTION WORK PLAN ARE THE

RESPONSIBILITY OF THE CONTRACTOR.

K. THESE CONTRACT DOCUMENTS DETAIL THE CONCEPT OF THE

WORK. COORDINATION OF CONCEPTUALLY EQUAL BUT

NOMINALLY DIFFERENT SYSTEMS OR PRODUCTS SELECTED BY

CONTRACTOR ARE THE RESPONSIBILITY OF THE CONTRACTOR.

REV

TH

TH

GKGLGMGNGP

STATION 1

P-401

PD401

MECHANICAL

EQUIPMENT ROOM

STORAGE

PUMP ROOM

AREA 3

AREA 2

GKGLGMGNGP

LOBBY 3A STATION 2

STATION 3

STATION 4

G3

G2

G1

MECHANICAL /

EQUIPMENT ROOM

STATION #3

VEST.

ELEV. EQUIP.

STATION #4

WALKWAY

ELEV. EQUIP.

STORAGE

ELEV. EQUIP.

P-401

PD401

AREA 3

AREA 2

AREA 2

AREA 1

N

THE DRAWINGS AND ADDITIONAL DETAILS

CONTAINED WITHIN THIS SHEET ARE COPYRIGHTED

AND DESIGNATED FOR USE EXCLUSIVELY IN

ASSOCIATION WITH THE PROJECT LOCATED AT THE

SPECIFIED ADDRESS. THESE DRAWINGS REMAIN

THE EXCLUSIVE PROPERTY OF GUERNSEY.

REPRODUCTION OF THIS SHEET IS PROHIBITED

WITHOUT THE WRITTEN CONSENT OF GUERNSEY.

21 22

7 8

124 5 6 www.guernsey.us phone: 405.416.8100 fax: 405.416.8111 guernsey

KEY PLAN

DATE:

PROJECT:

SUBMITTAL:

PROJECT #:

A u to d e s k D o c s

/7 -0

W

R W

A T u n n e l M

E P

U p g ra d e s /2

-0

W

R W

A T u n n e l M

E P

U p g ra d e s M

.r v t

/5

/2

:0

:3

P

M

PLUMBING COMPOSITE

PLAN

TUNNEL AND PARKING

GARAGE MEP UPGRADES

7100 Terminal Dr, Oklahoma City, OK 73159

OKC WILL ROGERS

INTERNATIONAL

AIRPORT

5 SEP 2025

P-100

ISSUE FOR

CONSTRUCTION

70486-004

1/16 = 1'-0

0 8' 16' 32'

2"

REV

REVISION NAME ISSUE

DATE

SCALE: 1/16" = 1'-0"

PLUMBING OVERALL PLAN - TUNNEL AREA 3

SCALE: 1/16" = 1'-0"

PLUMBING OVERALL PLAN - TUNNEL AREA 2

GAGBGCGDGEGFGGGHGJGKGLGMGNGPGQGRGSGTGUGVGWGXGYGZ

4" SD

IN JOISTS

4" SD

IN JOISTS

4" SD

IN JOISTS

4" SD

IN JOISTS

4" SD

4" SD

IN JOISTS

4" SD

IN JOISTS

4" SD FR AD ABV

4" SD FR AD ABV

4" SD FR AD ABV

4" SD FR AD ABV

4" SD FR AD ABV

4" SD FR AD ABV

6" SD FR ABV & DN.

DISCONNECT FROM UG SD LINE.

6" SD FR ABV & DN. DISCONNECT FROM UG SD LINE.

6" SD FR ABV & DN. DISCONNECT FROM UG SD LINE.

6" SD FR ABV & DN. DISCONNECT FROM UG SD LINE.

6" SD FR ABV & DN.

DISCONNECT

FROM UG SD LINE.

6" SD FR ABV & DN.

DISCONNECT FROM UG

SD LINE.

3" SD FR

AD ABV

3" SD FR

AD ABV

3" SD FR AD ABV3" SD FR AD ABV

3" SD FR AD ABV

3" SD FR AD ABV

3" SD FR AD ABV

4" SD FR ABV & DN

4" SD FR AD ABV

4" SD

G4

G3

G2

G1

TYP

AREA 2

STATION 3

STATION 4

N

THE DRAWINGS AND ADDITIONAL DETAILS

CONTAINED WITHIN THIS SHEET ARE COPYRIGHTED

AND DESIGNATED FOR USE EXCLUSIVELY IN

ASSOCIATION WITH THE PROJECT LOCATED AT THE

SPECIFIED ADDRESS. THESE DRAWINGS REMAIN

THE EXCLUSIVE PROPERTY OF GUERNSEY.

REPRODUCTION OF THIS SHEET IS PROHIBITED

WITHOUT THE WRITTEN CONSENT OF GUERNSEY.

21 22

7 8

124 5 6 www.guernsey.us phone: 405.416.8100 fax: 405.416.8111 guernsey

KEY PLAN

DATE:

PROJECT:

SUBMITTAL:

PROJECT #:

A u to d e s k D o c s

/7 -0

W

R W

A T u n n e l M

E P

U p g ra d e s /2

-0

W

R W

A T u n n e l M

E P

U p g ra d e s M

.r v t

/5

/2

:0

:3

P

M

ADD ALT #1 - GROUND

LEVEL GARAGE

PLUMBING DEMO PLAN

TUNNEL AND PARKING

GARAGE MEP UPGRADES

7100 Terminal Dr, Oklahoma City, OK 73159

OKC WILL ROGERS

INTERNATIONAL

AIRPORT

5 SEP 2025

PD101

ISSUE FOR

CONSTRUCTION

70486-004

DEMOLITION GENERAL NOTES

DEMOLITION SHEET NOTES

SCALE: 3/64" = 1'-0"

GROUND LEVEL GARAGE PLUMBING DEMO PLAN

3/64 = 1'-0

0 12' 24' 48'

2"

1. ALL HORIZONTAL STORM DRAINAGE PIPING AND ASSOCIATED

PIPE RISERS TO BE DEMOLISHED. RETAIN EXISTING AREA

DRAINS FOR CONNECTION OF NEW STORM DRAIN PIPING.

DISCONNECT FROM UNDERGROUND MAIN SD LINE.

A. REFER TO P-001 FOR GENERAL NOTES.

B. REMOVE EXISTING CAST IRON PIPING AND ASSOCIATED

SUPPORTS WITH CARE TO AVOID DAMAGE TO STRUCTURE AND

FINISHES.

C. EXISTING AREA DRAINS ARE TO REMAIN IN PLACE AND BE

PROTECTED DURING CONSTRUCTION.

D. ANY DAMAGE TO EXISTING AREA DRAINS SHALL BE REPAIRED.

E. VERIFY EXACT LOCATION, INVERT ELEVATION, AND

CONNECTION POINTS OF EXISTING STORM DRAINS PRIOR TO

NEW PIPING INSTALLATION.

REV

4" SD

4" SD

IN JOISTS

IN JOISTS

IN JOISTS

IN JOISTS

IN JOISTS

4" SD

4" SD

IN JOISTS

4" SD

4" SD

4" SD

3" SD

3" SD

4" SD

4" SD

4" SD FR AD ABV

4" SD FR AD ABV

6" SD FR ABV & DN

6" SD FR ABV & DN

6" SD FR ABV & DN

6" SD FR ABV & DN

6" SD FR ABV & DN

6" SD FR ABV & DN

4" SD FR AD ABV

4" SD FR AD ABV

4" SD FR AD ABV

4" SD FR ABV & DN 4" SD FR AD ABV

3" SD FR AD ABV

4" SD FR AD ABV

3" SD

3" SD FR AD ABV

G4

G3

G2

G1

3" SD FR

AD ABV

3" SD FR

AD ABV

3" SD FR AD ABV

3" SD FR AD ABV

AREA 2

STATION 3

STATION 4

N

THE DRAWINGS AND ADDITIONAL DETAILS

CONTAINED WITHIN THIS SHEET ARE COPYRIGHTED

AND DESIGNATED FOR USE EXCLUSIVELY IN

ASSOCIATION WITH THE PROJECT LOCATED AT THE

SPECIFIED ADDRESS. THESE DRAWINGS REMAIN

THE EXCLUSIVE PROPERTY OF GUERNSEY.

REPRODUCTION OF THIS SHEET IS PROHIBITED

WITHOUT THE WRITTEN CONSENT OF GUERNSEY.

21 22

7 8

124 5 6 www.guernsey.us phone: 405.416.8100 fax: 405.416.8111 guernsey

KEY PLAN

DATE:

PROJECT:

SUBMITTAL:

PROJECT #:

A u to d e s k D o c s

/7 -0

W

R W

A T u n n e l M

E P

U p g ra d e s /2

-0

W

R W

A T u n n e l M

E P

U p g ra d e s M

.r v t

/5

/2

:0

:3

P

M

ADD ALT #1 - 2ND THRU

4TH LEVEL GARAGE

DRAINAGE DEMO

PLUMBING PLAN

TUNNEL AND PARKING

GARAGE MEP UPGRADES

7100 Terminal Dr, Oklahoma City, OK 73159

OKC WILL ROGERS

INTERNATIONAL

AIRPORT

5 SEP 2025

PD102

ISSUE FOR

CONSTRUCTION

70486-004

DEMOLITION GENERAL NOTES

DEMOLITION SHEET NOTES

3/64 = 1'-0

0 12' 24' 48'

2"

SCALE: 3/64" = 1'-0"

2ND THRU 4TH LEVEL GARAGE DRAINAGE DEMO PLUMBING PLAN

1. ALL HORIZONTAL STORM DRAINAGE PIPING AND ASSOCIATED

PIPE RISERS TO BE DEMOLISHED. TYPICAL FOR LEVELS

GROUND THRU 4. RETAIN EXISTING AREA DRAINS FOR

CONNECTION OF NEW STORM DRAIN PIPING.

TYP

A. REFER TO P-001 FOR GENERAL NOTES.

B. REMOVE EXISTING CAST IRON PIPING AND ASSOCIATED

SUPPORTS WITH CARE TO AVOID DAMAGE TO STRUCTURE AND

FINISHES.

C. EXISTING AREA DRAINS ARE TO REMAIN IN PLACE AND BE

PROTECTED DURING CONSTRUCTION.

D. ANY DAMAGE TO EXISTING AREA DRAINS SHALL BE REPAIRED.

E. VERIFY EXACT LOCATION, INVERT ELEVATION, AND

CONNECTION POINTS OF EXISTING STORM DRAINS PRIOR TO

NEW PIPING INSTALLATION.

REV

GNGP

SUMP PUMP (EXIST)

G1

MECHANICAL /

EQUIPMENT ROOM

V

GNGP

SUMP PUMP (EXIST)

MECHANICAL

EQUIPMENT ROOM

V

D

N

THE DRAWINGS AND ADDITIONAL DETAILS

CONTAINED WITHIN THIS SHEET ARE COPYRIGHTED

AND DESIGNATED FOR USE EXCLUSIVELY IN

ASSOCIATION WITH THE PROJECT LOCATED AT THE

SPECIFIED ADDRESS. THESE DRAWINGS REMAIN

THE EXCLUSIVE PROPERTY OF GUERNSEY.

REPRODUCTION OF THIS SHEET IS PROHIBITED

WITHOUT THE WRITTEN CONSENT OF GUERNSEY.

21 22

7 8

124 5 6 www.guernsey.us phone: 405.416.8100 fax: 405.416.8111 guernsey

KEY PLAN

DATE:

PROJECT:

SUBMITTAL:

PROJECT #:

A u to d e s k D o c s

/7 -0

W

R W

A T u n n e l M

E P

U p g ra d e s /2

-0

W

R W

A T u n n e l M

E P

U p g ra d e s M

.r v t

/5

/2

:0

:3

P

M

TUNNEL DEMOLITION

PLAN

TUNNEL AND PARKING

GARAGE MEP UPGRADES

7100 Terminal Dr, Oklahoma City, OK 73159

OKC WILL ROGERS

INTERNATIONAL

AIRPORT

5 SEP 2025

PD401

ISSUE FOR

CONSTRUCTION

70486-004

DEMOLITION SHEET NOTES

1. DEMO EXIST SUMP PUMP AND BASIN COVER. SUMP BASIN TO

REMAIN.

2. DEMO PIPING ASSOCIATED WITH SUMP PUMP. EXISTING MAIN

PIPES TO REMAIN AS INDICATED ON THE DRAWING.

3. DEMO EXIST SUMP PUMP CONTROL PANEL.

4. EXIST VENT AND DISCHARGE PIPING TO REMAIN.

5. IF PIPING WAS DAMAGED DURING DEMOLITION PROCESS,

REPLACE VENT PIPING AS NEEDED.

SCALE: 3/8" = 1'-0"

ENLARGED TUNNEL DEMO PLAN - MECHANICAL EQUIPMENT ROOM 1000

SCALE: 3/8" = 1'-0"

ENLARGED TUNNEL DEMO PLAN - MECHANICAL EQUIPMENT ROOM 0003

3/8 = 1'-0

0 2' 3' 6'

2"

REV

IN JOISTS

IN JOISTS

IN JOISTS

IN JOISTS

IN JOISTS

IN JOISTS

4" SD FR FD ABV

6" SD FR ABV & DN.

CONNECT TO EXISTING

UG SD LINE.

3" SD FR AD ABV

3" SD FR AD ABV

6" SD FR ABV & DN.

CONNECT TO EXISTING

UG SD LINE.

4" SD FR AD ABV

4" SD FR AD ABV

6" SD FR ABV & DN. CONNECT TO

EXISTING UG SD LINE.

3" SD FR

AD ABV

3" SD FR

AD ABV

6" SD FR ABV & DN. CONNECT TO

EXISTING UG SD LINE.

4" SD FR AD ABV

4" SD FR AD ABV

4" SD FR AD ABV

4" SD FR ABV & DN

4" SD FR AD ABV

6" SD FR ABV & DN. CONNECT

TO EXISTING UG SD LINE.

3" SD FR AD ABV

3" SD FR AD ABV

3" SD FR AD ABV 6" SD FR ABV & DN. CONNECT

TO EXISTING UG SD LINE.

G4

G3

G2

G1

TYP

4" SD

4" SD

4" SD

4" SD

4" SD

4" SD

AREA 2

STATION 3

STATION 4

N

THE DRAWINGS AND ADDITIONAL DETAILS

CONTAINED WITHIN THIS SHEET ARE COPYRIGHTED

AND DESIGNATED FOR USE EXCLUSIVELY IN

ASSOCIATION WITH THE PROJECT LOCATED AT THE

SPECIFIED ADDRESS. THESE DRAWINGS REMAIN

THE EXCLUSIVE PROPERTY OF GUERNSEY.

REPRODUCTION OF THIS SHEET IS PROHIBITED

WITHOUT THE WRITTEN CONSENT OF GUERNSEY.

21 22

7 8

124 5 6 www.guernsey.us phone: 405.416.8100 fax: 405.416.8111 guernsey

KEY PLAN

DATE:

PROJECT:

SUBMITTAL:

PROJECT #:

A u to d e s k D o c s

/7 -0

W

R W

A T u n n e l M

E P

U p g ra d e s /2

-0

W

R W

A T u n n e l M

E P

U p g ra d e s M

.r v t

/5

/2

:0

:3

P

M

ADD ALT #1 - GROUND

FLOOR PLUMBING PLAN

TUNNEL AND PARKING

GARAGE MEP UPGRADES

7100 Terminal Dr, Oklahoma City, OK 73159

OKC WILL ROGERS

INTERNATIONAL

AIRPORT

5 SEP 2025

P-101

ISSUE FOR

CONSTRUCTION

70486-004

SHEET NOTES

SCALE: 3/64" = 1'-0"

ADD ALT #1 - GROUND LEVEL GARAGE PLUMBING PLAN

3/64 = 1'-0

0 12' 24' 48'

2"

1. NEW HORIZONTAL SCH. 40 PVC STORM DRAINAGE PIPING.

SLOPE AT A MIN 1/8" PER FOOT. CONNECT EXISTING AREA

DRAINS TO NEW PIPING.

REV

4" SD IN JOISTS

IN JOISTS

IN JOISTS

IN JOISTS

IN JOISTS

IN JOISTS

4" SD FR FD ABV

4" SD FR FD ABV

6" SD FR ABV & DN

3" SD FR

AD ABV

3" SD FR

AD ABV

3" SD FR FD ABV

3" SD FR FD ABV

4" SD FR FD ABV

3" SD FR FD ABV

4" SD FR FD ABV

4" SD FR FD ABV

4" SD FR FD ABV

3" SD FR AD ABV

3" SD FR AD ABV

6" SD FR ABV & DN

6" SD FR ABV & DN

4" SD FR ABV & DN 4" SD FR ABV

6" SD FR ABV & DN

6" SD FR ABV & DN

6" SD FR ABV & DN.

G4

G3

G2

G1

4" SD

4" SD

4" SD

4" SD

AREA 2

STATION 3

STATION 4

N

THE DRAWINGS AND ADDITIONAL DETAILS

CONTAINED WITHIN THIS SHEET ARE COPYRIGHTED

AND DESIGNATED FOR USE EXCLUSIVELY IN

ASSOCIATION WITH THE PROJECT LOCATED AT THE

SPECIFIED ADDRESS. THESE DRAWINGS REMAIN

THE EXCLUSIVE PROPERTY OF GUERNSEY.

REPRODUCTION OF THIS SHEET IS PROHIBITED

WITHOUT THE WRITTEN CONSENT OF GUERNSEY.

21 22

7 8

124 5 6 www.guernsey.us phone: 405.416.8100 fax: 405.416.8111 guernsey

KEY PLAN

DATE:

PROJECT:

SUBMITTAL:

PROJECT #:

A u to d e s k D o c s

/7 -0

W

R W

A T u n n e l M

E P

U p g ra d e s /2

-0

W

R W

A T u n n e l M

E P

U p g ra d e s M

.r v t

/5

/2

:0

:3

P

M

ADD ALT #1 - SECOND

THRU FOURTH FLOOR

PLUMBING PLAN

TUNNEL AND PARKING

GARAGE MEP UPGRADES

7100 Terminal Dr, Oklahoma City, OK 73159

OKC WILL ROGERS

INTERNATIONAL

AIRPORT

5 SEP 2025

P-102

ISSUE FOR

CONSTRUCTION

70486-004

SHEET NOTES

SCALE: 3/64" = 1'-0"

2ND THRU 4TH LEVEL GARAGE PLUMBING PLAN

3/64 = 1'-0

0 12' 24' 48'

2"

1. NEW HORIZONTAL SCH. 40 PVC STORM DRAINAGE PIPING.

SLOPE AT A MIN 1/8" PER FOOT. CONNECT EXISTING AREA

DRAINS TO NEW PIPING.

TYP

REV

GNGP

AHU-1

G1

3" V

P-401

SP-1

MECHANICAL /

EQUIPMENT ROOM

1 1/4" CD

WALKWAY

GNGP

AHU-2

SP-2

MECHANICAL

EQUIPMENT ROOM

1 1/4" CD

WALKWAY

EXIST FD

SP-2

TETHERED LEVEL

CONTROL FLOAT SWITCH

SP-1

OR

CHECK VALVE

ASSEMBLY

3" V

SUB BASE

GUIDE PIPE

SLIDING BRACKET

3" DISCHARGE PIPE

BASIN COVER

ACCESS DOOR

EXIST FLOOR

LEVEL CONTROL PLATE

EXIST INLET. VIF.

EXIST BASIN

PUMP OFF/STOP

LEAD/START

LAG/STANDBY

HIGH WATER ALARM

4'-0"

DRAIN PAN

DRAIN LINE SHALL BE AT

LEAST THE SAME SIZE AS THE

NIPPLE ON THE DRAIN PAN

PITCH DOWN

TOWARD DRAIN

CLEAN OUT

OPEN DRAIN

OR FLOOR

DRAIN

NOTE:

UNLESS NOTED OTHERWISE,

THIS DETAIL DOES NOT APPLY

TO FAN COIL UNITS

DRAW THRU

BLOW THRU

2" PLUS X

1" MINIMUM

X

2X

UNIT TYPE A B

WHERE X = STATIC PRESSURE IN PAN

DIELECTRIC

FITTING

A B

1"

N

THE DRAWINGS AND ADDITIONAL DETAILS

CONTAINED WITHIN THIS SHEET ARE COPYRIGHTED

AND DESIGNATED FOR USE EXCLUSIVELY IN

ASSOCIATION WITH THE PROJECT LOCATED AT THE

SPECIFIED ADDRESS. THESE DRAWINGS REMAIN

THE EXCLUSIVE PROPERTY OF GUERNSEY.

REPRODUCTION OF THIS SHEET IS PROHIBITED

WITHOUT THE WRITTEN CONSENT OF GUERNSEY.

21 22

7 8

124 5 6 www.guernsey.us phone: 405.416.8100 fax: 405.416.8111 guernsey

KEY PLAN

DATE:

PROJECT:

SUBMITTAL:

PROJECT #:

A u to d e s k D o c s

/7 -0

W

R W

A T u n n e l M

E P

U p g ra d e s /2

-0

W

R W

A T u n n e l M

E P

U p g ra d e s M

.r v t

/5

/2

:0

:4

P

M

TUNNEL PLUMBING PLAN

TUNNEL AND PARKING

GARAGE MEP UPGRADES

7100 Terminal Dr, Oklahoma City, OK 73159

OKC WILL ROGERS

INTERNATIONAL

AIRPORT

5 SEP 2025

P-401

ISSUE FOR

CONSTRUCTION

70486-004

SCALE: 3/8" = 1'-0"

ENLARGED TUNNEL PLAN - MECHANICAL EQUIPMENT ROOM 1000

SHEET NOTES

1. NEW, SUBMERSIBLE DUPLEX SUMP PUMP. NEW SOLID ACCESS

COVER OVER EXISTING SUMP BASIN. REFER TO PUMP

SCHEDULE.

2. ROTATE ACCESS COVER TO AVOID ELECTRICAL PANEL

CLEARANCES.

3. NEW PIPING TO CONNECT TO NEW SUBMERSIBLE DUPLEX

SUMP PUMP. CONNECT TO EXISTING ROUGH-IN PIPING.

4. LOCATE SUMP PUMP CONTROL PANEL. FIELD VERIFY LOCATION

TO ENSURE ADEQUATE SPACE FOR PANEL.

5. RETAIN AS MUCH EXISTING VENT PIPE AS POSSIBLE.

SCALE: 3/8" = 1'-0"

ENLARGED TUNNEL PLAN - MECHANICAL EQUIPMENT ROOM 0003

SCALE: NTS

TYPICAL SUMP PUMP DETAIL

3/8 = 1'-0

0 2' 3' 6'

2"

PUMP SCHEDULE

MARK DESCRIPTION GPM HEAD FT. WTR. H.P. RPM VOLTS/PHASE BASIS OF DESIGN REMARKS

SP-1 SUBMERSIBLE WASTEWATER PUMP 150 35 2 1750 460/3 WEIL 2515 ALL

SP-2 SUBMERSIBLE WASTEWATER PUMP 150 25 2 1750 460/3 WEIL 2515 ALL

1. PROVIDE WITH PUMP CONTROL PANEL AS INDICATED IN DRAWINGS. BOD WEIL 8138 WITH MANUFACTURER-PROVIDED INTEGRATED HIGH WATER ALARM SYSTEM, TYPE 4X AND ASSOCIATED DOME LIGHT. POWER REQUIREMENT: 460V/3-PHASE. TIE PANEL INTO EXISTING BAS SYSTEM FOR REMOTE MONITORING.

2. PROVIDE NEW BASIN COVER WITH NEW HINGED ACCESS DOOR. BOD WEIL 8804 - DUPLEX WITH ONE PUMP OPENING.

3. PROVIDE NEW CHECK VALVE ASSEMBLY. BOD WEIL 2616-3.

4. PROVIDE TETHERED LEVEL CONTROL FLOAT SWITCH. BOD WEIL 8233 WITH DUPLEX CONFIGURATION AND 20' CORD LENGTH AND 1" SCH. 40 MOUNTING PIPE.

SCALE: NTS

CONDENSATE DRAIN TRAP DETAIL

REV

P

D

HEATING HOT WATER SUPPLYHWS

HEATING HOT WATER RETURNHWR

RS REFRIGERANT SUCTION LINE

RL REFRIGERANT LIQUID LINE

RH REFRIGERANT HOT GAS LINE

CWS CHILLED WATER SUPPLY

CWR CHILLED WATER RETURN

CS CONDENSER WATER SUPPLY

CR CONDENSER WATER RETURN

CD CONDENSATE DRAIN LINE

DROP IN DUCTWORK

RISE IN DUCTWORK

MANUAL BALANCING DAMPER IN DUCT

AIR FLOW MEASUREMENT STATION

FIRE DAMPER

FIRE/SMOKE DAMPER

3-WAY VALVE (PNEUMATIC)

R

GATE VALVE

GATE VALVE W/OUTSIDE SCREW & YOKE

CHECK VALVE

BUTTERFLY VALVE

BALL VALVE

BALANCING VALVE

STRAINER

UNION

T THERMOSTAT

T TEMPERATURE SENSOR

S

H HUMIDISTAT

CONCENTRIC REDUCER

DIRECTION OF FLOW

SLOPE DOWN

CONNECT TO EXISTING

THERMOMETER

AC ABOVE CEILING

ABV ABOVE

AFF ABOVE FINISHED FLOOR

ACC ACCESS

ACU AIR CONDITIONING UNIT

AHU AIR HANDLING UNIT

AV AIR VENT

BDD BACKDRAFT DAMPER

BV BALL VALVE

BFF BELOW FINISHED FLOOR

BTU BRITISH THERMAL UNIT

CLG CEILING

CV CHECK VALVE

CWR CHILLED WATER RETURN

CWS CHILLED WATER SUPPLY

CONC CONCENTRIC

COND CONDENSATE

CD CONDENSATE DRAIN

CU CONDENSING UNIT

CF CUBIC FEET

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

DPR DAMPER

DP DEW POINT

DIFF DIFFUSER

DN DOWN

DT DRAW THROUGH

DB DRY BULB

EA EXHAUST/RELIEF AIR

ECC ECCENTRIC

ELEC ELECTRIC

EAT ENTERING AIR TEMPERATURE

EUH ELECTRIC UNIT HEATER

EWT ENTERING WATER TEMPERATURE

ES EQUAL SPLIT

EXH EXHAUST

EAG EXHAUST GRILLE

EXIST EXISTING

EXT EXTERNAL

FCU FAN COIL

FT FEET

FPM FEET PER MINUTE

FDPR FIRE DAMPER

F/SDPR FIRE/SMOKE DAMPER

FR FROM

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GC GENERAL CONTRACTOR

GR GRILLE

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

HP HORSEPOWER

IN INCHES

KW KILOWATTS

LAT LEAVING AIR TEMPERATUE

LWT LEAVING WATER TEMPERATURE

MBH 1000 BTU PER HOUR

MBD MANUAL BALANCING DAMPER

MAX MAXIMUM

MC MECHANICAL CONTRACTOR

MIN MINIMUM

MOD MOTOR OPERATED DAMPER

MTZ MOTORIZED

MTD MOUNTED

ND NECK DIAMETER

NC NORMALLY CLOSED

NO NORMALLY OPEN

NIC NOT IN CONTRACT

OC ON CENTER

OV OUTLET VELOCITY

OA OUTSIDE AIR

PSI POUNDS PER SQUARE INCH

PRESS PRESSURE

PD PRESSURE DROP

REC RECOVERY

REG REGISTER

RH RELATIVE HUMIDITY

RA RETURN AIR

RAG RETURN AIR GRILLE

RAO RETURN AIR OPENING

RAR RETURN AIR REGISTER

RPM REVOLUTIONS PER MINUTE

SO SHUT OFF

SF SQUARE FEET

SS STAINLESS STEEL

ST STATIC PRESSURE

SA SUPPLY AIR

SAG SUPPLY AIR GRILLE

SAR SUPPLY AIR REGISTER

SF SUPPLY FAN

TD TEMPERATURE DIFFERENCE

THERM THERMOMETER

TG TRANSFER GRILLE

TYP TYPICAL

UF UNDER FLOOR

UG UNDERGROUND

UH UNIT HEATER

UNO UNLESS NOTED OTHERWISE

VAV VARIABLE AIR VOLUME

VFD VARIABLE FREQUENCY DRIVE

VEL VELOCITY

VF VENTILATION FAN

VIF VERIFY IN FIELD.

WG WATER GAUGE

W WATTS

WB WET BULB

ABBREVIATIONS SYMBOLS

LEGEND & ABBREVIATIONS

ABV. DESCRIPTION ABV. DESCRIPTION

BAIR DEVICE

DESIGNATION CFM

DISCONNECT

N

THE DRAWINGS AND ADDITIONAL DETAILS

CONTAINED WITHIN THIS SHEET ARE COPYRIGHTED

AND DESIGNATED FOR USE EXCLUSIVELY IN

ASSOCIATION WITH THE PROJECT LOCATED AT THE

SPECIFIED ADDRESS. THESE DRAWINGS REMAIN

THE EXCLUSIVE PROPERTY OF GUERNSEY.

REPRODUCTION OF THIS SHEET IS PROHIBITED

WITHOUT THE WRITTEN CONSENT OF GUERNSEY.

21 22

7 8

124 5 6 www.guernsey.us phone: 405.416.8100 fax: 405.416.8111 guernsey

KEY PLAN

DATE:

PROJECT:

SUBMITTAL:

PROJECT #:

A u to d e s k D o c s

/7 -0

W

R W

A T u n n e l M

E P

U p g ra d e s /2

-0

W

R W

A T u n n e l M

E P

U p g ra d e s M

.r v t

/5

/2

:0

:4

P

M

LEGEND &

ABBREVIATIONS

TUNNEL AND PARKING

GARAGE MEP UPGRADES

7100 Terminal Dr, Oklahoma City, OK 73159

OKC WILL ROGERS

INTERNATIONAL

AIRPORT

5 SEP 2025

M-001

ISSUE FOR

CONSTRUCTION

70486-004

PROJECT NOTES

A. THE MECHANICAL INSTALLATION SHALL COMPLY WITH THE

CURRENT LOCAL MECHANICAL CODE.

B. CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH

MANUFACTURER'S CERTIFIED DRAWINGS. TRANSITIONS TO ALL

EQUIPMENT SHALL BE VERIFIED AND PROVIDED FOR

EQUIPMENT FURNISHED.

C. DIMENSIONS SHALL BE VERIFIED AND COORDINATED PRIOR TO

PROCUREMENT OR FABRICATION. COORDINATE THE WORK

WITH OTHER TRADES INVOLVED. FIELD MODIFICATIONS SUCH

AS OFFSETS IN PIPING OR DUCTWORK NEEDED DUE TO

OBSTRUCTIONS OR INTERFERENCES SHALL BE PROVIDED AT

NO ADDITIONAL COST.

D. SEE SPECIFICATIONS FOR DUCT PRESSURE CLASS.

E. PROVIDE AIR TURNING VANES IN ALL 90 DEGREE

RECTANGULAR DUCT ELBOWS.

F. DUCT CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE

LATEST EDITION OF THE SMACNA HVAC DUCT CONSTRUCTION

STANDARD.

G. LOCATE THERMOSTATS, TEMPERATURE SENSORS,

HUMIDISTATS, AND HUMIDITY SENSORS AT 48" ABOVE FINISHED

FLOOR UNLESS NOTED OTHERWISE. COORDINATE LOCATIONS

WITH OTHER EQUIPMENT, FURNITURE, DOOR SWINGS AND

LIGHT SWITCHES.

H. ALL DUCT SIZES ARE SHOWN ARE INSIDE CLEAR DIMENSIONS.

I. DAMPERS AND INTERIOR OF DUCT VISIBLE THOUGH AIR

DEVICES SHALL BE PAINTED FLAT BLACK.

J. PROVIDE TRAPPED CONDENSATE DRAINS WITH APPROPRIATE

DEPTH FOR ALL COOLING COILS.

K. ALL DUCTWORK AND PIPING IS SHOWN SCHEMATICALLY.

PROVIDE ALL TRANSITIONS, TURNING VANES, ELBOWS,

FITTINGS, ETC. TO ALLOW SMOOTH FLOWS. ALL DUCT SPLITS

SHALL TRANSITION TO FULL SIZE OF THE SUM OF BOTH

BRANCHES, UPSTREAM OF SPLIT.

L. PROVIDE CONCRETE HOUSEKEEPING PADS UNDER ALL FLOOR

MOUNTED EQUIPMENT. REFER TO SPECIFICATIONS FOR

DETAILED REQUIREMENTS.

M. VERIFY FINISHES WITH ARCHITECT PRIOR TO PURCHASING

GRILLES, REGISTERS, DIFFUSERS, LOUVERS AND OTHER AIR

DISTRIBUTION DEVICES.

N. PROVIDE DUCT FLEX CONNECTIONS ON ALL DUCTWORK

CONNECTING TO EACH FAN, AIR HANDLING UNIT, AND FAN COIL

UNIT.

O. PROVIDE TRANSITIONS AT DIFFUSER NECKS AS REQUIRED TO

MATCH SIZES OF FLEX DUCTS TO BE CONNECTED.

P. SLEEVE AND/OR FIRESTOP ALL PENETRATIONS THROUGH

RATED WALLS, CEILINGS, AND FLOORS WITH UL LISTED

ASSEMBLIES. FIRESTOP ASSEMBLIES SHALL BE EQUAL TO OR

EXCEED THE RATING OF THE WALL, CEILING OR FLOOR. SEE

ARCHITECTURAL DRAWINGS FOR FINAL FINISHES. ALL

FIRESTOP MATERIAL TO BE PROVIDED BY A SINGLE

MANUFACTURER.

Q. INTERRUPTIONS TO EXISTING SERVICES SHALL BE SCHEDULED

FOR TIMES OTHER THAN NORMAL OPERATING HOURS. SUCH

INTERRUPTIONS TO SERVICES SHALL NOT BE MADE WITHOUT

THE PRIOR WRITTEN CONSENT OF THE OWNER'S

REPRESENTATIVE AND PROPER COORDINATION WITH OTHER

TRADES. PRE-WORK SHALL BE PERFORMED TO MAKE THE

SHUTDOWN PERIOD AS BRIEF AS POSSIBLE.

R. MAINTAIN A MINIMUM CLEARANCE OF 6" BETWEEN DUCTWORK,

PIPING, EQUIPMENT, ETC. AND ALL FIRE RATED AND

FIRE/SMOKE RATED ASSEMBLIES TO ALLOW FOR INSPECTION

OF ASSEMBLY.

S. WATER PRESSURE DROPS THROUGH COIL CONTROL VALVES

SHALL NOT EXCEED 12 FEET OF WATER.

T. SLEEVE AND SEAL ALL PIPING PENETRATIONS THROUGH

BUILDING PARTITIONS AND MAINTAIN STC RATINGS. SEE

ARCHITECTURAL DRAWINGS FOR PARTITION RATINGS.

U. ANY DEVIATIONS IN ELECTRICAL REQUIREMENTS FROM THE

BASIS OF DESIGN FOR MECHANICAL EQUIPMENT SHALL BE THE

RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO

ENSURE COORDINATION WITH THE ELECTRICAL CONTRACTOR

FOR PROPER WIRE SIZE, CONDUITS, DISCONNECTS, FUSES,

STARTERS, VFD'S, ETC. AT NO ADDITIONAL COST.

V. PROVIDE UP-STREAM AND DOWN-STREAM TEST PLUGS FOR

ALL COILS.

W. THESE CONTRACT DOCUMENTS HAVE BEEN SUBMITTED FOR

CONTRACTOR DEVELOPMENT OF THE CONSTRUCTION WORK

PLAN. COORDINATION BETWEEN THE CONTRACTOR AND

SUBCONTRACTORS IS THE RESPONSIBILITY OF THE

CONTRACTOR. CHANGES TO THESE DRAWINGS AS A RESULT

OF THE CONSTRUCTION COORDINATION AND THE

DEVELOPMENT OF THE CONSTRUCTION WORK PLAN ARE THE

RESPONSIBILITY OF THE CONTRACTOR.

X. THESE CONTRACT DOCUMENTS DETAIL THE CONCEPT OF THE

WORK. COORDINATION OF CONCEPTUALLY EQUAL BUT

NOMINALLY DIFFERENT SYSTEMS OR PRODUCTS SELECTED BY

CONTRACTOR ARE THE RESPONSIBILITY OF THE CONTRACTOR.

Y. ALL EQUIPMENT SHALL BE SINGLE POINT WIRING AND SHALL

INCLUDE APPROPRIATE TRANSFORMERS, FUSING,

DISCONNECTS, ETC. THIS SHALL INCLUDE CIRCUITS FOR

CONTROLS/CONTROLLERS, ACTUATORS, ETC. WHERE

FACTORY SINGLE POINT WIRING IS NOT AVAILABLE,

MECHANICAL CONTRACTOR AND SUPPLIER SHALL COORDINATE

WITH ELECTRICAL CONTRACTOR TO INCLUDE ALL NECESSARY

CIRCUITS REQUIRED FOR COMPLETE OPERATION OF THE

EQUIPMENT AND ALL ASSOCIATED APPURTENANCES.

Z. CONTRACTOR TO PERFORM PRE-CONSTRUCTION TEST AND

BALANCE TO CONFIRM EXISTING PERFORMANCE OF

CONNECTED SYSTEMS, INCLUDING EXIST AHU'S. PROVIDE

REPORT TO ENGINEER AND OWNER PRIOR TO DEMOLITION.

REV

GKGLGMGNGP

MD401

M-401

STATION 1

AREA 3

AREA 2

GKGLGMGNGP

MD401

M-401

MD101

M-101

STATION 2

STATION 3

STATION 4

G3

G2

G1

AREA 3

AREA 2

AREA 2

AREA 1

N

THE DRAWINGS AND ADDITIONAL DETAILS

CONTAINED WITHIN THIS SHEET ARE COPYRIGHTED

AND DESIGNATED FOR USE EXCLUSIVELY IN

ASSOCIATION WITH THE PROJECT LOCATED AT THE

SPECIFIED ADDRESS. THESE DRAWINGS REMAIN

THE EXCLUSIVE PROPERTY OF GUERNSEY.

REPRODUCTION OF THIS SHEET IS PROHIBITED

WITHOUT THE WRITTEN CONSENT OF GUERNSEY.

21 22

7 8

124 5 6 www.guernsey.us phone: 405.416.8100 fax: 405.416.8111 guernsey

KEY PLAN

DATE:

PROJECT:

SUBMITTAL:

PROJECT #:

A u to d e s k D o c s

/7 -0

W

R W

A T u n n e l M

E P

U p g ra d e s /2

-0

W

R W

A T u n n e l M

E P

U p g ra d e s M

.r v t

/5

/2

:0

:4

P

M

MECHANICAL COMPOSITE

PLAN

TUNNEL AND PARKING

GARAGE MEP UPGRADES

7100 Terminal Dr, Oklahoma City, OK 73159

OKC WILL ROGERS

INTERNATIONAL

AIRPORT

5 SEP 2025

M-100

ISSUE FOR

CONSTRUCTION

70486-004

3/64 = 1'-0

0 12' 24' 48'

2"

REV

REVISION NAME ISSUE

DATE

SCALE: 1/16" = 1'-0"

HVAC OVERALL PLAN - TUNNEL AREA 3

SCALE: 1/16" = 1'-0"

HVAC OVERALL PLAN - TUNNEL AREA 2

GLGM

G3

G1

HWR

CHS

HWR

HWS

CD

FCU (EXIST)

HWR

HWS

HWR

HWS

CD

FCU (EXIST)

STATION 4

STATION 3

GLGM

1" CD FROM ABOVE

1-1/2" HWS UP

1-1/2" CHR FROM ABOVE

1-1/2" CHS UP

1-1/2" HWR FROM ABOVE

1" CD FROM ABOVE

1-1/2" HWS UP

1-1/2" CHR FROM ABOVE

1-1/2" CHS UP

1-1/2" HWR FROM ABOVE

G3

G1

HWS

HWR

STATION 4

STATION 3

HWS

HWR

N

THE DRAWINGS AND ADDITIONAL DETAILS

CONTAINED WITHIN THIS SHEET ARE COPYRIGHTED

AND DESIGNATED FOR USE EXCLUSIVELY IN

ASSOCIATION WITH THE PROJECT LOCATED AT THE

SPECIFIED ADDRESS. THESE DRAWINGS REMAIN

THE EXCLUSIVE PROPERTY OF GUERNSEY.

REPRODUCTION OF THIS SHEET IS PROHIBITED

WITHOUT THE WRITTEN CONSENT OF GUERNSEY.

21 22

7 8

124 5 6 www.guernsey.us phone: 405.416.8100 fax: 405.416.8111 guernsey

KEY PLAN

DATE:

PROJECT:

SUBMITTAL:

PROJECT #:

A u to d e s k D o c s

/7 -0

W

R W

A T u n n e l M

E P

U p g ra d e s /2

-0

W

R W

A T u n n e l M

E P

U p g ra d e s M

.r v t

/5

/2

:0

:4

P

M

PARKING GARAGE HVAC

DEMOLITION PLAN

TUNNEL AND PARKING

GARAGE MEP UPGRADES

7100 Terminal Dr, Oklahoma City, OK 73159

OKC WILL ROGERS

INTERNATIONAL

AIRPORT

5 SEP 2025

MD101

ISSUE FOR

CONSTRUCTION

70486-004

DEMOLITION GENERAL NOTES

A. THESE DRAWINGS WERE COMPILED USING OWNER PROVIDED

RECORD DRAWINGS AND LIMITED FIELD VERIFICATION OF

EXISTING CONDITIONS. THE DRAWINGS ARE INTENDED TO

INDICATE THE SCOPE OF DEMOLITION WORK REQUIRED FOR

THE EXISTING HVAC AND PLUMBING SYSTEMS. THE

CONTRACTOR SHALL VERIFY ALL DUCTWORK, PIPING SYSTEM,

EQUIPMENT LOCATION, DIMENSIONS AND ALL FIELD

CONDITIONS AFFECTING THEIR WORK.

B. THESE DRAWINGS DO NOT INDICATE EVERY COMPONENT THAT

MUST BE REMOVED.

C. DASHED LINES INDICATE ITEMS TO BE REMOVED UNLESS

NOTED OTHERWISE.

D. REPLACE AND/OR PATCH TO MATCH EXISTING; ANY EXISTING

PIPE AND/OR DUCT INSULATION THAT IS TO REMAIN EXISTING

AND IS DAMAGED OR REMOVED DURING CONSTRUCTION.

E. CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL

PENETRATIONS CREATED BY REMOVAL OF EQUIPMENT,

DUCTWORK, ETC. TO MATCH EXISTING. REPAIR ADJACENT

CONSTRUCTION AND FINISHES DAMAGED DURING DEMOLITION

AND EXTENSION WORK.

F. ALL EXISTING MECHANICAL EQUIPMENT AND DEVICES SHALL

REMAIN UNLESS SPECIFICALLY NOTED TO BE REMOVED.

G. EXISTING DUCTS, PIPING, AND EQUIPMENT, ETC., NOT TO BE

UTILIZED IN THE COMPLETED BUILDING SHALL BE REMOVED AS

REQUIRED. ALL ENDS OF DISCONTINUED PIPING AND DUCTS

SHALL BE CAPPED IN THE NEAREST WALL, CEILING, OR FLOOR

SO THAT THEY ARE COMPLETELY CONCEALED. OPENINGS LEFT

IN WALLS, CEILINGS, ETC. WHERE EQUIPMENT, PIPES AND

DUCTS, ETC. ARE REMOVED AND NOT REPLACED, SHALL BE

PATCHED NEATLY WITH SIMILAR MATERIAL TO ADJACENT

CONSTRUCTION.

H. USE EXISTING PIPING SYSTEM VALVES WHERE POSSIBLE TO

ISOLATE SYSTEMS AND TO CAP EXISTING PIPING. REPLACE

EXISTING VALVES WHERE NECESSARY WHEN EXISTING VALVES

WILL NOT HOLD.

I. REFER TO ELECTRICAL PLANS FOR EXTENT OF DEMOLITION

WORK RELATING TO WIRING FOR SUPPORT OF HVAC

EQUIPMENT TO BE REMOVED.

J. THE CONTRACTOR SHALL COORDINATE THEIR DEMOLITION

WORK WITH THAT OF OTHER TRADES IN ORDER TO AVOID

CONFLICTS.

K. THE CONTRACTOR SHALL REMOVE ALL PIPING SUPPORTS, ETC.

FROM PARTITIONS THAT ARE TO BE REMOVED. NO EXISTING

HANGER SYSTEMS SHALL BE REUSED FOR NEW PIPING.

WHERE THE REMOVAL OF THESE ITEMS DISRUPTS EXISTING

PIPING THAT IS TO REMAIN, THE CONTRACTOR SHALL INSTALL

AND PROVIDE BYPASS CONNECTIONS NECESSARY.

L. PORTIONS OF PIPING TO BE REMOVED AS A RESULT OF

DEMOLITION WORK, BUT WHICH ARE REQUIRED TO REMAIN

ACTIVE, SHALL BE CUT AT CONVENIENT LOCATIONS,

REROUTED AND RECONNECTED.

M. THE CONTRACTOR SHALL MAINTAIN THE INTEGRITY OF THE

FIRESTOPPING AND THE FIRE RESISTANT ASSEMBLIES OF

MATERIALS IN COMPLIANCE WITH THE CONSTRUCTION

DOCUMENTS AND THE REQUIREMENTS OF THE REFERENCED

UL ASSEMBLIES. THESE MATERIALS SHALL BE REAPPLIED OR

REPAIRED TO MAINTAIN THE REQUIRED BARRIER AT NO

ADDITIONAL COST.

DEMOLITION SHEET NOTES

SCALE: 1/4" = 1'-0"

TUNNEL LOWER LEVEL HVAC DEMO PLAN

1/4 = 1'-0

0 2' 4' 8'

2"

SCALE: 1/4" = 1'-0"

BLUE GARAGE LEVELS GROUND-4 HVAC DEMO PLAN

1. DEMO CD RISER AND BRANCHES ASSOCIATED WITH EXISTING

FCU'S.

2. DEMO EXISTING CONCEALED DUCTED FAN COIL UNIT, INCLUDING

BUT NOT LIMITED TO UNIT CASING, FAN/MOTOR ASSEMBLY,

DRAIN PAN, AND ACCESS PANEL. DISCONNECT AND REMOVE ALL

ASSOCIATED CHILLED WATER SUPPLY/RETURN AND HEATING

HOT WATER SUPPLY/RETURN PIPING BACK TO NEAREST MAIN

BRANCH CONNECTION. REMOVE CONDENSATE DRAIN PIPING

BACK TO NEAREST SANITARY OR MAIN CONDENSATE BRANCH.

DISCONNECT AND REMOVE ASSOCIATED DUCTWORK

CONNECTIONS TO AND FROM UNIT, INCLUDING SUPPLY AIR

DUCT, SUPPLY DIFFUSER, RETURN GRILLE, AND ANY BALANCING

DAMPERS. REMOVE ALL CONTROL DEVICES (THERMOSTAT,

VALVES, ACTUATORS, ELECTRIC CONTROLS) ASSOCIATED WITH

THE FAN COIL UNIT.

3. DEMO HWS AND HWR PIPE RISER AND BRANCHES ASSOCIATED

WITH EXISTING FCU'S. CAP PIPE ON THE TUNNEL LEVEL.

4. DEMO AND CAP CHS AND CHR UP UNTIL MAIN LINE.

REV

MD301

AHU-2 (EXIST)

60x32 RA 24x26 SA

38x24 SA

36x26 SA

10x16 SA

GNGP

MD301

10x16 SA

20x38 SA

38x24 SA

RA FAN (EXIST)

60x32 RA

30x60

GN GP

30x60 EA 30x60 OA

DEMO EXIST MTZ DPR

MD301

MD301

AHU-2 (EXIST)

RA FAN (EXIST)

BEYOND

32x60 RA

24x38 SA

26x36 SA 26x24 SA

16x10 SA

G1

MD301

30x60 EA

38x48 RA

36x26 SA 54x32 RA

60x30 EA

54x40 RA

RA FAN (EXIST)

GNGP

14x8 SA

DEMO EXIST MTZ DPR

BEYOND

60x30 OA

MD301

30x60 EA 54x32 RA

AHU-1 (EXIST)

36x26 SA

BEYOND

22x60 SA

GN GP

DEMO EXIST MTZ DPR

MD301

MD301

AHU-1 (EXIST)

38x48 RA

RA FAN (EXIST)

30x60 EA

8x14 SA 26x36 SA

BEYOND

60x30

26x36 SA

30x60 OA

DEMO EXIST MTZ DPR

N

THE DRAWINGS AND ADDITIONAL DETAILS

CONTAINED WITHIN THIS SHEET ARE COPYRIGHTED

AND DESIGNATED FOR USE EXCLUSIVELY IN

ASSOCIATION WITH THE PROJECT LOCATED AT THE

SPECIFIED ADDRESS. THESE DRAWINGS REMAIN

THE EXCLUSIVE PROPERTY OF GUERNSEY.

REPRODUCTION OF THIS SHEET IS PROHIBITED

WITHOUT THE WRITTEN CONSENT OF GUERNSEY.

21 22

7 8

124 5 6 www.guernsey.us phone: 405.416.8100 fax: 405.416.8111 guernsey

KEY PLAN

DATE:

PROJECT:

SUBMITTAL:

PROJECT #:

A u to d e s k D o c s

/7 -0

W

R W

A T u n n e l M

E P

U p g ra d e s /2

-0

W

R W

A T u n n e l M

E P

U p g ra d e s M

.r v t

/5

/2

:0

:4

P

M

DEMO SECTIONS

TUNNEL AND PARKING

GARAGE MEP UPGRADES

7100 Terminal Dr, Oklahoma City, OK 73159

OKC WILL ROGERS

INTERNATIONAL

AIRPORT

5 SEP 2025

MD301

ISSUE FOR

CONSTRUCTION

70486-004

SCALE: 3/8" = 1'-0"

SECTION OF MECHANICAL EQUIPMENT ROOM 1000 - LOOKING NORTH

SCALE: 3/8" = 1'-0"

SECTION OF MECHANICAL EQUIPMENT ROOM 1000 - LOOKING SOUTH

SCALE: 3/8" = 1'-0"

SECTION OF MECHANICAL EQUIPMENT ROOM 1000 - LOOKING WEST

SCALE: 3/8" = 1'-0"

SECTION OF MECHANICAL EQUIPMENT ROOM 0003 - LOOKING NORTH

SCALE: 3/8" = 1'-0"

SECTION OF MECHANICAL EQUIPMENT ROOM 0003 - LOOKING SOUTH

SCALE: 3/8" = 1'-0"

SECTION OF MECHANICAL EQUIPMENT ROOM 0003 - LOOKING WEST

DEMOLITION SHEET NOTES

3/8 = 1'-0

0 2' 3' 6'

2"

1. DEMO IN-LINE FAN, ASSOCIATED RA DUCTING UP TO AHU, AND

OA AND EA DUCTING UP TO CEILING.

2. DEMO AIR HANDLING UNIT. RETAIN DUCT AS INDICATED FOR

CONNECTION OF NEW.

3. DEMO SIDEWALL SUPPLY REGISTERS SERVED BY AHU-1 IN

TUNNEL. TYP OF 25.

4. DEMO SIDEWALL SUPPLY REGISTERS SERVED BY AHU-2 IN

TUNNEL. TYP OF 19.

5. DEMO EXIST AHU CONTROL PANEL.

6. DEMO GRATE SUPPORT TO BE MOVED TO DIFFERENT

LOCATION. REFER TO ARCHITECTURAL PLANS. DEMO CHILLED

WATER SUPPLY PIPE RISER. DEMO ELECTRICAL BOX. REFER TO

ELECTRICAL PLANS.

7. DEMO EA AND OA DUCT UP UNTIL NEXT LEVEL AS INDICATED

FOR CONNECTION OF NEW.

REV

REVISION NAME ISSUE

DATE

DEMOLITION GENERAL NOTES

A. THESE DRAWINGS WERE COMPILED USING OWNER PROVIDED

RECORD DRAWINGS AND LIMITED FIELD VERIFICATION OF

EXISTING CONDITIONS. THE DRAWINGS ARE INTENDED TO

INDICATE THE SCOPE OF DEMOLITION WORK REQUIRED FOR

THE EXISTING HVAC AND PLUMBING SYSTEMS. THE

CONTRACTOR SHALL VERIFY ALL DUCTWORK, PIPING SYSTEM,

EQUIPMENT LOCATION, DIMENSIONS AND ALL FIELD

CONDITIONS AFFECTING THEIR WORK.

B. THESE DRAWINGS DO NOT INDICATE EVERY COMPONENT THAT

MUST BE REMOVED.

C. DASHED LINES INDICATE ITEMS TO BE REMOVED UNLESS

NOTED OTHERWISE.

D. REPLACE AND/OR PATCH TO MATCH EXISTING; ANY EXISTING

PIPE AND/OR DUCT INSULATION THAT IS TO REMAIN EXISTING

AND IS DAMAGED OR REMOVED DURING CONSTRUCTION.

E. CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL

PENETRATIONS CREATED BY REMOVAL OF EQUIPMENT,

DUCTWORK, ETC. TO MATCH EXISTING. REPAIR ADJACENT

CONSTRUCTION AND FINISHES DAMAGED DURING DEMOLITION

AND EXTENSION WORK.

F. ALL EXISTING MECHANICAL EQUIPMENT AND DEVICES SHALL

REMAIN UNLESS SPECIFICALLY NOTED TO BE REMOVED.

G. EXISTING DUCTS, PIPING, AND EQUIPMENT, ETC., NOT TO BE

UTILIZED IN THE COMPLETED BUILDING SHALL BE REMOVED AS

REQUIRED. ALL ENDS OF DISCONTINUED PIPING AND DUCTS

SHALL BE CAPPED IN THE NEAREST WALL, CEILING, OR FLOOR

SO THAT THEY ARE COMPLETELY CONCEALED. OPENINGS LEFT

IN WALLS, CEILINGS, ETC. WHERE EQUIPMENT, PIPES AND

DUCTS, ETC. ARE REMOVED AND NOT REPLACED, SHALL BE

PATCHED NEATLY WITH SIMILAR MATERIAL TO ADJACENT

CONSTRUCTION.

H. USE EXISTING PIPING SYSTEM VALVES WHERE POSSIBLE TO

ISOLATE SYSTEMS AND TO CAP EXISTING PIPING. REPLACE

EXISTING VALVES WHERE NECESSARY WHEN EXISTING VALVES

WILL NOT HOLD.

I. REFER TO ELECTRICAL PLANS FOR EXTENT OF DEMOLITION

WORK RELATING TO WIRING FOR SUPPORT OF HVAC

EQUIPMENT TO BE REMOVED.

J. THE CONTRACTOR SHALL COORDINATE THEIR DEMOLITION

WORK WITH THAT OF OTHER TRADES IN ORDER TO AVOID

CONFLICTS.

K. THE CONTRACTOR SHALL REMOVE ALL PIPING SUPPORTS, ETC.

FROM PARTITIONS THAT ARE TO BE REMOVED. NO EXISTING

HANGER SYSTEMS SHALL BE REUSED FOR NEW PIPING.

WHERE THE REMOVAL OF THESE ITEMS DISRUPTS EXISTING

PIPING THAT IS TO REMAIN, THE CONTRACTOR SHALL INSTALL

AND PROVIDE BYPASS CONNECTIONS NECESSARY.

L. PORTIONS OF PIPING TO BE REMOVED AS A RESULT OF

DEMOLITION WORK, BUT WHICH ARE REQUIRED TO REMAIN

ACTIVE, SHALL BE CUT AT CONVENIENT LOCATIONS,

REROUTED AND RECONNECTED.

M. THE CONTRACTOR SHALL MAINTAIN THE INTEGRITY OF THE

FIRESTOPPING AND THE FIRE RESISTANT ASSEMBLIES OF

MATERIALS IN COMPLIANCE WITH THE CONSTRUCTION

DOCUMENTS AND THE REQUIREMENTS OF THE REFERENCED

UL ASSEMBLIES. THESE MATERIALS SHALL BE REAPPLIED OR

REPAIRED TO MAINTAIN THE REQUIRED BARRIER AT NO

ADDITIONAL COST.

N. DEMO HYDRONIC PIPING BRANCHES ASSOCIATED WITH

EXISTING FCU UP UNTIL MAIN BRANCH UNLESS OTHERWISE

NOTED.

O. DEMO ALL DUCTWORK, GRILLES, AND DIFFUSERS. DEMO FCU'S.

P. DEMO HYDRONIC AND CONDENSATE PIPE ASSOCIATED WITH

FCU'S UP UNTIL MAIN BRANCH.

MD301

MD301

MD301

GNGP

AHU-1 (EXIST)

40x54 RA

60x30 EA

36x26 SA

14x8 SA

48x38 RA

48x38 RA

54x32 RA

36x26 SA

60x30 OA

60x30 EA

MECHANICAL

EQUIPMENT ROOM

RA FAN (EXIST)

14x8 SA

MD301

MD301

MD301

GNGP

RA FAN (EXIST)

38x24 SA

16x10 SA

30x60 OA 30x60 EA

60x32 RA

36x26 SA

FR ABV

UP

G1

MECHANICAL /

EQUIPMENT ROOM

AHU-2 (EXIST) 2

N

THE DRAWINGS AND ADDITIONAL DETAILS

CONTAINED WITHIN THIS SHEET ARE COPYRIGHTED

AND DESIGNATED FOR USE EXCLUSIVELY IN

ASSOCIATION WITH THE PROJECT LOCATED AT THE

SPECIFIED ADDRESS. THESE DRAWINGS REMAIN

THE EXCLUSIVE PROPERTY OF GUERNSEY.

REPRODUCTION OF THIS SHEET IS PROHIBITED

WITHOUT THE WRITTEN CONSENT OF GUERNSEY.

21 22

7 8

124 5 6 www.guernsey.us phone: 405.416.8100 fax: 405.416.8111 guernsey

KEY PLAN

DATE:

PROJECT:

SUBMITTAL:

PROJECT #:

A u to d e s k D o c s

/7 -0

W

R W

A T u n n e l M

E P

U p g ra d e s /2

-0

W

R W

A T u n n e l M

E P

U p g ra d e s M

.r v t

/5

/2

:0

:4

P

M

TUNNEL MECHANICAL

DEMOLITION ENLARGED

PLAN

TUNNEL AND PARKING

GARAGE MEP UPGRADES

7100 Terminal Dr, Oklahoma City, OK 73159

OKC WILL ROGERS

INTERNATIONAL

AIRPORT

5 SEP 2025

MD401

ISSUE FOR

CONSTRUCTION

70486-004

DEMOLITION GENERAL NOTES

A. THESE DRAWINGS WERE COMPILED USING OWNER PROVIDED

RECORD DRAWINGS AND LIMITED FIELD VERIFICATION OF

EXISTING CONDITIONS. THE DRAWINGS ARE INTENDED TO

INDICATE THE SCOPE OF DEMOLITION WORK REQUIRED FOR

THE EXISTING HVAC AND PLUMBING SYSTEMS. THE

CONTRACTOR SHALL VERIFY ALL DUCTWORK, PIPING SYSTEM,

EQUIPMENT LOCATION, DIMENSIONS AND ALL FIELD

CONDITIONS AFFECTING THEIR WORK.

B. THESE DRAWINGS DO NOT INDICATE EVERY COMPONENT THAT

MUST BE REMOVED.

C. DASHED LINES INDICATE ITEMS TO BE REMOVED UNLESS

NOTED OTHERWISE.

D. THE PLUMBING CONTRACTOR SHALL REMOVE ALL PLUMBING

FIXTURES, CARRIERS, TRIM, ACCESSORIES, EQUIPMENT,

FLOOR DRAINS, PIPING AND PIPING INSULATION AS SHOWN OR

INDICATED ON THE DRAWINGS.

E. REPLACE AND/OR PATCH TO MATCH EXISTING; ANY EXISTING

PIPE AND/OR DUCT INSULATION THAT IS TO REMAIN EXISTING

AND IS DAMAGED OR REMOVED DURING CONSTRUCTION.

F. CONTRACTOR IS…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .