OCAT OKC 2531_Tunnel_Garage MEP Upgrades_IFC (1).pdf
PDF 3 MB Posted
- Attached to
- Tunnel and Parking Garage MEP Upgrades
- Solicitation number
- OCAT-OKC-2531
- Issued by
- Ottawa County, Oklahoma
About this file
This is a comprehensive set of construction documents for the Tunnel and Parking Garage MEP (Mechanical, Electrical, and Plumbing) Upgrades at Will Rogers International Airport in Oklahoma City, Oklahoma, prepared by Guernsey Engineering for the Oklahoma City Airport Trust (OKC). The project involves selective demolition and replacement of mechanical, electrical, and plumbing systems in the airport's tunnel and parking garage, with work spanning multiple levels and mechanical equipment rooms. The documents, dated September 5, 2025, are issued for construction and include detailed architectural, mechanical, plumbing, and electrical plans for upgrades to air handling units, electrical panels, transformers, HVAC systems, refrigerant piping, and lighting fixtures.
The project scope includes replacing existing air handling units (AHU-1 and AHU-2), installing new variable refrigerant flow (VRF) systems with indoor and outdoor units, upgrading electrical distribution with new panels and transformers, replacing sump pumps, and updating lighting and power systems across ground through fifth levels of the parking garage. The estimated project budget is not explicitly stated, but the comprehensive nature of the upgrades suggests a significant capital investment. The electrical upgrades involve replacing multiple panels with new units from manufacturers like Reliagear and Square D, installing new transformers, and reconfiguring electrical distribution to improve system reliability and accommodate new mechanical equipment. The mechanical upgrades focus on improving climate control and ventilation efficiency through modern HVAC technologies and precise equipment replacement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Maria Angelica
Prado-Diaz
No. 08228
A R C H I T
E C
T
OKLAHO
M
A
L
IC
E
N
SED
S T
A
T E
OF
guernsey
DATE:
OWNER:
CONTACT:
PHONE: (405)-316-3211
EMAIL: JOE.FRANA@OKC.GOV
ARCHITECT AND ENGINEER: GUERNSEY
CONTACT: STEVE SCOVEL
PHONE: (405)-416-8258
EMAIL: STEVE.SCOVEL@GUERNSEY.US
PROJECT #
OCAT OKC 2531
GUERNSEY PROJECT NO.: OK70486004
9/5/25
OKC WILL ROGERS INTERNATIONAL AIRPORT
70486000-004
5 SEP 2025
ISSUE FOR CONSTRUCTION
OKC WILL ROGERS INTERNATIONAL AIRPORT
JOE FRANA
TUNNEL AND PARKING GARAGE MEP UPGRADES
7100 Terminal Dr, Oklahoma City, OK 73159
SHEET INDEX
SHEET
NUMBER SHEET NAME
GENERAL
G-001 COVER SHEET
ARCHITECTURAL
A-101 TUNNEL SELECTIVE DEMOLITION FLOOR PLAN AND
TUNNEL NEW WORK FLOOR PLAN
A-102 PARKING GARAGE LOBBIES PLANS AND DETAILS
PLUMBING
P-001 LEGEND, ABBREVIATIONS, & SCHEDULES
P-100 PLUMBING COMPOSITE PLAN
PD101 ADD ALT #1 - GROUND LEVEL GARAGE PLUMBING DEMO
PLAN
PD102 ADD ALT #1 - 2ND THRU 4TH LEVEL GARAGE DRAINAGE
DEMO PLUMBING PLAN
PD401 TUNNEL DEMOLITION PLAN
P-101 ADD ALT #1 - GROUND FLOOR PLUMBING PLAN
P-102 ADD ALT #1 - SECOND THRU FOURTH FLOOR PLUMBING
PLAN
P-401 TUNNEL PLUMBING PLAN
MECHANICAL
M-001 LEGEND & ABBREVIATIONS
M-100 MECHANICAL COMPOSITE PLAN
MD101 PARKING GARAGE HVAC DEMOLITION PLAN
MD301 DEMO SECTIONS
MD401 TUNNEL MECHANICAL DEMOLITION ENLARGED PLAN
M-101 PARKING GARAGE HVAC PLAN
M-102 PARKING GARAGE HVAC PLAN
M-103 PARKING GARAGE HVAC PLAN
M-301 SECTIONS
M-401 LOWER LEVEL HVAC PLAN
M-601 SCHEDULES & DETAILS
M-801 CONTROLS
M-802 CONTROLS
ELECTRICAL
E-001 LEGEND & ABBREVIATIONS
EP101 ELECTRICAL OVERALL PLAN - TUNNEL
EP102 GROUND FLOOR OVERALL TYPICAL GARAGE PLAN
E-401 ENLARGED ELECTRICAL PLANS
E-402 ENLARGED ELECTRICAL PLANS
E-403 ENLARGED ELECTRICAL PLANS
E-404 ENLARGED ELECTRICAL PLANS
E-405 ENLARGED ELECTRICAL PLANS
E-601 ELECTRICAL RISER DIAGRAM
PROJECT LOCATION
UP UP
DEMO PLAN LEGEND
EXISTING
CONSTRUCTION
DEMO
GLGMGNGP
G1
MECHANICAL
EQUIPMENT ROOM
WALKWAY
PUMP ROOM
STORAGE
STATION #3
ELEV. EQUIP.
MECHANICAL /
EQUIPMENT ROOM
REMOVE AND RELOCATE
CABLES, CONDUIT,
PIPING AND FIRE
SUPRESSION IN NEW
DOOR OPENING AREA.
DEMOLISH AND REMOVE
SECTION OF WALL FOR
NEW SWING DOOR. WALL
IS A NON-RATED
PARTITION COMPOSED
OF METAL STUDS,
GYPSUM BOARD AND
TILE WALL BASE (ON
TUNNEL SIDE).
DEMOLISH AND REMOVE
DOORS, FRAME,
HARDWARE AND
PORTION OF PARTITION.
PREP OPENING FOR
NEW SINGLE DOOR,
RETURN GRILLE AND
WALL INFILL. COORD.
WITH MECH FOR SIZE
OF GRILLE
REMOVE AND
RELOCATE HOSE BIB
PLAN NORTH
AREA OF SCOPE
OF WORK
DEMOLISH AND
REMOVE DOORS,
FRAME, HARDWARE
AND PORTION OF
WALL. PREP OPENING
FOR NEW SINGLE
DOOR, LOUVER AND
WALL INFILL
AREA OF SCOPE
OF WORK
/ A
-1
AREA 2
AREA 3
CONTRACTOR SHALL
ERECT AND MAINTAIN
SECURE AND DUST
RESISTANT BARRIER
DURING CONSTRUCTION
OPERATIONS
CONTRACTOR SHALL
ERECT AND MAINTAIN
SECURE AND DUST
RESISTANT BARRIER
DURING CONSTRUCTION
OPERATIONS
GLGMGNGP
G1
MECHANICAL
EQUIPMENT ROOM
WALKWAY
PUMP ROOM
STORAGE
STATION #3
ELEV. EQUIP.
MECHANICAL /
EQUIPMENT ROOM
INFILL OPENINGS WITH 3 5/8" METAL
STUDS (.33MILS), 5/8" TYPE "X" GYPSUM
BOARD ON EACH SIDE AND 3" BATT
INSULATION BETWEEN THE STUDS.
PROVIDE TILE BASE ON TUNNEL SIDE TO
MATCH EXISTING. TEXTURE AND PAINT
WALL TO MATCH EXISTING ON TUNNEL
SIDE - TAPE AND BED ON MECHANICAL
ROOM SIDE.
AREA OF SCOPE
OF WORK
0003A
0003B
GENERAL NOTES:
1. PATCH AND REPAIR AROUND NEW OPENINGS
ON BOTH SIDES OF WALL TO BLEND AND
MATCH EXISTING CONDITIONS.
2. PROVIDE CONTROL JOINTS IN GYPSUM BOARD
AT EACH SIDE OF ALL NEW DOOR FRAMES.
3. IF WORK MUST BE PERFORMED BEYOND THE
AREA OF SCOPE OF WORK, CONTRACTOR
SHALL ENSURE THOSE AREAS ARE MINIMALLY
DISTRUBED AND LEFT IN LIKE NEW
CONDITIONS.
1000A
INFILL OPENINGS WITH 3 5/8" METAL
STUDS (.33MILS), 5/8" TYPE "X" GYPSUM
BOARD ON EACH SIDE AND BATT
INSULATION BETWEEN THE STUDS.
PROVIDE TILE BASE ON TUNNEL SIDE TO
MATCH EXISTING. TEXTURE AND PAINT
WALL TO MATCH EXISTING ON TUNNEL
SIDE - TAPE AND BED ON MECHANICAL
ROOM SIDE. COORDINATE WITH MECH
CONTRACTOR FOR LOCATION OF NEW RA
DUCT AND GRILLE.
EXISTING SPECIALTY
PAINT SCHEME AND WALL
GRAPHICS THAT SHALL BE
AFFECTED BY WORK
SHALL BE REMOVED AND
REPLACED BY THE GC.
PAINT AND GRAPHIC WALL
ARTWORK SHALL BE
COORDINATED WITH THE
OWNER.
SEAL ALL NEW AND EXISTING
PENETRATIONS IN ROOM
SEAL ALL NEW AND
EXISITNG
PENETRATIONS IN
ROOM
AREA 2
AREA 3
PLAN LEGEND
NEW
CONSTRUCTION
EXISTING
CONSTRUCTION
OVERHEAD
HM-1
1 1/2' HOLLOW METAL
DOUBLE RABBET
MITTER JOINT
CONTINOUS WELD
FRAME ELEVATION
FLUSH
F
DOOR ELEVATION
TUNNEL LEVEL
0"
4'-4"
7'-4"
1'-0"
DEMOLISH PORTION OF PARTITION
FOR NEW DOOR. COORDINATE
EXACT LOCATION WITH
MEP/DATA/COMM CONTRACTORS IN
FIELD TO ACCOMMODATE EXISTING
CONDITIONS
DEMOLISH DOORS,
FRAME AND HARDWARE
DEMOLISH PORTION OF
PARTITION FOR NEW DOOR
AND RETURN AIR GRILLE
V .I .F
B O
T T
O M
O F
S O
F F
IT
1. FACILITY WILL REMAIN OPERATIONAL DURING THE EXECUTION OF THIS WORK. GENERAL
CONTRACTOR SHALL COORDINATE WITH FACILITY USER FOR ALL ACCESS, STAGING,
TEMPORARY BARRIERS, CIRCULATION, STORAGE OF MATERIALS, ETC. BEFORE COMMENCING
WORK.
2. IN ADDITION TO THE DEMOLITION WORK DESCRIBED ON THIS ARCHITECTURAL SHEET, THE
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR PERFORMING ADDITIONAL DEMOLITION
WORK DESCRIBED IN THE MECHANICAL AND ELECTRICAL DRAWINGS CONTAINED WITHIN THIS
SET OF CONSTRUCTION DOCUMENTS.
3. ALL DEMOLITION WORK SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THE
SPECIFICATIONS, ALL APPLICABLE CODES AND STANDARDS FOR DEMOLITION WORK, OSHA
STANDARDS, DUST CONTROL REQUIREMENTS AND ANY OTHER APPLICABLE REQUIREMENTS.
4. THE GENERAL CONTRACTOR SHALL PROVIDE, ERECT, AND MAINTAIN TEMPORARY BARRIERS
AS REQUIRED.
5. THE GENERAL CONTRACTOR SHALL REPAIR OR REPLACE AT NO ADDITIONAL COST TO THE
OWNER ANY BUILDING ELEMENT OR APPURTENANCE TO THE FACILITY WHICH IS NOT
REQUIRED TO BE DEMOLISHED.
6. THE OWNER SHALL REMOVE ALL EQUIPMENT, MOVEABLE CABINETS, CHEMICALS, AND
PRODUCT PRIOR TO THE COMMENCEMENT OF THIS PROJECT. THE GENERAL CONTRACTOR
SHALL NOTIFY THE OWNER BEFORE REMOVING ANY EQUIPMENT OR CHEMICALS LEFT IN THE
DEMOLITION AREA.
7. GENERAL CONTRACTOR SHALL VERIFY EXISTING CONDITIONS, PRIOR TO ANY DEMOLITION
AND OR CONSTRUCTION.
8. GENERAL CONTRACTOR SHALL PROTECT ANY AND ALL ITEMS THAT ARE TO REMAIN OR
INDICATED TO BE ALTERED.
9. COORDINATE ALL DEMOLITION WORK WITH SEQUENCE OF CONSTRUCTION WITH OTHER
TRADES.
10. ALL EXISTING COLUMNS, BEAMS AND STRUCTURAL OR LOAD BEARING WALLS UNLESS NOTED
OTHERWISE SHALL REMAIN INTACT. IF ANY STRUCTURAL WALLS OR UNSEEN COLUMNS NOT
SEEN IN THESE DOCUMENTS ARE FOUND, THE CONTRACTOR SHALL STOP WORK IN THAT
AREA IMMEDIATELY AND CONTACT THE BUILDING MANAGER.
11. LOCATION OF TRASH CHUTES THROUGH EXTERIOR OPENINGS AND HAUL ROUTED FOR
DEMOLISHED BUILDING MATERIAL MUST BE APPROVED BY THE BUILDING MANAGER PRIOR TO
INSTALLATION AND USE.
12. CONTRACTOR MUST PROTECT THE GENERAL PUBLIC FROM DEMOLITION ACTIVITIES BY THE
USE OF BARRIERS, SIGNAGE ETC.
13. OWNER RESERVES THE RIGHT TO FIRST REFUSAL OF ALL ITEMS DEMOLISHED, INCLUDING
NOT LIMITED TO, DOORS, FIXTURES, AND APPLIANCES. GYPSUM, STUD FRAMING, AND ALL
FINISHES REQUIRED TO BE DESTROYED DURING DEMOLITION SHALL BE DISPOSED OF
PROPERLY IN ACCORDANCE WITH THE SPECIFICATIONS.
14. THE GENERAL CONTRACTOR IS TO PROVIDE ADEQUATE PROTECTION FOR ALL EXISTING
ELEMENTS TO REMAIN (I.E. WALLS, CEILING ELEMENTS, ETC.) WHICH ARE ADJACENT TO THE
CONSTRUCTION AREAS.
15. THE GENERAL CONTRACTOR IS RESPONSIBLE TO ENSURE THE SPACE AND ALL SURFACES
ARE COMPLETELY CLEAN UPON COMPLETION OF WORK. EXTENTS OF CLEANING SHALL
ENCOMPASS THE ENTIRE WORK ARE AND IS READY FOR FACILITY OWNER TO CONTINUE
OPERATIONS IMMEDIATELY ON DAY OF COMPLETION OF WORK. NO DEBRIS SHALL BE LEFT
BEHIND OR HIDDEN WITHIN CAVITIES. ALL DEBRIS REMOVED DURING DEMOLITION SHALL BE
DISPOSED OF IN A SAFE AND LEGAL MANNER.
16. GENERAL CONTRACTOR TO CONFER WITH OWNER REGARDING ANY DEMOLITION NOTED
AND/OR REQUIRED BEYOND THE WORK PERIMETER PRIOR TO START OF DEMOLITION.
17. GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING LOCATION OF ALL EXISTING
LIGHTING, HVAC EQUIPMENT, SPEAKERS, FIRE PROTECTION SYSTEMS, ELECTRICAL
SYSTEMS, SECURITY SYSTEMS, AND OTHER EQUIPMENT.
18. ALL DEMOLISHED PIPING, WIRING, EQUIPMENT, ETC. DISCONNECTED IN THE COURSE OF
CONSTRUCTION WITHIN THE WORK AREA SHALL BE REMOVED FROM THE SITE IN
ACCORDANCE WITH THE SPECIFICATIONS AND LOCAL AND STATE ORIDNANCES.
DEMOLITION GENERAL NOTES
EXISTING PAINTED
WALLS, DOORS AND
CELING
EXISTING WALL COVERING
WITH SPECIALTY GRAPHICS
A_DOOR SCHEDULE
MARK DESCRIPTION
DOORS FRAMES HARDWARE
SET COMMENTSDOOR FINISH WIDTH HEIGHT FRAME FINISH FRAME TYPE
0003B HOLLOW METAL
DOOR WITH
HOLLOW METAL
FRAME
SHOP
PRIME/FIELD
PAINT
4'-0" 6'-8" SHOP
PRIME/FIELD
PAINT
HM-1 1 INSULATED
CORE
0003A HOLLOW METAL
DOOR WITH
HOLLOW METAL
FRAME
SHOP
PRIME/FIELD
PAINT
3'-0" 6'-8" SHOP
PRIME/FIELD
PAINT
HM-1 1 INSULATED
CORE
1000A HOLLOW METAL
DOOR WITH
HOLLOW METAL
FRAME
SHOP
PRIME/FIELD
PAINT
3'-0" 6'-8" SHOP
PRIME/FIELD
PAINT
HM-1 1 INSULATED
CORE
Maria Angelica
Prado-Diaz
No. 08228
A R C H I T
E C
T
OKLAHO
M
A
L
IC
E
N
SED
S T
A
T E
OF
N
THE DRAWINGS AND ADDITIONAL DETAILS
CONTAINED WITHIN THIS SHEET ARE COPYRIGHTED
AND DESIGNATED FOR USE EXCLUSIVELY IN
ASSOCIATION WITH THE PROJECT LOCATED AT THE
SPECIFIED ADDRESS. THESE DRAWINGS REMAIN
THE EXCLUSIVE PROPERTY OF GUERNSEY.
REPRODUCTION OF THIS SHEET IS PROHIBITED
WITHOUT THE WRITTEN CONSENT OF GUERNSEY.
21 22
7 8
124 5 6 www.guernsey.us phone: 405.416.8100 fax: 405.416.8111 guernsey
KEY PLAN
DATE:
PROJECT:
SUBMITTAL:
PROJECT #:
9/5/25
A u to d e s k D o c s
/7 -0
W
R W
A T u n n e l M
E P
U p g ra d e s /2
-0
W
R W
A T u n n e l M
E P
U p g ra g e s A
.r v t
/5
/2
:4 :3
A
M
TUNNEL SELECTIVE
DEMOLITION FLOOR PLAN
AND TUNNEL NEW WORK
FLOOR PLAN
TUNNEL AND PARKING
GARAGE MEP UPGRADES
7100 Terminal Dr, Oklahoma City, OK 73159
OKC WILL ROGERS
INTERNATIONAL
AIRPORT
5 SEP 2025
A-101
ISSUE FOR
CONSTRUCTION
70486000-004
SCALE: 1/8" = 1'-0"
TUNNEL - SELECTIVE DEMO FLOOR PLAN
SCALE: 1/8" = 1'-0"
TUNNEL - NEW WORK FLOOR PLAN
HARDWARE SET #1:
MODEL FINISH MFR
1 GEARED CONTINUOUS HINGE 041XY 626 IV
1 STORAGE LOCK ND80 626 SC
1 GASKETING 303-PK 626 PE
NOTE: KEY CYLINDER TO MATCH OWNER'S EXISTING SCHEDULE
IV - IVES
SC - SCHLAGE (ASSA-ABLOY)
PE - PEMKO
SCALE: 3/8" = 1'-0"
ELEVATION - DEMOLITION AT TUNNEL SIDE OF MECH 0003
SCALE: 3/4" = 1'-0"
EXISTING CONDITION OF MECH ROOM 1000 ON TUNNEL SIDE
LOCATION OF NEW RETURN
AIR GRILLE R-1
REV
REVISION NAME ISSUE
DATE
GKGLGM
G1
G3
DEMO NOTES:
• DEMOLISH AND REMOVE ACT
CEILING GRID,PANELS AND
SUSPENSION SYSTEM
• REMOVE OR PROTECT ITEMS TO
REMAIN IN CEILING.
• PREP WALLS, HOLLOW METAL DOOR,
HOLLOW METAL FRAME AND
ELEVATOR FRAME FOR NEW PAINT.
DEMOLISH AND
REMOVE CHASE
WALLS
DEMO NOTES:
• DEMOLISH AND REMOVE ACT
CEILING
• REMOVE OR PROTECT ITEMS TO
REMAIN IN CEILING.
• PREP WALLS, HOLLOW METAL DOOR,
HOLLOW METAL FRAME AND
ELEVATOR FRAME FOR NEW PAINT.
DEMOLISH AND
REMOVE CHASE
WALLS
STATION #3
STATION #4
AREA 2
GKGLGM
G1
G3
8"
E Q
E Q
PROVE 18" X 18"
FLUSH ACCESS
DOOR. LOCATED 3'-0"
A.F.F TO CENTERLINE
OF DOOR. B.O.D:
ACUDOR DW-5040
SEE GENERAL NOTES FOR FINISHES
PROVE 18" X 18"
FLUSH ACCESS
DOOR. LOCATED 3'-0"
A.F.F TO CENTERLINE
OF DOOR. B.O.D:
ACUDOR DW-5040
SEE GENERAL NOTES FOR FINISHES
8"
E Q
E Q
3'-9"3'-6"
STEEL PIPE BOLLARDS WITH
COVER SLEEVE (TYP)
NEW UNIT ON
MECHANICAL PAD
ALIGN FINISH BOLLARD
FACE WITH DOOR JAMB
3'-2"3'-3"
STEEL PIPE BOLLARD WITH
COVER SLEEVE (TYP)
NEW UNIT ON
MECHANICAL PAD
STATION #3
STATION #4
AREA 2
REPAIR/PAINT WALL
AFTER PIPING
INSTALLATION IS
COMPLETE
PLAN LEGEND
NEW
CONSTRUCTION
EXISTING
CONSTRUCTION
OVERHEAD
DEMO PLAN LEGEND
EXISTING
CONSTRUCTION
DEMO
GENERAL NOTES
A. SCOPE OF WORK IS FOR LOBBIES ON LEVELS: GROUND, 2, 3, 4
AND 5.
B. PROVIDE NEW 2' X 2' ACOUSTIC PANEL CEILING. B.O.D:
ARMSTRONG 2 CLEAN ROOM, SYSTEM LINES. COLOR: WHITE
C. PAINT CONCRETE WALLS, HOLLOW METAL DOOR FRAME,
HOLLOW METAL DOOR AND ELEVATOR FRAME IN COLOR TO
MATCH EXISTING WARM GRAY.
D. PROVIDE NEW CHASE WALLS OUT OF 3 5/8" NON-STURCTURAL
METAL FRAMING @ 16" O.C. WITH 5/8" GYPSUM BOARD. TAPE,
BED AND FINISH GYPSUM BOARD TO LEVEL 4.
E. VERIFY IN FIELD DEPTH OF CHASE WITH MEP WORK.
F. VERIFY IN FIELD LOCATION OF ACCESS PANEL WITH REQUIRED
ACCESS TO MEP SYSTEMS IN WALL.
6" DIA. STD PIPE COVER - TYP
BASE PLATE 1/2"X11"X0'-11"
W/ (4) 1/2" DIA F1554 THREADED
ROD ANCHOR BOLTS @ 8" GA EW
DRILL & EPOXY (4" EMBED) TYP
3/16
WELD TO SEAL
Maria Angelica
Prado-Diaz
No. 08228
A R C H I T
E C
T
OKLAHO
M
A
L
IC
E
N
SED
S T
A
T E
OF
N
THE DRAWINGS AND ADDITIONAL DETAILS
CONTAINED WITHIN THIS SHEET ARE COPYRIGHTED
AND DESIGNATED FOR USE EXCLUSIVELY IN
ASSOCIATION WITH THE PROJECT LOCATED AT THE
SPECIFIED ADDRESS. THESE DRAWINGS REMAIN
THE EXCLUSIVE PROPERTY OF GUERNSEY.
REPRODUCTION OF THIS SHEET IS PROHIBITED
WITHOUT THE WRITTEN CONSENT OF GUERNSEY.
21 22
7 8
124 5 6 www.guernsey.us phone: 405.416.8100 fax: 405.416.8111 guernsey
KEY PLAN
DATE:
PROJECT:
SUBMITTAL:
PROJECT #:
9/5/25
A u to d e s k D o c s
/7 -0
W
R W
A T u n n e l M
E P
U p g ra d e s /2
-0
W
R W
A T u n n e l M
E P
U p g ra g e s A
.r v t
/5
/2
:4 :3
A
M
PARKING GARAGE
LOBBIES PLANS AND
DETAILS
TUNNEL AND PARKING
GARAGE MEP UPGRADES
7100 Terminal Dr, Oklahoma City, OK 73159
OKC WILL ROGERS
INTERNATIONAL
AIRPORT
5 SEP 2025
A-102
ISSUE FOR
CONSTRUCTION
70486000-004
SCALE: 1/4" = 1'-0"
BLUE GARAGE LOBBIES DEMO PLAN LEVELS GROUND THRU 5 - TYPICAL
SCALE: 1/4" = 1'-0"
BLUE GARAGE LOBBIES RENO PLAN LEVELS GROUND THRU 5 - TYPICAL
SCALE: 1" = 1'-0"
BOLLARD DETAIL
REV
ABV ABOVE
AC ABOVE CEILING
ACC ACCESS
AD AREA DRAIN
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
BFF BELOW FINISHED FLOOR
BLW BELOW
BV BALL VALVE
BWV BACK WATER VALVE
CD CONDENSATE DRAIN
CI CAST IRON
CLG CEILING
CO CLEAN OUT
COND CONDENSATE
CV CHECK VALVE
DCW DOMESTIC COLD WATER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER
RETURN
DN DOWN
ECC ECCENTRIC
ELEC ELECTRIC
EXIST EXISTING
EXT EXTERNAL
FCU FAN COIL UNIT
FD FLOOR DRAIN
FL FLOW LINE
FLR FLOOR
FR FROM
FS FLOOR SINK
FT FEET
GC GENERAL CONTRACTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GW GREASE WASTE
HP HORSEPOWER
IN INCHES
MAX MAXIMUM
MIN MINIMUM
MTD MOUNTED
NIC NOT IN CONTRACT
NPW NON-POTABLE WATER
OC ON CENTER
OS&Y OUTSIDE, SCREW AND YOKE
PD PRESSURE DROP
PRES PRESSURE
PRV PRESSURE RELIEF VALVE
PSI POUNDS PER SQUARE INCH
RPM REVOLUTIONS PER MINUTE
SD STORM DRAIN
SF SUPPLY FAN
SO SHUT OFF
SS SANITARY SEWER
TMV THERMOSTATIC MIXING
VALVE
TYP TYPICAL
UF UNDERFLOOR
UG UNDER GROUND
UH UNIT HEATER
W WASTE
WCO WALL CLEANOUT
WM WATER METER
PLUMBING VENT
CD CONDENSATE DRAIN LINE
NPW NON-POTABLE WATER (GRAY WATER)
D SUMP PUMP DISCHARGE
CHECK VALVE
BUTTERFLY VALVE
BALL VALVE
STRAINER
UNION
SHUT OFF VALVE IN DROP
A
COLD WATER OUTLETC
GAS OUTLETG
HOT WATER OUTLETH
OXYGEN OUTLETO
VACUUM INLETV
AIR OUTLET
ECCENTRIC REDUCER, WATER
CONCENTRIC REDUCER
DIRECTION OF FLOW
SLOPE DOWN
PRESSURE REDUCING VALVE
ANCHOR
EXPANSION JOINT
PIPE GUIDE
CONNECT TO EXISTING
WATER METER
GAS PRESSURE REGULATOR
FLOOR SINK
FLOOR DRAIN
B BREATHING AIR OUTLET
M
P-TRAP
BALANCING VALVE
GAS COCK
PLUG COCK
ABBREVIATIONS SYMBOLS
LEGEND & ABBREVIATIONS
ABV. DESCRIPTION ABV. DESCRIPTION
DISCONNECT
N
THE DRAWINGS AND ADDITIONAL DETAILS
CONTAINED WITHIN THIS SHEET ARE COPYRIGHTED
AND DESIGNATED FOR USE EXCLUSIVELY IN
ASSOCIATION WITH THE PROJECT LOCATED AT THE
SPECIFIED ADDRESS. THESE DRAWINGS REMAIN
THE EXCLUSIVE PROPERTY OF GUERNSEY.
REPRODUCTION OF THIS SHEET IS PROHIBITED
WITHOUT THE WRITTEN CONSENT OF GUERNSEY.
21 22
7 8
124 5 6 www.guernsey.us phone: 405.416.8100 fax: 405.416.8111 guernsey
KEY PLAN
DATE:
PROJECT:
SUBMITTAL:
PROJECT #:
A u to d e s k D o c s
/7 -0
W
R W
A T u n n e l M
E P
U p g ra d e s /2
-0
W
R W
A T u n n e l M
E P
U p g ra d e s M
.r v t
/5
/2
:0
:3
P
M
LEGEND, ABBREVIATIONS,
& SCHEDULES
TUNNEL AND PARKING
GARAGE MEP UPGRADES
7100 Terminal Dr, Oklahoma City, OK 73159
OKC WILL ROGERS
INTERNATIONAL
AIRPORT
5 SEP 2025
P-001
ISSUE FOR
CONSTRUCTION
70486-004
PROJECT NOTES
A. THE PLUMBING INSTALLATION SHALL COMPLY WITH THE
CURRENT LOCAL PLUMBING CODES.
B. PIPE ROUTING SHOWN IS SCHEMATIC AND IS NOT INTENDED TO
INDICATE EXACT ROUTING. CONTRACTOR SHALL PROVIDE ANY
ADDITIONAL OFFSETS AND FITTINGS REQUIRED FOR PROPER
INSTALLATION AND TO MAINTAIN CLEARANCES. COORDINATE
WITH OTHER DISCIPLINES TO AVOID WHEN ROUTING PIPING.
C. PROVIDE ACCESS PANELS FOR ALL VALVES CONCEALED IN
WALLS OR ABOVE NON-ACCESSIBLE CEILINGS.
D. PROVIDE CLEANOUTS IN ACCORDANCE WITH THE PLUMBING
CODE.
E. VERIFY IN FIELD LOCATIONS OF EXISTING FLOOR AND AREA
DRAINS.
F. COORDINATE PIPING WITH ELECTRICAL EQUIPMENT (PANELS ,
TRANSFORMERS, ETC) PRIOR TO ANY INSTALLATION. DO NOT
ROUTE ANY PIPING OVER ANY ELECTRICAL PANELS UNDER ANY
CIRCUMSTANCES. ANY PIPING ROUTED OVER PANELS SHALL
BE RE-ROUTED AT NO ADDITIONAL COST.
G. INSULATION SHALL COMPLY WITH THE SPECIFICATIONS.
H. INSTALL ALL CONDENSATE DRAIN PIPING WITH INSULATION
PER SPECIFICATIONS.
I. ANY DEVIATIONS IN ELECTRICAL REQUIREMENTS FROM THE
BASIS OF DESIGN FOR PLUMBING EQUIPMENT SHALL BE THE
RESPONSIBILITY OF THE PLUMBING CONTRACTOR TO ENSURE
COORDINATION WITH THE ELECTRICAL CONTRACTOR FOR
PROPER WIRE SIZE, CONDUITS, DISCONNECTS, FUSES,
STARTERS, VFD'S, ETC. AT NO ADDITIONAL COST.
J. THESE CONTRACT DOCUMENTS HAVE BEEN SUBMITTED FOR
CONTRACTOR DEVELOPMENT OF THE CONSTRUCTION WORK
PLAN. COORDINATION BETWEEN THE CONTRACTOR AND
SUBCONTRACTORS IS THE RESPONSIBILITY OF THE
CONTRACTOR. CHANGES TO THESE DRAWINGS AS A RESULT
OF THE CONSTRUCTION COORDINATION AND THE
DEVELOPMENT OF THE CONSTRUCTION WORK PLAN ARE THE
RESPONSIBILITY OF THE CONTRACTOR.
K. THESE CONTRACT DOCUMENTS DETAIL THE CONCEPT OF THE
WORK. COORDINATION OF CONCEPTUALLY EQUAL BUT
NOMINALLY DIFFERENT SYSTEMS OR PRODUCTS SELECTED BY
CONTRACTOR ARE THE RESPONSIBILITY OF THE CONTRACTOR.
REV
TH
TH
GKGLGMGNGP
STATION 1
P-401
PD401
MECHANICAL
EQUIPMENT ROOM
STORAGE
PUMP ROOM
AREA 3
AREA 2
GKGLGMGNGP
LOBBY 3A STATION 2
STATION 3
STATION 4
G3
G2
G1
MECHANICAL /
EQUIPMENT ROOM
STATION #3
VEST.
ELEV. EQUIP.
STATION #4
WALKWAY
ELEV. EQUIP.
STORAGE
ELEV. EQUIP.
P-401
PD401
AREA 3
AREA 2
AREA 2
AREA 1
N
THE DRAWINGS AND ADDITIONAL DETAILS
CONTAINED WITHIN THIS SHEET ARE COPYRIGHTED
AND DESIGNATED FOR USE EXCLUSIVELY IN
ASSOCIATION WITH THE PROJECT LOCATED AT THE
SPECIFIED ADDRESS. THESE DRAWINGS REMAIN
THE EXCLUSIVE PROPERTY OF GUERNSEY.
REPRODUCTION OF THIS SHEET IS PROHIBITED
WITHOUT THE WRITTEN CONSENT OF GUERNSEY.
21 22
7 8
124 5 6 www.guernsey.us phone: 405.416.8100 fax: 405.416.8111 guernsey
KEY PLAN
DATE:
PROJECT:
SUBMITTAL:
PROJECT #:
A u to d e s k D o c s
/7 -0
W
R W
A T u n n e l M
E P
U p g ra d e s /2
-0
W
R W
A T u n n e l M
E P
U p g ra d e s M
.r v t
/5
/2
:0
:3
P
M
PLUMBING COMPOSITE
PLAN
TUNNEL AND PARKING
GARAGE MEP UPGRADES
7100 Terminal Dr, Oklahoma City, OK 73159
OKC WILL ROGERS
INTERNATIONAL
AIRPORT
5 SEP 2025
P-100
ISSUE FOR
CONSTRUCTION
70486-004
1/16 = 1'-0
0 8' 16' 32'
2"
REV
REVISION NAME ISSUE
DATE
SCALE: 1/16" = 1'-0"
PLUMBING OVERALL PLAN - TUNNEL AREA 3
SCALE: 1/16" = 1'-0"
PLUMBING OVERALL PLAN - TUNNEL AREA 2
GAGBGCGDGEGFGGGHGJGKGLGMGNGPGQGRGSGTGUGVGWGXGYGZ
4" SD
IN JOISTS
4" SD
IN JOISTS
4" SD
IN JOISTS
4" SD
IN JOISTS
4" SD
4" SD
IN JOISTS
4" SD
IN JOISTS
4" SD FR AD ABV
4" SD FR AD ABV
4" SD FR AD ABV
4" SD FR AD ABV
4" SD FR AD ABV
4" SD FR AD ABV
6" SD FR ABV & DN.
DISCONNECT FROM UG SD LINE.
6" SD FR ABV & DN. DISCONNECT FROM UG SD LINE.
6" SD FR ABV & DN. DISCONNECT FROM UG SD LINE.
6" SD FR ABV & DN. DISCONNECT FROM UG SD LINE.
6" SD FR ABV & DN.
DISCONNECT
FROM UG SD LINE.
6" SD FR ABV & DN.
DISCONNECT FROM UG
SD LINE.
3" SD FR
AD ABV
3" SD FR
AD ABV
3" SD FR AD ABV3" SD FR AD ABV
3" SD FR AD ABV
3" SD FR AD ABV
3" SD FR AD ABV
4" SD FR ABV & DN
4" SD FR AD ABV
4" SD
G4
G3
G2
G1
TYP
AREA 2
STATION 3
STATION 4
N
THE DRAWINGS AND ADDITIONAL DETAILS
CONTAINED WITHIN THIS SHEET ARE COPYRIGHTED
AND DESIGNATED FOR USE EXCLUSIVELY IN
ASSOCIATION WITH THE PROJECT LOCATED AT THE
SPECIFIED ADDRESS. THESE DRAWINGS REMAIN
THE EXCLUSIVE PROPERTY OF GUERNSEY.
REPRODUCTION OF THIS SHEET IS PROHIBITED
WITHOUT THE WRITTEN CONSENT OF GUERNSEY.
21 22
7 8
124 5 6 www.guernsey.us phone: 405.416.8100 fax: 405.416.8111 guernsey
KEY PLAN
DATE:
PROJECT:
SUBMITTAL:
PROJECT #:
A u to d e s k D o c s
/7 -0
W
R W
A T u n n e l M
E P
U p g ra d e s /2
-0
W
R W
A T u n n e l M
E P
U p g ra d e s M
.r v t
/5
/2
:0
:3
P
M
ADD ALT #1 - GROUND
LEVEL GARAGE
PLUMBING DEMO PLAN
TUNNEL AND PARKING
GARAGE MEP UPGRADES
7100 Terminal Dr, Oklahoma City, OK 73159
OKC WILL ROGERS
INTERNATIONAL
AIRPORT
5 SEP 2025
PD101
ISSUE FOR
CONSTRUCTION
70486-004
DEMOLITION GENERAL NOTES
DEMOLITION SHEET NOTES
SCALE: 3/64" = 1'-0"
GROUND LEVEL GARAGE PLUMBING DEMO PLAN
3/64 = 1'-0
0 12' 24' 48'
2"
1. ALL HORIZONTAL STORM DRAINAGE PIPING AND ASSOCIATED
PIPE RISERS TO BE DEMOLISHED. RETAIN EXISTING AREA
DRAINS FOR CONNECTION OF NEW STORM DRAIN PIPING.
DISCONNECT FROM UNDERGROUND MAIN SD LINE.
A. REFER TO P-001 FOR GENERAL NOTES.
B. REMOVE EXISTING CAST IRON PIPING AND ASSOCIATED
SUPPORTS WITH CARE TO AVOID DAMAGE TO STRUCTURE AND
FINISHES.
C. EXISTING AREA DRAINS ARE TO REMAIN IN PLACE AND BE
PROTECTED DURING CONSTRUCTION.
D. ANY DAMAGE TO EXISTING AREA DRAINS SHALL BE REPAIRED.
E. VERIFY EXACT LOCATION, INVERT ELEVATION, AND
CONNECTION POINTS OF EXISTING STORM DRAINS PRIOR TO
NEW PIPING INSTALLATION.
REV
4" SD
4" SD
IN JOISTS
IN JOISTS
IN JOISTS
IN JOISTS
IN JOISTS
4" SD
4" SD
IN JOISTS
4" SD
4" SD
4" SD
3" SD
3" SD
4" SD
4" SD
4" SD FR AD ABV
4" SD FR AD ABV
6" SD FR ABV & DN
6" SD FR ABV & DN
6" SD FR ABV & DN
6" SD FR ABV & DN
6" SD FR ABV & DN
6" SD FR ABV & DN
4" SD FR AD ABV
4" SD FR AD ABV
4" SD FR AD ABV
4" SD FR ABV & DN 4" SD FR AD ABV
3" SD FR AD ABV
4" SD FR AD ABV
3" SD
3" SD FR AD ABV
G4
G3
G2
G1
3" SD FR
AD ABV
3" SD FR
AD ABV
3" SD FR AD ABV
3" SD FR AD ABV
AREA 2
STATION 3
STATION 4
N
THE DRAWINGS AND ADDITIONAL DETAILS
CONTAINED WITHIN THIS SHEET ARE COPYRIGHTED
AND DESIGNATED FOR USE EXCLUSIVELY IN
ASSOCIATION WITH THE PROJECT LOCATED AT THE
SPECIFIED ADDRESS. THESE DRAWINGS REMAIN
THE EXCLUSIVE PROPERTY OF GUERNSEY.
REPRODUCTION OF THIS SHEET IS PROHIBITED
WITHOUT THE WRITTEN CONSENT OF GUERNSEY.
21 22
7 8
124 5 6 www.guernsey.us phone: 405.416.8100 fax: 405.416.8111 guernsey
KEY PLAN
DATE:
PROJECT:
SUBMITTAL:
PROJECT #:
A u to d e s k D o c s
/7 -0
W
R W
A T u n n e l M
E P
U p g ra d e s /2
-0
W
R W
A T u n n e l M
E P
U p g ra d e s M
.r v t
/5
/2
:0
:3
P
M
ADD ALT #1 - 2ND THRU
4TH LEVEL GARAGE
DRAINAGE DEMO
PLUMBING PLAN
TUNNEL AND PARKING
GARAGE MEP UPGRADES
7100 Terminal Dr, Oklahoma City, OK 73159
OKC WILL ROGERS
INTERNATIONAL
AIRPORT
5 SEP 2025
PD102
ISSUE FOR
CONSTRUCTION
70486-004
DEMOLITION GENERAL NOTES
DEMOLITION SHEET NOTES
3/64 = 1'-0
0 12' 24' 48'
2"
SCALE: 3/64" = 1'-0"
2ND THRU 4TH LEVEL GARAGE DRAINAGE DEMO PLUMBING PLAN
1. ALL HORIZONTAL STORM DRAINAGE PIPING AND ASSOCIATED
PIPE RISERS TO BE DEMOLISHED. TYPICAL FOR LEVELS
GROUND THRU 4. RETAIN EXISTING AREA DRAINS FOR
CONNECTION OF NEW STORM DRAIN PIPING.
TYP
A. REFER TO P-001 FOR GENERAL NOTES.
B. REMOVE EXISTING CAST IRON PIPING AND ASSOCIATED
SUPPORTS WITH CARE TO AVOID DAMAGE TO STRUCTURE AND
FINISHES.
C. EXISTING AREA DRAINS ARE TO REMAIN IN PLACE AND BE
PROTECTED DURING CONSTRUCTION.
D. ANY DAMAGE TO EXISTING AREA DRAINS SHALL BE REPAIRED.
E. VERIFY EXACT LOCATION, INVERT ELEVATION, AND
CONNECTION POINTS OF EXISTING STORM DRAINS PRIOR TO
NEW PIPING INSTALLATION.
REV
GNGP
SUMP PUMP (EXIST)
G1
MECHANICAL /
EQUIPMENT ROOM
V
GNGP
SUMP PUMP (EXIST)
MECHANICAL
EQUIPMENT ROOM
V
D
N
THE DRAWINGS AND ADDITIONAL DETAILS
CONTAINED WITHIN THIS SHEET ARE COPYRIGHTED
AND DESIGNATED FOR USE EXCLUSIVELY IN
ASSOCIATION WITH THE PROJECT LOCATED AT THE
SPECIFIED ADDRESS. THESE DRAWINGS REMAIN
THE EXCLUSIVE PROPERTY OF GUERNSEY.
REPRODUCTION OF THIS SHEET IS PROHIBITED
WITHOUT THE WRITTEN CONSENT OF GUERNSEY.
21 22
7 8
124 5 6 www.guernsey.us phone: 405.416.8100 fax: 405.416.8111 guernsey
KEY PLAN
DATE:
PROJECT:
SUBMITTAL:
PROJECT #:
A u to d e s k D o c s
/7 -0
W
R W
A T u n n e l M
E P
U p g ra d e s /2
-0
W
R W
A T u n n e l M
E P
U p g ra d e s M
.r v t
/5
/2
:0
:3
P
M
TUNNEL DEMOLITION
PLAN
TUNNEL AND PARKING
GARAGE MEP UPGRADES
7100 Terminal Dr, Oklahoma City, OK 73159
OKC WILL ROGERS
INTERNATIONAL
AIRPORT
5 SEP 2025
PD401
ISSUE FOR
CONSTRUCTION
70486-004
DEMOLITION SHEET NOTES
1. DEMO EXIST SUMP PUMP AND BASIN COVER. SUMP BASIN TO
REMAIN.
2. DEMO PIPING ASSOCIATED WITH SUMP PUMP. EXISTING MAIN
PIPES TO REMAIN AS INDICATED ON THE DRAWING.
3. DEMO EXIST SUMP PUMP CONTROL PANEL.
4. EXIST VENT AND DISCHARGE PIPING TO REMAIN.
5. IF PIPING WAS DAMAGED DURING DEMOLITION PROCESS,
REPLACE VENT PIPING AS NEEDED.
SCALE: 3/8" = 1'-0"
ENLARGED TUNNEL DEMO PLAN - MECHANICAL EQUIPMENT ROOM 1000
SCALE: 3/8" = 1'-0"
ENLARGED TUNNEL DEMO PLAN - MECHANICAL EQUIPMENT ROOM 0003
3/8 = 1'-0
0 2' 3' 6'
2"
REV
IN JOISTS
IN JOISTS
IN JOISTS
IN JOISTS
IN JOISTS
IN JOISTS
4" SD FR FD ABV
6" SD FR ABV & DN.
CONNECT TO EXISTING
UG SD LINE.
3" SD FR AD ABV
3" SD FR AD ABV
6" SD FR ABV & DN.
CONNECT TO EXISTING
UG SD LINE.
4" SD FR AD ABV
4" SD FR AD ABV
6" SD FR ABV & DN. CONNECT TO
EXISTING UG SD LINE.
3" SD FR
AD ABV
3" SD FR
AD ABV
6" SD FR ABV & DN. CONNECT TO
EXISTING UG SD LINE.
4" SD FR AD ABV
4" SD FR AD ABV
4" SD FR AD ABV
4" SD FR ABV & DN
4" SD FR AD ABV
6" SD FR ABV & DN. CONNECT
TO EXISTING UG SD LINE.
3" SD FR AD ABV
3" SD FR AD ABV
3" SD FR AD ABV 6" SD FR ABV & DN. CONNECT
TO EXISTING UG SD LINE.
G4
G3
G2
G1
TYP
4" SD
4" SD
4" SD
4" SD
4" SD
4" SD
AREA 2
STATION 3
STATION 4
N
THE DRAWINGS AND ADDITIONAL DETAILS
CONTAINED WITHIN THIS SHEET ARE COPYRIGHTED
AND DESIGNATED FOR USE EXCLUSIVELY IN
ASSOCIATION WITH THE PROJECT LOCATED AT THE
SPECIFIED ADDRESS. THESE DRAWINGS REMAIN
THE EXCLUSIVE PROPERTY OF GUERNSEY.
REPRODUCTION OF THIS SHEET IS PROHIBITED
WITHOUT THE WRITTEN CONSENT OF GUERNSEY.
21 22
7 8
124 5 6 www.guernsey.us phone: 405.416.8100 fax: 405.416.8111 guernsey
KEY PLAN
DATE:
PROJECT:
SUBMITTAL:
PROJECT #:
A u to d e s k D o c s
/7 -0
W
R W
A T u n n e l M
E P
U p g ra d e s /2
-0
W
R W
A T u n n e l M
E P
U p g ra d e s M
.r v t
/5
/2
:0
:3
P
M
ADD ALT #1 - GROUND
FLOOR PLUMBING PLAN
TUNNEL AND PARKING
GARAGE MEP UPGRADES
7100 Terminal Dr, Oklahoma City, OK 73159
OKC WILL ROGERS
INTERNATIONAL
AIRPORT
5 SEP 2025
P-101
ISSUE FOR
CONSTRUCTION
70486-004
SHEET NOTES
SCALE: 3/64" = 1'-0"
ADD ALT #1 - GROUND LEVEL GARAGE PLUMBING PLAN
3/64 = 1'-0
0 12' 24' 48'
2"
1. NEW HORIZONTAL SCH. 40 PVC STORM DRAINAGE PIPING.
SLOPE AT A MIN 1/8" PER FOOT. CONNECT EXISTING AREA
DRAINS TO NEW PIPING.
REV
4" SD IN JOISTS
IN JOISTS
IN JOISTS
IN JOISTS
IN JOISTS
IN JOISTS
4" SD FR FD ABV
4" SD FR FD ABV
6" SD FR ABV & DN
3" SD FR
AD ABV
3" SD FR
AD ABV
3" SD FR FD ABV
3" SD FR FD ABV
4" SD FR FD ABV
3" SD FR FD ABV
4" SD FR FD ABV
4" SD FR FD ABV
4" SD FR FD ABV
3" SD FR AD ABV
3" SD FR AD ABV
6" SD FR ABV & DN
6" SD FR ABV & DN
4" SD FR ABV & DN 4" SD FR ABV
6" SD FR ABV & DN
6" SD FR ABV & DN
6" SD FR ABV & DN.
G4
G3
G2
G1
4" SD
4" SD
4" SD
4" SD
AREA 2
STATION 3
STATION 4
N
THE DRAWINGS AND ADDITIONAL DETAILS
CONTAINED WITHIN THIS SHEET ARE COPYRIGHTED
AND DESIGNATED FOR USE EXCLUSIVELY IN
ASSOCIATION WITH THE PROJECT LOCATED AT THE
SPECIFIED ADDRESS. THESE DRAWINGS REMAIN
THE EXCLUSIVE PROPERTY OF GUERNSEY.
REPRODUCTION OF THIS SHEET IS PROHIBITED
WITHOUT THE WRITTEN CONSENT OF GUERNSEY.
21 22
7 8
124 5 6 www.guernsey.us phone: 405.416.8100 fax: 405.416.8111 guernsey
KEY PLAN
DATE:
PROJECT:
SUBMITTAL:
PROJECT #:
A u to d e s k D o c s
/7 -0
W
R W
A T u n n e l M
E P
U p g ra d e s /2
-0
W
R W
A T u n n e l M
E P
U p g ra d e s M
.r v t
/5
/2
:0
:3
P
M
ADD ALT #1 - SECOND
THRU FOURTH FLOOR
PLUMBING PLAN
TUNNEL AND PARKING
GARAGE MEP UPGRADES
7100 Terminal Dr, Oklahoma City, OK 73159
OKC WILL ROGERS
INTERNATIONAL
AIRPORT
5 SEP 2025
P-102
ISSUE FOR
CONSTRUCTION
70486-004
SHEET NOTES
SCALE: 3/64" = 1'-0"
2ND THRU 4TH LEVEL GARAGE PLUMBING PLAN
3/64 = 1'-0
0 12' 24' 48'
2"
1. NEW HORIZONTAL SCH. 40 PVC STORM DRAINAGE PIPING.
SLOPE AT A MIN 1/8" PER FOOT. CONNECT EXISTING AREA
DRAINS TO NEW PIPING.
TYP
REV
GNGP
AHU-1
G1
3" V
P-401
SP-1
MECHANICAL /
EQUIPMENT ROOM
1 1/4" CD
WALKWAY
GNGP
AHU-2
SP-2
MECHANICAL
EQUIPMENT ROOM
1 1/4" CD
WALKWAY
EXIST FD
SP-2
TETHERED LEVEL
CONTROL FLOAT SWITCH
SP-1
OR
CHECK VALVE
ASSEMBLY
3" V
SUB BASE
GUIDE PIPE
SLIDING BRACKET
3" DISCHARGE PIPE
BASIN COVER
ACCESS DOOR
EXIST FLOOR
LEVEL CONTROL PLATE
EXIST INLET. VIF.
EXIST BASIN
PUMP OFF/STOP
LEAD/START
LAG/STANDBY
HIGH WATER ALARM
4'-0"
DRAIN PAN
DRAIN LINE SHALL BE AT
LEAST THE SAME SIZE AS THE
NIPPLE ON THE DRAIN PAN
PITCH DOWN
TOWARD DRAIN
CLEAN OUT
OPEN DRAIN
OR FLOOR
DRAIN
NOTE:
UNLESS NOTED OTHERWISE,
THIS DETAIL DOES NOT APPLY
TO FAN COIL UNITS
DRAW THRU
BLOW THRU
2" PLUS X
1" MINIMUM
X
2X
UNIT TYPE A B
WHERE X = STATIC PRESSURE IN PAN
DIELECTRIC
FITTING
A B
1"
N
THE DRAWINGS AND ADDITIONAL DETAILS
CONTAINED WITHIN THIS SHEET ARE COPYRIGHTED
AND DESIGNATED FOR USE EXCLUSIVELY IN
ASSOCIATION WITH THE PROJECT LOCATED AT THE
SPECIFIED ADDRESS. THESE DRAWINGS REMAIN
THE EXCLUSIVE PROPERTY OF GUERNSEY.
REPRODUCTION OF THIS SHEET IS PROHIBITED
WITHOUT THE WRITTEN CONSENT OF GUERNSEY.
21 22
7 8
124 5 6 www.guernsey.us phone: 405.416.8100 fax: 405.416.8111 guernsey
KEY PLAN
DATE:
PROJECT:
SUBMITTAL:
PROJECT #:
A u to d e s k D o c s
/7 -0
W
R W
A T u n n e l M
E P
U p g ra d e s /2
-0
W
R W
A T u n n e l M
E P
U p g ra d e s M
.r v t
/5
/2
:0
:4
P
M
TUNNEL PLUMBING PLAN
TUNNEL AND PARKING
GARAGE MEP UPGRADES
7100 Terminal Dr, Oklahoma City, OK 73159
OKC WILL ROGERS
INTERNATIONAL
AIRPORT
5 SEP 2025
P-401
ISSUE FOR
CONSTRUCTION
70486-004
SCALE: 3/8" = 1'-0"
ENLARGED TUNNEL PLAN - MECHANICAL EQUIPMENT ROOM 1000
SHEET NOTES
1. NEW, SUBMERSIBLE DUPLEX SUMP PUMP. NEW SOLID ACCESS
COVER OVER EXISTING SUMP BASIN. REFER TO PUMP
SCHEDULE.
2. ROTATE ACCESS COVER TO AVOID ELECTRICAL PANEL
CLEARANCES.
3. NEW PIPING TO CONNECT TO NEW SUBMERSIBLE DUPLEX
SUMP PUMP. CONNECT TO EXISTING ROUGH-IN PIPING.
4. LOCATE SUMP PUMP CONTROL PANEL. FIELD VERIFY LOCATION
TO ENSURE ADEQUATE SPACE FOR PANEL.
5. RETAIN AS MUCH EXISTING VENT PIPE AS POSSIBLE.
SCALE: 3/8" = 1'-0"
ENLARGED TUNNEL PLAN - MECHANICAL EQUIPMENT ROOM 0003
SCALE: NTS
TYPICAL SUMP PUMP DETAIL
3/8 = 1'-0
0 2' 3' 6'
2"
PUMP SCHEDULE
MARK DESCRIPTION GPM HEAD FT. WTR. H.P. RPM VOLTS/PHASE BASIS OF DESIGN REMARKS
SP-1 SUBMERSIBLE WASTEWATER PUMP 150 35 2 1750 460/3 WEIL 2515 ALL
SP-2 SUBMERSIBLE WASTEWATER PUMP 150 25 2 1750 460/3 WEIL 2515 ALL
1. PROVIDE WITH PUMP CONTROL PANEL AS INDICATED IN DRAWINGS. BOD WEIL 8138 WITH MANUFACTURER-PROVIDED INTEGRATED HIGH WATER ALARM SYSTEM, TYPE 4X AND ASSOCIATED DOME LIGHT. POWER REQUIREMENT: 460V/3-PHASE. TIE PANEL INTO EXISTING BAS SYSTEM FOR REMOTE MONITORING.
2. PROVIDE NEW BASIN COVER WITH NEW HINGED ACCESS DOOR. BOD WEIL 8804 - DUPLEX WITH ONE PUMP OPENING.
3. PROVIDE NEW CHECK VALVE ASSEMBLY. BOD WEIL 2616-3.
4. PROVIDE TETHERED LEVEL CONTROL FLOAT SWITCH. BOD WEIL 8233 WITH DUPLEX CONFIGURATION AND 20' CORD LENGTH AND 1" SCH. 40 MOUNTING PIPE.
SCALE: NTS
CONDENSATE DRAIN TRAP DETAIL
REV
P
D
HEATING HOT WATER SUPPLYHWS
HEATING HOT WATER RETURNHWR
RS REFRIGERANT SUCTION LINE
RL REFRIGERANT LIQUID LINE
RH REFRIGERANT HOT GAS LINE
CWS CHILLED WATER SUPPLY
CWR CHILLED WATER RETURN
CS CONDENSER WATER SUPPLY
CR CONDENSER WATER RETURN
CD CONDENSATE DRAIN LINE
DROP IN DUCTWORK
RISE IN DUCTWORK
MANUAL BALANCING DAMPER IN DUCT
AIR FLOW MEASUREMENT STATION
FIRE DAMPER
FIRE/SMOKE DAMPER
3-WAY VALVE (PNEUMATIC)
R
GATE VALVE
GATE VALVE W/OUTSIDE SCREW & YOKE
CHECK VALVE
BUTTERFLY VALVE
BALL VALVE
BALANCING VALVE
STRAINER
UNION
T THERMOSTAT
T TEMPERATURE SENSOR
S
H HUMIDISTAT
CONCENTRIC REDUCER
DIRECTION OF FLOW
SLOPE DOWN
CONNECT TO EXISTING
THERMOMETER
AC ABOVE CEILING
ABV ABOVE
AFF ABOVE FINISHED FLOOR
ACC ACCESS
ACU AIR CONDITIONING UNIT
AHU AIR HANDLING UNIT
AV AIR VENT
BDD BACKDRAFT DAMPER
BV BALL VALVE
BFF BELOW FINISHED FLOOR
BTU BRITISH THERMAL UNIT
CLG CEILING
CV CHECK VALVE
CWR CHILLED WATER RETURN
CWS CHILLED WATER SUPPLY
CONC CONCENTRIC
COND CONDENSATE
CD CONDENSATE DRAIN
CU CONDENSING UNIT
CF CUBIC FEET
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
DPR DAMPER
DP DEW POINT
DIFF DIFFUSER
DN DOWN
DT DRAW THROUGH
DB DRY BULB
EA EXHAUST/RELIEF AIR
ECC ECCENTRIC
ELEC ELECTRIC
EAT ENTERING AIR TEMPERATURE
EUH ELECTRIC UNIT HEATER
EWT ENTERING WATER TEMPERATURE
ES EQUAL SPLIT
EXH EXHAUST
EAG EXHAUST GRILLE
EXIST EXISTING
EXT EXTERNAL
FCU FAN COIL
FT FEET
FPM FEET PER MINUTE
FDPR FIRE DAMPER
F/SDPR FIRE/SMOKE DAMPER
FR FROM
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GC GENERAL CONTRACTOR
GR GRILLE
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HP HORSEPOWER
IN INCHES
KW KILOWATTS
LAT LEAVING AIR TEMPERATUE
LWT LEAVING WATER TEMPERATURE
MBH 1000 BTU PER HOUR
MBD MANUAL BALANCING DAMPER
MAX MAXIMUM
MC MECHANICAL CONTRACTOR
MIN MINIMUM
MOD MOTOR OPERATED DAMPER
MTZ MOTORIZED
MTD MOUNTED
ND NECK DIAMETER
NC NORMALLY CLOSED
NO NORMALLY OPEN
NIC NOT IN CONTRACT
OC ON CENTER
OV OUTLET VELOCITY
OA OUTSIDE AIR
PSI POUNDS PER SQUARE INCH
PRESS PRESSURE
PD PRESSURE DROP
REC RECOVERY
REG REGISTER
RH RELATIVE HUMIDITY
RA RETURN AIR
RAG RETURN AIR GRILLE
RAO RETURN AIR OPENING
RAR RETURN AIR REGISTER
RPM REVOLUTIONS PER MINUTE
SO SHUT OFF
SF SQUARE FEET
SS STAINLESS STEEL
ST STATIC PRESSURE
SA SUPPLY AIR
SAG SUPPLY AIR GRILLE
SAR SUPPLY AIR REGISTER
SF SUPPLY FAN
TD TEMPERATURE DIFFERENCE
THERM THERMOMETER
TG TRANSFER GRILLE
TYP TYPICAL
UF UNDER FLOOR
UG UNDERGROUND
UH UNIT HEATER
UNO UNLESS NOTED OTHERWISE
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
VEL VELOCITY
VF VENTILATION FAN
VIF VERIFY IN FIELD.
WG WATER GAUGE
W WATTS
WB WET BULB
ABBREVIATIONS SYMBOLS
LEGEND & ABBREVIATIONS
ABV. DESCRIPTION ABV. DESCRIPTION
BAIR DEVICE
DESIGNATION CFM
DISCONNECT
N
THE DRAWINGS AND ADDITIONAL DETAILS
CONTAINED WITHIN THIS SHEET ARE COPYRIGHTED
AND DESIGNATED FOR USE EXCLUSIVELY IN
ASSOCIATION WITH THE PROJECT LOCATED AT THE
SPECIFIED ADDRESS. THESE DRAWINGS REMAIN
THE EXCLUSIVE PROPERTY OF GUERNSEY.
REPRODUCTION OF THIS SHEET IS PROHIBITED
WITHOUT THE WRITTEN CONSENT OF GUERNSEY.
21 22
7 8
124 5 6 www.guernsey.us phone: 405.416.8100 fax: 405.416.8111 guernsey
KEY PLAN
DATE:
PROJECT:
SUBMITTAL:
PROJECT #:
A u to d e s k D o c s
/7 -0
W
R W
A T u n n e l M
E P
U p g ra d e s /2
-0
W
R W
A T u n n e l M
E P
U p g ra d e s M
.r v t
/5
/2
:0
:4
P
M
LEGEND &
ABBREVIATIONS
TUNNEL AND PARKING
GARAGE MEP UPGRADES
7100 Terminal Dr, Oklahoma City, OK 73159
OKC WILL ROGERS
INTERNATIONAL
AIRPORT
5 SEP 2025
M-001
ISSUE FOR
CONSTRUCTION
70486-004
PROJECT NOTES
A. THE MECHANICAL INSTALLATION SHALL COMPLY WITH THE
CURRENT LOCAL MECHANICAL CODE.
B. CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH
MANUFACTURER'S CERTIFIED DRAWINGS. TRANSITIONS TO ALL
EQUIPMENT SHALL BE VERIFIED AND PROVIDED FOR
EQUIPMENT FURNISHED.
C. DIMENSIONS SHALL BE VERIFIED AND COORDINATED PRIOR TO
PROCUREMENT OR FABRICATION. COORDINATE THE WORK
WITH OTHER TRADES INVOLVED. FIELD MODIFICATIONS SUCH
AS OFFSETS IN PIPING OR DUCTWORK NEEDED DUE TO
OBSTRUCTIONS OR INTERFERENCES SHALL BE PROVIDED AT
NO ADDITIONAL COST.
D. SEE SPECIFICATIONS FOR DUCT PRESSURE CLASS.
E. PROVIDE AIR TURNING VANES IN ALL 90 DEGREE
RECTANGULAR DUCT ELBOWS.
F. DUCT CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE
LATEST EDITION OF THE SMACNA HVAC DUCT CONSTRUCTION
STANDARD.
G. LOCATE THERMOSTATS, TEMPERATURE SENSORS,
HUMIDISTATS, AND HUMIDITY SENSORS AT 48" ABOVE FINISHED
FLOOR UNLESS NOTED OTHERWISE. COORDINATE LOCATIONS
WITH OTHER EQUIPMENT, FURNITURE, DOOR SWINGS AND
LIGHT SWITCHES.
H. ALL DUCT SIZES ARE SHOWN ARE INSIDE CLEAR DIMENSIONS.
I. DAMPERS AND INTERIOR OF DUCT VISIBLE THOUGH AIR
DEVICES SHALL BE PAINTED FLAT BLACK.
J. PROVIDE TRAPPED CONDENSATE DRAINS WITH APPROPRIATE
DEPTH FOR ALL COOLING COILS.
K. ALL DUCTWORK AND PIPING IS SHOWN SCHEMATICALLY.
PROVIDE ALL TRANSITIONS, TURNING VANES, ELBOWS,
FITTINGS, ETC. TO ALLOW SMOOTH FLOWS. ALL DUCT SPLITS
SHALL TRANSITION TO FULL SIZE OF THE SUM OF BOTH
BRANCHES, UPSTREAM OF SPLIT.
L. PROVIDE CONCRETE HOUSEKEEPING PADS UNDER ALL FLOOR
MOUNTED EQUIPMENT. REFER TO SPECIFICATIONS FOR
DETAILED REQUIREMENTS.
M. VERIFY FINISHES WITH ARCHITECT PRIOR TO PURCHASING
GRILLES, REGISTERS, DIFFUSERS, LOUVERS AND OTHER AIR
DISTRIBUTION DEVICES.
N. PROVIDE DUCT FLEX CONNECTIONS ON ALL DUCTWORK
CONNECTING TO EACH FAN, AIR HANDLING UNIT, AND FAN COIL
UNIT.
O. PROVIDE TRANSITIONS AT DIFFUSER NECKS AS REQUIRED TO
MATCH SIZES OF FLEX DUCTS TO BE CONNECTED.
P. SLEEVE AND/OR FIRESTOP ALL PENETRATIONS THROUGH
RATED WALLS, CEILINGS, AND FLOORS WITH UL LISTED
ASSEMBLIES. FIRESTOP ASSEMBLIES SHALL BE EQUAL TO OR
EXCEED THE RATING OF THE WALL, CEILING OR FLOOR. SEE
ARCHITECTURAL DRAWINGS FOR FINAL FINISHES. ALL
FIRESTOP MATERIAL TO BE PROVIDED BY A SINGLE
MANUFACTURER.
Q. INTERRUPTIONS TO EXISTING SERVICES SHALL BE SCHEDULED
FOR TIMES OTHER THAN NORMAL OPERATING HOURS. SUCH
INTERRUPTIONS TO SERVICES SHALL NOT BE MADE WITHOUT
THE PRIOR WRITTEN CONSENT OF THE OWNER'S
REPRESENTATIVE AND PROPER COORDINATION WITH OTHER
TRADES. PRE-WORK SHALL BE PERFORMED TO MAKE THE
SHUTDOWN PERIOD AS BRIEF AS POSSIBLE.
R. MAINTAIN A MINIMUM CLEARANCE OF 6" BETWEEN DUCTWORK,
PIPING, EQUIPMENT, ETC. AND ALL FIRE RATED AND
FIRE/SMOKE RATED ASSEMBLIES TO ALLOW FOR INSPECTION
OF ASSEMBLY.
S. WATER PRESSURE DROPS THROUGH COIL CONTROL VALVES
SHALL NOT EXCEED 12 FEET OF WATER.
T. SLEEVE AND SEAL ALL PIPING PENETRATIONS THROUGH
BUILDING PARTITIONS AND MAINTAIN STC RATINGS. SEE
ARCHITECTURAL DRAWINGS FOR PARTITION RATINGS.
U. ANY DEVIATIONS IN ELECTRICAL REQUIREMENTS FROM THE
BASIS OF DESIGN FOR MECHANICAL EQUIPMENT SHALL BE THE
RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO
ENSURE COORDINATION WITH THE ELECTRICAL CONTRACTOR
FOR PROPER WIRE SIZE, CONDUITS, DISCONNECTS, FUSES,
STARTERS, VFD'S, ETC. AT NO ADDITIONAL COST.
V. PROVIDE UP-STREAM AND DOWN-STREAM TEST PLUGS FOR
ALL COILS.
W. THESE CONTRACT DOCUMENTS HAVE BEEN SUBMITTED FOR
CONTRACTOR DEVELOPMENT OF THE CONSTRUCTION WORK
PLAN. COORDINATION BETWEEN THE CONTRACTOR AND
SUBCONTRACTORS IS THE RESPONSIBILITY OF THE
CONTRACTOR. CHANGES TO THESE DRAWINGS AS A RESULT
OF THE CONSTRUCTION COORDINATION AND THE
DEVELOPMENT OF THE CONSTRUCTION WORK PLAN ARE THE
RESPONSIBILITY OF THE CONTRACTOR.
X. THESE CONTRACT DOCUMENTS DETAIL THE CONCEPT OF THE
WORK. COORDINATION OF CONCEPTUALLY EQUAL BUT
NOMINALLY DIFFERENT SYSTEMS OR PRODUCTS SELECTED BY
CONTRACTOR ARE THE RESPONSIBILITY OF THE CONTRACTOR.
Y. ALL EQUIPMENT SHALL BE SINGLE POINT WIRING AND SHALL
INCLUDE APPROPRIATE TRANSFORMERS, FUSING,
DISCONNECTS, ETC. THIS SHALL INCLUDE CIRCUITS FOR
CONTROLS/CONTROLLERS, ACTUATORS, ETC. WHERE
FACTORY SINGLE POINT WIRING IS NOT AVAILABLE,
MECHANICAL CONTRACTOR AND SUPPLIER SHALL COORDINATE
WITH ELECTRICAL CONTRACTOR TO INCLUDE ALL NECESSARY
CIRCUITS REQUIRED FOR COMPLETE OPERATION OF THE
EQUIPMENT AND ALL ASSOCIATED APPURTENANCES.
Z. CONTRACTOR TO PERFORM PRE-CONSTRUCTION TEST AND
BALANCE TO CONFIRM EXISTING PERFORMANCE OF
CONNECTED SYSTEMS, INCLUDING EXIST AHU'S. PROVIDE
REPORT TO ENGINEER AND OWNER PRIOR TO DEMOLITION.
REV
GKGLGMGNGP
MD401
M-401
STATION 1
AREA 3
AREA 2
GKGLGMGNGP
MD401
M-401
MD101
M-101
STATION 2
STATION 3
STATION 4
G3
G2
G1
AREA 3
AREA 2
AREA 2
AREA 1
N
THE DRAWINGS AND ADDITIONAL DETAILS
CONTAINED WITHIN THIS SHEET ARE COPYRIGHTED
AND DESIGNATED FOR USE EXCLUSIVELY IN
ASSOCIATION WITH THE PROJECT LOCATED AT THE
SPECIFIED ADDRESS. THESE DRAWINGS REMAIN
THE EXCLUSIVE PROPERTY OF GUERNSEY.
REPRODUCTION OF THIS SHEET IS PROHIBITED
WITHOUT THE WRITTEN CONSENT OF GUERNSEY.
21 22
7 8
124 5 6 www.guernsey.us phone: 405.416.8100 fax: 405.416.8111 guernsey
KEY PLAN
DATE:
PROJECT:
SUBMITTAL:
PROJECT #:
A u to d e s k D o c s
/7 -0
W
R W
A T u n n e l M
E P
U p g ra d e s /2
-0
W
R W
A T u n n e l M
E P
U p g ra d e s M
.r v t
/5
/2
:0
:4
P
M
MECHANICAL COMPOSITE
PLAN
TUNNEL AND PARKING
GARAGE MEP UPGRADES
7100 Terminal Dr, Oklahoma City, OK 73159
OKC WILL ROGERS
INTERNATIONAL
AIRPORT
5 SEP 2025
M-100
ISSUE FOR
CONSTRUCTION
70486-004
3/64 = 1'-0
0 12' 24' 48'
2"
REV
REVISION NAME ISSUE
DATE
SCALE: 1/16" = 1'-0"
HVAC OVERALL PLAN - TUNNEL AREA 3
SCALE: 1/16" = 1'-0"
HVAC OVERALL PLAN - TUNNEL AREA 2
GLGM
G3
G1
HWR
CHS
HWR
HWS
CD
FCU (EXIST)
HWR
HWS
HWR
HWS
CD
FCU (EXIST)
STATION 4
STATION 3
GLGM
1" CD FROM ABOVE
1-1/2" HWS UP
1-1/2" CHR FROM ABOVE
1-1/2" CHS UP
1-1/2" HWR FROM ABOVE
1" CD FROM ABOVE
1-1/2" HWS UP
1-1/2" CHR FROM ABOVE
1-1/2" CHS UP
1-1/2" HWR FROM ABOVE
G3
G1
HWS
HWR
STATION 4
STATION 3
HWS
HWR
N
THE DRAWINGS AND ADDITIONAL DETAILS
CONTAINED WITHIN THIS SHEET ARE COPYRIGHTED
AND DESIGNATED FOR USE EXCLUSIVELY IN
ASSOCIATION WITH THE PROJECT LOCATED AT THE
SPECIFIED ADDRESS. THESE DRAWINGS REMAIN
THE EXCLUSIVE PROPERTY OF GUERNSEY.
REPRODUCTION OF THIS SHEET IS PROHIBITED
WITHOUT THE WRITTEN CONSENT OF GUERNSEY.
21 22
7 8
124 5 6 www.guernsey.us phone: 405.416.8100 fax: 405.416.8111 guernsey
KEY PLAN
DATE:
PROJECT:
SUBMITTAL:
PROJECT #:
A u to d e s k D o c s
/7 -0
W
R W
A T u n n e l M
E P
U p g ra d e s /2
-0
W
R W
A T u n n e l M
E P
U p g ra d e s M
.r v t
/5
/2
:0
:4
P
M
PARKING GARAGE HVAC
DEMOLITION PLAN
TUNNEL AND PARKING
GARAGE MEP UPGRADES
7100 Terminal Dr, Oklahoma City, OK 73159
OKC WILL ROGERS
INTERNATIONAL
AIRPORT
5 SEP 2025
MD101
ISSUE FOR
CONSTRUCTION
70486-004
DEMOLITION GENERAL NOTES
A. THESE DRAWINGS WERE COMPILED USING OWNER PROVIDED
RECORD DRAWINGS AND LIMITED FIELD VERIFICATION OF
EXISTING CONDITIONS. THE DRAWINGS ARE INTENDED TO
INDICATE THE SCOPE OF DEMOLITION WORK REQUIRED FOR
THE EXISTING HVAC AND PLUMBING SYSTEMS. THE
CONTRACTOR SHALL VERIFY ALL DUCTWORK, PIPING SYSTEM,
EQUIPMENT LOCATION, DIMENSIONS AND ALL FIELD
CONDITIONS AFFECTING THEIR WORK.
B. THESE DRAWINGS DO NOT INDICATE EVERY COMPONENT THAT
MUST BE REMOVED.
C. DASHED LINES INDICATE ITEMS TO BE REMOVED UNLESS
NOTED OTHERWISE.
D. REPLACE AND/OR PATCH TO MATCH EXISTING; ANY EXISTING
PIPE AND/OR DUCT INSULATION THAT IS TO REMAIN EXISTING
AND IS DAMAGED OR REMOVED DURING CONSTRUCTION.
E. CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL
PENETRATIONS CREATED BY REMOVAL OF EQUIPMENT,
DUCTWORK, ETC. TO MATCH EXISTING. REPAIR ADJACENT
CONSTRUCTION AND FINISHES DAMAGED DURING DEMOLITION
AND EXTENSION WORK.
F. ALL EXISTING MECHANICAL EQUIPMENT AND DEVICES SHALL
REMAIN UNLESS SPECIFICALLY NOTED TO BE REMOVED.
G. EXISTING DUCTS, PIPING, AND EQUIPMENT, ETC., NOT TO BE
UTILIZED IN THE COMPLETED BUILDING SHALL BE REMOVED AS
REQUIRED. ALL ENDS OF DISCONTINUED PIPING AND DUCTS
SHALL BE CAPPED IN THE NEAREST WALL, CEILING, OR FLOOR
SO THAT THEY ARE COMPLETELY CONCEALED. OPENINGS LEFT
IN WALLS, CEILINGS, ETC. WHERE EQUIPMENT, PIPES AND
DUCTS, ETC. ARE REMOVED AND NOT REPLACED, SHALL BE
PATCHED NEATLY WITH SIMILAR MATERIAL TO ADJACENT
CONSTRUCTION.
H. USE EXISTING PIPING SYSTEM VALVES WHERE POSSIBLE TO
ISOLATE SYSTEMS AND TO CAP EXISTING PIPING. REPLACE
EXISTING VALVES WHERE NECESSARY WHEN EXISTING VALVES
WILL NOT HOLD.
I. REFER TO ELECTRICAL PLANS FOR EXTENT OF DEMOLITION
WORK RELATING TO WIRING FOR SUPPORT OF HVAC
EQUIPMENT TO BE REMOVED.
J. THE CONTRACTOR SHALL COORDINATE THEIR DEMOLITION
WORK WITH THAT OF OTHER TRADES IN ORDER TO AVOID
CONFLICTS.
K. THE CONTRACTOR SHALL REMOVE ALL PIPING SUPPORTS, ETC.
FROM PARTITIONS THAT ARE TO BE REMOVED. NO EXISTING
HANGER SYSTEMS SHALL BE REUSED FOR NEW PIPING.
WHERE THE REMOVAL OF THESE ITEMS DISRUPTS EXISTING
PIPING THAT IS TO REMAIN, THE CONTRACTOR SHALL INSTALL
AND PROVIDE BYPASS CONNECTIONS NECESSARY.
L. PORTIONS OF PIPING TO BE REMOVED AS A RESULT OF
DEMOLITION WORK, BUT WHICH ARE REQUIRED TO REMAIN
ACTIVE, SHALL BE CUT AT CONVENIENT LOCATIONS,
REROUTED AND RECONNECTED.
M. THE CONTRACTOR SHALL MAINTAIN THE INTEGRITY OF THE
FIRESTOPPING AND THE FIRE RESISTANT ASSEMBLIES OF
MATERIALS IN COMPLIANCE WITH THE CONSTRUCTION
DOCUMENTS AND THE REQUIREMENTS OF THE REFERENCED
UL ASSEMBLIES. THESE MATERIALS SHALL BE REAPPLIED OR
REPAIRED TO MAINTAIN THE REQUIRED BARRIER AT NO
ADDITIONAL COST.
DEMOLITION SHEET NOTES
SCALE: 1/4" = 1'-0"
TUNNEL LOWER LEVEL HVAC DEMO PLAN
1/4 = 1'-0
0 2' 4' 8'
2"
SCALE: 1/4" = 1'-0"
BLUE GARAGE LEVELS GROUND-4 HVAC DEMO PLAN
1. DEMO CD RISER AND BRANCHES ASSOCIATED WITH EXISTING
FCU'S.
2. DEMO EXISTING CONCEALED DUCTED FAN COIL UNIT, INCLUDING
BUT NOT LIMITED TO UNIT CASING, FAN/MOTOR ASSEMBLY,
DRAIN PAN, AND ACCESS PANEL. DISCONNECT AND REMOVE ALL
ASSOCIATED CHILLED WATER SUPPLY/RETURN AND HEATING
HOT WATER SUPPLY/RETURN PIPING BACK TO NEAREST MAIN
BRANCH CONNECTION. REMOVE CONDENSATE DRAIN PIPING
BACK TO NEAREST SANITARY OR MAIN CONDENSATE BRANCH.
DISCONNECT AND REMOVE ASSOCIATED DUCTWORK
CONNECTIONS TO AND FROM UNIT, INCLUDING SUPPLY AIR
DUCT, SUPPLY DIFFUSER, RETURN GRILLE, AND ANY BALANCING
DAMPERS. REMOVE ALL CONTROL DEVICES (THERMOSTAT,
VALVES, ACTUATORS, ELECTRIC CONTROLS) ASSOCIATED WITH
THE FAN COIL UNIT.
3. DEMO HWS AND HWR PIPE RISER AND BRANCHES ASSOCIATED
WITH EXISTING FCU'S. CAP PIPE ON THE TUNNEL LEVEL.
4. DEMO AND CAP CHS AND CHR UP UNTIL MAIN LINE.
REV
MD301
AHU-2 (EXIST)
60x32 RA 24x26 SA
38x24 SA
36x26 SA
10x16 SA
GNGP
MD301
10x16 SA
20x38 SA
38x24 SA
RA FAN (EXIST)
60x32 RA
30x60
GN GP
30x60 EA 30x60 OA
DEMO EXIST MTZ DPR
MD301
MD301
AHU-2 (EXIST)
RA FAN (EXIST)
BEYOND
32x60 RA
24x38 SA
26x36 SA 26x24 SA
16x10 SA
G1
MD301
30x60 EA
38x48 RA
36x26 SA 54x32 RA
60x30 EA
54x40 RA
RA FAN (EXIST)
GNGP
14x8 SA
DEMO EXIST MTZ DPR
BEYOND
60x30 OA
MD301
30x60 EA 54x32 RA
AHU-1 (EXIST)
36x26 SA
BEYOND
22x60 SA
GN GP
DEMO EXIST MTZ DPR
MD301
MD301
AHU-1 (EXIST)
38x48 RA
RA FAN (EXIST)
30x60 EA
8x14 SA 26x36 SA
BEYOND
60x30
26x36 SA
30x60 OA
DEMO EXIST MTZ DPR
N
THE DRAWINGS AND ADDITIONAL DETAILS
CONTAINED WITHIN THIS SHEET ARE COPYRIGHTED
AND DESIGNATED FOR USE EXCLUSIVELY IN
ASSOCIATION WITH THE PROJECT LOCATED AT THE
SPECIFIED ADDRESS. THESE DRAWINGS REMAIN
THE EXCLUSIVE PROPERTY OF GUERNSEY.
REPRODUCTION OF THIS SHEET IS PROHIBITED
WITHOUT THE WRITTEN CONSENT OF GUERNSEY.
21 22
7 8
124 5 6 www.guernsey.us phone: 405.416.8100 fax: 405.416.8111 guernsey
KEY PLAN
DATE:
PROJECT:
SUBMITTAL:
PROJECT #:
A u to d e s k D o c s
/7 -0
W
R W
A T u n n e l M
E P
U p g ra d e s /2
-0
W
R W
A T u n n e l M
E P
U p g ra d e s M
.r v t
/5
/2
:0
:4
P
M
DEMO SECTIONS
TUNNEL AND PARKING
GARAGE MEP UPGRADES
7100 Terminal Dr, Oklahoma City, OK 73159
OKC WILL ROGERS
INTERNATIONAL
AIRPORT
5 SEP 2025
MD301
ISSUE FOR
CONSTRUCTION
70486-004
SCALE: 3/8" = 1'-0"
SECTION OF MECHANICAL EQUIPMENT ROOM 1000 - LOOKING NORTH
SCALE: 3/8" = 1'-0"
SECTION OF MECHANICAL EQUIPMENT ROOM 1000 - LOOKING SOUTH
SCALE: 3/8" = 1'-0"
SECTION OF MECHANICAL EQUIPMENT ROOM 1000 - LOOKING WEST
SCALE: 3/8" = 1'-0"
SECTION OF MECHANICAL EQUIPMENT ROOM 0003 - LOOKING NORTH
SCALE: 3/8" = 1'-0"
SECTION OF MECHANICAL EQUIPMENT ROOM 0003 - LOOKING SOUTH
SCALE: 3/8" = 1'-0"
SECTION OF MECHANICAL EQUIPMENT ROOM 0003 - LOOKING WEST
DEMOLITION SHEET NOTES
3/8 = 1'-0
0 2' 3' 6'
2"
1. DEMO IN-LINE FAN, ASSOCIATED RA DUCTING UP TO AHU, AND
OA AND EA DUCTING UP TO CEILING.
2. DEMO AIR HANDLING UNIT. RETAIN DUCT AS INDICATED FOR
CONNECTION OF NEW.
3. DEMO SIDEWALL SUPPLY REGISTERS SERVED BY AHU-1 IN
TUNNEL. TYP OF 25.
4. DEMO SIDEWALL SUPPLY REGISTERS SERVED BY AHU-2 IN
TUNNEL. TYP OF 19.
5. DEMO EXIST AHU CONTROL PANEL.
6. DEMO GRATE SUPPORT TO BE MOVED TO DIFFERENT
LOCATION. REFER TO ARCHITECTURAL PLANS. DEMO CHILLED
WATER SUPPLY PIPE RISER. DEMO ELECTRICAL BOX. REFER TO
ELECTRICAL PLANS.
7. DEMO EA AND OA DUCT UP UNTIL NEXT LEVEL AS INDICATED
FOR CONNECTION OF NEW.
REV
REVISION NAME ISSUE
DATE
DEMOLITION GENERAL NOTES
A. THESE DRAWINGS WERE COMPILED USING OWNER PROVIDED
RECORD DRAWINGS AND LIMITED FIELD VERIFICATION OF
EXISTING CONDITIONS. THE DRAWINGS ARE INTENDED TO
INDICATE THE SCOPE OF DEMOLITION WORK REQUIRED FOR
THE EXISTING HVAC AND PLUMBING SYSTEMS. THE
CONTRACTOR SHALL VERIFY ALL DUCTWORK, PIPING SYSTEM,
EQUIPMENT LOCATION, DIMENSIONS AND ALL FIELD
CONDITIONS AFFECTING THEIR WORK.
B. THESE DRAWINGS DO NOT INDICATE EVERY COMPONENT THAT
MUST BE REMOVED.
C. DASHED LINES INDICATE ITEMS TO BE REMOVED UNLESS
NOTED OTHERWISE.
D. REPLACE AND/OR PATCH TO MATCH EXISTING; ANY EXISTING
PIPE AND/OR DUCT INSULATION THAT IS TO REMAIN EXISTING
AND IS DAMAGED OR REMOVED DURING CONSTRUCTION.
E. CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL
PENETRATIONS CREATED BY REMOVAL OF EQUIPMENT,
DUCTWORK, ETC. TO MATCH EXISTING. REPAIR ADJACENT
CONSTRUCTION AND FINISHES DAMAGED DURING DEMOLITION
AND EXTENSION WORK.
F. ALL EXISTING MECHANICAL EQUIPMENT AND DEVICES SHALL
REMAIN UNLESS SPECIFICALLY NOTED TO BE REMOVED.
G. EXISTING DUCTS, PIPING, AND EQUIPMENT, ETC., NOT TO BE
UTILIZED IN THE COMPLETED BUILDING SHALL BE REMOVED AS
REQUIRED. ALL ENDS OF DISCONTINUED PIPING AND DUCTS
SHALL BE CAPPED IN THE NEAREST WALL, CEILING, OR FLOOR
SO THAT THEY ARE COMPLETELY CONCEALED. OPENINGS LEFT
IN WALLS, CEILINGS, ETC. WHERE EQUIPMENT, PIPES AND
DUCTS, ETC. ARE REMOVED AND NOT REPLACED, SHALL BE
PATCHED NEATLY WITH SIMILAR MATERIAL TO ADJACENT
CONSTRUCTION.
H. USE EXISTING PIPING SYSTEM VALVES WHERE POSSIBLE TO
ISOLATE SYSTEMS AND TO CAP EXISTING PIPING. REPLACE
EXISTING VALVES WHERE NECESSARY WHEN EXISTING VALVES
WILL NOT HOLD.
I. REFER TO ELECTRICAL PLANS FOR EXTENT OF DEMOLITION
WORK RELATING TO WIRING FOR SUPPORT OF HVAC
EQUIPMENT TO BE REMOVED.
J. THE CONTRACTOR SHALL COORDINATE THEIR DEMOLITION
WORK WITH THAT OF OTHER TRADES IN ORDER TO AVOID
CONFLICTS.
K. THE CONTRACTOR SHALL REMOVE ALL PIPING SUPPORTS, ETC.
FROM PARTITIONS THAT ARE TO BE REMOVED. NO EXISTING
HANGER SYSTEMS SHALL BE REUSED FOR NEW PIPING.
WHERE THE REMOVAL OF THESE ITEMS DISRUPTS EXISTING
PIPING THAT IS TO REMAIN, THE CONTRACTOR SHALL INSTALL
AND PROVIDE BYPASS CONNECTIONS NECESSARY.
L. PORTIONS OF PIPING TO BE REMOVED AS A RESULT OF
DEMOLITION WORK, BUT WHICH ARE REQUIRED TO REMAIN
ACTIVE, SHALL BE CUT AT CONVENIENT LOCATIONS,
REROUTED AND RECONNECTED.
M. THE CONTRACTOR SHALL MAINTAIN THE INTEGRITY OF THE
FIRESTOPPING AND THE FIRE RESISTANT ASSEMBLIES OF
MATERIALS IN COMPLIANCE WITH THE CONSTRUCTION
DOCUMENTS AND THE REQUIREMENTS OF THE REFERENCED
UL ASSEMBLIES. THESE MATERIALS SHALL BE REAPPLIED OR
REPAIRED TO MAINTAIN THE REQUIRED BARRIER AT NO
ADDITIONAL COST.
N. DEMO HYDRONIC PIPING BRANCHES ASSOCIATED WITH
EXISTING FCU UP UNTIL MAIN BRANCH UNLESS OTHERWISE
NOTED.
O. DEMO ALL DUCTWORK, GRILLES, AND DIFFUSERS. DEMO FCU'S.
P. DEMO HYDRONIC AND CONDENSATE PIPE ASSOCIATED WITH
FCU'S UP UNTIL MAIN BRANCH.
MD301
MD301
MD301
GNGP
AHU-1 (EXIST)
40x54 RA
60x30 EA
36x26 SA
14x8 SA
48x38 RA
48x38 RA
54x32 RA
36x26 SA
60x30 OA
60x30 EA
MECHANICAL
EQUIPMENT ROOM
RA FAN (EXIST)
14x8 SA
MD301
MD301
MD301
GNGP
RA FAN (EXIST)
38x24 SA
16x10 SA
30x60 OA 30x60 EA
60x32 RA
36x26 SA
FR ABV
UP
G1
MECHANICAL /
EQUIPMENT ROOM
AHU-2 (EXIST) 2
N
THE DRAWINGS AND ADDITIONAL DETAILS
CONTAINED WITHIN THIS SHEET ARE COPYRIGHTED
AND DESIGNATED FOR USE EXCLUSIVELY IN
ASSOCIATION WITH THE PROJECT LOCATED AT THE
SPECIFIED ADDRESS. THESE DRAWINGS REMAIN
THE EXCLUSIVE PROPERTY OF GUERNSEY.
REPRODUCTION OF THIS SHEET IS PROHIBITED
WITHOUT THE WRITTEN CONSENT OF GUERNSEY.
21 22
7 8
124 5 6 www.guernsey.us phone: 405.416.8100 fax: 405.416.8111 guernsey
KEY PLAN
DATE:
PROJECT:
SUBMITTAL:
PROJECT #:
A u to d e s k D o c s
/7 -0
W
R W
A T u n n e l M
E P
U p g ra d e s /2
-0
W
R W
A T u n n e l M
E P
U p g ra d e s M
.r v t
/5
/2
:0
:4
P
M
TUNNEL MECHANICAL
DEMOLITION ENLARGED
PLAN
TUNNEL AND PARKING
GARAGE MEP UPGRADES
7100 Terminal Dr, Oklahoma City, OK 73159
OKC WILL ROGERS
INTERNATIONAL
AIRPORT
5 SEP 2025
MD401
ISSUE FOR
CONSTRUCTION
70486-004
DEMOLITION GENERAL NOTES
A. THESE DRAWINGS WERE COMPILED USING OWNER PROVIDED
RECORD DRAWINGS AND LIMITED FIELD VERIFICATION OF
EXISTING CONDITIONS. THE DRAWINGS ARE INTENDED TO
INDICATE THE SCOPE OF DEMOLITION WORK REQUIRED FOR
THE EXISTING HVAC AND PLUMBING SYSTEMS. THE
CONTRACTOR SHALL VERIFY ALL DUCTWORK, PIPING SYSTEM,
EQUIPMENT LOCATION, DIMENSIONS AND ALL FIELD
CONDITIONS AFFECTING THEIR WORK.
B. THESE DRAWINGS DO NOT INDICATE EVERY COMPONENT THAT
MUST BE REMOVED.
C. DASHED LINES INDICATE ITEMS TO BE REMOVED UNLESS
NOTED OTHERWISE.
D. THE PLUMBING CONTRACTOR SHALL REMOVE ALL PLUMBING
FIXTURES, CARRIERS, TRIM, ACCESSORIES, EQUIPMENT,
FLOOR DRAINS, PIPING AND PIPING INSULATION AS SHOWN OR
INDICATED ON THE DRAWINGS.
E. REPLACE AND/OR PATCH TO MATCH EXISTING; ANY EXISTING
PIPE AND/OR DUCT INSULATION THAT IS TO REMAIN EXISTING
AND IS DAMAGED OR REMOVED DURING CONSTRUCTION.
F. CONTRACTOR IS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .