About this file

This document is a Roof Diagnostic Survey prepared by Tremco Construction Products Group for Oakland University's Recreation & Athletics Center, located at 569 Pioneer Drive in Rochester, Michigan. The survey involves a comprehensive infrared and moisture assessment of the facility's roofing system, utilizing advanced technologies like mid-wave IR cameras and Roof Moisture Meters to detect and verify areas of wet insulation. The survey was conducted on 10/14/2025, covering multiple roof sections with a total wet size of 60 sq. ft. and a wet percentage of 0.20%. Core cuts were performed on certain roof sections (4-A and 4-B) to establish moisture levels, with specific markings and measurements recorded.

The survey details the technical process of infrared scanning, which involves detecting temperature differences between wet and dry roof insulation during day and night conditions. Wet insulation areas absorb and retain more solar energy, which is then identified using specialized equipment. The document includes thermogram images, core cut photographs, and a detailed roof plan with moisture grid indicators. No core cuts were performed on roof section 4A per sales instructions. The survey provides a comprehensive assessment of the roof's moisture condition, which can be crucial for maintenance planning, potential repairs, and understanding the overall structural integrity of the building's roofing system.

View the file

Other files

File Type Posted
OU-RAC-Roof-Roof-Restoration-Technical Spec Oct 22 2025.docx DOCX document
prevailing wages.pdf PDF
Front End RAC Roofing 2026.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROOF DIAGNOSTIC SURVEY FOR OAKLAND UNIVERSITY

569 PIONEER DRIVE, ROCHESTER, MICHIGAN 48309

RECREATION & ATHLETICS CENTER

DRAWINGS

TITLE PAGE

SHEET A MOISTURE SURVEY

© 2025 BY TREMCO CONSTRUCTION PRODUCTS GROUP, ALL RIGHTS RESERVED. NO PART OF THIS DOCUMENT MAY BE REPRODUCED OR TRANSMITTED IN ANY FORM OR BY ANY MEANS, ELECTRONIC, MECHANICAL, PHOTOCOPYING, RECORDING OR OTHERWISE WITHOUT THE EXPRESS PRIOR WRITTEN

CONSENT OF TREMCO CONSTRUCTION PRODUCTS GROUP. THE INFORMATION PROVIDED IN THIS

DRAWING IS CURRENT AS OF THE DATE OF INSPECTION BY TREMCO CONSTRUCTION PRODUCTS GROUP, WEATHERPROOFING TECHNOLOGIES, INC. OR THEIR DESIGNATED CONTRACTOR. ROOFING SYSTEM AND/OR BUILDING CONDITIONS CAN CHANGE AT ANY TIME, INCLUDING BUT NOT LIMITED TO THE AMOUNT OF WET INSULATION IN THE ROOFING SYSTEM, AND CAUSE THE INFORMATION PROVIDED IN

THIS DRAWING TO CHANGE OR BECOME OUT OF DATE.

TREMCO CONSTRUCTION PRODUCTS GROUP INFRARED INSPECTIONS ARE PERFORMED BY CERTIFIED (EXPERIENCED) INFRARED THERMOGRAPHERS UTILIZING STATE-OF-THE-ART EQUIPMENT. ALL WORK CONFORMS WITH CURRENT INDUSTRY BEST PRACTICES, AND IS PERFORMED IN ACCORDANCE WITH STANDARDS PUBLISHED BY

ASTM INTERNATIONAL AND INFRASPECTION INSTITUTE.

How An Infrared Survey Works:

Wet roof insulation absorbs more solar energy from the sun during the day than dry insulation. As the sun sets, the nighttime cools the roof surface. Wet insulation retains more solar energy than dry insulation. These temperature differences are detected by the infrared camera. All full service scans are performed using a mid-wave IR camera with a 2.5 - 5.6 spectral range. Suspected wet insulation is verified through core cuts and/or a Roof Moisture Meter.

Core cuts are taken to establish acceptable levels of moisture. Confirmed wet areas are marked out on the roof surface with paint.

How A Moisture Meter Works:

During the daytime, readings are taken and recorded in random locations and at wet areas found by the infrared camera.

Fast neutrons are emitted from the source in the Roof Moisture Meter into the roof system. The presence of hydrogen in the roof system slows the neutrons. These slowed neutrons as well as the fast neutrons are detected by the Roof Moisture Meter. A reading is displayed in the digital readout and gets recorded.

Core cuts are taken to determine a baseline for dry roof materials. Wet areas of insulation are marked on the roof surface with paint.

THIS IS A WTI BRANDED REPORT. THE TEMPLATE AND OR

REPORT CAN NOT BE REPRODUCED IN ANY MANNER.

N ROOF PLAN

SCALE: NO SCALE

60 SQ. FT.

A10/14/2025

OAKLAND UNIVERSITY

RECREATION & ATHLETICS CENTER

569 PIONEER DRIVE

ROCHESTER, MICHIGAN 48309

SR

9895703

STANDARD KEY OF SYMBOLS

ROOF SECTION

DRY CORE THERMOGRAM

R.I.M. (RANDOM

INTERMITTENT MOISTURE) MOISTURE READING

WET CORE

PHOTO

MOISTURE GRID

N.A.F. (NO ANOMALIES

WET INSULATION

# P-#

T-#

© 2025 BY TREMCO CONSTRUCTION PRODUCTS GROUP, ALL RIGHTS RESERVED. NO PART OF THIS DOCUMENT MAY BE REPRODUCED OR TRANSMITTED IN ANY FORM OR BY ANY MEANS, ELECTRONIC, MECHANICAL, PHOTOCOPYING, RECORDING OR OTHERWISE WITHOUT THE EXPRESS PRIOR WRITTEN CONSENT OF TREMCO CONSTRUCTION PRODUCTS GROUP. THE INFORMATION PROVIDED IN THIS DRAWING IS CURRENT AS OF THE DATE OF INSPECTION BY TREMCO CONSTRUCTION PRODUCTS GROUP, WEATHERPROOFING TECHNOLOGIES, INC. OR THEIR DESIGNATED CONTRACTOR. ROOFING SYSTEM AND/OR BUILDING CONDITIONS CAN CHANGE AT ANY TIME, INCLUDING BUT NOT LIMITED TO THE AMOUNT OF WET INSULATION IN THE ROOFING SYSTEM, AND CAUSE THE INFORMATION PROVIDED IN THIS DRAWING TO CHANGE OR BECOME OUT OF DATE.

N.I.C.

PROJECT NO.:

DATE:

DRAWN BY: SHEET NO.:

DIAGNOSTIC TECHNICIAN:

TRACE CORE

FOUND)

N ROOF PLAN

SCALE: NO SCALE

M. SPORCIC

Thermogram T-01

N KEY PLAN

SCALE: NO SCALE

AREA OF SURVEY

44A

184-A

54-B

T-01

NOTE:

NO CORE CUTS ON ROOF 4A PER SALES.

4 4

Core Cut 4-A

Core Cut 4-B

5'