This document is a detailed drydock repair specification for the USCGC OAK (WLB-225B), a 225' Coast Guard vessel, planned for availability between 31 March 2026 and 20 June 2026. The comprehensive specification covers 62 distinct work items encompassing extensive hull, mechanical, electrical, and preservation requirements, including ultrasonic side scan hull testing, underwater hull inspections, full underwater body preservation, propulsion system overhauls, equipment renewals, and coating/preservation processes.
Key technical requirements include comprehensive ultrasonic scanning of underwater hull plating at 0.5" resolution, full removal and replacement of existing underwater coating systems, inspections of critical components like propeller shafts, rudders, sea chests, and zinc anodes, and preservation of various vessel systems. The specification provides extensive technical references, government-furnished property lists, and detailed inspection protocols. The work will be performed by a contractor certified in underwater hull preservation and non-destructive testing, with strict quality assurance requirements and mandatory critical inspection reports for multiple work items.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT 0002 - OAK.docx | DOCX document | |
| AMENDMENT 0002 QUESTIONS AND ANSWERS.docx | DOCX document | |
| OAK (WLB 225B) DD FQ3 BGW R2.pdf | ||
| OAK SOLICITATION.docx | DOCX document | |
| AMENDMENT 0001 OAK.pdf | ||
| AMEND 001 - OAK.docx | DOCX document | |
| OAK SOLICITATION.docx | DOCX document | |
| AMENDMENT 0001 OAK PRICING SHEET.xlsx | XLSX spreadsheet | |
| OAK (WLB 225B) DD PRICING SHEET.xlsx | XLSX spreadsheet | |
| OAK SOLICITATION 23DEC25.docx | DOCX document | |
| OAK._JTFOC_DMS_WI-12.docx | DOCX document | |
| OAK Thordon WIs11-22-23-24.docx | DOCX document | |
| OAK JTFOC_RollRoyce_WIs11-19-26.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC OAK (WLB 211)
SPECIFICATION FOR DRYDOCK REPAIRS
FY2025
Developed By: Bryan Wright
(Rev-0, 30 SEP 2025)
USCGC OAK (WLB-225B) DRYDOCK AVAILABILITY FY2025
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record .......................................................................................................................................... iv Consolidated List of References .................................................................................................................... v Consolidated List of Government-furnished Property ............................................................................... xii Consolidated List of Critical Inspection Items ........................................................................................... xiv Principal Characteristics .............................................................................................................................. xv General Requirements WORK ITEM 1: Fire Prevention Requirements Drydock WORK ITEM 2: Hull Plating, Side Scan, Ultrasonic Testing WORK ITEM 3: Hull Plating, U/W Body, Inspect WORK ITEM 4: U/W Body, Preserve, 100 percent WORK ITEM 5: Hull Plating Freeboard, Preserve, 100 Percent WORK ITEM 6: Hull Plating Freeboard (Buoy Port Areas), Preserve WORK ITEM 7: Propulsion Shaft Fairwaters and Rope Guards, Inspect WORK ITEM 8: Appendages, U/W, Leak Test WORK ITEM 9: Appendages, U/W, Internal, Preserve WORK ITEM 10: Hydraulically Operated Cargo Hatch, Inspect and Service WORK ITEM 11: Propulsion Shafting; Remove, Inspect, and Reinstall WORK ITEM 12: Propulsion Shaft Seals, Mechanical Overhaul And Inflatable Renewal WORK ITEM 13: Propulsion Shaft Bearings, External, Check Clearances WORK ITEM 14: Stern Tube Interior Surfaces, Preserve, 100 Percent WORK ITEM 15: Controllable Pitch Propellers, Clean and Inspect WORK ITEM 16: Controllable Pitch Propeller (CPP), Fluid Change to EAL - TCTO WORK ITEM 17: Controllable Pitch Propeller Hub, Remove and Reinstall WORK ITEM 18: Fathometer Transducer, Renew WORK ITEM 19: Sea Valves and Waster Pieces, Overhaul Or Renew WORK ITEM 20: Sea Strainers, All Sizes, Renew WORK ITEM 21: Sea Bay, Preserve 100% WORK ITEM 22: Rudder and Rudder Stock, Remove and Inspect WORK ITEM 23: Rudder Stock Bearings, Check Clearances WORK ITEM 24: Rudder Bearings, Renewal WORK ITEM 25: Thruster Motor, Replace - TCTO WORK ITEM 26: Thruster Units, Overhaul Fluid Change to EAL WORK ITEM 27: Thruster Unit Bearings, Renew WORK ITEM 28: Anchor Windlass, Inspect and Service WORK ITEM 29: Anchor Chains and Ground Tackle, Inspect and Repair WORK ITEM 30: Hull Fittings (Mooring and Towing), Inspect and Test WORK ITEM 31: Sewage Holding Tanks, Clean and Inspect WORK ITEM 32: Sewage Piping, Clean and Flush WORK ITEM 33: Voids, Non-Accessible, Leak Test WORK ITEM 34: Voids, Non-Accessible, Internal Surfaces, Preserve WORK ITEM 35: Tanks, Ballast, Clean and Inspect WORK ITEM 36: Tanks, Ballast, Preserve, 100 Percent WORK ITEM 37: Chain Locker, Preserve, 100 Percent WORK ITEM 38: Tanks, Potable Water Preserve, 100 Percent WORK ITEM 39: Decks – Exterior (Buoy or Construction Deck), Preserve 100% WORK ITEM 40: Impressed Current Cathodic Protection System, Inspect and Maintain WORK ITEM 41: Cathodic Protection, Zinc Anodes, Renew, WORK ITEM 42: Impressed Current, Cathodic Protection System, Reference Cells, Renew iii (Rev-0)
WORK ITEM 43: Drydock WORK ITEM 44: Temporary Services, Provide - Cutter WORK ITEM 45: Sea Trial Performance, Support, Provide WORK ITEM 46: SORS Cargo Rail Remove WORK ITEM 47: MMR, AMR Deck Renew WORK ITEM 48: Gooseneck Ventilation, Renew WORK ITEM 49: Cargo Hold Padeyes Renew WORK ITEM 50: Deck Plating 01 Level, Repair WORK ITEM 51: Handrails and Stanchions, Renew WORK ITEM 52: Reduction Gear Piping, Renew WORK ITEM 53: Reduction Gears Flexible Hoses, Renew WORK ITEM 54: CPP Piping, Renewal WORK ITEM 55: Controllable Pitch Propeller (CPP) System Flexible Hoses, Renew WORK ITEM 56: Cutter Boat, Large (CB-L) Cradle, Repair WORK ITEM 57: Kickpipe, Renew WORK ITEM 58: Anchor Pocket Modify WORK ITEM 59: Hull Fittings (Weight Handling Rigging Hardware), Inspect and Test WORK ITEM 60: ASW CLA-VAL PRV, Install WORK ITEM 61: Firemain CLA-VAL PRV, Install WORK ITEM 62: Steering Gear Heat Exchanger, iv (Rev-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
v (Rev-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 225 WLB 184-001, Rev B, CRP-V850 Transducer Adapter Ring Coast Guard Drawing 225 WLB 256-001, Rev P, Seawater Cooling System Diagram Coast Guard Drawing 225 WLB 424-001, Rev G, Acoustic Navigation System Block & Isometric Coast Guard Drawing 225 WLB 581-001, Rev E, Anchor Handling System Arrangement Coast Guard Drawing 225 WLB 601-001, Rev M; General Arrangement Inboard & Outboard Profiles Coast Guard Drawing 225B WLB 114-001, Rev C, Shell Appendages Coast Guard Drawing 225B WLB 114-002, Rev -, Flow Accelerating Fin Coast Guard Drawing 225B WLB 801-006, Rev G, Docking Drawing Coast Guard Drawing 225B WLB 111-001, Rev A, Shell Expansion Coast Guard Drawing 225B WLB 114-001, Rev C; Shell Appendages Coast Guard Drawing 225B WLB 243-001, Rev J, Propulsion Shafting Arrangement Coast Guard Drawing 225B WLB 243-002, Rev G, Stern Tube and Bearings A&D Coast Guard Drawing 225B WLB 256-001, Rev P, Seawater Cooling System Diagram Coast Guard Drawing 225B WLB 528-001, Rev G, Plumbing and Interior Deck Drains Coast Guard Drawing 225B WLB 528-002, Rev D, Weather Deck Drains Diagram Coast Guard Drawing 225B WLB 532-002, Rev D, Potable Water Sys Dia Coast Guard Drawing 225B WLB 549-001, Rev F, Onboard Lubrication Requirements Coast Guard Drawing 225B WLB 555-005, Rev D, CO2 System A/D, Fr 48 Aft, Block 930, 940, 950, 960A Coast Guard Drawing 225B WLB 555-006, Rev A, CO2 System, A/D, Flammable Liquid Storeroom, Blk 901, 910 Coast Guard Drawing 225B WLB 555-007, Rev B, CO2 System, A/D, Emergency Generator Rm, Block 970 Coast Guard Drawing 225B WLB 556-001, Rev F, Hydraulic System Diagram Coast Guard Drawing 225B WLB 562-002, Rev D, Rudder Structural A&D Coast Guard Drawing 225B WLB 581-001 Rev E, Anchor Handling System Arrangement Coast Guard Drawing 225B WLB 582-002, Rev -, Mooring and Towing A & D Coast Guard Drawing 225B WLB 593-001, Rev D, Sewage and Waste Water System Coast Guard Drawing 225B WLB 593-009, Rev B, Sewage Holding Tank Coast Guard Drawing 225B WLB 601-001, Rev P; General Arrangement Inboard & Outboard Profiles Coast Guard Drawing 225B WLB 601-002, Rev Y, Booklet of General Drawings vi (Rev-0)
Coast Guard Drawing 225B WLB 633-001, Rev B, Cathodic Protection System Arrangement, Block Diagram, Wiring Deck Plan, and Elementary Diagrams
Coast Guard Drawing 225B WLB 633-002, Rev A; Cathodic protection passive Coast Guard Drawing 225B WLB 801-001, Rev A, Lines and Offsets Coast Guard Drawing 225B WLB 801-003, Rev -, Curves of Forms and Cross Curves of Stability Coast Guard Drawing 225B WLB 801-006, Rev G, Docking Drawing Coast Guard Drawing 225B WLB 901-003, Rev A, Hull Block 901 Block Assembly Coast Guard Drawing 225B-WLB 243-1, Rev J, Propulsion Shafting Arrangement Coast Guard Drawing 225B-WLB 243-2, Rev G, Stern Tube and Bearing A & D Coast Guard Drawing 225B-WLB 556-008, Rev D, CPP Hydraulic System Diagram Coast Guard Drawing 225B-WLB 562-003, Rev -; Thordon Lower Rudder Stock Bearing Coast Guard Drawing 225B-WLB 562-004, Rev -; Pintle Bearing Coast Guard Drawing 225B-WLB 562-002, Rev D, Rudder Structural A & D Coast Guard Drawing 225B-WLB 568-001, Rev B, Bow Thruster A & D Coast Guard Drawing 225B-WLB 568-002, Rev B, Stern Thruster Arrangement and Detail Coast Guard Drawing 225B-WLB 611-001, Rev D, Lifting Pads - Main and Aux Machinery Room Coast Guard Drawing 225B-WLB 111-001, Rev A, Shell Expansion Coast Guard Drawing 225B-WLB 243-001, Rev J, Propulsion Shafting Arrangement Coast Guard Drawing 225B-WLB 243-002, Rev G; Stern Tube and Bearing A & D Coast Guard Drawing 225B WLB 256-001, Rev T; Seawater Cooling Sys Diagram Coast Guard Drawing 225B WLB 505-001, Rev D; General Requirements for Piping Systems Coast Guard Drawing 225B WLB 561-001, Rev D, Steering Gear Hydraulic Diagram Coast Guard Drawing 225B WLB 561-005, Rev E; Steering Gear Heat Exchanger Replacement Coast Guard Drawing 225B-WLB 561-003, Rev B; Steering Gear Arrangement Coast Guard Drawing 225B-WLB 562-001, Rev J; Steering Components A/D Coast Guard Drawing 225B-WLB 633-002, Rev A, Cathodic Protection Passive Coast Guard Drawing 225B-WLB 801-013, Rev B, Midship Section & Typical Sections Coast Guard Drawing 225B-WLB 801-015, Rev B, Scantling, Decks, & Platforms Coast Guard Drawing 225B-WLB 801-016, Rev -, Scantlings, Watertight Bulkheads Coast Guard Drawing 225B-WLB 801-006, Rev G; Docking Drawing Coast Guard Drawing 225B-WLB 940-002, Rev E, Hull Block 940 – Modules Coast Guard Drawing 225B-WLB 970-1, Rev H, Hull Block 970 - Panels Coast Guard Drawing 225B-WLB-597-051, Rev A, SORS Hold Stowage and Handling Fittings Coast Guard Drawing 225-WLB 568-202, Rev N, Bow & Stern Thruster Coast Guard Drawing 225-WLB 243-001, Rev B; PROPULSION SHAFTING ARRANGEMENT Coast Guard Drawing 225-WLB-597-020, Rev B, SORS Hold Stowage and Rail System Coast Guard Drawing FL 1204-3. Rev A, Welded Padeyes and Links Coast Guard Drawing FL 533-001, Rev B, Placard Potable Water Flush Coast Guard Fleet Drawing FL 2804-12, Rev -, U.S.C.G. Emblem Coast Guard Fleet Drawing FL 2804-22, Rev-, Consolidated Visual ID for Cutters vii (Rev-0)
NAVSEA Drawing 803-5001104, Rev -; Rudder Stock Bearings and Seals NAVSEA Dwg 803-2145807, Propulsion Shafting & Components Coast Guard Drawing (DWG) 225B-WLB-180-011, Rev B, Bow & Stern Thruster
Coast Guard Drawing (DWG) 225B-WLB-201-2, Rev D, Access Removal Routes
Coast Guard Drawing (DWG) 225B-WLB-320-1, Rev AK, Electrical One Line Diagram
Coast Guard Drawing 225B-WLB-320-015, Rev H, MMA Electrical One-Line Diagram
Coast Guard Drawing 225B-WLB-321-001, Rev B, Standard Electrical Methods
Coast Guard Drawing 225B-WLB-321-002, Rev A, Cableways Master Plans
Coast Guard Drawing 225B-WLB-405-001, Rev V, Antenna Arrangements
Coast Guard Drawing 225B-WLB-441-001, Rev C, 00069-SCC(V)4 Small Cutter Connectivity
(SCC)
Coast Guard Drawing 225B-WLB-445-001, Rev AA, Radio Comm & Crypto Sys Block Diag & Isometric
Coast Guard Drawing 225B WLB 521-001, Rev F, Firemain System Diagram
Coast Guard Drawing 225B WLB 521-003, Rev -, Firemain CLA-VAL PRV Installation
Coast Guard Drawing 225B WLB 551-001, Rev G, Compressed Air System Diagram Coast Guard Drawing (DWG) 225B-WLB-437-3, Rev D, Thruster Control System Block & Elem Wrg Diag Modifications Coast Guard Drawing 225B WLB 256-002, Rev -, ASW CLA-VAL PRV Installation Coast Guard Drawing 225B WLB 551-001, Rev G, Compressed Air System Diagram Coast Guard Drawing (DWG) 225B-WLB-74-5, Rev A, Guideline for Field Cut Penetrations NAVSEA Drawing 803-1385866, Rev E, Penetration, Bulkhead and Deck viii (Rev-0)
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual Coast Guard Drawing 225B WLB 633-001, Rev B, Cathodic Protection System Arrangement, Block
Diagram, Wiring Deck Plan, and Elementary Diagrams Coast Guard Technical Publication (TP) 3498, Section A, Jul 2015, Buoy Chain Winch Coast Guard Technical Publication (TP) 3523, Apr 2002, SWBS 241-A, Reduction Gear - Model
96DHCMG-Cp Coast Guard Technical Publication (TP) 3523-241-A&B, 225 WLB MIB, VOL 5, SWBS 241, GEAR, REDUCTION, MMC PN 241-01-01
Coast Guard Technical Publication (TP) 3524, 2013, Manufacturer's Instruction Book-SWBS Group(s)
243-262 Coast Guard Technical Publication (TP) 3524, 07-JAN-97, Manufacturer's Instruction Book-SWBS
Group(s) 243-262 Coast Guard Technical Publication (TP) 3524, SWBS 245-B, Aug 2005, Instruction Manual for the
Model 102 B Class Controllable Pitch Propeller and Shafting System Coast Guard Technical Publication (TP) 3556, Manufacturer’s Instruction Book-SWBS Group(s) 568, Bow and Stern Thruster – Model 125/3 STAY/FP Coast Guard Technical Publication (TP) 3559, SWBS 581B, Anchor Windlass, P/S - Model BMD-478 Coast Guard Technical Publication (TP) 3574, Mar 2009, SWBS Group 633-638 Coast Guard Technical Publication (TP) 3574, May 1996, Manufacturer's Instruction Book-SWBS
Group(s) 633-638 Coast Guard Technical Publication (TP) 3717, Jun 2003, Hydraulic Cargo Hatch Coast Guard Technical Publication (TP) E-424-006, Version WLB97-1, Wesmar 3060-08/M-8/AC
Forward Scan Sonar Coast Guard Technical Publication (TP) 3524, Jan 1997, Manufacturer's Instruction Book-SWBS
Group(s) 243-262 Fire Prevention and Response Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General
Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and
Allied Processes Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), 2022, Overhaul AC
Electrical Motors Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2022, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair, and Installation Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary
Machine Systems Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022 Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2022, Drydocking Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2022, Temporary
Services ix (Rev-0)
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2022, Temporary Hull Accesses
Coast Guard Technical Publication (TP) 3556, SWBS 568, Section A, Feb 2021, Bow and Stern Thrusters Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General
Requirements Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 2351, 2022, Overhaul DC
Generators & Motors
OTHER REFERENCES
The Society for Protective Coatings SSPC-SP 10/NACE No.2, Rev 7; Near-White Blast Cleaning A-A-59323, Rev -; CLOTHS, CLEANING, LOW-LINT , 6/30/99 American Bureau of Shipping (ABS) Approved Chain, Accessory and Bar Manufacturing Facilities List, Oct 2016 American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2011, Disinfection of Water-Storage Facilities American National Standards Institute/NSF International (ANSI/NSF) 61, 2008, Drinking Water System
Components - Health Effects American Society for Nondestructive Testing (ASNT) SNT-TC-1A, 2020, Recommended Practice for
Personal Qualification and Certification in Nondestructive Testing American Society of Mechanical Engineers (ASME) B16.34, 2017, Valves-Flanged, Threaded, and
Welding End APM: If work is being done in DD, no cofferdam is needed; delete cofferdam protective measures paragraph 3.1.3 and above NAVSEA ref. Above NAVSEA ref is accessible on-line ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets ASTM International (ASTM) D3359, 2009, Standard Test Methods for Measuring Adhesion by Tape
Test ASTM International (ASTM) D4138, 2013, Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means ASTM International (ASTM) D5363, 2016, Standard Specification for Anaerobic Single-Component
Adhesives (AN) ASTM International (ASTM) F992, 2017, Standard Specification for Valve Label Plates Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for
Shipyard Employment Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Anti-seize, Zinc Dust-
Petrolatum Commercial Item Descriptions (CID) A-A-59323, Rev A; Cloths, Cleaning, Low-Lint Federal Specification (Fed Spec) HH-P-151, Mar 1991, Packing; Rubber-Sheet, Cloth-Insert Federal Specification (Fed Spec) RR-C-271, Rev E, Mar 2016, Chains and Attachments, Carbon and
Alloy Steel Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2013 Edition, Pressure Testing Of Steel Valves Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2017 Edition, Butterfly Valves x (Rev-0)
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 2018 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2013 Edition, Bronze Gate, Globe, Angle and Check Valves
MIL PRF-16173, Sep 2006, Corrosion Preventive Compound, Solvent Cutback, Cold-Application MIL-A-18001, May 2005, Anodes, Sacrificial Zinc Alloy (Commercially Accepted - ASTM B418) MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning MIL-C-24633, Oct 2014, Chain, Stud Link, Anchor, Low Alloy Steel, Flash Butt Welded MIL-DTL-23549, Sep 2016, Grease, General Purpose MIL-PRF-16173, Sep 2006, Corrosion Preventive Compound, Solvent Cutback, Cold-Application MIL-PRF-24176, 2004, Cement, Epoxy, Metal Repair and Hull Smoothing (Metric) MIL-PRF-24647, Jan 2018, Paint System, Anticorrosive and Antifouling, Ship Hull MIL-PRF-9000, Rev H; Lubricating Oil, Shipboard Internal Combustion Engine, High Output Diesel, 9/16/87 MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant Naval Sea Systems Command (NAVSEA) S9243-AW-TRS-011, Surface Ships Main Propulsion Shafting
Refurbishment Procedures, Volume I, Part 1 Naval Sea Systems Command (NAVSEA) S9243-AW-TRS-012, Surface Ships Main Propulsion Shafting
Examination, Test and Repair Action Record, Volume 1, Part 2 Naval Sea Systems Command (NAVSEA) Underwater Ship Husbandry Manuals (UWSH) S0600-AA-
PRO-160, Nov 2011, Chapter 16, Cofferdams Naval Ships' Technical Manual, Chapter 241, Propulsion Reduction Gears, Couplings, Clutches, and
Associated Components NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for
Fabrication, Welding, and Inspection of Submarine Structure ODOM Echotrac DF3200 MKII, Rev 2, Technical Manual Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 2020 Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric Society of Automotive Engineers (SAE) AMS-G-6032, August 2012, Grease, Plug Valve, Gasoline and
Oil Resistant, NATO Code Number G-363, Metric The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2016, Solvent Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power-Tool Cleaning to Bare Metal The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2004, Power Tool Cleaning The Society for Protective Coatings (SSPC), January 2015, Paint Application Specification No. 2 (PA-2), Procedure for Determining Conformance to Dry Coating Thickness Requirements The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 12/NACE No.5, 2002, Surface Preparation and Cleaning of Metals by Waterjetting Prior to Recoating
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 6/NACE No. 3, 2007, Commercial Blast Cleaning xi (Rev-0)
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 7/NACE No.4, 2007, Brush-Off Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP WJ-4/NACE WJ-4, 2012, Waterjet Cleaning of Metals – Light Cleaning
The Society for Protective Coatings (SSPC)/NACE Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2004, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, 2007, Near-White Metal Blast Cleaning
The Society for Protective Coatings (SSPC)-SP 3, Power Tool Cleaning, 11-1-2004 xii (Rev-0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
11 Y **Propeller shaft NSN: 2010-01-399-5912 1ea. 165,000.00 11 N **Grounding Silver
Strip NSN: 5340-01-126-4569 1ea. 1,889.00
11 N **SST Straps NSN: 5340-01-126-4570 4ea. 28.00 11 N **SST Bailing Seals NSN: 5330-01-284-3686 4ea. 6.00 12 N 225' WLB Major
Overhaul Kit NSN: 5330-01-520-5284 1 ea. 35,249.00
12 N **225' WLB Seat (Split)
NSN: 5330-01-645-3665 1 ea. 12,500.00
12 Y *Seal Compression Tool
Onboard Tool 1 ea. 200.00
16 N Filter Cart NSN: 4330-01-F21-6414 2 ea. 53,222.00 16 N Analyzer, Oil Handheld NSN: 6635-01-F21-6415 1 ea. 35,685.17 17 Y Shaft Assembly, Oil
Distribution Box NSN: 3040-01-453-6473 1 ea. 35,249.00
17 Y Hub Assembly, Propeller, Ship
NSN: 2010-01-421-3952 1 ea. 150,063.93
17 Y Blade, Propeller, Ship NSN: 2010-01-421-8904 4 ea. 135,707.00 18 Y *** Fathometer
Transducer, shallow water
NSN: 5845-01-668-2181 1 ea. 1,884.26
22 N **Upper bearing NSN: 3110-01-466-9924 1 ea. 10,525.45 22 N Rudder Seal Kit NSN: 5330-01-565-8083 1 ea. 2,433.76 24 N Lower bearing NSN: 3120-21-912-7635 1 ea. 6,661.26 24 N Pintle bearing NSN: 3120-21-912-7634 1 ea. 3,380.38 25 Y Thruster Motor, DC NSN: 6105-01-687-0855 2 ea. 97,200.00 25 Y Thruster Motor, Blower NSN: 6105-01-461-8718 2 ea. 623.29 25 Y Coupling, Shaft, Assembly NSN: 3040-01-F23-6730 2 ea. 25,900.00
26 N Seal Kit, Thruster NSN: 2010-01-555-9048 2 ea. $4,280.00 26 N Seal Spacer NSN: 2010-01-495-6823 2 ea. $700.00 26 N Shaft Sleeve NSN: 2010-01-495-2638 2 ea. $5702.40 26 N Filter Element, Fluid NSN: 4330-01-504-9506 2 ea. 300.00 26 N Filter Element, Fluid NSN:4330-01-645-8621 2 ea. 300.00 26 N Filter Element, Fluid NSN: 2940-01-478-3309 2 ea. 300.00 27 Y Seal, Plain NSN: 5330-01-495-3435 10 ea. 277.80 27 N Bearing, Roller, Tapered NSN: 3110-01-495-3354 2 ea. 2,816.52
27 N Bearing, Roller, Tapered
NSN: 3110-01-495-3344 2 ea. 500.44
27 N Bearing, Roller, NSN: 3110-01-495-3334 2 ea. 1,323.83 xiii (Rev-0)
Tapered 27 N Bearing, Roller, Tapered NSN: 3110-01-495-3465 2 ea. 1064.42
42 N Reference electrode, silver & silver chloride
Siemens Water Technologies W3T105012
(Electrocatalytic 32622)
NSN: 5977-01-346-0750 2 ea. 1,300.02
43 Y *Transducer Cover Plate
N/A 4 ea. 50.00
60 N 4” Cla-Val Model 50- 20 Pressure Relief
Valve, Globe Pattern, CL150 NAB Bodied / Monel Internal Trim /
316 SST Pilot Equipped with
Standard Internal Trim, CK2 Isolation Valves
NSN: 4820-01-722-8451 1 ea. $15,568.00
61 N- 4” Cla-Val Model 50- 20 Pressure Relief
Valve, Globe Pattern, CL150 NAB Bodied / Monel Internal Trim /
316 SST Pilot Equipped with KO-1 Anti-Cavitation Trim, CK2 Isolation Valves
NSN: 4820-01-722-8444 2 ea. $19,360.00
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT Service Center xiv (Rev-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):
Work Item Title
2 Hull Plating, Side Scan, Ultrasonic Testing
4 U/W Body, Preserve, 100 percent
8 Appendages, U/W, Leak Test
11 Propulsion Shafting; Remove, Inspect, and Reinstall
12 Propulsion Shaft Seals, Mechanical Overhaul And Inflatable Renewal
13 Propulsion Shaft Bearings, External, Check Clearances
15 Controllable Pitch Propellers, Clean and Inspect
22 Rudder and Rudder Stock, Remove and Inspect
23 Rudder Stock Bearings, Check Clearances
28 Anchor Windlass, Inspect and Service
29 Anchor Chains and Ground Tackle, Inspect and Repair xv (Rev-0)
PRINCIPAL CHARACTERISTICS
225' WLB (B-CLASS)
PHYSICAL
Length overall 225' 0" Length between perpendiculars 206' 0" Maximum beam 46' Designed draft 13' 0" Full load displacement 1905.6 Long Tons SW Light ship displacement 1500.7 Long Tons SW Minimum operating displacement 1869.2 Long Tons SW Mast height (above 12' waterline) 67' 5" Anchor Two 4000 lb standard Navy stockless anchors, 8 shots each, port and starboard, 1-3/8 die lock chain
HULL
Bilge keels (port & starboard) Frames 42-79 Frame spacing FR 0 to 12 21" FR 12 to 30 22" FR 30 to 102 24"
MACHINERY
Main propulsion Diesel Reduction Diesel engines Two Caterpillar 3608, TA, 3100 BHP each @ 900 RPM Number of propellers 1 Number of blades 4 Diameter 10' Pitch Controllable
RPM 254
Ship's service diesel generators Two Caterpillar 3508 TA, 450 KW Emergency diesel generator One Caterpillar 3406 DITA, 280 KW Shore tie Two 450 VAC, 400 Amp, 3-wire Shaft bearing, forward Cooper Bearing 01-BCP-1400-EX-TL Shaft bearing, aft Water Lubricated Cutless Bearing
TANK CAPACITIES
Diesel oil 76,498 gal.
Fresh water capacity 8056 gal.
Hydraulic oil capacity 2785 gal.
Lube oil storage 764 gal.
Grey water tank 2700 gal.
Sewage holding tank 1700 gal.
1 (Rev-0)
00000_0824_FLT
REC_00000_FLT_CG Yard Project (0121)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by and at CG the Yard for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor' and 'CG Yard' are used interchangeably in this specification.
Where the primary service provider is Coast Guard personnel, references to contractors and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General
Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and
Allied Processes Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire Prevention and Response Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for
Shipyard Employment NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for
Fabrication, Welding, and Inspection of Submarine Structure
3. REQUIREMENTS
3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements in this WI apply to all work under the
2 (Rev-0) scope of this contract, whether explicitly stated in all the following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.1.1 The Contractor must conform to all requirements specified in SFLC Std Spec 5550 and in the Fire Protection and Response work item, as applicable, during the performance of this availability.
3.1.1.1 Fire Safety Plan submission. The Contractor must submit a copy of the CFR 1915, Subpart P, Fire Safety Plan with the Contractor’s bid when work will be conducted in a Contractor–owned facility. Include any MOA(s) with local firefighting facilities.
3.1.1.2 Fire Plan submission. The Contractor must submit a copy of the developed availability specific fire plan as requested in the Fire Protection and Response work item, with the Contractor’s bid.
NOTE
NAVSEA drawings listed will be available FOR INSPECTION ONLY from the Coast Guard Port Engineer post-award. SFLC will not redistribute NAVSEA documents.
Contractors can apply to NAVSEA headquarters directly for copies.
3.2 Fire watch requirements. The Contractor must refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:
• Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.
• Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.
3.3 Preservation requirements. The Contractor must accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. The Contractor must obtain a written KO authorization to deviate from any coatings required in SFLC Std Spec 6310 Appendix C before work.
3.3.3 In-process quality control measures. The Contractor must abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).
3.3.3.1 Quality control requirements. The Contractor must abide by the following when performing preservation related inspections. The following measurements must be randomly spaced throughout for the purposes of providing a representation of the entire prepared or coated surface.
3.3.3.1.1 Surface profile measurements. One surface profile measurement must be taken for every 200 square feet for the first 1000 square feet; for each additional 500 square feet or less, one profile measurement must be taken.
Profile measurements must be taken in accordance with SFLC Std Spec 6310, paragraph 3.1.8.3 (Surface profile measurements). A “measurement” for surface profile is defined as follows:
• ASTM D4417, Method B: One profile measurement is the average (mean) of 10 individual readings.
• ASTM D4417, Method C: One profile measurement is the average (mean) of 2 individual readings.
3 (Rev-0)
3.3.3.1.2 Soluble salt conductivity measurements. 5 conductivity measurements must be taken every 1000 square feet. For submerged (immersed) applications conductivity measurements must not exceed 30 microsiemens/cm.
For non-submerged (non-immersed) applications conductivity measurements must not exceed 70 microsiemens/cm. If a conductivity check fails, clean the surface in accordance with SFLC Std Spec 6310, paragraph 3.1.8.5 (Soluble salt removal).
3.3.3.1.3 Coating thickness measurements. Three area measurements must be taken for the first 1000 square feet;
for each additional 1000 square feet, perform an additional area measurement. A “measurement” for coating thickness is defined as follows:
• SSPC-PA 2 defines an area measurement as 5 separate spot measurements randomly spaced throughout a 100 square foot area.
• SSPC-PA 2 defines a spot measurement as 3 gage readings and each new gage reading the probe must be moved to a new location within a 1.5-inch diameter circle defining the spot.
3.4 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.4.1 HY-130 material substitution. The Contractor must be aware that HY-130 steel plating is no longer commercially available. For the purpose of performing flight deck repairs on US Coast Guard WMEC-270 “B- Class” cutters, Weldox 900 steel plating has been approved as a replacement for HY-130. Due to the similarity in material properties and weldability of HY-130 and Weldox 900, all welding procedures and welder qualifications for welding Weldox 900 must be the same as those outlined in NAVSEA TP 1688 as applicable for welding HY- 130.
3.4.2 Standard spec modification. For any welding involving HY-130 on the flight deck of WMEC-270 “B-Class” cutters, perform all welding and allied processes, and non-destructive evaluation (NDE) in accordance with NAVSEA TP 1688. The Contractor must be aware that the welding requirements specified in this document take precedence over paragraph 3.3.6 of SFLC Standard Spec 0000 for the purpose of welding involving HY-130.
3.4.3 Approval to weld HY-130. To obtain Coast Guard approval to weld on HY-130 steel for WMEC-270 “B- Class” cutters, the Contractor must provide written Performance Qualification Records (PQR’s) for each process to be used. The PQR’s must be approved by one of the regulatory agencies affirming that the WPS meets the welding requirements of NAVSEA TP 1688. In addition, the Contractor must ensure that all subcontractors, prior to performing welding operations, have qualified procedures by meeting all the requirements set forth in this document.
NOTE
NAVSEA approval is NOT required for welding procedures submitted but the procedures must be reviewed and shown to satisfy the requirements set forth in NAVSEA TP 1688, by a welding regulatory agency. The requirements for welding Weldox 900 are considered the same as those for welding HY-130.
3.5 Environmental protection requirements. The Contractor must adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 USCG facilities. The Contractor must provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractors must plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractors must comply with applicable
4 (Rev-0)
Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item must not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is medium.
3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:
• Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.
• National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.
• Air Emission Permit: Unit has an Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.
3.5.2 Test and procedures. The Contractor is required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work must be done by qualified laboratories; and where required by law, the laboratories must be certified.
3.5.3 Regulatory notifications. The Contractor is responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor must submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications must be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor must appoint in writing an Environmental Manager for the project, who is responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager must ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out;
ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Coast Guard Yard personnel and Contractors must comply with SFLC Std Spec 0000 Appendix B, Requirements For Environmental Protection At USCG Facilities for HW disposal.
3.6 Local Policy. The Contractor must refer to site (e.g., Base) Regulations and Instructions for details regarding local policies (e.g., crane services, parking, or facility usage).
5 (Rev-0)
3.7 SFLC Standard Specification approved changes. Approved updates to the 2022 SFLC Standard Specifications will appear here.
3.7.1 None.
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
6 (Rev-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK
ITEM #
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOPCOAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE / TIME
NAME OF CG REPRESENTATIVE SIGNATURE UNIT DATE/TIME
7 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL # WORK
ITEM # WORK ITEM TITLE
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER
COAT, BARRIER COAT,
TOPCOAT, ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFAC
E
AMBIEN
T
ΔT
| DP -
SURFACE |
8 (Rev-0)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK ITEM
LOCATION OF WORK (FRAME REFERENCES) AREA (SQFT)
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/AMPP No. 2
SSPC-SP WJ-2/AMPP WJ-2
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS
DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE /
TIME
9 (Rev-0)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/AMPP No. 2
SSPC-SP WJ-2/AMPP WJ-2
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT
QA RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO
SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Mils Reading (IAW ASTM D4417-Method B for above 10 readings (by column):
Mean Reading (mils)
10 (Rev-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
VESSEL NAME HULL # WORK
ITEM #
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
11 (Rev-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
VESSEL NAME HULL # WORK ITEM
# WORK ITEM TITLE
COATING MFG PRODUCT NAME BATC
H #
INDUCTI
ON TIME
COATING SYSTEM
SEQUENCE
(PRIMER/TOUCHUP/3RD
COAT, ETC.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.
SPOT 1 2 3 4 5 AVERAGE
VALUE
*BASE METAL READING
(BMR)
*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
APPLICATION METHOD (AIRLESS,
CONVENTIONAL SPRAY, ROLLED)
AVERAGE DFT
12 (Rev-0)
4.2 Tank and Void Assessment form.
13 (Rev-0)
14 (Rev-0)
WORK ITEM 1: Fire Prevention Requirements Drydock
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to minimize shipboard fire risk and to clarify the Contractors’ role in fire prevention and response.
NOTE
This work item is not separately priced. Factor fire prevention and response costs into bid of affected work items.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire
Prevention and Response
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 Fire Plan. The Contractor must develop and implement a written fire plan in accordance SFLC Std Spec 5550. The Contractors Fire Plan must address Fire Protection and Response specifics as required in this Work Item.
3.1.1 The availability’s specific Fire Plan must always address the following:
• material condition and fire protection boundary obstruction mitigations
• inoperable fittings log
• fire alarms
15 (Rev-0)
• firefighting equipment disposition
3.1.2 The Fire Plan must also address the following:
• fire protection system status
• communication links
• temporary services
• power disconnects
• fire prevention and safety inspections
3.2 Fire Prevention Responsible Party. The Contractor must appoint a Fire Prevention Responsible Party (FPRP) who acts as the Contractor’s Responsible Person for fire prevention concerns during the entire…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .