Oakridge Phase III Plans.pdf
PDF 14 MB Posted
- Solicitation number
- PE-66098-NONST-2026-000000098
- Issued by
- Fulton County, Georgia
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26_004 Oakridge Forest SubDivision Stormwater.pdf | ||
| Vendor Responsibility Questionnaire.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OAKRIDGE FOREST SUBDIVISION
STORMWATER IMPROVEMENTS
PHASE 3
OAKRIDGE FOREST SUBDIVISION
SANDY SPRINGS, GA 30328
FOR
CITY OF SANDY SPRINGS
1 GALAMBOS WAY
SANDY SPRINGS, GA, 30328
PHONE: 770.730.5600
PREPARED BY:
C0.00
COVER SHEET
N/A
Planners & Engineers Collaborative+
LAND PLANNING + LANDSCAPE ARCHITECTURE + CIVIL ENGINEERING
ARBORISTS + SURVEYING & CONSTRUCTION + WATER RESOURCES
350 RESEARCH COURT STE 200 PEACHTREE CORNERS, GA 30092 P: (770) 451-2741
22205.00 03/26/2024
2 3 4 5 6 7 8 9 10 11 12 13 14 151
K
J
I
H
G
F
E
D
C
B
A
2 3 4 5 6 7 8 9 10 11 12 13 14 151
SCALE:
DATE:
PROJECT:
DESCRIPTIONNO. BYDATE
GEORGIA WEST ZONE
GRID NORTH
SHEET
REVISIONS
c Th is d ra w in g is th e pr op er ty o f P la nn er s an d En gi ne er s
C ol la bo ra tiv e an d is n ot to b e co pi ed in w ho le o r i n pa rt.
It is n ot to b e us ed o n an y ot he r p ro je ct a nd is to b e re tu rn ed u po n re qu es t.
P la nn er s an d En gi ne er s
C ol la bo ra tiv e.
FOR
PROJECT
AT
J:
\2
2\
0\
D e\
_P la ns he et s\
C 0.
C O
V E
R S
H E
E T
P H
0.
dw g
- C Te st a
- 4 /1
4/
0:
A M
P: (770) 451-2741
350 RESEARCH COURT STE 200
PEACHTREE CORNERS, GA 30092
F: (770) 451-3915
WWW.PEC.PLUS
Planners & Engineers Collaborative+
LAND PLANNING
SURVEYING & CONSTRUCTION
CIVIL ENGINEERING
ARBORISTS
LANDSCAPE ARCHITECTURE
WATER RESOURCES+ +
CITY OF SANDY SPRINGS
1 GALAMBOS WAY
SANDY SPRINGS, GA, 30328
P: 770-730-5600
OAKRIDGE FOREST
SUBDIVISION
STORMWATER
IMPROVEMENTS
PHASE 3
AN INFRASTRUCTURE IMPROVEMENT PROJECT
OAKRIDGE FOREST SUBDIVISION
SANDY SPRINGS, GA 30328
THIS SEAL IS ONLY VALID IF COUNTER SIGNED
AND DATED WITH AN ORIGINAL SIGNATURE.
GSWCC LEVEL II DESIGN PROFESSIONAL
CERTIFICATION # 0000067548 EXP. 12/21/2027
4/14/2025
SHEET INDEX
SHEET NO. SHEET NAME
C0.00 COVER SHEET
C0.01 STANDARD SPECIFICATIONS
SURV BOUNDARY AND TOPOGRAPHIC SURVEY
C2.00 PHASE III LINING PLAN LAYOUT
C2.10
C2.20
CONTACT INFORMATION:
ENGINEER: NEIL SCHAAP
PLANNERS AND ENGINEERS
COLLABORATIVE
ADDRESS: 350 RESEARCH COURT
PEACHTREE CORNERS,
GEORGIA 30092
PHONE: 770.451.2741
EMAIL: NSCHAAP@PEC.PLUS
OWNER: CITY OF SANDY SPRINGS
ADDRESS: 1 GALAMBOS WAY
SANDY SPRINGS, GA, 30328
PHONE: 770.730.5600
24 HOUR CONTACT:
CITY OF SANDY SPRINGS
770.730.5600
ADDRESS:
DISTRICT:
LAND LOT: SITE LOCATION MAP
NOT TO SCALE
FEMA FIRM MAP
FEMA FIRM PANEL NO.: 13121C0163 F
NOT TO SCALE
OAKRIDGE FOREST SUBDIVISION
SANDY SPRINGS, GA 30328
17TH
SITE DATA
N
SITE LOCATION
SITE LOCATION
THIS PROJECT INVOLVES CURED-IN-PLACE (CIPP) LINING OF EXISTING CMP PIPE, SPECIFICALLY, 860 (+/-) LF OF 18" DIAMETER CMP PIPE AND 139 (+/-) LF OF 30" CMP. ALL ASSOCIATED WORK WITH CIPP LINING, AS OUTLINED IN CIPP SPECIFICATIONS ON SHEET C0.01 IS INCLUDED IN THE SCOPE OF WORK. CONTRACTOR IS RESPONSIBLE FOR TRAFFIC LOCATION AND UTILITY LOCATE AS NECESSARY FOR PROJECT COMPLETION.
PROJECT SCOPE:
LINING PLAN LAYOUT (30-SCALE)
LINING PLAN LAYOUT (20-SCALE)
AutoCAD SHX Text No. 34209
AutoCAD SHX Text
PROFESSIONAL
CURED-IN-PLACE PIPE (CIPP) LINING SPECIFICATIONS
PART 1 - GENERAL
1.1 SUMMARY
A. It is the intent of this specification to provide for the reconstruction of pipelines by the installation of a resin-impregnated flexible tube that is inverted into the original pipeline and expanded to fit tightly against said pipeline. The finished cured-in-place pipe (CIPP) shall be such that when the thermosetting resin cures, the total wall thickness shall be a homogenous and monolithic felt and resin composite matrix, chemically resistant to withstand internal exposure to stormwater.
B. All products supplied and all work performed shall be in accordance with The Facility Owner's Standard Specifications, applicable standards from American Society for Testing and Material American Water Works Association (AWWA), American National Standards Institute GDOT Utility Accommodation Policy and Standards, and the Georgia Environmental Protection Division (EPD) Guidelines for Sewage Collection Systems. Latest revisions of all standards shall apply.
C. Related Requirements:
1. GDOT Specification 660 - Sanitary Sewers
a. Special Provision Section 660 (dated 11/13/14 or most recent version)
2. GDOT Specification 936 - CCTV
3. NASSCO Cured in Place Pipe (CIPP) Installation Performance Specification Guideline
1.2 UNIT PRICE - MEASUREMENT AND PAYMENT
A. CIPP Pipe Lining:
1. Basis of Measurement: By linear foot, measured from center of manhole to center of manhole.
Basis of Payment: Includes pipe cleaning and flushing, pre- and post- TV inspection and videography, liner installation, water for inversion, disposal of water, pipe gaskets (end seals), testing of liner, and cure tracking technology as specified below.
1.3 REFERENCE STANDARDS
A. ASTM International:
1. ASTM D5260 - Standard Classification for Chemical Resistance of Poly (Vinyl Chloride) (PVC) Homopolymer and
Copolymer Compounds and Chlorinated Poly (Vinyl Chloride) (CPVC) Compounds.
2. ASTM D638 - Standard Test Method for Tensile Properties of Plastics.
3. ASTM D790 - Standard Test Methods for Flexural Properties of Unreinforced and
Reinforced Plastics and Electrical Insulating Materials.
4. ASTM D1693 - Standard Test Method for Environmental Stress-Cracking of Ethylene
Plastics.
5. ASTM D2837 - Standard Test Method for Obtaining Hydrostatic Design Basis for Thermoplastic Pipe Materials or
Pressure Design Basis for Thermoplastic Pipe Products.
6. ASTM D5813 - Standard Specification for Cured-In-Place Thermosetting Resin Sewer Piping Systems.
7. ASTM F1216 - Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Inversion and Curing of a Resin-Impregnated Tube.
8. ASTM F1743 - Standard Practice for Rehabilitation of Existing Pipelines and Conduits by Pulled-in-Place Installation of Cured-in-Place Thermosetting Resin Pipe (CIPP).
9. ASTM F2019 - Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Pulled in Place
Installation of Glass Reinforced Plastic (GRP) Cured-in-Place Thermosetting Resin Pipe (CIPP).
10. ASTM F2599 Standard Practice for Sectional Repair of Damaged Pipe by Means of an Inverted Cured-In-Place Liner.
11. ASTM F3240 - Standard Practice for Installation of Seamless Molded Hydrophilic Gaskets for Long-Term
Watertightness of Cured-In-Place Rehabilitation of Main and Lateral Pipelines.
1.4 SUBMITTALS
A. Product Data:
1. Submit manufacturer information regarding liner material, curing chemicals, and lubricants.
Include fabric tube, flexible membrane coating, resins, and pre-liner.
2. Submit complete description of proposed wet-out procedures.
3. All MSDS sheets for materials to be furnished on the project.
4. Fabric tube shall be accompanied by minimal void volume in the felt that will be filled with resin.
5. Submit copy of wet out report and manufacturers recommended cure schedule for each liner.
6. Submit liner thickness basis of design including all calculations and selection criteria for the products being supplied.
B. Shop Drawings: Indicate liner dimensions for each pipe size to be relined.
C. Samples: Submit two samples of liner material in both uncured and cured state. For each inversion length, cured sample should be cut from termination point that has been inverted through a like diameter pipe held in place by a suitable heat sink. Sample shall be provided to third party testing agency by Contractor.
D. Pipe Inspection and Reporting:
1. Submit video recordings of piping sections as follows:
a. Pre CCTV inspection showing condition of existing pipe and pipe joints after cleaning and prior to relining.
b. Post CCTV inspection showing cured liner, if applicable, after relining Work has been completed.
c. Pre and post CCTV inspection shall be performed in current NASSCO PACP format.
d. Videos shall be provided in digital form or USB submission in MP4 format.
2. Reporting
a. Provide pre- and post- CCTV inspection reports in hard copy and electronic format
(.pdf).
E. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.
F. Delegated Design Submittals: Submit signed and sealed Shop Drawings with design calculations and assumptions for liner thickness.
G. Test and Evaluation Reports: Submit reports certifying that liner material meets ASTM testing standards as specified in this Section.
H. Manufacturer Instructions:
1. Submit detailed description of liner placement and curing procedures for piping.
2. Include description of procedures for sealing liner material at manholes and reestablishing service connections.
3. Submit manufacturer's requirements for receiving, handling, and storage of materials. I. Source Quality-Control
Submittals: Indicate results of factory tests and inspections.
J. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections. Contractor shall provide testing as indicated by the Engineer. Contractor shall be responsible for costs associated with testing. Contractor shall employ 3rd party testing agency qualified to perform said work. Tests shall be conducted on flexural modulus, flexural strength, and wall thickness with test method D790.
K. Qualifications Statements:
1. Submit qualifications for manufacturer, installer, licensed professional, pipeline assessor.
2. Submit manufacturer's approval of installer.
L. A detailed Notification Plan including staged notification to residents affected by the CIPP installation. The Installation Contractor shall notify all residents affected by this construction at least 24 hours prior to any service disruption affecting their service connection. The Installation Contractor shall make every effort to maintain service usage throughout the duration of the project.
M. Safety Plan, per NASSCO guidelines:
1. The Contractor shall conform to all work safety requirements of pertinent regulatory agencies, and shall secure the site for the working conditions in compliance with the same. The Contractor shall erect such signs and other devices as are necessary for the safety of the work site.
2. The Contractor shall perform all of the Work in accordance with applicable OSHA standards. Emphasis shall be placed upon the requirements for entering confined spaces and with the equipment being utilized for pipe renewal.
3. The Contractor shall submit a proposed Safety Plan to the Owner, prior to beginning any work, identifying all competent persons. The plan shall include a description of a daily safety program for the job site and all emergency procedures to be implemented in the event of a safety incident. All work shall be conducted in accordance with the Contractor's submitted Safety Plan.
4. Compensation for all work required for the submittal of the Safety Plan shall be included in the various pipelining items contained in the Proposal N. Quality Control Plan (QCP), per NASSCO guidelines:
1. A detailed quality control plan (QCP) shall be submitted to the Owner that fully represents and conforms to the requirements of these specifications. At a minimum the QCP shall include the following:
a. A detailed discussion of the proposed quality controls to be performed by the Contractor.
b. Defined responsibilities, of the Contractor's personnel, for assuring that all quality requirements for this contract are met. These shall be assigned, by the Contractor, to specific personnel.
c. Proposed procedures for quality control, product sampling and testing shall be defined and submitted as part of the plan.
d. Proposed methods for product performance controls, including method of and frequency of product sampling and testing both in raw material form and cured product form.
e. Scheduled performance and product test result reviews between the Contractor and the Owner at a regularly scheduled job meeting.
f. Inspection forms and guidelines for quality control inspections shall be prepared in accordance with the standards specified in this contract and submitted with the QCP.
O. Cure Tracking Technology
1. Submit reports for all sections of pipe which will be cured in place.
2. Reports shall include continuous data from the start of the curing process throughout the completion of the curing process.
1.5 QUALITY ASSURANCE
A. Perform Work according to manufacturer's standards and NASSCO CIPP Installation Guidelines (2017).
B. Maintain one copy of each standard affecting Work of this Section on Site.
1.6 QUALIFICATIONS
A. Manufacturer: Company specializing in manufacturing products specified in this Section with minimum five years' documented experience.
B. Installer: Company specializing in performing Work of this Section with minimum five years' documented experience in installation of liner materials and certified by manufacturer.
1. Minimum of 50,000 feet of similar pipe size and length installed in the U.S.
C. Licensed Professional: Professional engineer experienced in design of specified Work and licensed in State of Georgia.
D. Pipeline Assessor:
1. Person specializing in assessing condition of sewer pipelines prior to and following relining.
2. Currently certified in Pipeline Assessment and Certification Program (PACP) of the National Association of Sewer
Service Companies (NASSCO).
3. Provide certification status.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage.
B. Store materials according to manufacturer instructions. The CIPP shall be vacuum impregnated with resin not more than
120 hours before the time of installation and stored out of direct sunlight at a temperature of less than 70° F.
C. The Installation Contractor shall deliver the resin impregnated CIPP tube to the site and provide all equipment required to insert and cure the CIPP within the host pipe. The Installation Contractor shall designate a location where the CIPP tube will be vacuum impregnated with the resin prior to installation. If requested by the Owner, the Installation Contractor shall notify the Engineer at least 48 hours prior to wet out to allow the Engineer to observe the materials and wet out procedure. All procedures to prepare the CIPP for installation shall be in strict accordance with the Manufacturer's recommendations.
D. Protection:
1. Protect materials from moisture and dust by storing in clean, dry location remote from construction operations areas.
2. Provide additional protection according to manufacturer instructions.
1.8 EXISTING CONDITIONS
A. Field Measurements:
1. Contractor shall verify field measurements prior to fabrication such as diameter and length.
2. Indicate field measurements on Shop Drawings.
1.9 WARRANTY
A. Furnish one-year manufacturer's warranty for liner.
PART 2 - PRODUCTS
2.1 PERFORMANCE AND DESIGN CRITERIA
A. Design lining material to have sufficient structural strength to support dead loads, live loads, and groundwater load imposed, assuming existing pipe cannot share loading or contribute to structural integrity of liner.
B. Design liner to least-possible thickness to minimize decreasing interior pipe diameter.
C. Design liner material to provide jointless, continuous, and structurally sound construction able to withstand imposed static, dynamic, and hydrostatic loads on a long-term basis.
D. Identify design provisions for shrinkage control to prevent future misalignment of service reconnections.
2.2INVERTED, RESIN-IMPREGNATED TUBE PIPE LINER
A. Furnish materials according to Manufacturer's standards.
B. Description:
1. Fabric Tube:
a. One or more layers of absorbent, non-woven felt fabric, felt/fiberglass, or fiberglass.
b. Comply with ASTM D5813, F1216, F1743, and F2019.
c. Capable of absorbing and carrying resins.
d. Comply with NASSCO Guidelines.
2. Resin:
a. Corrosion-resistant polyester or vinyl ester resin and catalyst system.
b. Comply with ASTM F1216 and F1743.
c. The resin to tube ratio, by volume shall be furnished as recommended by the manufacturer.
3. Wet-Out Fabric Tube:
a. Furnish uniform thickness and excess resin distribution that, when compressed at installation pressure, will meet or exceed design thickness after cure.
4. Cure Tracking Technology
a. Continuous Temperature Monitoring and data collection shall be required during the CIPP process. To monitor the temperatures inside the tube wall and to verify proper curing, temperature sensors shall be placed between the host pipe and the liner in the bottom of the host pipe (invert) throughout the reach to record the heating and cooling that takes place on the outside of the liner during processing.
2.3 SECTIONAL INVERTED, RESIN IMPREGNATED TUBE PIPE LINER
A. Furnish materials according to Manufacturer's standards.
B. Description:
1. The tube will consist of one or more layers of flexible coated non-woven needled felt or a reinforced non-woven. The tube will be continuous in length exhibiting a uniform minimum wall thickness based upon design calculations found in ASTM F1216 appendix XI. No overlapping sections shall be allowed in the circumference or the length of the liner.
The tube shall include compressible material at each end forming a smooth transition to the host pipe. The liner will be capable of conforming to offset joints, bells, and disfigured pipe sections. The resin will be polyester, or vinyl-ester with proper catalysts as designed for the specific application. The cured-in-place pipe shall provide a smooth bore interior. Each installation shall have a design report documenting the design criteria for a fully deteriorated pipe section. The cured-in-place pipe shall meet or exceed the minimum test standards specified by the American Society for Testing Methods as described in the most current ASTM F1216 standard.
a. Flexural Strength ASTM D790 4,500 psi
b. Flexural Modulus ASTM D790 250,000 psi c.
2.4 SOURCE QUALITY CONTROL
A. Inspect material for defects. Verify liner material is homogeneous and free of defects, cracks, holes, blisters, protrusions, foreign materials, or other deleterious faults.
B. Marking:
1. For testing purposes, mark each production lot with identical marking number.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify location of piping to be relined.
3.2 PREPARATION
A. Cleaning: Clean existing pipes of debris, sedimentation, and mineral deposits with high-velocity cleaner, bucket and scraper, root saws, rolling or balling units, or other appropriate means.
B. Initial Video Inspection and Repair:
1. Conduct closed-circuit video inspection as specified in GDOT Specification 936 - CCTV.
2. Determine condition of existing piping, degree of offset of joints, and locations of crushed walls and obstructions.
3. Evaluation of pipe conditions, performed by pipeline assessor.
4. Clear obstructions, service piping protrusions, and other materials from bottom of existing pipe to ensure that inserted pipe liner directly contacts existing pipe wall.
5. It shall be the responsibility of the Installation Contractor to notify the Owner of line obstructions, offset joints or collapsed pipe that will prevent the insertion of the tube or significantly reduce the capacity of the sewer. The Owner, with input from the Installation Contractor, shall determine the method of pipe repair required and shall address these concerns on a case-by-case basis.
C. Bypass pumping:
1. Set up bypassing pump system to isolate each section of piping for relining, as deemed necessary.
2. Maintain bypass pumping until lining is totally formed and connections have been reestablished.
3.3 INSTALLATION
A. Excavate for point repairs only on emergency basis and as permitted by Engineer.
B. Inverted, Resin-Impregnated Tube Pipe Liner:
1. Coat layer of fabric tube (before inversion or pull-in, as applicable) with an impermeable, flexible membrane that will contain resin and facilitate, if applicable, vacuum impregnation and monitoring of resin saturation during resin impregnation (wet-out) procedure.
2. Prior to installation, and as recommended by manufacturer, place remote temperature gages or sensors inside host pipe at 6 o'clock position to monitor temperature during cure cycle.
3. Positioning:
a. Position wet-out tube in pipeline using method specified by manufacturer.
b. Do not damage tube during installation.
4. Cure installed liner by using appropriate medium according to manufacturer's recommended cure schedule.
5. Allow installed pipe liner to cool according to manufacturer instructions.
6. Annular Spaces:
a. Verify that no gap or annular space exists between finished liner and existing pipe.
b. Install watertight seals to host pipe at beginning and end of installed liner.
C. Sectional Inverted, Rein Impregnated Tube Pipe Liner:
1. Installation procedure shall conform to ASTM F2599 “Standard Practice for Sectional Repair of Damaged Pipe by
Means of an Inverted Cured-In-Place Liner.”
2. When required, the flow shall be by-passed. The pumping system will be sufficiently sized for normal to peak flow conditions.
3. Installer will clean and inspect the line using a pan/tilt camera capable of verifying active or inactive service connections and the overall structural condition of the pipeline. All roots, debris, and protruding service connections will be removed prior to reconstruction of the pipe segment.
4. The tube shall be inspected for tears or frayed sections.
5. The saturated tube along with the inversion bladder will be inserted into a flexible inversion launcher device. The inversion launching device is pulled into the pipe using a cable winch. The pull is complete when the end of the launching device is aligned with the beginning of the damaged pipe section. The resin and tube are completely protected during the pull. No resin shall be lost by contact with manhole walls or the pipe during the pull. The resin that provides a structural liner shall not contact the pipe until positioned at the point of repair. The resin should not be contaminated or diluted by exposure to dirt, debris, or water during the pull.
6. The installer shall be capable of viewing the beginning of the liner contacting the host pipe verifying the exact placement of the liner. Video documentation of the placement, prior to curing, shall be provided to the owner. No measuring from a CCTV counter or estimating will be allowed. The liner must be installed at low pressure to prevent damage or further damage to the host pipe.
7. The tube will be inverted out of the inversion launching device by controlled air pressure. The installer shall be capable of viewing the entire liner contacting the host pipe from the beginning to the end of the liner verifying the liner has covered the entire damaged section. Video documentation of the entire liner contacting the host pipe, prior to curing shall be provided to the owner. The tube is held tightly in place against the wall of the host pipe by the pressure until the cure is complete.
8. When the curing process is complete, the pressure will be released. The inflation bladder and launching device shall be removed from the host pipe with the winch. No barriers, coatings, or any material other than the cured tube/resin composite, specifically designed for desirable physical and chemical resistance properties, should ever be left in the host pipe. Any materials used in the installation other than the cured tube/resin composite must be removed from the pipe by installer.
9. A second CCTV inspection is performed to verify the proper cure of the material, the proper opening of service laterals, and the integrity of the seamless pipe. The owner will receive video recording documenting the inspection and a written report documenting the repair.
10. Testing and Acceptance:
a. Upon completion, the installer will deliver a digital video recording and report describing the repair to the owner.
3.4 FIELD QUALITY CONTROL
A. Liner Acceptance:
1. Adjust, repair, modify, or replace components failing to perform as specified and rerun tests.
2. If liner fails to form, remove failed liner and install new liner.
3. Conduct closed-circuit video inspection of completed relining Work, indicating no visual defects, including foreign inclusions, dry spots, pinholes, cracks, delamination, wrinkles/fins that interface with flow, or bulging.
4. Confirm that service connections are complete and unobstructed.
5. No infiltration of groundwater is permitted.
6. Make final adjustments to liner under direction of manufacturer's representative.
B. Testing:
1. Contractor shall prepare each pipe/sewer scheduled for cured-in-place lining for end sampling, or as directed by the
Engineer.
2. Selected samples shall be tested by a 3rd party testing agency qualified to perform said work.
3. Contractor shall be responsible for all costs associated with sampling and testing.
4. Tests shall be conducted on flexural modulus, flexural strength and wall thickness per ASTM D790.
C. Furnish installation certificate from manufacturer's representative attesting that liner has been properly installed and is ready for startup and testing.
END OF SECTION
PLANNERS AND ENGINEERS COLLABORATIVE
STANDARDS AND SPECIFICATIONS DRAWING LEGEND
FFE XX.XX FINISHED FLOOR ELEVATION
BFE XX.XX BASEMENT FLOOR ELEVATION
SPOT ELEVATION
EXISTING CONTOURS
PROPOSED CONTOURS
PROPOSED WATER LINE
PROPOSED WATER METER
PROPOSED VALVE & END CAP
PROPOSED FIRE HYDRANT & FDC
PROPOSED TEE, BEND & INTERSECTION
PROPOSED SANITARY SEWER LINE
PROPOSED SANITARY MANHOLE
PROPOSED SANITARY CLEANOUT
PROPOSED GREASE TRAP
PROPOSED STORM LINE
PROPOSED JUNCTION BOX
PROPOSED DROP INLET
PROPOSED YARD INLET
PROPOSED CURB INLET
PROPOSED WEIR INLET
PROPOSED CATCH BASIN
PROPOSED HEADWALL
PROPOSED OUTLET CONTROL STRUCTURE
TYPICAL WALL LABELS
TW = TOP OF WALL
TFG = TOP FINISHED GRADE
BFG = BOTTOM FINISHED GRADE
TF = TOP OF FOOTING
BF = BOTTOM OF FOOTING
W
10.72
TF
BF
BFG
TFG TW
SHEET NUMBERING STANDARDS
C0.00 COVER SHEET
C0.01 - C0.99 STANDARD SPECIFICATIONS & GENERAL NOTES
C1.00 - C1.49 ZONING CONDITIONS
C1.50 - C1.99 PRELIMINARY PLAT & ZONING SITE PLANS
C2.00 - C2.99 DEMOLITION PLAN
C3.00 - C3.09 SITE PLAN
C3.10 - C3.19 DIMENSION PLAN
C3.20 - C3.29 SIGNAGE & STRIPING PLAN
C3.30 - C3.39 LOT LAYOUT
C3.40 - C3.49 FIRE ACCESS
C3.50 - C3.59 ADA ACCESSIBILITY PLAN
C3.60 - C3.99 MISCELLANEOUS SITE PLANS
C4.00 - C4.19 GRADING PLAN
C4.20 - C4.39 DRAINAGE PLAN
C4.40 - C4.99 STORMWATER MANAGEMENT
C5.00 - C5.49 UTILITY PLAN
C5.50 - C5.69 WATER PLAN
C5.70 - C5.99 MISCELLANEOUS UTILITY PLANS
C6.00 - C6.09 EROSION CONTROL NOTES
C6.10 - C6.19 INITIAL EROSION CONTROL
C6.20 - C6.29 INTERMEDIATE EROSION CONTROL
C6.30 - C6.39 FINAL EROSION CONTROL
C6.40 - C6.99 EROSION CONTROL DETAILS
C7.00 - C7.49 SANITARY SEWER PROFILES
C7.50 - C7.99 STORM SEWER PROFILES
C8.00 - C8.49 SIGHT DISTANCE PROFILES
C8.50 - C8.99 ROAD PROFILES
C9.00 - C9.99 CONSTRUCTION DETAILS
NOTE: THE ABOVE TABLE SHOWS THE TYPICAL NUMBERING SCHEME FOR
CONSTRUCTION PLANS AND IS NOT REPRESENTATIVE OF THE
DRAWINGS INCLUDED IN THIS SET OF PLANS. REFER TO THE
SHEET INDEX SHOWN ON THE COVER SHEET (C0.00) FOR THE
SHEET INDEX REPRESENTATIVE OF THIS SET OF PLANS.
DETAIL
TYPICAL DRAWING SET
C0.01
C0.01 - STANDARD
SPECIFICATIONS
N/A
22205.00 03/26/2024
2 3 4 5 6 7 8 9 10 11 12 13 14 151
K
J
I
H
G
F
E
D
C
B
A
2 3 4 5 6 7 8 9 10 11 12 13 14 151
SCALE:
DATE:
PROJECT:
DESCRIPTIONNO. BYDATE
GEORGIA WEST ZONE
GRID NORTH
SHEET
REVISIONS
c Th is d ra w in g is th e pr op er ty o f P la nn er s an d En gi ne er s
C ol la bo ra tiv e an d is n ot to b e co pi ed in w ho le o r i n pa rt.
It is n ot to b e us ed o n an y ot he r p ro je ct a nd is to b e re tu rn ed u po n re qu nn er s an d En gi ne er s
C ol la bo ra tiv e.
FOR
PROJECT
AT
J:
\2
2\
0\
D e\
_P la ns he et s\
C 0.
C O
V E
R S
H E
E T
P H
0.
dw g
- C Te st a
- 4 /1
4/
0:
A M
P: (770) 451-2741
350 RESEARCH COURT STE 200
PEACHTREE CORNERS, GA 30092
F: (770) 451-3915
WWW.PEC.PLUS
Planners & Engineers Collaborative+
LAND PLANNING
SURVEYING & CONSTRUCTION
CIVIL ENGINEERING
ARBORISTS
LANDSCAPE ARCHITECTURE
WATER RESOURCES+ +
CITY OF SANDY SPRINGS
1 GALAMBOS WAY
SANDY SPRINGS, GA, 30328
P: 770-730-5600
OAKRIDGE FOREST
SUBDIVISION
STORMWATER
IMPROVEMENTS
PHASE 3
AN INFRASTRUCTURE IMPROVEMENT PROJECT
OAKRIDGE FOREST SUBDIVISION
SANDY SPRINGS, GA 30328
THIS SEAL IS ONLY VALID IF COUNTER SIGNED
AND DATED WITH AN ORIGINAL SIGNATURE.
GSWCC LEVEL II DESIGN PROFESSIONAL
CERTIFICATION # 0000067548 EXP. 12/21/2027
4/14/2025
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text No. 34209
VICTOR E. & SABA W. SILVERMAN
ORLOW M. & KNOX C. WALSTAD
JUDY L. & CHARLES L. NEWTON
FREDERICK T. & PAMELA K. ZENDT
MERRILEE AYNES GOBER
MEHRYAR YAZDANI & LICONG PEDRAM FAMILY
JOSEPH H. & IRENE GRUENHUT
ANDREW JO & ASHELY ROSE CONNOR
ILSA MENDOZA
MICHAEL A. & VIRGINIA W. STONER
STACIE M. ZWEBEN
BERNARD B. & LAURA L. WOLFBERG
SARA BENTON & MICHAEL BRENT WALKER
MIRIAM PARKERBROOKS & WHITNEY GREGORYBETH W. JENSON
THOMAS B. & PAMELA M. STOUGHTON JEFFREY R. HEINICKA HUSSEIN & NAZLY ESSAWY
MICHAEL J. & CYNTHIA H. HUBBARD
LUMINITA D. NEACSU
ALEANDRA R. LIND
GeoSurvey
Overton Drive & Balboa Court
GeoSurvey
GeoSurvey
Know what's below.
before you dig.Call Dial 811
Or Call 800-282-7411 http://www.geosurvey.com http://www.geosurvey.com http://www.geosurvey.com http://www.geosurvey.com http://www.geosurvey.com http://www.geosurvey.com http://www.geosurvey.com http://www.geosurvey.com http://www.geosurvey.com http://www.geosurvey.com http://www.geosurvey.com http://www.geosurvey.com http://www.geosurvey.com http://www.geosurvey.com http://www.geosurvey.com http://www.geosurvey.com http://www.geosurvey.com http://www.geosurvey.com
OVERTON DRIVE
(50' R/W)
OV
ER
TO
N
DR
IV
E (5
0' R
/W
BALBOA COURT
(44' R/W)
(5 0'
R/ W
BALBOA COURT
(44' R/W)
VICTOR E. & SABA W. SILVERMAN
ORLOW M. & KNOX C. WALSTAD
JUDY L. & CHARLES L. NEWTON
FREDERICK T. & PAMELA K. ZENDT
MERRILEE AYNES GOBER
MEHRYAR YAZDANI & LICONG PEDRAM FAMILY
JOSEPH H. & IRENE GRUENHUT
ANDREW JO & ASHELY ROSE CONNOR
ILSA MENDOZA
MICHAEL A. & VIRGINIA W. STONER
STACIE M. ZWEBEN
BERNARD B. & LAURA L. WOLFBERG
SARA BENTON & MICHAEL BRENT WALKER
MIRIAM PARKERBROOKS & WHITNEY GREGORYBETH W. JENSON
THOMAS B. & PAMELA M. STOUGHTONJEFFREY R. HEINICKA HUSSEIN & NAZLY ESSAWY
MICHAEL J. & CYNTHIA H. HUBBARD
LUMINITA D. NEACSU
ALEANDRA R. LIND
ZEBLIN ROAD
(60' R/W)
HI
GH
P
OI
NT
R
OA
D
(8 0'
R /W
W
YT
H W
AY
EXTENTS OF
PERMANENT
DRAINAGE
EASEMENT
IMS 980
IMS 982
AGM
02213
AGM 02211
IMS 985
IMS 984
AGM
02212
LINE 30" CMP (82')
LINE 30" CMP (57')
LINE 18" CMP (100')
LINE 18" CMP (204')
LINE 18" CMP (69')
LINE 18" CMP (79')
IMS 978
IMS
LINE 18" CMP (29')
LINE 18" CMP (31')
LINE 18" CMP (13')
LINE 18" CMP (26')
IMS 983
IMS 987
AGM 02203
AGM 02206
IMS 988
LINE 18" CMP (39')
IMS 986
IMS 989
LINE 18" CMP (270')
10'
20' TEMPORARY CONSTRUCTION EASEMENT
(TO BE OBTAINED)
AREA: 0.026 ACRES (1,146 SQ. FT.)
R
Knowwhat'sbelow.
Callbefore you dig.
www.Georgia811.com
1" = 40'
20 40 80 1200
22205.00 03/26/2024
2 3 4 5 6 7 8 9 10 11 12 13 14 151
K
J
I
H
G
F
E
D
C
B
A
2 3 4 5 6 7 8 9 10 11 12 13 14 151
SCALE:
DATE:
PROJECT:
DESCRIPTIONNO. BYDATE
GEORGIA WEST ZONE
GRID NORTH
SHEET
REVISIONS
c Th is d ra w in g is th e pr op er ty o f P la nn er s an d En gi ne er s
C ol la bo ra tiv e an d is n ot to b e co pi ed in w ho le o r i n pa rt.
It is n ot to b e us ed o n an y ot he r p ro je ct a nd is to b e re tu rn ed u po n re qu nn er s an d En gi ne er s
C ol la bo ra tiv e.
FOR
PROJECT
AT
J:
\2
2\
0\
D e\
_P la ns he et s\
C 2.
P H
A S
E
II
I -
.d w g
- C Te st a
- 4 /1
4/
0:
A M
P: (770) 451-2741
350 RESEARCH COURT STE 200
PEACHTREE CORNERS, GA 30092
F: (770) 451-3915
WWW.PEC.PLUS
Planners & Engineers Collaborative+
LAND PLANNING
SURVEYING & CONSTRUCTION
CIVIL ENGINEERING
ARBORISTS
LANDSCAPE ARCHITECTURE
WATER RESOURCES+ +
CITY OF SANDY SPRINGS
1 GALAMBOS WAY
SANDY SPRINGS, GA, 30328
P: 770-730-5600
OAKRIDGE FOREST
SUBDIVISION
STORMWATER
IMPROVEMENTS
PHASE 3
AN INFRASTRUCTURE IMPROVEMENT PROJECT
OAKRIDGE FOREST SUBDIVISION
SANDY SPRINGS, GA 30328
THIS SEAL IS ONLY VALID IF COUNTER SIGNED
AND DATED WITH AN ORIGINAL SIGNATURE.
GSWCC LEVEL II DESIGN PROFESSIONAL
CERTIFICATION # 0000067548 EXP. 12/21/2027
4/14/2025
UmC2 - URBAN LAND, 2 TO 15% SLOPES
UgE - URBAN LAND, 2 TO 15% SLOPES
NRCS SOIL SERIES INFORMATION
THERE ARE NO STATE WATERS IN THE PROJECT AREA
THERE ARE IMPAIRED STREAMS WITHIN 1 LINEAR MILE OF THE SITE (NANCY
CREEK)
THERE ARE NO WETLANDS IN THE PROJECT AREA
SITE AND EROSION CONTROL NOTES:
1. DISTURBED AREAS LEFT IDLE FOR FOURTEEN DAYS, AND NOT TO FINAL GRADE, SHALL BE ESTABLISHED TO TEMPORARY
VEGETATION (Ds2). DISTURBED AREAS LEFT IDLE FOUR WEEKS OR MORE WILL BE ESTABLISHED TO PERMANENT VEGETATION, SOD (Ds4). ALL AREAS TO FINAL GRADE SHALL BE ESTABLISHED TO PERMANENT VEGETATION WITHIN TWO
WEEKS.
2. NO TREES ARE TO BE REMOVED FOR THIS WORK WITHOUT DIRECTION FROM THE ENGINEER / CITY OF SANDY SPRINGS.
3. WHEN HAND PLANTING, MULCH (HAY OR STRAW) SHALL BE UNIFORMLY SPREAD OVER SEEDED AREA WITHIN 24 HOURS OF
SEEDING.
4. DURING UNSUITABLE GROWING SEASONS, MULCH SHALL BE USED AS A TEMPORARY COVER (Ds1). ON SLOPES THAT ARE 4:1
OR STEEPER, MULCH SHALL BE ANCHORED.
5. SEDIMENT/EROSION CONTROL DEVICES MUST BE CHECKED AFTER EACH STORM EVENT. EACH DEVICE SHALL BE MAINTAINED OR REPLACED IF SEDIMENT ACCUMULATION HAS REACHED ON HALF THE CAPACITY OF THE DEVICE.
6. ALL WORK AND MATERIALS SHALL COMPLY WITH THE CITY OF SANDY SPRINGS REGULATIONS AND CODES AND O.S.H.A.
STANDARDS.
7. OPEN BURNING OR BURY PITS ARE NOT ALLOWED.
8. CONTRACTOR TO CALL 811 TO VERIFY ALL UTILITIES.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL RELOCATION INCLUDING BUT NOT LIMITED TO, ALL UTILITIES, STORM DRAINAGE, SIGNS, TRAFFIC SIGNALS AND POLES, ETC., GOVERNING AUTHORITIES SPECIFICATIONS AND SHALL BE APPROVED
BY SUCH.
10. CONTRACTOR TO PROVIDE CIPP CALCULATIONS PRIOR TO LINING ACTIVITIES.
11. CONTRACTOR TO PREPARE AND CLEAN PIPE PRIOR TO LINING.
12. CCTV IS REQUIRED BEFORE AND FOLLOWING LINING (SEE SECTION 3.2 OF CIPP LINING SPECIFICATIONS).
NOTES:
1. ALL TRAFFIC CONTROL AND WARNING DEVICES MUST BE SHOWN AND PLACED PER THE MUTCD. THE TRAFFIC
CONTROL PLAN IS SUBJECT TO CHANGE BY THE SANDY SPRINGS TRAFFIC ENGINEER.
2. TEMPORARY TRAFFIC CONTROL AND WARNING DEVICES SHALL BE PLACED PRIOR TO THE COMMENCEMENT
OF ANY WORK AND SHALL REMAIN IN PLACE UNTIL THE CONCLUSION OF ALL SIGNING AND STRIPING WORK.
3. ALL SIGNS SHALL CONFORM TO THE MUTCD STANDARDS AND SANDY SPRINGS STANDARDS FOR COLOR, SIZE, REFLECTIVITY, HEIGHT, AND PLACEMENT.
4. A CITY OF SANDY SPRINGS UTILITY PERMIT IS REQUIRED FOR ANY CONSTRUCTION WITHIN THE RIGHT OF WAY.
REFER TO THE CITY'S UTILITY PERMIT POLICY FOR REQUIREMENTS.
5. NO CLOSURES OF OR ENCROACHMENTS INTO THE PEDESTRIAN, BICYCLE, OR VEHICULAR TRAVEL AREAS
SHALL BE DONE WITHOUT PRIOR APPROVAL FROM THE SANDY SPRINGS TRAFFIC ENGINEER. ALL PROPOSED PLANS FOR CLOSURES AND ENCROACHMENTS SHALL BE SUBMITTED AT LEAST TWO WEEKS PRIOR TO
INTENDED BEGINNING AND MUST BE APPROVED PRIOR TO COMMENCEMENT.
6. CONTRACTOR TO VERIFY ALL CONDITIONS, ELEVATIONS AND DIMENSIONS BEFORE BEGINNING CONSTRUCTION. ANY DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER FOR JUSTIFICATION AND/OR CORRECTION BEFORE PROCEEDING WITH THE WORK. CONTRACTOR TO ASSUME RESPONSIBILITY FOR DISCREPANCIES WHICH ARE NOT REPORTED. ALL DIMENSIONS SHOULD BE READ OR CALCULATED.
7. CONTRACTOR TO HAVE ALL UTILITIES FIELD LOCATED AND CLEARLY MARKED PRIOR TO THE START OF AN
CONSTRUCTION ACTIVITY.
TRAFFIC CONTROL NOTES:
1. CONTRACTOR SHALL PROVIDE TRAFFIC CONTROL IN
ACCORDANCE WITH MUTCD REQUIREMENTS.
2. DURING CONSTRUCTION, ONE LANE OF ROAD SHALL REMAIN
OPEN AT ALL TIMES UNLESS OTHERWISE APPROVED.
THIS PROJECT INVOLVES THE LINING OF TWELVE CORRUGATED METAL PIPE SEGMENTS. THE TOTAL LINING LENGTH BEING
PROPOSED IS APPROXIMATELY 999 LF.
THIS WORK IS INTENDED TO ENHANCE THE LIFE SPAN OF THE STORMWATER INFRASTRUCTURE IN THE OAKRIDGE FOREST
SUBDIVISION.
PROJECT SCOPE:
IMS 979 TO IMS 978 18" CMP 29 LF
IMS 978 TO IMS 980 18" CMP 204 LF
AGM 982 TO AGM 02212 30" CMP 57 LF
AGM 02212 TO AGM 02213 30" CMP 82 LF
IMS 989 TO IMS 984 18" CMP 69 LF
IMS 983 TO IMS 984 18" CMP 31 LF
IMS 984 TO IMS 985 18" CMP 270 LF
IMS 985 TO IMS 02212 18" CMP 13 LF
IMS 988 TO AGM 02206 18" CMP 100 LF
AGM 02206 TO AGM 02203 18" CMP 79 LF
AGM 02203 TO IMS 987 18" CMP 26 LF
IMS 986 TO AGM 02211 18" CMP 39 LF
PHASE III PIPES TO BE LINED:
24 HOUR CONTACT:
CITY OF SANDY SPRINGS @ 770.730.5600
C2.00
OAKRIDGE FOREST PIPE
LINING - PHASE III
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
CONC
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
TIMBER
AutoCAD SHX Text
WALL
AutoCAD SHX Text
STONE
AutoCAD SHX Text
WALL
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
MB
AutoCAD SHX Text
STONE WALL
AutoCAD SHX Text
GAS LINE
AutoCAD SHX Text
APPROXIMATE
AutoCAD SHX Text
(LINE MAY RUN IN SAME TRENCH
AutoCAD SHX Text
POWER FROM TRANSFORMER.
AutoCAD SHX Text
GAS LINE SIGNAL LOST HERE
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
CONC
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
STONE
AutoCAD SHX Text
STEPS
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
WALL
AutoCAD SHX Text
STONE
AutoCAD SHX Text
STONE
AutoCAD SHX Text
WALL
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC
AutoCAD SHX Text
GRAVEL
AutoCAD SHX Text
PER RECORDS
AutoCAD SHX Text
LOCATOR UNABLE TO TRACE
AutoCAD SHX Text
POWER TO/FROM TRANSFORMER.
AutoCAD SHX Text
AS NEARBY COMMUNICATION,
AutoCAD SHX Text
EXCAVATION NEEDED TO CONFIRM)
AutoCAD SHX Text
LOCATOR UNABLE TO TRACE
AutoCAD SHX Text
(LINE MAY RUN IN SAME TRENCH
AutoCAD SHX Text
AS NEARBY COMMUNICATION,
AutoCAD SHX Text
EXCAVATION NEEDED TO CONFIRM)
AutoCAD SHX Text ATT fiber/DSL main line - this line may split to houses and cross the street for service (services cannot be traced)
AutoCAD SHX Text
2"STEEL
AutoCAD SHX Text
2"STEEL
AutoCAD SHX Text
CONC
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
CPED
AutoCAD SHX Text
CPED
AutoCAD SHX Text
CPED
AutoCAD SHX Text
CPED
AutoCAD SHX Text
CPED
AutoCAD SHX Text
CPED
AutoCAD SHX Text
CPED
AutoCAD SHX Text
CPED
AutoCAD SHX Text
CPED
AutoCAD SHX Text
CPED
AutoCAD SHX Text
CPED
AutoCAD SHX Text
CPED
AutoCAD SHX Text
CPED
AutoCAD SHX Text
ICV
AutoCAD SHX Text
ICV
AutoCAD SHX Text ICV(3x)
AutoCAD SHX Text
ICV
AutoCAD SHX Text
ICV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
CM
AutoCAD SHX Text
CM
AutoCAD SHX Text
CM
AutoCAD SHX Text
CM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
CPED
AutoCAD SHX Text
ICV
AutoCAD SHX Text
ICV
AutoCAD SHX Text
6' WOOD FENCE
AutoCAD SHX Text N:1,418,938.78
AutoCAD SHX Text E:2,236,129.23
AutoCAD SHX Text
EL:1,020.45
AutoCAD SHX Text
NAIL IN ASPHALT
AutoCAD SHX Text
BENCHMARK
AutoCAD SHX Text N:1,418,655.48
AutoCAD SHX Text E:2,236,110.20
AutoCAD SHX Text
EL:995.65
AutoCAD SHX Text
NAIL IN ASPHALT
AutoCAD SHX Text
BENCHMARK
AutoCAD SHX Text
NAIL IN ASPHALT
AutoCAD SHX Text
BENCHMARK
AutoCAD SHX Text N:1,418,502.24
AutoCAD SHX Text E:2,236,309.75
AutoCAD SHX Text
EL:984.82
AutoCAD SHX Text
WM
AutoCAD SHX Text
CM
AutoCAD SHX Text
WM
AutoCAD SHX Text
CM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
CM
AutoCAD SHX Text
CONC. DRIVE
AutoCAD SHX Text
CONC. DRIVE
AutoCAD SHX Text
CONC. DRIVE
AutoCAD SHX Text
CONC. DRIVE
AutoCAD SHX Text
CONC. DRIVE
AutoCAD SHX Text
CONC. DRIVE
AutoCAD SHX Text
CONC DRIVE
AutoCAD SHX Text
CONC DRIVE
AutoCAD SHX Text
CM
AutoCAD SHX Text
CM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SWCB
AutoCAD SHX Text
TOP 993.84
AutoCAD SHX Text
IN 988.9
AutoCAD SHX Text
OUT 989.0
AutoCAD SHX Text
SWCB
AutoCAD SHX Text
TOP 1027.01
AutoCAD SHX Text
IN 1020.7
AutoCAD SHX Text
OUT 1020.5
AutoCAD SHX Text
SWCB
AutoCAD SHX Text
SWCB
AutoCAD SHX Text
TOP 1006.50
AutoCAD SHX Text
IN 1001.7
AutoCAD SHX Text
OUT 1001.6
AutoCAD SHX Text
SWCB
AutoCAD SHX Text
TOP 1027.42
AutoCAD SHX Text
IN 1010.2
AutoCAD SHX Text
OUT 1010.2
AutoCAD SHX Text
SWCB
AutoCAD SHX Text
TOP 986.11
AutoCAD SHX Text
IN 979.9
AutoCAD SHX Text
OUT 979.8
AutoCAD SHX Text
SWCB
AutoCAD SHX Text
TOP 1017.49
AutoCAD SHX Text
OUT 1012.2
AutoCAD SHX Text C.O.
AutoCAD SHX Text
DWCB
AutoCAD SHX Text
TOP 1022.14
AutoCAD SHX Text
OUT 1017.6
AutoCAD SHX Text
DWCB
AutoCAD SHX Text
TOP 994.11
AutoCAD SHX Text
IN 982.0
AutoCAD SHX Text
OUT 981.8
AutoCAD SHX Text
DWCB
AutoCAD SHX Text
DWCB
AutoCAD SHX Text
TOP 1030.20
AutoCAD SHX Text
IN 1026.8
AutoCAD SHX Text
OUT 1026.5
AutoCAD SHX Text
DWCB
AutoCAD SHX Text
TOP 968.66
AutoCAD SHX Text
OUT 960.8
AutoCAD SHX Text
JB
AutoCAD SHX Text
JB
AutoCAD SHX Text
JB
AutoCAD SHX Text
TOP 1028.71
AutoCAD SHX Text
IN 1022.8
AutoCAD SHX Text
OUT 1022.8
AutoCAD SHX Text
JB
AutoCAD SHX Text
TOP 983.48
AutoCAD SHX Text
JB
AutoCAD SHX Text
JB
AutoCAD SHX Text
TOP 990.87
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
OUT 1012.0
AutoCAD SHX Text
SSMH
AutoCAD SHX Text
TOP 1021.68
AutoCAD SHX Text
IN(A) 1012.6
AutoCAD SHX Text S
AutoCAD SHX Text
OUT 1000.2
AutoCAD SHX Text
SSMH
AutoCAD SHX Text
TOP 1006.52
AutoCAD SHX Text
IN 1000.2
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
OUT 993.1
AutoCAD SHX Text
SSMH
AutoCAD SHX Text
TOP 1002.63
AutoCAD SHX Text
IN 994.4
AutoCAD SHX Text S
AutoCAD SHX Text
OUT 1020.3
AutoCAD SHX Text
SSMH
AutoCAD SHX Text
TOP 1028.94
AutoCAD SHX Text
IN 1021.9
AutoCAD SHX Text S
AutoCAD SHX Text
OUT 966.7
AutoCAD SHX Text
SSMH
AutoCAD SHX Text
TOP 976.36
AutoCAD SHX Text
IN(A) 966.8
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
OUT 988.2
AutoCAD SHX Text
SSMH
AutoCAD SHX Text
TOP 994.96
AutoCAD SHX Text
IN 988.6
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
OUT 955.8
AutoCAD SHX Text
SSMH
AutoCAD SHX Text
TOP 968.24
AutoCAD SHX Text
IN 956.1
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
YI
AutoCAD SHX Text
TOP 991.22
AutoCAD SHX Text
IN 988.9
AutoCAD SHX Text
OUT 981.1
AutoCAD SHX Text
AREA DRAIN
AutoCAD SHX Text
TOP 987.05
AutoCAD SHX Text (A)
AutoCAD SHX Text (B)
AutoCAD SHX Text
IN(B) 1012.0
AutoCAD SHX Text
OUT 988.4
AutoCAD SHX Text
SSMH
AutoCAD SHX Text
TOP 995.17
AutoCAD SHX Text
IN(A) 988.7
AutoCAD SHX Text
IN(B) 988.6
AutoCAD SHX Text
OUT 977.5
AutoCAD SHX Text
IN(A) 977.6
AutoCAD SHX Text
IN(B) 978.4
AutoCAD SHX Text (A)
AutoCAD SHX Text (B)
AutoCAD SHX Text (A)
AutoCAD SHX Text (B)
AutoCAD SHX Text
OUT 1000.3
AutoCAD SHX Text
SSMH
AutoCAD SHX Text
TOP 1007.22
AutoCAD SHX Text
IN(A) 1000.8
AutoCAD SHX Text
IN(B) 1000.4
AutoCAD SHX Text (A)
AutoCAD SHX Text (B)
AutoCAD SHX Text (A)
AutoCAD SHX Text (B)
AutoCAD SHX Text
IN(B) 969.2
AutoCAD SHX Text
OUT 944.4
AutoCAD SHX Text
SSMH
AutoCAD SHX Text
TOP 957.35
AutoCAD SHX Text
IN(A) 946.4
AutoCAD SHX Text (A)
AutoCAD SHX Text (B)
AutoCAD SHX Text
IN(B) 947.1
AutoCAD SHX Text
8"PVC
AutoCAD SHX Text
8"PVC
AutoCAD SHX Text
8"PVC
AutoCAD SHX Text
8"PVC
AutoCAD SHX Text
6"VCP
AutoCAD SHX Text
8"PVC
AutoCAD SHX Text
8"PVC
AutoCAD SHX Text
8"PVC
AutoCAD SHX Text
8"VCP
AutoCAD SHX Text
8"VCP
AutoCAD SHX Text
8"PVC
AutoCAD SHX Text
8"PVC
AutoCAD SHX Text
8"PVC
AutoCAD SHX Text
8"PVC
AutoCAD SHX Text
8"PVC
AutoCAD SHX Text
8"PVC
AutoCAD SHX Text
8"PVC
AutoCAD SHX Text
8"PVC
AutoCAD SHX Text (B)
AutoCAD SHX Text (A)
AutoCAD SHX Text (B)
AutoCAD SHX Text (A)
AutoCAD SHX Text
TOP 993.91
AutoCAD SHX Text
IN(A) 981.4
AutoCAD SHX Text
OUT 980.2
AutoCAD SHX Text
IN(B) 980.5
AutoCAD SHX Text (B)
AutoCAD SHX Text (A)
AutoCAD SHX Text
TOP 1008.12
AutoCAD SHX Text
IN(A) 993.6
AutoCAD SHX Text
OUT 993.4
AutoCAD SHX Text
IN(B) %%P1001.6
AutoCAD SHX Text
IN(A) 978.1
AutoCAD SHX Text
IN(B) 979.3
AutoCAD SHX Text (B)
AutoCAD SHX Text (A)
AutoCAD SHX Text (C)
AutoCAD SHX Text
OUT 978.8
AutoCAD SHX Text
IN(C) 978.1 (6"CPP)
AutoCAD SHX Text
IN(A) 975.1
AutoCAD SHX Text
IN(B) 976.7
AutoCAD SHX Text (B)
AutoCAD SHX Text (A)
AutoCAD SHX Text
OUT 974.7
AutoCAD SHX Text
36"CMP
AutoCAD SHX Text
INV 951.2
AutoCAD SHX Text
36"CMP
AutoCAD SHX Text
30"CMP
AutoCAD SHX Text
18"CMP
AutoCAD SHX Text
30"CMP
AutoCAD SHX Text
30"CMP
AutoCAD SHX Text
18"CMP
AutoCAD SHX Text
18"CMP
AutoCAD SHX Text
15"CMP
AutoCAD SHX Text
18"CMP
AutoCAD SHX Text
18"CMP
AutoCAD SHX Text
18"CMP
AutoCAD SHX Text
18"CMP
AutoCAD SHX Text
30"CMP
AutoCAD SHX Text
18"CMP
AutoCAD SHX Text
18"CMP
AutoCAD SHX Text
18"CMP
AutoCAD SHX Text
18"CMP
AutoCAD SHX Text
18"CMP
AutoCAD SHX Text
18"CMP
AutoCAD SHX Text
18"CMP
AutoCAD SHX Text
18"CMP
AutoCAD SHX Text
24"CMP
AutoCAD SHX Text
18"CMP
AutoCAD SHX Text
TIMBER
AutoCAD SHX Text
WALL
AutoCAD SHX Text
STONE
AutoCAD SHX Text
WALL
AutoCAD SHX Text
STONE
AutoCAD SHX Text
WALL
AutoCAD SHX Text
STONE
AutoCAD SHX Text
WALL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
OAKRIDGE FOREST
AutoCAD SHX Text
BLOCK "C"
AutoCAD SHX Text
PB 113, PG 29
AutoCAD SHX Text
OAKRIDGE FOREST
AutoCAD SHX Text
BLOCK "D"
AutoCAD SHX Text
PB 113, PG 29
AutoCAD SHX Text
OAKRIDGE FOREST
AutoCAD SHX Text
BLOCK "5"
AutoCAD SHX Text
PB 113, PG 29
AutoCAD SHX Text
OAKRIDGE FOREST
AutoCAD SHX Text
BLOCK "B"
AutoCAD SHX Text
PB 113, PG 29
AutoCAD SHX Text
OAKRIDGE FOREST
AutoCAD SHX Text
BLOCK "C"
AutoCAD SHX Text
PB 113, PG 29
AutoCAD SHX Text
OAKRIDGE FOREST
AutoCAD SHX Text
BLOCK "B"
AutoCAD SHX Text
PB 113, PG 29
AutoCAD SHX Text
OAKRIDGE FOREST
AutoCAD SHX Text
BLOCK "B"
AutoCAD SHX Text
PB 113, PG 29
AutoCAD SHX Text
N/F PROPERTY OF
AutoCAD SHX Text
DEED BOOK 57084 / PAGE 363
AutoCAD SHX Text
185 ZEBLIN DR
AutoCAD SHX Text
PID: 17 003900020221
AutoCAD SHX Text
PB 113 / PG 29
AutoCAD SHX Text
N/F PROPERTY OF
AutoCAD SHX Text
DEED BOOK 7664 / PAGE 325
AutoCAD SHX Text
195 OVERTON DR
AutoCAD SHX Text
PID: 17 003900020239
AutoCAD SHX Text
PB 113 / PG 29
AutoCAD SHX Text
N/F PROPERTY OF
AutoCAD SHX Text
DEED BOOK 54721 / PAGE 657
AutoCAD SHX Text
365 BALBOA CT
AutoCAD SHX Text
PID: 17 003900020247
AutoCAD SHX Text
N/F PROPERTY OF
AutoCAD SHX Text
DEED BOOK 7357 / PAGE 437
AutoCAD SHX Text
355 BALBOA CT
AutoCAD SHX Text
PID: 17 003900020254
AutoCAD SHX Text
N/F PROPERTY OF
AutoCAD SHX Text
DEED BOOK 45845 / PAGE 224
AutoCAD SHX Text
345 BALBOA CT
AutoCAD SHX Text
PID: 17 003900020262
AutoCAD SHX Text
N/F PROPERTY OF
AutoCAD SHX Text
DEED BOOK 62702 / PAGE 465
AutoCAD SHX Text
335 BALBOA CT
AutoCAD SHX Text
PID: 17 003900020270
AutoCAD SHX Text
N/F PROPERTY OF
AutoCAD SHX Text
DEED BOOK 64085 / PAGE 274
AutoCAD SHX Text
352 BALBOA CT
AutoCAD SHX Text
PID: 17 003900020288
AutoCAD SHX Text
N/F PROPERTY OF
AutoCAD SHX Text
DEED BOOK 65616 / PAGE 405
AutoCAD SHX Text
330 BALBOA CT
AutoCAD SHX Text
PID: 17 003900020296
AutoCAD SHX Text
N/F PROPERTY OF
AutoCAD SHX Text
DEED BOOK 9936 / PAGE 116
AutoCAD SHX Text
340 BALBOA CT
AutoCAD SHX Text
PID: 17 003900020304
AutoCAD SHX Text
N/F PROPERTY OF
AutoCAD SHX Text
DEED BOOK 7410 / PAGE 392
AutoCAD SHX Text
375 WYTH WAY
AutoCAD SHX Text
PID: 17 003900020312
AutoCAD SHX Text
N/F PROPERTY OF
AutoCAD SHX Text
DEED BOOK 43262 / PAGE 599
AutoCAD SHX Text
370 WYTH WAY
AutoCAD SHX Text
PID: 17 003900020320
AutoCAD SHX Text
N/F PROPERTY OF
AutoCAD SHX Text
DEED BOOK 14294 / PAGE 162
AutoCAD SHX Text
360 BALBOA CT
AutoCAD SHX Text
PID: 17 003900020338
AutoCAD SHX Text
PB 113 / PG 29
AutoCAD SHX Text
N/F PROPERTY OF
AutoCAD SHX Text
DEED BOOK 53200 / PAGE 576
AutoCAD SHX Text
185 OVERTON DR
AutoCAD SHX Text
PID: 17 0003900020346
AutoCAD SHX Text
PB 113 / PG 29
AutoCAD SHX Text
N/F PROPERTY OF
AutoCAD SHX Text
DEED BOOK 529430641 / PAGE 641
AutoCAD SHX Text
175 OVERTON DR
AutoCAD SHX Text
PID: 17 003900020353
AutoCAD SHX Text
PB 113 / PG 29
AutoCAD SHX Text
N/F PROPERTY OF
AutoCAD SHX Text
DEED BOOK 62367 / PAGE 537
AutoCAD SHX Text
165 OVERTON DR
AutoCAD SHX Text
PID: 17 003900020361
AutoCAD SHX Text
N/F PROPERTY OF
AutoCAD SHX Text
DEED BOOK 19515 / PAGE 179
AutoCAD SHX Text
155 OVERTON DR
AutoCAD SHX Text
PID: 17 003900020379
AutoCAD SHX Text
PB 113 / PG 29
AutoCAD SHX Text
N/F PROPERTY OF
AutoCAD SHX Text
DEED BOOK 6358 / PAGE 697
AutoCAD SHX Text
150 OVERTON DR
AutoCAD SHX Text
PID: 17 003900020387
AutoCAD SHX Text
PB 113 / PG 29
AutoCAD SHX Text
N/F PROPERTY OF
AutoCAD SHX Text
DEED BOOK 6310 / PAGE 182
AutoCAD SHX Text
160 OVERTON DR
AutoCAD SHX Text
PID: 17 003900020395
AutoCAD SHX Text
PB 113 / PG 29
AutoCAD SHX Text
N/F PROPERTY OF
AutoCAD SHX Text
DEED BOOK 5614 / PAGE 667
AutoCAD SHX Text
170 OVERTON DR
AutoCAD SHX Text
PID: 17 003900020403
AutoCAD SHX Text
PB 113 / PG 29
AutoCAD SHX Text
N/F PROPERTY OF
AutoCAD SHX Text
DEED BOOK 2258 / PAGE 315
AutoCAD SHX Text
180 OVERTON DR
AutoCAD SHX Text
PID: 17 003900020411
AutoCAD SHX Text
PB 113 / PG 29
AutoCAD SHX Text
N/F PROPERTY OF
AutoCAD SHX Text
DEED BOOK 47597 / PAGE 0381
AutoCAD SHX Text
190 OVERTON DR
AutoCAD SHX Text
PID: 17 003900020429
AutoCAD SHX Text
PB 113 / PG 29
AutoCAD SHX Text
PB 113 / PG 29
AutoCAD SHX Text
PB 113 / PG 29
AutoCAD SHX Text
PB 113 / PG 29
AutoCAD SHX Text
PB 113 / PG 29
AutoCAD SHX Text
PB 113 / PG 29
AutoCAD SHX Text
PB 113 / PG 29
AutoCAD SHX Text
PB 113 / PG 29
AutoCAD SHX Text
PB 113 / PG 29
AutoCAD SHX Text
PB 113 / PG 29
AutoCAD SHX Text
PB 113 / PG 29
AutoCAD SHX Text
SSMH
AutoCAD SHX Text
TOP 984.23
AutoCAD SHX Text
MB
AutoCAD SHX Text
STONE WALL
AutoCAD SHX Text
WEIR STRUCTURE
AutoCAD SHX Text
INV IN 1003.9 (V-NOTCH)
AutoCAD SHX Text
INV OUT 1003.6
AutoCAD SHX Text
SWCB
AutoCAD SHX Text
TOP 1016.57
AutoCAD SHX Text
IN(A) 1011.8
AutoCAD SHX Text
IN(B) 1011.8
AutoCAD SHX Text
OUT 1011.5
AutoCAD SHX Text (A)
AutoCAD SHX Text (B)
AutoCAD SHX Text
GRAVEL
AutoCAD SHX Text
JB
AutoCAD SHX Text
TOP 993.56
AutoCAD SHX Text
IN(B) 988.2
AutoCAD SHX Text
IN(A) 979.7
AutoCAD SHX Text
OUT 979.6
AutoCAD SHX Text
LOCATOR UNABLE TO TRACE
AutoCAD SHX Text
POWER TO/FROM TRANSFORMER.
AutoCAD SHX Text
(LINE MAY RUN IN SAME TRENCH
AutoCAD SHX Text
AS NEARBY COMMUNICATION,
AutoCAD SHX Text
EXCAVATION NEEDED TO CONFIRM)
AutoCAD SHX Text
LOCATOR UNABLE TO TRACE
AutoCAD SHX Text
POWER FROM TRANSFORMER.
AutoCAD SHX Text
(LINE MAY RUN IN SAME TRENCH
AutoCAD SHX Text
AS NEARBY COMMUNICATION,
AutoCAD SHX Text
EXCAVATION NEEDED TO CONFIRM)
AutoCAD SHX Text
EXISTING R/W
AutoCAD SHX Text
EXISTING R/W
AutoCAD SHX Text
APPROXIMATE R/W
A…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .