TECHNICAL SPECIFICATIONS

VOLUME 1

WEATHER FORECAST OFFICE

KEY WEST, FLORIDA

NATIONAL WEATHER SERVICE

Eskew+Dumez+Ripple Guidry Beazley Architects

A Joint Venture

January 9, 2004

Contract No. 50WCNA806042 Order No. 56WCNA101080

Associated Design Group McKee & Deville Consulting Engineers

TerraDesigns, Inc.

URS Group, Inc.

Atkins HF&G

Project No. KW 01

Index 1

I N D E X

DIVISION 15 - MECHANICAL

15010 Basic Mechanical Methods and Materials

15030 Electrical Requirements for Mechanical Equipment

15060 Pipes and Pipe Fittings

15100 Valves

15135 Meters and Gauges

15145 Hangers and Supports

15190 Mechanical Identification

15250 Mechanical Insulation

15410 Plumbing Piping

15413 Storm Drainage Systems

15420 Drainage and Vent Systems

15430 Plumbing Specialties

15440 Plumbing Fixtures

15460 W ater Heaters

15483 Fuel Oil Piping Systems

15485 Helium Gas Piping Systems & Equipment

15530 Refrigerant Piping

15550 Aboveground Fuel Tank and Monitoring System

15670 Outdoor Condensing Unit

15855 Air Handling Unit

15860 Fans

15891 Ductwork

15910 Ductwork Accessories

15932 Air Outlets and Inlets

15933 Air Terminals

15960 Building Automation System

15990 Test, Adjusting and Balancing

15991 Government Furnished Commissioning

DIVISION 16 - ELECTRICAL

16010 Basic Electrica l Requirem ents

16045 Fire Detection, Alarm and Com munication System

16050 Basic Electrical Materials and Methods

16100 Raceways, Boxes, and Cabinets

16120 W ires and Cables

16140 W iring Devices

16460 Transformers

16470 Panelboards

16475 Overcurrent Protective Device

16476 Disconnects and C ircuit Breakers

16481 Motor Controllers

16495 Transfer Switches

16515 Interior Lighting

16525 Exterior Lighting

16621 Diesel Generator Set

Index 2

16670 Lightning Protection System

16671 Surge Suppression Filter System - 150,000 AMP Class

16800 Electrical Systems Com missioning

16820 Proximity Reader Control System

16830 Closed Circuit Television System

DIVISION 17 - GEOTECHNICAL

Soil and Foundation Investigation Report

Index 1

I N D E X

DIVISION 1 - GENERAL REQUIREMENTS

01010 Sum mary of Work

01010-A Notice of Completion

01012 W ork By Others

01014 Commissioning

01014-A Sample Preliminary Commissioning Plan

01015 Contractor Use of Premises

01016 Occupancy By Owner

01018 Government Furnished Equipment

01018-A GFE Receiving & Acceptance Notice

01025 Measurement and Payment

01025-A Schedule of Prices

01025-B Release of Claim s

01045 Cutting, Patching and Restoration

01060 Regulatory/Permitting Requirements

01065 Safety

01153 Change Procedure

01200 Project Meetings

01310 Construction Schedules

01310-A Contractors Daily Activity Report

01340 Subm ittals

01340-A Subm ittal Summary

01350 Special Environmental Requirem ents

01350-A Sustainable Goals and Leed Certification Requirements

01400 Quality Control

01400-A Construction Contract Site Instruction

01400-B Construction Contract Non-Compliance Notice

01500 Construction Utilities

01540 Security

01560 Temporary Controls/Environmental Protection

01565 Indoor Air Quality Management Plan

01572 W aste Management

01580 Project Identification Sign

01580-A Project Identification Sign Layout

01590 Field Offices

01710 Cleaning

01720 Record Drawings

01740 W arranties and Bonds

DIVISION 2 - SITE W ORK

02230 Site Clearing

02231 Tree Protection

02300 Earthwork

02361 Termite Control

02630 Storm Drainage

02751 Cement Concrete Pavement

02764 Pavem ent Joint Sealants

Index 2

02795 GravelPave2 Porous Paving

02800 Site Im provements

02813 Lawn Sprinkler Piping

02870 Site and Street Furnishings

02920 Lawns and Grasses

02930 Exterior Plants

DIVISION 3 - CONCRETE

03300 Concrete W ork

03331 Cast-In-P lace Architectural Concrete

03365 Post-Tensioned Concrete

03450 Plant-Precast Architectural Concrete

DIVISION 4 - MASONRY

04810 Unit Masonry Assemblies

DIVISION 5 - METALS

05120 Structural Steel

05210 Steel Joists

05310 Steel Deck

05500 Metal Fabrications

05511 Metal Stairs

05517 Alternating Tread Steel Stairs

05521 Pipe and Tube Railings

05530 Gratings

DIVISION 6 - WOOD AND PLASTICS

06100 Rough Carpentry

06401 Exterior Architectural Woodwork

06402 Interior Architectural W oodwork

DIVISION 7 -THERMAL AND MOISTURE PROTECTION

07115 Bituminous Dampproofing

07162 Crystalline Waterproofing

07170 Bentonite Waterproofing

07190 W ater Repellents

07210 Building Insulation

07411 Metal Roof Panels

07552 SBS-Modified Bituminous Membrane Roofing

07620 Sheet Metal Roofing, Flashing and Trim

07841 Through-Penetration Firestop Systems

07920 Joint Sealants

DIVISION 8 -DOORS AND W INDOWS

08110 Steel Doors and Frames

Index 3

08211 Flush W ood Doors

08311 Access Doors and Frames

08331 Overhead Coiling Doors

08361 Pneum atic Vertical Rise Shutters

08412 Aluminum & Glass Doors

08712 Door Hardware

08800 Glazing

08911 Glazed Alum inum Curtain W alls

DIVISION 9 - FINISHES

09220 Portland Cement Plaster

09260 Gypsum Board Assemblies

09310 Ceram ic T ile

09514 Acoustical Tile Ceilings

09651 Resilient Floor Tile

09653 Resilient W all Base and Accessories

09681 Carpet Tile

09785 Dry-Shake Colored Hardener

09841 Acoustical W all Panels

09911 Painting (Consumer Line Products)

09931 Exterior Wood Stains

DIVISION 10 - SPECIALTIES

10155 Toilet Com partm ents

10200 Louvers and Vents

10270 Access Flooring

10350 Flagpoles

10431 Signs

10505 Metal Lockers

10520 Fire Protection Specialties

10801 Toilet and Bath Accessories

10900 Radome

DIVISION 11 - EQUIPMENT

11160 Loading Dock Equipment

DIVISION 12 - FURNISHINGS

12491 Sun Screens and Blinds

DIVISION 13 - SPECIAL CONSTRUCTION

13500 Structural Fiberglass Reinforced Plastic Fabrications

PROJECT NO. KW01

CCTV System 16830 - 1

SECTION 16830 - CLOSED CIRCUIT TELEVISION SYSTEM

PART 1 GENERAL

1.1 DESCRIPTION OF WORK.

A. This section of the specifications requires the complete installation of the Closed Circuit Television System (CCTV) as indicated on the drawings and/or specified herein.

B. The work shall consist of the installation of a complete closed circuit television system consisting of, but not limited to, the following major components:

1. Exterior remote cameras, including lens, housings, and mounting devices.

2. 14-inch Color Monitors (two required).

3. Digital Video Recorder (DVR).

4. Multi Camera Power Supply.

5. Equipment shelves for DVR, and Power Supply, etc

6. System wiring.

1.2 APPLICABLE PUBLICATIONS. Industry publications, latest edition, controlling the work of this Section include:

A. National Fire Protection Association (NFPA): NFPA - 70 National Electrical Code (NEC).

B. Uniform Federal Accessibility Standards (UFAS).

C. Underwriters Laboratories Inc (UL).

D. Manufacturer’s installation, start-up, operation and maintenance manual.

1.3 RELATED DOCUMENTS

A. The drawings and general provisions of this Contract, including General and Supplementary Conditions, Division 1, and all Specification Sections, apply to this Section.

1.4 SUBMITTAL. Submit the following to the Government in accordance with Section 01340, SUBMITTALS. Submittals for approval are as follows:

A. Catalog cuts of: Exterior remote cameras, including lens, housings, and mounting devices; 14-inch Color Monitor; Digital Video Recorder (DVR); Multiple Camera Power Supply; conduits, wiring, and sealants.

B. Shop drawings showing the layout of the system and schematics.C.Manuals with the following information:

1. Submit simultaneously with the shop drawings, companion copies of complete operating and maintenance manuals including technical data sheets, wiring diagrams, and information for ordering replacement parts as follows:

a. Wiring diagrams shall have their terminals identified to facilitate installation, operation and maintenance.

b. Wiring diagrams shall indicate internal wiring for each item of equipment and the interconnections between the items of equipment.

CCTV System 16830 - 2

c. Provide clear and concise description of operation which gives, in detail, the information required to properly operate the equipment and system.

d. Approvals will be base on complete submissions of manuals together with shop drawings.

2. Two weeks prior to final inspection, deliver three (3) copies of the final updated operating and maintenance manual to the Contracting Officer’s Technical Representative (COTR).Upon completion of this portion of the work, and as a condition of its acceptance, submit the following:

3. Three(3) sets of the functional test result report.

4. Three (3) sets of as-built drawings.

5. Three (3) sets of Operation and Maintenance Manuals.

6. Three (3) copies of all warranties and guarantees.

1.5 QUALITY ASSURANCE

A. The design, equipment and installation shall be in accordance with the requirements of the applicable publications listed in this section and the equipment manufacturer recommendations.

1.6 TRAINING

A. Upon completion of work, at a time directed by the COTR, a knowledgeable representative of the Contractor shall be made available for a period of not less than 4 hours to instruct a representative(s) of the Government in the operation and maintenance of the CCTV system and components.

PART 2 PRODUCTS

2.1 CAMERAS

A. CCTV cameras shall be UL listed and shall be the standard product of PELCO, 300 West Pontiac Way, Clovis, CA 93612, telephone no.(800)-380-9100, PELCO Model No. CC3700 series CCD Color Camera, or approved equal, complying with not less than the specifications contained herein. Installation of each camera shall include mounting brackets and camera housings fully compatible with the camera provided.

B. All camera installations shall be securely attached to mounting surface. Use expansion anchors or steel push anchors on solid masonry, wood screws for wood, toggle bolts for hollow masonry, and machine bolts for steel. All anchoring devices shall be rated to support not less than five times the total equipment weight. All screws or bolts shall be stainless steel.

C. Camera shall be as follows:

1. Solid state charge coupled color camera device 1/3-image format.

2. Resolution - 470 TV lines.

3. Picture Element - 768 (H) x 494 (V).

4. Sensing Area - 6.3mm (H) x 4.7mm (V).

5. Signal to noise ratio - 50 Db.

6. Scanning System - 525 lines.

7. Minimum Illumination - 1.9 lux(f1.2, with AGC set to ON (in Turbo mode)).

8. Genlock - capable of external sync.

9. CCD Iris - 1/60 to 1/100,000 second.

10. Video Output - 1.0 V p-p composite.

CCTV System 16830 - 3

11. Lens Type - Video/DC servo switchable.

12. Lens Mount - type C/CS (adjustable)

13. Back light Compensation - On/Off Selectable.

14. Operating Voltage - 24 VAC.

15. Operating Temperature - 14 to 122 degrees F.

16. Operating Humidity Range - 0 to 90% relative humidity.

2.2 CAMERA HOUSING AND SUPPORTS

A. All camera housing and support brackets shall be compatible with CCTV camera specified.

Housing shall be provided with all cable entrance facilities for camera power and video signal and shall be adaptable to mounting devices used with cameras. All camera housing and supports shall be manufactured by the manufacturer of the supplied camera.

B. Weatherproof-tamper proof housing shall be constructed of aluminum and finished with a weatherproof(WP) heat-reflecting paint. All cameras outside heated spaces shall have WP housings. Housing shall be internally insulated. Hinged cover shall be secured in place by tamper proof locks. Housing shall be provided with the following features:

1. Bottom air intake and filter.

2. Thermostatically controlled blower, 8 watts (maximum) at 24 VAC.

3. Thermostatically controlled heater,80 Watts (maximum) at 24 VAC.

4. Sun shield.

5. Automatic defroster, 15 Watts (maximum) at 24 VAC.

C. The control of blower, heater and defroster shall be automatic when camera power circuit is energized. Power and wiring requirements shall be sized highest load voltage drop not to exceed

(2) percent. Camera housing shall be by camera manufacturer as required by camera provided, with accessories specified.D.Camera mounting brackets shall be heavy-duty, for wall mounting and shall be suitable for outdoor use. Wall mounting brackets shall be suitable for camera and enclosures specified, maximum wind and ice loading encountered at the site, and shall be rated for support of not less than the total weight of the camera and enclosure with all accessories.

Bracket extension from wall should not exceed 24-inches. Brackets with extension of 24" or larger shall be provided with support strut. All screws or bolts shall be stainless steel.

D. Camera mounting brackets shall be heavy-duty, for wall mounting and shall be suitable for outdoor use. Wall mounting brackets shall be suitable for camera and enclosures specified and shall be rated for support of not less than the total weight of the camera and enclosure with all accessories. Bracket extension from wall should not exceed 24-inches. All screws or bolts shall be stainless steel.

E. Provide ten foot anodized aluminum support pole (6" square) cross section for camera at vehicle gate.

F. Provide weather-proof domed enclosure with integral pan/tilt for surface mounting at Hurricane Support Building - Pelco SPECTRA III SE Series.

2.3 TELEVISION MONITOR

A. CCTV monitor shall be standard product of PELCO, PELCO Model PMC14E, High Resolution, Universal Color Monitor, or approved equal with the total system specified herein and complying with these specifications. Monitor and cameras shall be provided by the same manufacturer.

CCTV System 16830 - 4

B. CCTV monitor shall be solid state with exception of picture tube, mounted as indicated on the drawings and as specified herein. Monitor controls shall be on-off, channel select, brightness, contrast, vertical hold and horizontal hold. Monitor shall contain differential input amplifier, voltage regulation and shall be rated for continuous duty. All monitors shall be UL listed.

C. The color monitor shall be 14" diagonal. This monitor shall conform to the following specifications:

1. Size: 14" diagonal tube.

2. Power Source: 120 VAC, 60 Hz.

3. Horizontal Resolution: 480 lines.

4. Switching Between Two Inputs: Manual A/B switch and auto-switching with adjustable dwell setting.

5. S-Video in/out terminals.

6. Video: Throughout, auto. Termination opener, BNC.

7. Audio: Throughout, phono.

8. Video Input: 1.0V p-p 75 Ohms or high impedance (auto), BNC.

9. Multiple Inputs with composite video channels 1 and 2, with looping outputs.

10. VCR compatibility.

11. Front panel controls for color, tint, brightness, contrast, vertical hold, horizonal hold, dwell, channel select, power, and audio volume.

12. Geometric Distortion less than 3%.

13. Supports NTSC and PAL video.

2.4 POWER SUPPLY

A. Multiple camera power supply shall be standard products of PELCO, or approved equal, with the total system specified herein and complying with these specifications. The multiple camera power supply shall be capable of supplying the necessary voltage to run the cameras and its accessories. The multi camera power supply shall provide the following features:

1. Output connectors shall be 90 degree quick connect screw type.

2. Input voltage shall be 120 VAC.

3. Frequency - 60 Hz.

4. Input Volt-Amperes shall be 55 VA.

5. Output voltage shall be 24 VAC.

6. Maximum output of 40 volt-amperes.

7. NEMA rating of 1.

B. Contractor shall determine the number of multiple camera power supplies required for this CCTV system. This determination should be based on, but not limited to, the following:

1. Length of cable runs to the cameras.

2. Camera power requirements.

3. Blower power requirements.

4. Heater power requirements.

5. Window defroster requirements.

2.5 VIDEO WIRING SYSTEMS

A. Video signal cables shall be coaxial cable, RG-59U with PVC outer jacket. Cable lengths in

CCTV System 16830 - 5 excess of 700 feet shall be upgraded to an RG-11 coaxial cable. Cables shall be installed in concealed conduit system within building.

B. Cable shall conform to the following specifications as a minimum.

1. Temperature Range:-30C to +75C

2. Center Conductor:Stranded 18 AWG

3. Nominal Impedance:75 ohms

4. Maximum Attenuation:1.0 dB/100 ft. @ MHZ

C. Power cable shall be multi conductor twisted shielded cables with PVC outer jacket and selected for use with the specific equipment to be powered for installation in concealed conduit system.

Power cables shall be installed in the same conduit with the video signal cables.

D. Power and video signal cables for the exterior remote cameras shall be installed in liquid tight conduit from junction box to camera housing.

E. Raceway system shall be sized by the contractor to allow all power and video signal cables to be installed as required by the cable manufacturer for pull and bending ratios.

2.6 CAMERA LENSES

A. Camera lenses shall be compatible with camera construction and iris control circuit. The lenses shall be supplied by the camera manufacturer. PELCO Model No. 13VD3-8 or approved equal.

B. All lenses shall be auto iris type driven by the camera iris control circuit.

2.7 DIGITAL VIDEO RECORDER

A. Digital video recorder (DVR)shall be the standard product of Pelco, or approved equal with the total system specified herein and complying with these specifications. Pelco Model No. DX3000, or approved equal.

B. The recorder shall accept input from the monitor cameras, as well as, inputs from the auto switching high resolution universal color monitor. Contractor shall provide all materials necessary in order to integrate recorder for complete operation. The DVR unit shall have the following characteristics:

1. 9 or 16 camera inputs

2. 120 GB hard drive.

3. Multiple camera displays.

4. Continuous recording mode.

5. On-screen programming.

6. Alarm recording.

7. Speed search.

8. Accepts 0.5 to 2.0 V p-p composite video signal, 75 ohms.

9. Output is 1.0 V p-p composite video signal, 75 ohms.

10. Audio frequency response of 50 Hz to 10 kHz.

2.8 CCTV EQUIPMENT SHELVES

A. Contractor shall provide and install wall mounted shelves in the Communications Room that are

CCTV System 16830 - 6 suitable to place the DVR, multi camera power supply(s), termination boxes, video motion detectors and other associated equipment for the proper installation and operation of the CCTV system. The color of the shelves shall match the adjacent wall. The 14" Color Monitors will be located in the Operations Room and at the reception desk.

PART 3 EXECUTION

3.1 CUTTING AND PATCHING

A. Cutting shall be done with extreme care and in such a manner that the strength of the structure will not be endangered. Wherever possible, openings in concrete or masonry construction shall be by concrete saw or rotary core drill. Openings in any construction shall be cut the minimum size required for the installation of the work. After work is installed through any opening, the opening around the work shall be patched and sealed watertight with epoxy or silicone based, non-cracking elastomeric sealant. Provide fire stop sealant, Nelson Firestop Products or approved equal, when going through fire rated walls.

B. Grommets shall be used in the access flooring openings to run the video signal and power cables between the under access floor junction box and the Color Monitor.

3.2 INSTALLATION

A. Install the CCTV system, as indicated on the drawings and as specified, in accordance with recognized industry practices. The installer shall be trained and certified by the factory to install the equipment provided by the contractor.

B. Provide all labor, materials, equipment and supervision to install, checkout, adjust and calibrate total system. All pictures shall be clear and free of snow, ground loops, or other conditions that will degrade the picture.

C. Route conduits containing camera video signal and power cabling to the CCTV equipment shelving located in the Communications Room. Conduit containing video signal cabling shall be extended from the CCTV equipment shelving area to a junction box located near the center the Operations Room area and below the Reception desk as indicated on the drawings. The video signal cabling shall then be extended to the CCTV monitor. Allow an extra thirty (30) feet of video signal cabling from the junction box located under the access flooring, near the center of the room, to allow movement of CCTV monitor to any location within the Operations Room.

3.3 ADJUSTING AND CLEANING.

A. Remove rough edges from junction boxes and raceways to prevent damage to insulation when conductors are pulled.

B. Clean junction boxes and conduit upon completion of installation.

3.4 TESTING

A. When the CCTV system has been completed, and prior to scheduling of the final inspection, furnish testing equipment and perform the functional tests described below, and provide a report describing the results of this test to the COTR.

B. Functional Tests shall include the following:

CCTV System 16830 - 7

1. Before energizing the cables and wires, check for correct connections and test for short circuits, ground faults, continuity, and insulation.

2. Verification that all video sources and video outputs provide a full bandwidth signal.

3. Verification that all video signals are terminated properly.

4. Verification that all cameras are aimed and focused properly. The Contractor shall conduct a walk test of the area covered by each camera to verify the field of view.

5. Verification that cameras facing the direction of rising or setting sun are aimed sufficiently below the horizon so that the camera does not view the sun directly.

6. If vehicles are used in proximity of the assessment areas, verification of night assessment capabilities and determination if headlights cause blooming or picture degradation.

7. Verification that all cameras are synchronized and that the picture does not roll when cameras are switched.

8. Operation of all electrical equipment and mechanical switcher controls in the high resolution universal color monitor and verification that the control performs the designed function.

9. Verification that all other CCTV system components are working properly.

C. When any defects are detected, make repairs or install replacement components, and repeat the tests until such time that the complete CCTV system meets all contract requirements. After the CCTV system has passed the test and been approved by the COTR, the contractor may request a final inspection. Final acceptance of system will not be made until retested at final inspection.

3.5 FINAL INSPECTION

A. At the final inspection a factory trained representative of the manufacture of the major equipment shall demonstrate that the system function properly in every respect. The demonstration shall be made in the presence of the COTR.

END OF SECTION 16830

PROJECT NO.: KW01

Proximity Reader Control System 16820 - 1

SECTION 16820 - PROXIMITY READER CONTROL SYSTEM

PART 1 GENERAL

1.1 DESCRIPTION OF WORK.

A. This section of the specifications requires the complete installation of a proximity reader control system equipment, which also includes, but not limited to, peripheral equipment, as indicated on the drawings and/or specified herein.

B. The proximity reader control system equipment shall be a Ccure 800 system as manufactured by Sensormatic Electronics Corporation/Software House, 951 Yamato Road, Boca Raton, Florida 33431, telephone no. (561)-989-7000. The proximity reader control system equipment shall be compatable with existing government owned equipment manufactured by Sensormatic Electronics Corporation.

C. The work shall consist of the installation of a complete proximity reader control system equipment and peripheral equipment consisting of, but not limited to, the following major components:

1. Proximity Card Readers with Keypad.

2. Weather-Proof Intercom Call Stations.

3. Interior Intercom Stations with Integrated and Labeled Release Push Buttons for:

a. Front Door.

b. Vehicle Gate.

c. Pedestrian Gate.

4. Access Control and Alarm Monitoring Panel.

5. Host Computer with software.

6. Remote door release buttons for four (4) doors (four buttons on a single plate).

7. System wiring.

1.2 APPLICABLE PUBLICATIONS. Industry publications, latest edition, controlling the work of this Section include:

A. National Fire Protection Association (NFPA):

B. NFPA - 70National Electrical Code (NEC).

C. Uniform Federal Accessibility Standards (UFAS).

D. Underwriters Laboratories Inc. (UL)

E. Manufacturer’s installation, start-up, operation and maintenance manual.

1.3 RELATED DOCUMENTS

A. The drawings and general provisions of this Contract, including General and Supplementary Conditions, Division 1, and all Specification Sections, apply to this Section.

1.4 SUBMITTAL. Submit the following to the Government in accordance with Section 01340, SUBMITTALS. Submittals for approval are as follows:

A. Catalog cuts of: Proximity Card Reader with Keypad, Access Control Panel, Host Computer and

Proximity Reader Control System 16820 - 2 software, Security Door Hardware, Conduits, Wiring, and Sealants.

B. Shop drawings showing the layout of the system and schematics including indoor and outdoor intercom stations.

C. Manuals with the following information:

1. Submit simultaneously with the shop drawings, companion copies of complete operating and maintenance manuals including technical data sheets, wiring diagrams, and information for ordering replacement parts as follows:

a. Wiring diagrams shall have their terminals identified to facilitate installation, operation and maintenance.

b. Wiring diagrams shall indicate internal wiring for each item of equipment and the interconnections between the items of equipment.

c. Provide clear and concise description of operation which gives, in detail, the information required to properly operate the equipment and system.

d. Approvals will be base on complete submissions of manuals together with shop drawings.

e. Two weeks prior to final inspection, deliver three (3) copies of the final updated operating and maintenance manual to the Contracting Officer’s Technical Representative (COTR).

f. Upon completion of this portion of the work, and as a condition of its acceptance, submit the following:

i. Three (3) sets of the functional test result report.

ii. Three (3) sets of as-built drawings.

iii. Three (3) sets of Operation and Maintenance Manuals.

iv. Three (3) copies of all warranties and guarantees.

1.5 QUALITY ASSURANCE.

A. The design, equipment and installation shall be in accordance with the requirements of the applicable publications listed in this section and the equipment manufacturer recommendations.

1.6 TRAINING.

A. Upon completion of work, at a time directed by the COTR, a knowledgeable representative of the Contractor shall be made available for a period of not less than 4 hours to instruct a representative(s) of the Government in the operation and maintenance of the Proximity Reader Control System, peripheral equipment, and its components.

PART 2 PRODUCTS

2.1 PROXIMITY CARD READERS.

A. Sensormatic/Software House Proximity Reader HID version with keypad, Model Number RM2-

PH.

B. Proximity Card Readers with Keypad shall be wall mounted at 42 inches above finished floor (AFF) to center where shown on the drawings and shall be fully compatible with access control and alarm panel.

2.2 HOST COMPUTER SYSTEM WITH SOFTWARE.

Proximity Reader Control System 16820 - 3

A. Sensormatic/Software House C-Cure 800 Access Control System and Basic System Package.

2.3 PROXIMITY CARDS.

A. Sensormatic/ISO Prox Credit Card, size PVC card 37 bit.

B. The Contractor shall furnish fifty (50) proximity cards to the COTR.

2.4 PROXIMITY READER CONTROL SYSTEM WIRING

A. All wiring from proximity card readers with keypad,remote door release buttons, panic bars, electromagnetic locks and electromechanical strikes to access control and alarm panel shall be as specified by the equipment manufacturer of the access control system. All wiring shall be installed in concealed conduit system within the building.

B. Raceway system shall be sized by the contractor to allow all wiring to be installed as required by the wire manufacturer for pull and bending ratios.

PART 3 EXECUTION

3.1 CUTTING AND PATCHING

A. Cutting shall be done with extreme care and in such a manner that the strength of the structure will not be endangered. Where ever possible, openings in concrete or masonry construction shall be by concrete saw or rotary core drill. Openings in any construction shall be cut the minimum size required for the installation of the work. After work is installed through any opening, the opening around the work shall be patched and sealed watertight with epoxy or silicone based, non-cracking elastomeric sealant. Provide fire stop sealant, Nelson Firestop Products or approved equal, when going through fire rated walls.

3.2 INSTALLATION

A. Install the Proximity Reader Control System, as indicated on the drawings and as specified, in accordance with recognized industry practices. The installer shall be trained and certified by the factory to install the equipment provided by the contractor.

B. Provide all labor, materials, equipment and supervision to install, checkout, adjust and calibrate total system.

C. Provide free standing painted steel pedestal for card reader/intercom support at vehicle access drive. Paint color selected by Architect.

3.3 TESTING

A. When the Proximity Reader Control System has been completed, and prior to scheduling of the final inspection, furnish testing equipment and perform the functional tests described below, and provide a report describing the results of this test to the COTR.

B. Functional Tests shall include the following:1.Before energizing the cables and wires, check for correct connections and test for short circuits, ground faults, and continuity.

Proximity Reader Control System 16820 - 4

1. Verification that all Proximity Card Readers with Keypad System are working properly.

2. Verification that Access Control and Alarm Monitoring Panel are working properly.

3. Verification that the host computer and software interaction with the Access Control and

Alarm Monitoring Panel are working properly.

4. Verification that all door hardware are working properly.

5. Verification that remote door release buttons are working properly.

6. Verification that all other Proximity Reader Control System components are working properly.

C. When any defects are detected, make repairs or install replacement components, and repeat the tests until such time that the complete Proximity Reader Control System meets all contract requirements. After the Proximity Reader Control System has passed the test and been approved by the COTR, the contractor may request a final inspection. Final acceptance of system will not be made until retested at final inspection.

3.4 FINAL INSPECTION

A. At the final inspection a factory trained representative of the manufacture of the major equipment shall demonstrate that the system function properly in every respect. The demonstration shall be made in the presence of the COTR.

END OF SECTION 16820

Project No.: KW01

Electrical Systems Commissioning 16800 - 1

SECTION 16800 - ELECTRICAL SYSTEMS COMMISSIONING

PART 1 GENERAL

1.1 DESCRIPTION

A. General provisions and other electrical systems are specified in other Sections of Division 16.

B. Commissioning is an ongoing process and shall be performed throughout construction.

Commissioning ensures that systems are operating in a manner consistent with the Construction Documents. The general requirements of the commissioning process and the duties of the Commissioning Authority are detailed in Section 17100, Commissioning.

Become familiar with the requirements and coordination obligations of Section 17100, Commissioning and the commissioning schedule issued by the Commissioning Authority as they apply to the work of Division 16, and execute commissioning responsibilities specified herein.

C. Commissioning shall conclude with the completion of required deferred testing, training, and system documentation as specified herein and required to demonstrate the proper operation of the electrical equipment and systems provided by this Division.

D. This Section covers electrical systems commissioning, as required to demonstrate that the equipment and systems of Division 16 are ready for safe and satisfactory operation, as defined by the Construction Documents. Commissioning shall include, but shall not be limited to, identification of equipment, cleaning, lubrication, start-up, check-out, testing and adjusting of systems, preparation of equipment and systems documentation and of maintenance and operation manuals, Owner training, and preparation of record drawings.

E. Commission the following systems and equipment:

1. Section 16100, Raceways, Boxes and Cabinets.

2. Section 16120, Wires and Cables.

3. Section 16140, Wiring Devices.

4. Section 16170, Circuit and Motor Disconnects.

5. Section 16621, Diesel Generator Set.

6. Section 16495, Transfer Switches.

7. Section 16670, Lightning Protection System.

8. Section 16460, Transformers.

9. Section 16470, Panelboards:

a. Lighting and appliance branch circuit panelboards.

b. Distribution panelboards.

10. Section 16475, Overcurrent Protective Devices.

11. Section 16476, Disconnects.

12. Section 16481, Motor Controllers.

13. Section 16515, Interior Lighting.

14. Section 16525, Exterior Lighting.

15. Section 16671, Surge Suppression Filter System.

16. Section 16721, Fire Alarm System.

1.2 QUALITY ASSURANCE

Electrical Systems Commissioning 16800 - 2

A. Provide an Electrical Commissioning Supervisor with 10 years experience in electrical contracting. The Electrical Commissioning Supervisor shall become familiar with the Owner's project requirements and the requirements of the commissioning process as defined in this Section and in Section 17100, Commissioning. Electrical systems commissioning shall be accomplished under the supervision of the Commissioning Authority. The Electrical Commissioning Supervisor shall assist the Commissioning Authority in coordinating and executing the required commissioning activities.

B. The Electrical Commissioning Supervisor shall review submittal data for conformance with the requirements of the Project, shall monitor compliance with the requirements specified herein for storage and protection of equipment during construction, shall authorize the initial starting of equipment and systems in a manner to avoid damage to equipment, shall oversee start-up, testing, and shall document that the scheduled and specified performance requirements of each system have been accomplished.

C. Refer to ASHRAE Guideline 1-1996, The HVAC Commissioning Process, and Guideline 4- 1993.

1.3 COMMISSIONING RESPONSIBILITIES

A. The Electrical Commissioning Supervisor shall be responsible for, in conjunction with the Commissioning Authority, scheduling, supervising, and coordinating the start-up and executing, testing, and commissioning activities as specified herein. Include and itemize the cost of commissioning in the contract price, and in each purchase order or subcontract written, include requirements for submittal data, commissioning efforts and documentation, operations and maintenance data, and training as specified herein.

B. Electrical commissioning shall take place in three phases. Commissioning requirements for each phase are as follows:

1. Construction Phase:

a. Attend a commissioning scoping meeting and additional commissioning meetings, initially scheduled monthly until prefunctional testing of equipment and systems begins, and weekly thereafter during the construction phase to facilitate the commissioning process. The Electrical Commissioning Supervisor shall coordinate meeting attendance with the Commissioning Authority.

b. Report in writing to the Commissioning Authority, at least as often as commissioning meetings are scheduled, concerning the status of electrical activities as they affect the commissioning process, the status of each discrepancy identified during the prefunctional and functional testing process, explanations of any disagreements with the identified deficiencies, and the proposed resolution and schedule for correction of the deficiency.

c. Provide the Commissioning Authority with data sheets and submittals for equipment to be commissioned.

d. Provide documentation of installed systems and equipment to the Commissioning Authority for development of functional testing procedures, prior to normal operation and maintenance manual submittals. This documentation shall include detailed manufacturer installation, start-up, operating, troubleshooting and maintenance procedures; full details of any Owner-contracted tests; full factory testing reports, if any; and full warranty information, including responsibilities of the Owner to keep the warranty in force. In addition, the installation, start-up and check-out materials that are actually shipped inside the equipment and the actual field check-out sheet forms

Electrical Systems Commissioning 16800 - 3 to be used by the factory or field technicians shall be submitted to the Commissioning Authority. The Commissioning Authority may request further documentation necessary for the development of functional performance testing and the commissioning process. This data request may be made prior to normal submittals.

e. Develop and submit to the Commissioning Authority, for review and comment, prior to equipment or system start-up, a complete start-up and initial check-out plan using manufacturer's start-up procedures and prefunctional checklists for equipment to be commissioned.

f. Provide a copy of the operation and maintenance manuals and submittals of equipment to be commissioned to the Commissioning Authority for review and comment.

g. Assist in clarifying the proposed operation and control of commissioned equipment in areas where the specifications, control drawings or equipment documentation is not sufficient for writing detailed testing procedures.

h. Provide assistance to the Commissioning Authority in preparing the specific functional test procedures as specified herein and review the proposed functional test procedures to ensure feasibility, safety, and equipment protection, and provide necessary written alarm limits to be used during the tests.

i. Prepare a preliminary schedule for commissioning activities, including equipment start-up, and testing, adjusting and balancing start and completion, for use by the Commissioning Authority and update the schedule during the construction period, as appropriate. Notify the Commissioning Authority immediately when commissioning activities not yet performed or not yet scheduled will delay construction.

j. Provide start-up and prefunctional testing for equipment and execute the electrical -related portions of the prefunctional checklists for commissioned equipment during the start-up and initial check-out process.

k. Perform and document start-up and system operational check-out procedures, providing a copy to the Commissioning Authority.

l. Correct noncompliance items before beginning functional testing. Discrepancies and problems shall be remedied before functional testing.

2. Acceptance Phase

a. Place equipment and systems into operation and continue their operation during each working day of the testing and commissioning activities, as required.

b. Provide skilled technicians to execute starting and prefunctional testing of equipment and to execute the functional tests for each individual piece of equipment and system. Technicians shall be available and present during the agreed upon scheduled tests and for sufficient duration to complete the necessary tests, adjustments and problem-solving.

c. Perform functional testing under the direction of the Commissioning Authority for specified equipment and assist the Commissioning Authority in interpreting the test data, as necessary.

d. Correct deficiencies (differences between specified and observed performance) as identified by the Commissioning Authority and interpreted by the Architect Engineer and retest the equipment, as required to demonstrate proper operation and performance.

e. Prepare operation and maintenance manuals as specified, including clarifying and updating the original sequences of operation to as-built conditions.

f. Maintain marked-up record drawings and produce final record drawings of project drawings and contractor-generated coordination drawings.

g. Provide specified training of the Owner’s operating personnel.

h. Coordinate with equipment manufacturers to determine specific requirements to

Electrical Systems Commissioning 16800 - 4 maintain the validity of the warranty.

3. Warranty Period

a. Execute deferred functional testing (after coordinating activity with the mechanical commissioning supervisor), witnessed by the Commissioning Authority, as specified in Section 17100, Commissioning.

b. Correct deficiencies and make necessary adjustments to operations and maintenance manuals and as-built drawings system or equipment modifications made during the warranty period and those identified in any deferred functional performance testing.

PART 2 PRODUCTS

2.1 TEST EQUIPMENT

A. Standard testing equipment required to perform start-up, initial check-out, prefunctional, and required functional testing shall be provided by the Contractor for the equipment or system being tested.

PART 3 EXECUTION

3.1 SUBMITTALS

A. Submit additional documentation as required to support the commissioning process. This additional submittal documentation shall include, at a minimum, the proposed start-up and initial check-out procedures, and prefunctional checklists.

3.2 START-UP PLAN AND PREFUNCTIONAL TESTING

A. Prefunctional testing shall be required for each piece of equipment to ensure that the equipment and systems are properly installed and ready for operation, so that functional testing may proceed without delays. Follow the approved start-up, initial check-out, and prefunctional testing procedures. Sampling strategies shall not be used for prefunctional testing. The prefunctional testing for equipment and subsystems of a given system shall be successfully completed and documented prior to functional testing of the system.

B. The following procedures shall apply to equipment and systems to be commissioned:

1. Start-up and initial check-out plan: develop the detailed start-up and prefunctional testing plans for equipment and systems that are to be commissioned, as specified herein. The Commissioning Authority shall review the proposed procedures and prefunctional testing documentation to ensure that there is written documentation that each of the manufacturer-recommended procedures have been completed.

2. The start-up and initial check-out plan shall consist, as a minimum, of the following:

a. The manufacturer’s standard written start-up and check-out procedures copied from the installation manuals and manufacturer’s normally used field check-out sheets.

The plan shall include checklists and procedures with specific boxes or lines for recording and documenting the checking and inspections of each procedure and a summary statement with a signature block at the end of the plan.

b. First-run checklist for equipment, including:

1) Equipment properly set.

2) Adjustment of vibration isolators.

3) Equipment properly connected.

4) Completion of initial lubrication procedures.

Electrical Systems Commissioning 16800 - 5

5) Wiring properly connected.

6) Electrical overload relays appropriate for load.

7) Electrical accessories properly installed and adjusted.

8) Controls, safeties, and time switches properly set.

9) Verification of direction of motor rotation after final electrical connections by jogging motor.

10) Measurement of amperage draw of electric motors and comparison with nameplate rating and with overload heater ratings.

11) Monitoring of temperature build-up in motors and bearings.

c. Contractor-developed prefunctional checklists.

3. Prior to energizing, test cables and wire for continuity, shorts, and circuitry, and correct short circuits, opens, and errors in circuiting.

4. Overcurrent Protective Devices:

a. Set field-adjustable devices subsequent to installation of units.

b. Prior to energizing overcurrent protective devices, test devices for continuity of circuitry and for short circuits. Correct malfunctioning units.

5. Start-up equipment and check-out operation in accordance with manufacturer's published procedures and with the procedures specified herein.

a. Submit report on equipment start-up and check-out with data from recorded findings.

6. In addition to other requirements specified herein, manufacturer shall provide services to start-up, check-out, and test the following equipment and systems:

a. Emergency power supply systems.

7. Emergency Power Supply System:

a. Upon completion of the installation, the emergency power supply system shall be tested to ensure conformity to the requirements of the NFPA 110-2002, both in power output and in function. The authority having jurisdiction, and the Owner, shall be given advance notification of the time the final test will be performed in order that the authority may witness these tests. The tests shall include performance test, full load test and cycle crank test, and shall be conducted and recorded as described in

NFPA 110-2002.

b. Fill and top-off the fuel tanks after testing is completed.

8. Switchboards:

a. After complete installation, a certified electrical testing firm shall provide complete switchboard testing, including:

1) Check for tightness of bolted connections.

2) Check for bus bar bracing.

3) Check that contact and joint resistances in circuit breakers are within manufacturer's tolerances.

4) Check for installation and connection of equipment and circuits, and calibration or adjustment of meters, relays, remote controls, and other devices to ensure operation.

5) Test to determine that circuit breaker trip devices are operating and adjusted.

b. The Owner reserves the right to witness the above described tests, checks, and inspections. Notify the Owner at least 10 days prior to the date scheduled for the test.

9. Grounding

a. Ground resistance shall be measured by a licensed professional engineer in accordance with IEEE 81P-1983. Measurements shall be made with the grounding system isolated from the utility neutral. Results of the tests shall be submitted in a certified test report, bearing the seal of the test engineer. The certified test report shall include the following minimum data:

1) Project name, date and location of test.

Electrical Systems Commissioning 16800 - 6

2) Instrument serial number and type used.

3) Sketch, showing layout of ground system and locations of test spikes.

4) Measured ground resistance.

10. Luminaires:

a. Luminaires shall be operational at the time of substantial completion.

b. Replace lamps that fail within 30 days after the date of the Architect's final certificate substantial completion at no additional cost to the Owner.

11. Fire Alarm System:

a. Procedures, methods, and testing of the fire alarm system shall be conducted in accordance with NFPA 72-1999, Chapter 7.

b. Alarm initiating, notification, and auxiliary devices shall be tested to ensure they are operational and that alarm outputs are as specified herein. Devices and circuits shall be tested in both normal and trouble modes. Smoke detectors shall be tested using smoke, or a listed aerosol acceptable to the manufacturer.

c. Alarm initiating, notification, and auxiliary devices shall be tested to ensure they are annunciating the proper device label at the fire alarm control panel and/or remote annunciator display. This includes verification of the proper address, device description, and location. If the device labels are found to be inaccurate, correct and retest.

d. Verify the transmission of alarm, trouble, and supervisory signals to the central station.

e. SLC, NAC, and IDC circuits shall be tested for opens, shorts, and ground conditions, and the proper annunciation. Circuit board jumpers in the system that inhibit checking for ground faults shall be identified and shown to be in the correct position.

f. Auxiliary system functions shall be verified, including but not limited to elevator recall, control of HVAC systems, fire or smoke doors/dampers/shutters, and the monitoring of the fire pump.

g. Significant portions of the testing shall be conducted on battery power. This includes the main control panel, and remote equipment such as network nodes, and/or auxiliary power supplies.

h. Site specific software shall be verified during testing of the sequence of operations.

i. Operational tests shall be conducted at a time coordinated between the Owner, Contractor and Commissioning Authority. The manufacturer's authorized representative for the fire alarm equipment shall be present during the tests. The manufacturer's authorized representative for auxiliary equipment monitored or activated by the fire alarm system shall also be present during the tests. This may include but is not limited to HVAC controls, elevators, suppression systems, fire pumps, and sprinkler systems. If the building is occupied prior to the operational test, these tests shall be conducted after normal business hours. Failure of the system to operate as specified herein shall require retesting.

j. Sound Output Levels:

1) Finishes and furnishings shall be in place and building systems and equipment shall be in operation for these tests.

2) Take sound level measurements throughout the building with a sound level meter to verify notification appliance sound output levels at a minimum of 15 dB above the ambient conditions. Provide a complete set of fire alarm shop drawings annotated to indicate the locations and sound level readings that were measured.

k. Submit a type test report, similar to that shown in NFPA 72-1999, Chapter 7, recording test results, system descriptions, and witnesses.

l. Submit a printout of the event history log for testing.

12. Air Sampling Smoke Detectors:

Electrical Systems Commissioning 16800 - 7

a. Smoke transport time shall be measured by introducing smoke into the most remote sample point and recording the elapsed time, until the detector bar graph registers at least 20% above normal ambient conditions. Where measured transport time exceeds the calculated transport time by more than 10%, the cause of the deviation shall be determined and corrected. Where separate control units are used, they shall be tested for alarm, trouble, and supervisory conditions, and the reporting of these signals to the main fire alarm control panel.

b. Test Records Record Switchgear & Switchboard Assemblies Test Record 1…