NV Army National Guard Section 010000 - Safety and Security.pdf
PDF 241 KB Posted
- Attached to
- Fencing & Gates Repairs & Installation
- Solicitation number
- 43ADG-S1577
- Issued by
- Washoe County, Nevada
About this file
This document outlines a state and local contract opportunity from the State of Nevada Purchasing Division on behalf of the Nevada Army National Guard (NVARNG) for fencing and gates repairs and installation services across multiple locations in the state. The project will involve repairing and installing various types of fences and gates over multiple years, depending on available funding from the National Guard Bureau. The contract is open to qualified vendors, who will be required to submit a proposal for the as-needed services. The document provides detailed technical specifications for the required work, including safety and security procedures, concrete work, chain link fencing, and stormwater conveyance. Pricing terms, set-asides, and funding sources are not explicitly stated, but the contract will be awarded to the responsive and responsible bidder(s) that meet the requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NV Army National Guard Environmental Policy.pdf | ||
| ATTACHMENT B Vendor Certification.pdf | ||
| LetterOfIntent~1.pdf | ||
| ATTACHMENT D - Insurance Schedule~1.docx | DOCX document | |
| ATTACHMENT A Confidentiality and Certification of Indemnification.pdf | ||
| ATTACHMENT H Certification Regarding Lobbying.pdf | ||
| Quote Instructions.pdf | ||
| RFP Final~2.docx | DOCX document | |
| ATTACHMENT I Federal Laws and Authorities.pdf | ||
| Standard Contract Form~1.docx | DOCX document | |
| UFC 4-022-03 Security Fences and Gates.pdf | ||
| Personal Security Questionnaire.docx | DOCX document | |
| ATTACHMENT G COST SCHEDULE.docx | DOCX document | |
| Service Agreement.docx | DOCX document | |
| Proposed Staff Resume - 04-05-17~2.doc | DOC document | |
| Reference Questionnaire - 01-24-20~2.doc | DOC document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1/12/2021 Nevada Army National Guard Perimeter Security Fence
SECTION 010000 – SAFETY AND SECURITY
This specification outlines safety procedures and regulations to be followed by the Contractor during the course of this work. This work item shall consist of, but is not limited to, furnishing, installing and removing temporary signing and fencing required during the course of this work. It shall also include labor, equipment and materials required for traffic control throughout the duration of the project. The Contractor shall be required to submit a Safety Plan to the Owner and have it approved prior to beginning construction activities.
It shall be the responsibility of the contractor to make all necessary accommodations for security or safety when working on the project at all times during construction. At the end of each shift, the Contractor shall be required to secure the site by replacing fencing fabric at all locations that are open due to construction operations. No gaps in the fencing are allowed at the end of a work shift. The contractor shall be responsible for any damages incurred to the facilities being connected to.
1. Prior to commencement of the work on any portion of the project, the Contractor shall schedule a meeting with NVARNG to discuss and interview the personnel planned to operate any and all equipment during the course of construction. The drivers must have a valid driver’s license and will be subject to screening/background check. If NVARNG deem any one individual to not meet expectations for operating equipment within the project area, they shall be replaced immediately with another operator that has met all the same criteria. The NVARNG representative will have final approval authority of the selected operator(s). If the operator(s) does not meet NVARNG standards, they will not be allowed to operate equipment during the course of construction. To the extent possible the operator(s) shall remain the same during the course of construction.
2. Absolutely no access to NVARNG will be allowed without prior approval from NVARNG.
Delays to construction due to access restrictions will not be just cause for contract time extensions.
3. Prior to commencement of work on any of the project area, the Contractor will submit a haul route plan for review and approval by the NVARG Project Manager. The Contractor shall furnish, install, and maintain appropriate flaggers, traffic signs, barricades and pilot cars that clearly identify a haul route throughout its length within the flight operation area.
4. Contractor’s access to the site shall be as shown on the plans. No other access points shall be allowed unless approved by NVARNG. Contractor’s traffic authorized to enter the site shall be experienced in the route or guided by contractor personnel. The contractor shall be responsible for traffic control to and from the construction area on Guard property. The contractor is responsible for immediate clean-up of any debris deposited along the delivery route to the storage area or work site shall be as directed by the NVARNG Project Manager.
SAFETY AND SECURITY 033000 - 1
END OF SECTION 010000
SAFETY AND SECURITY 033000 - 2
SECTION 033000 - CAST-IN-PLACE CONCRETE
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract Sections, apply to this Section.
1.2 SUMMARY
A. Section includes cast-in-place concrete, including formwork, reinforcement, concrete materials, mixture design, placement procedures, and finishes, for the following:
1. Footings.
B. Related Sections:
1. Section 323113 "Chain Link Fences and Gates" for fencing.
1.3 DEFINITIONS
A. Cementitious Materials: Portland cement alone or in combination with one or more of the following: blended hydraulic cement, fly ash and other pozzolans, ground granulated blast-furnace slag, and silica fume; subject to compliance with requirements.
1.4 ACTION SUBMITTALS
A. Product Data: For each type of product indicated.
B. Design Mixtures: For each concrete mixture. Submit alternate design mixtures when characteristics of materials, Project conditions, weather, test results, or other circumstances warrant adjustments.
1.5 INFORMATIONAL SUBMITTALS
A. Qualification Data: For Manufacturer.
B. Material Certificates: For each of the following, signed by manufacturers:
1. Cementitious materials.
2. Admixtures.
C. Material Test Reports: For the following, from a qualified testing agency, indicating compliance with requirements:
CAST-IN-PLACE CONCRETE 033000 - 1
1. Aggregates.
D. Field quality-control reports.
1.6 QUALITY ASSURANCE
A. Installer Qualifications: A qualified installer who employs on Project personnel qualified as ACI-certified Flatwork Technician and Finisher and a supervisor who is an ACI-certified Concrete Flatwork Technician.
B. Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM C 94/C 94M requirements for production facilities and equipment.
PART 2 - PRODUCTS
2.1 CONCRETE MATERIALS
A. Cementitious Material: Use the following cementitious materials, of the same type, brand, and source, throughout Project:
1. Portland Cement: ASTM C 150, Type II.
2. Maximum Coarse-Aggregate Size: 1 inch nominal.
3. Fine Aggregate: Free of materials with deleterious reactivity to alkali in cement.
B. Water: ASTM C 94/C 94M and potable.
2.2 ADMIXTURES
A. Air-Entraining Admixture: ASTM C 260.
B. Water-reducing admixtures: ASTM C 494.
C. Other admixtures: The use of other admixtures shall be approved by the Engineer.
2.3 CONCRETE MIXTURES, GENERAL
A. Prepare design mixtures for each type and strength of concrete, proportioned on the basis of laboratory trial mixture or field test data, or both, according to ACI 301.
1. Use a qualified independent testing agency for preparing and reporting proposed mixture designs based on laboratory trial mixtures.
B. Cementitious Materials: Limit percentage, by weight, of cementitious materials other than portland cement in concrete as follows:
1. Fly Ash: 25 percent.
CAST-IN-PLACE CONCRETE 033000 - 2
1/12/2021Nevada Army National Guard
2. Combined Fly Ash and Pozzolan: 25 percent.
3. Ground Granulated Blast-Furnace Slag: 50 percent.
4. Combined Fly Ash or Pozzolan and Ground Granulated Blast-Furnace Slag: 50 percent portland cement minimum, with fly ash or pozzolan not exceeding 25 percent.
C. Admixtures: Use admixtures according to manufacturer's written instructions.
1. Use admixture in concrete, as required, for placement and workability.
2. Use water-reducing and retarding admixture when required by high temperatures, low humidity, or other adverse placement conditions.
2.4 CONCRETE MIXING
A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete according to ASTM C 94/C 94M and furnish batch ticket information.
1. When air temperature is between 85 and 90 deg F, reduce mixing and delivery time from 1-1/2 hours to 75 minutes; when air temperature is above 90 deg F, reduce mixing and delivery time to 60 minutes.
B. Project-Site Mixing: Measure, batch, and mix concrete materials and concrete according to ASTM C 94/C 94M. Mix concrete materials in appropriate drum-type batch machine mixer.
1. For mixer capacity of 1 cu. yd. or smaller, continue mixing at least 1-1/2 minutes, but not more than 5 minutes after ingredients are in mixer, before any part of batch is released.
2. For mixer capacity larger than 1 cu. yd., increase mixing time by 15 seconds for each additional 1 cu. yd.
3. Provide batch ticket for each batch discharged and used in the Work, indicating Project identification name and number, date, mixture type, mixture time, quantity, and amount of water added. Record approximate location of final deposit in structure.
PART 3 - EXECUTION
3.1 CONCRETE PLACEMENT
A. Before placing concrete, verify that required inspections have been performed.
B. Do not add water to concrete during delivery, at Project site, or during placement unless approved by the engineer.
C. Deposit concrete continuously in one layer or in horizontal layers of such thickness that no new concrete will be placed on concrete that has hardened enough to cause seams or planes of weakness. Deposit concrete to avoid segregation.
1. Deposit concrete in horizontal layers of depth to not exceed formwork design pressures and in a manner to avoid inclined construction joints.
CAST-IN-PLACE CONCRETE 033000 - 3
D. Cold-Weather Placement: Comply with ACI 306.1 and as follows. Protect concrete work from physical damage or reduced strength that could be caused by frost, freezing actions, or low temperatures.
1. When average high and low temperature is expected to fall below 40 deg F for three successive days, maintain delivered concrete mixture temperature within the temperature range required by ACI 301.
2. Do not use frozen materials or materials containing ice or snow. Do not place concrete on frozen subgrade or on subgrade containing frozen materials.
3. Do not use calcium chloride, salt, or other materials containing antifreeze agents or chemical accelerators unless otherwise specified and approved in mixture designs.
E. Hot-Weather Placement: Comply with ACI 301 and as follows:
1. Maintain concrete temperature below 90 deg F at time of placement. Chilled mixing water or chopped ice may be used to control temperature, provided water equivalent of ice is calculated to total amount of mixing water. Using liquid nitrogen to cool concrete is Contractor's option.
2. Fog-spray forms, steel reinforcement, and subgrade just before placing concrete. Keep subgrade uniformly moist without standing water, soft spots, or dry areas.
3.2 CONCRETE REPAIRS
A. Defective Concrete: Repair and patch defective areas when approved by the engineer. Remove and replace concrete that cannot be repaired and patched to the engineer's approval.
B. Repair materials and installation are subject to the engineer's approval.
3.3 FIELD QUALITY CONTROL
A. Testing and Inspecting: Owner will engage a qualified testing and inspecting agency to perform field tests and inspections and prepare test reports.
B. Inspections:
1. Concrete placement, including conveying and depositing.
2. Curing procedures and maintenance of curing temperature.
3. Verification of concrete strength.
C. Concrete Tests: Testing of composite samples of fresh concrete obtained according to ASTM C 172 shall be performed according to the following requirements:
1. Testing Frequency: Obtain at least one composite sample for each 100 cu. Yd. or fraction thereof of each concrete mixture placed each day.
a. When frequency of testing will provide fewer than five compressive-strength tests for each concrete mixture, testing shall be conducted from at least five randomly selected batches or from each batch if fewer than five are used.
2. Compression Test Specimens: ASTM C 31/C 31M.
CAST-IN-PLACE CONCRETE 033000 - 4
a. Cast and laboratory cure two sets of two standard cylinder specimens for each composite sample.
b. Cast and field cure two sets of two standard cylinder specimens for each composite sample.
3. Compressive-Strength Tests: ASTM C 39/C 39M; test one set of two laboratory-cured specimens at 7 days and one set of two specimens at 28 days.
END OF SECTION 033000
CAST-IN-PLACE CONCRETE 033000 - 5
SECTION 311000 - SITE CLEARING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Protecting existing vegetation to remain.
2. Removing existing vegetation.
3. Clearing and grubbing.
4. Removing above- and below-grade site improvements.
5. Temporary erosion and sedimentation control.
1.3 DEFINITIONS
A. Subsoil: Soil beneath the level of subgrade; soil beneath the topsoil layers of a naturally occurring soil profile, typified by less than 1 percent organic matter and few soil organisms.
B. Surface Soil: Soil that is present at the top layer of the existing soil profile. In undisturbed areas, surface soil is typically called "topsoil," but in disturbed areas such as urban environments, the surface soil can be subsoil.
C. Topsoil: Top layer of the soil profile consisting of existing native surface topsoil or existing in-place surface soil; the zone where plant roots grow.
D. Topsoil: Top layer of the soil profile consisting of existing native surface topsoil or existing in-place surface soil; the zone where plant roots grow. Its appearance is generally friable, pervious, and black or a darker shade of brown, gray, or red than underlying subsoil; reasonably free of subsoil, clay lumps, gravel, and other objects larger than 2 inches in diameter; and free of weeds, roots, toxic materials, or other nonsoil materials.
E. Vegetation: Trees, shrubs, groundcovers, grass, and other plants.
1.4 MATERIAL OWNERSHIP
A. Except for materials indicated to be stockpiled or otherwise remain Owner's property, cleared materials shall become Contractor's property and shall be removed from Project site.
SITE CLEARING 311000 - 1
1.5 INFORMATIONAL SUBMITTALS
A. Existing Conditions: Documentation of existing trees and plantings, adjoining construction, and site improvements that establishes preconstruction conditions that might be misconstrued as damage caused by site clearing.
1. Use sufficiently detailed photographs or video recordings.
2. Include plans and notations to indicate specific wounds and damage conditions of each tree or other plant designated to remain.
B. Rock stockpiling program.
C. Record Drawings: Identifying and accurately showing locations of capped utilities and other subsurface structural, electrical, and mechanical conditions.
D. Burning: Documentation of compliance with burning requirements and permitting of authorities having jurisdiction. Identify location(s) and conditions under which burning will be performed.
1.6 QUALITY ASSURANCE
A. Topsoil Stripping and Stockpiling Program: Prepare a written program to systematically demonstrate the ability of personnel to properly follow procedures and handle materials and equipment during the Work. Include dimensioned diagrams for placement and protection of stockpiles.
B. Rock Stockpiling Program: Prepare a written program to systematically demonstrate the ability of personnel to properly follow procedures and handle materials and equipment during the Work. Include dimensioned diagrams for placement and protection of stockpiles.
1.7 FIELD CONDITIONS
A. Traffic: Minimize interference with adjoining roads, streets, walks, and other adjacent occupied or used facilities during site-clearing operations.
1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction.
2. Provide alternate routes around closed or obstructed trafficways if required by Owner or authorities having jurisdiction.
B. Improvements on Adjoining Property: Authority for performing site clearing indicated on property adjoining Owner's property will be obtained by Owner before award of Contract.
1. Do not proceed with work on adjoining property until directed by Architect.
C. Salvageable Improvements: Carefully remove items indicated to be salvaged and store on Owner's premises (coordinate with Owner for location).
D. Utility Locator Service: Notify Call Before You Dig for area where Project is located before site clearing.
SITE CLEARING 311000 - 2
E. Do not commence site clearing operations until temporary erosion- and sedimentation-control measures are in place.
F. Soil Stripping, Handling, and Stockpiling: Perform only when the soil is dry or slightly moist.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Satisfactory Soil Material: Requirements for satisfactory soil material are specified in Section 312000 "Earth Moving."
1. Obtain approved borrow soil material off-site when satisfactory soil material is not available on-site.
PART 3 - EXECUTION
3.1 PREPARATION
A. Protect and maintain benchmarks and survey control points from disturbance during construction.
B. Protect existing site improvements to remain from damage during construction.
1. Restore damaged improvements to their original condition, as acceptable to Owner.
3.2 TEMPORARY EROSION AND SEDIMENTATION CONTROL
A. Provide temporary erosion- and sedimentation-control measures to prevent soil erosion and discharge of soil-bearing water runoff or airborne dust to adjacent properties and walkways, according to erosion- and sedimentation-control Drawings and requirements of authorities having jurisdiction.
B. Verify that flows of water redirected from construction areas or generated by construction activity do not enter or cross protection zones.
C. Inspect, maintain, and repair erosion- and sedimentation-control measures during construction until permanent vegetation has been established.
D. Remove erosion and sedimentation controls, and restore and stabilize areas disturbed during removal.
3.3 CLEARING AND GRUBBING
A. Remove obstructions, trees, shrubs, and other vegetation to permit installation of new construction.
SITE CLEARING 311000 - 3
1. Do not remove trees, shrubs, and other vegetation indicated to remain or to be relocated.
2. Grind down stumps and remove roots larger than 3 inches in diameter, obstructions, and debris to a depth of 18 inches below exposed subgrade.
B. Fill depressions caused by clearing and grubbing operations with satisfactory soil material unless further excavation or earthwork is indicated.
1. Place fill material in horizontal layers not exceeding a loose depth of 8 inches, and compact each layer to a density equal to adjacent original ground.
3.4 SITE IMPROVEMENTS
A. Remove existing above- and below-grade improvements as indicated and necessary to facilitate new construction.
B. Remove slabs, paving, curbs, gutters, and aggregate base as indicated.
1. Unless existing full-depth joints coincide with line of demolition, neatly saw-cut along line of existing pavement to remain before removing adjacent existing pavement. Saw-cut faces vertically.
2. Paint cut ends of steel reinforcement in concrete to remain with two coats of antirust coating, following coating manufacturer's written instructions. Keep paint off surfaces that will remain exposed.
3.5 DISPOSAL OF SURPLUS AND WASTE MATERIALS
A. Remove surplus soil material, unsuitable topsoil, obstructions, demolished materials, and waste materials including trash and debris, and legally dispose of them off Owner's property.
B. Burning tree, shrub, and other vegetation waste is permitted according to burning requirements and permitting of authorities having jurisdiction. Control such burning to produce the least smoke or air pollutants and minimum annoyance to surrounding properties. Burning of other waste and debris is prohibited.
C. Separate recyclable materials produced during site clearing from other nonrecyclable materials.
Store or stockpile without intermixing with other materials, and transport them to recycling facilities. Do not interfere with other Project work.
END OF SECTION 311000
SITE CLEARING 311000 - 4
SECTION 312000 - EARTH MOVING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Excavating and filling for rough grading the Site.
2. Preparing subgrades for aggregate base roads, storm drain pipes, headwall structures and rip rap bedding.
B. Related Requirements:
1. Section 311000 "Site Clearing" for site stripping, grubbing, stripping and stockpiling topsoil, and removal of above- and below-grade improvements and utilities.
1.3 DEFINITIONS
A. Backfill: Soil material or controlled low-strength material used to fill an excavation.
1. Initial Backfill: Backfill placed beside and over pipe in a trench, including haunches to support sides of pipe.
2. Final Backfill: Backfill placed over initial backfill to fill a trench.
B. Bedding Course: Aggregate layer placed over the excavated subgrade in a trench before laying pipe.
C. Borrow Soil: Satisfactory soil imported from off-site for use as fill or backfill.
D. Excavation: Removal of material encountered above subgrade elevations and to lines and dimensions indicated.
E. Structures: Buildings, footings, foundations, retaining walls, slabs, tanks, curbs, mechanical and electrical appurtenances, or other man-made stationary features constructed above or below the ground surface.
F. Subgrade: Uppermost surface of an excavation or the top surface of a fill or backfill immediately below subbase, drainage fill, drainage course, or topsoil materials.
G. Utilities: On-site underground pipes, conduits, ducts, and cables as well as underground services within buildings.
EARTH MOVING 312000 - 1
1.4 ACTION SUBMITTALS
A. Product Data: For each type of the following manufactured products required:
1. Geotextiles. (If Needed)
1.5 INFORMATIONAL SUBMITTALS
A. Qualification Data: For qualified testing agency.
B. Material Test Reports: For each borrow soil material proposed for fill and backfill as follows:
1. Classification according to ASTM D2487.
2. Laboratory compaction curve according to ASTM D1557.
1.6 QUALITY ASSURANCE
A. Geotechnical Testing Agency Qualifications: Qualified according to ASTM E329 and
ASTM D3740 for testing indicated.
1.7 FIELD CONDITIONS
A. Traffic: Minimize interference with adjoining roads, streets, walks, and other adjacent occupied or used facilities during earth-moving operations.
1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction.
2. Provide alternate routes around closed or obstructed traffic ways if required by Owner or authorities having jurisdiction.
B. Improvements on Adjoining Property: Authority for performing earth moving indicated on property adjoining Owner's property will be obtained by Owner before award of Contract.
1. Do not proceed with work on adjoining property until directed by Architect.
C. Utility Locator Service: Notify Call Before You Dig for area where Project is located before beginning earth-moving operations.
D. Do not commence earth-moving operations until temporary site fencing and erosion- and sedimentation-control measures specified in Section 311000 "Site Clearing” are in place.
PART 2 - PRODUCTS
2.1 SOIL MATERIALS
A. General: Provide borrow soil materials when sufficient satisfactory soil materials are not available from excavations.
EARTH MOVING 312000 - 2
2.2 GEOTEXTILES (If Needed)
A. As specified on the plan details.
PART 3 - EXECUTION
3.1 PREPARATION
A. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by earth-moving operations.
B. Protect and maintain erosion and sedimentation controls during earth-moving operations.
C. Protect subgrades and foundation soils from freezing temperatures and frost. Remove temporary protection before placing subsequent materials.
3.2 DEWATERING
A. Provide dewatering system of sufficient scope, size, and capacity to control hydrostatic pressures and to lower, control, remove, and dispose of ground water and permit excavation and construction to proceed on dry, stable subgrades.
B. Prevent surface water and ground water from entering excavations, from ponding on prepared subgrades, and from flooding Project site and surrounding area.
C. Protect subgrades from softening, undermining, washout, and damage by rain or water accumulation.
1. Reroute surface water runoff away from excavated areas. Do not allow water to accumulate in excavations. Do not use excavated trenches as temporary drainage ditches.
D. Dispose of water removed by dewatering in a manner that avoids endangering public health, property, and portions of work under construction or completed. Dispose of water and sediment in a manner that avoids inconvenience to others.
3.3 EXPLOSIVES
A. Explosives: Do not use explosives.
3.4 EXCAVATION, GENERAL
A. Unclassified Excavation: Excavate to subgrade elevations regardless of the character of surface and subsurface conditions encountered. Unclassified excavated materials may include rock, soil materials, and obstructions. No changes in the Contract Sum or the Contract Time will be authorized for rock excavation or removal of obstructions.
EARTH MOVING 312000 - 3
brodie.lynch Cross-Out
1. If excavated materials intended for fill and backfill include unsatisfactory soil materials and rock, replace with satisfactory soil materials.
B. Classified Excavation: Excavate to subgrade elevations. Material to be excavated will be classified as earth and rock. Do not excavate rock until it has been classified and cross sectioned by Architect. The Contract Sum will be adjusted for rock excavation according to unit prices included in the Contract Documents. Changes in the Contract Time may be authorized for rock excavation.
1. Earth excavation includes excavating pavements and obstructions visible on surface;
underground structures, utilities, and other items indicated to be removed; and soil, boulders, and other materials not classified as rock or unauthorized excavation.
3.5 EXCAVATION FOR UTILITY TRENCHES
A. Excavate trenches to indicated gradients, lines, depths, and elevations.
B. Excavate trenches to uniform widths to provide the following clearance on each side of pipe or conduit. Excavate trench walls vertically from trench bottom to 12 inches higher than top of pipe or conduit unless otherwise indicated.
C. Trench Bottoms: Excavate and shape trench bottoms to provide uniform bearing and support of pipes and conduit. Shape subgrade to provide continuous support for bells, joints, and barrels of pipes and for joints, fittings, and bodies of conduits. Remove projecting stones and sharp objects along trench subgrade.
3.6 SUBGRADE INSPECTION
A. Notify Engineer when excavations have reached required subgrade.
B. If Engineer determines that unsatisfactory soil is present, continue excavation and replace with compacted backfill or fill material as directed.
3.7 STORAGE OF SOIL MATERIALS
A. Stockpile borrow soil materials and excavated satisfactory soil materials without intermixing.
Place, grade, and shape stockpiles to drain surface water. Cover to prevent windblown dust.
1. Stockpile soil materials away from edge of excavations. Do not store within drip line of remaining trees.
3.8 BACKFILL
A. Place and compact backfill in excavations promptly, but not before completing the following:
1. Construction below finish grade including, where applicable, subdrainage, dampproofing, waterproofing, and perimeter insulation.
2. Surveying locations of underground utilities for Record Documents.
EARTH MOVING 312000 - 4
3. Testing and inspecting underground utilities.
4. Removing concrete formwork.
5. Removing trash and debris.
6. Removing temporary shoring, bracing, and sheeting.
7. Installing permanent or temporary horizontal bracing on horizontally supported walls.
B. Place backfill on subgrades free of mud, frost, snow, or ice.
3.9 UTILITY TRENCH BACKFILL
A. Place backfill on subgrades free of mud, frost, snow, or ice.
B. Place and compact bedding course on trench bottoms and where indicated. Shape bedding course to provide continuous support for bells, joints, and barrels of pipes and for joints, fittings, and bodies of conduits.
C. Backfill voids with satisfactory soil while removing shoring and bracing.
3.10 GRADING
A. General: Uniformly grade areas to a smooth surface, free of irregular surface changes. Comply with compaction requirements and grade to cross sections, lines, and elevations indicated.
1. Provide a smooth transition between adjacent existing grades and new grades.
2. Cut out soft spots, fill low spots, and trim high spots to comply with required surface tolerances.
3.11 FIELD QUALITY CONTROL
A. Special Inspections: Owner will engage a qualified special inspector to perform the following special inspections:
1. Determine prior to placement of fill that site has been prepared in compliance with requirements.
2. Determine that fill material classification and maximum lift thickness comply with requirements.
3. Determine, during placement and compaction, that in-place density of compacted fill complies with requirements.
B. Testing Agency: Owner will engage a qualified geotechnical engineering testing agency to perform tests and inspections.
C. Allow testing agency to inspect and test subgrades and each fill or backfill layer. Proceed with subsequent earth moving only after test results for previously completed work comply with requirements.
EARTH MOVING 312000 - 5
D. Testing agency will test compaction of soils in place according to ASTM D1556, ASTM D2167, ASTM D2937, and ASTM D6938, as applicable. Tests will be performed at the following locations and frequencies:
1. Trench Backfill: At each compacted initial and final backfill layer, at least one test for every length of trench.
E. When testing agency reports that subgrades, fills, or backfills have not achieved degree of compaction specified, scarify and moisten or aerate, or remove and replace soil materials to depth required; recompact and retest until specified compaction is obtained.
3.12 PROTECTION
A. Protecting Graded Areas: Protect newly graded areas from traffic, freezing, and erosion. Keep free of trash and debris.
B. Repair and reestablish grades to specified tolerances where completed or partially completed surfaces become eroded, rutted, settled, or where they lose compaction due to subsequent construction operations or weather conditions.
1. Scarify or remove and replace soil material to depth as directed by Architect; reshape and recompact.
C. Where settling occurs before Project correction period elapses, remove finished surfacing, backfill with additional soil material, compact, and reconstruct surfacing.
1. Restore appearance, quality, and condition of finished surfacing to match adjacent work, and eliminate evidence of restoration to greatest extent possible.
3.13 DISPOSAL OF SURPLUS AND WASTE MATERIALS
A. Remove surplus satisfactory soil and waste materials, including unsatisfactory soil, trash, and debris, and legally dispose of them off Owner's property.
B. Transport surplus satisfactory soil to designated storage areas on Owner's property. Stockpile or spread soil as directed by Architect.
1. Remove waste materials, including unsatisfactory soil, trash, and debris, and legally dispose of them off Owner's property.
END OF SECTION 312000
EARTH MOVING 312000 - 6
SECTION 323113 - CHAIN LINK FENCES AND GATES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract shall apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Chain-link fences.
2. Chain-link gates.
B. Related Sections:
1. Section 033000 "Cast-in-Place Concrete for cast-in-place concrete post footings.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product indicated. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for chain-link fences.
1. Fence and gate posts, rails, and fittings.
2. Chain-link fabric, reinforcements, and attachments.
3. Accessories: Barbed wire.
B. Shop Drawings: Include plans, elevations, sections, details, and attachments to other work.
1.4 INFORMATIONAL SUBMITTALS
A. Product Certificates: For each type of chain-link fence from manufacturer.
B. Product Test Reports: For framing strength according to ASTM F 1043.
C. Field quality-control reports.
D. Warranty: Sample of special warranty.
1.5 CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data: For the following to include in emergency, operation, and maintenance manuals:
CHAIN LINK FENCES AND GATES 323113 - 1
1. Gate hardware.
1.6 QUALITY ASSURANCE
A. Testing Agency Qualifications: For testing fence grounding. Member company of NETA or an
NRTL.
1. Testing Agency's Field Supervisor: Currently certified by NETA to supervise on-site testing.
1.7 PROJECT CONDITIONS
A. Field Measurements: Verify layout information for chain-link fences shown on Drawings in relation to property survey and existing structures. Verify dimensions by field measurements.
1.8 WARRANTY
A. Special Warranty: Manufacturer's standard form in which installer agrees to repair or replace components of chain-link fences and gates that fail in materials or workmanship within specified warranty period.
1. Failures include, but are not limited to, the following:
a. Deterioration of metals, metal finishes, and other materials beyond normal weathering.
PART 2 - PRODUCTS
2.1 CHAIN-LINK FENCE FABRIC
A. General: Provide fabric in one-piece heights measured between top and bottom of outer edge of selvage knuckle or twist. Comply with CLFMI Product Manual and with requirements indicated below:
1. Fabric Height: 84 inches.
2. Steel Wire Fabric: 9-gage wire mesh.
a. Mesh Size: 2 inches.
b. Aluminum-Coated Fabric: ASTM A 491, Type I, or
c. Zinc-Coated Fabric: ASTM A 392, Type II.
d. Coat selvage ends of fabric that is metallic coated before the weaving process with manufacturer's standard clear protective coating.
3. Selvage: Twisted top and bottom.
CHAIN LINK FENCES AND GATES 323113 - 2
2.2 FENCE FRAMING
A. Posts and Rails: Comply with ASTM F 1043 for framing, including rails, braces, and line;
terminal; and corner posts. Provide members with minimum dimensions and wall thickness according to ASTM F 1043 or ASTM F 1083 based on the following:
1. Fence Height: 84 inches.
2. Heavy Industrial Strength: Material Group IA, round steel pipe, Schedule 40 or Group IC, round steel pipe, electric-resistance-welded pipe.
a. Line Post: 2.5 inch-diameter.
b. End, Corner and Pull Post: 4.0 inch-diameter.
3. Brace Rails: 1.625 inches in diameter and complying with ASTM F 1043.
4. Truss Rods: 0.3125 inches in diameter.
5. Metallic Coating for Steel Framing:
a. Type A, consisting of not less than minimum 2.0-oz./sq. ft. average zinc coating per ASTM A 123/A 123M or 4.0-oz./sq. ft. zinc coating per
ASTM A 653/A 653M.
2.3 TENSION WIRE
A. Metallic-Coated Steel Wire: 9-gage, marcelled tension wire complying with ASTM A 817 and ASTM A 824, with the following metallic coating:
1. Type II, zinc coated (galvanized) by hot-dip process, with the following minimum coating weight:
a. Class 3: Not less than 0.8 oz./sq. ft. of uncoated wire surface.
2.4 SWING GATES
A. General: ASTM F900 for gate posts and double swing gate types.
1. Gate Leaf Width: As indicated.
2. Framework Member Sizes and Strength: Based on gate fabric height of 84 inches.
B. Pipe and Tubing:
1. Zinc-Coated Steel: ASTM F1043 and ASTM F1083; protective coating and finish to match fence framework.
2. Aluminum: ASTM B429/B429M; manufacturer's standard finish.
3. Gate Posts: Round tubular steel.
4. Gate Frames and Bracing: Round tubular steel.
C. Frame Corner Construction: assembled with corner fittings.
CHAIN LINK FENCES AND GATES 323113 - 3
D. Extended Gate Posts and Frame Members: Fabricate gate posts and frame end members to extend as indicated above top of chain-link fabric at both ends of gate frame to attach barbed wire assemblies.
E. Hardware:
1. Hinges: 180-degree inward swing.
2. Latch: Permitting operation from both sides of gate.
3. Lock: Manufacturer's standard.
4. Padlock and Chain: Coordinate with owner.
5. Closer: Manufacturer's standard.
2.5 FITTINGS
A. General: Comply with ASTM F 626.
B. Post Caps: Provide for each post.
1. Provide line post caps with loop to receive tension wire or top rail.
C. Rail and Brace Ends: For each corner, pull, and end post.
D. Rail Fittings: Provide the following:
1. Top Rail Sleeves: Pressed-steel or round-steel tubing not less than 6 inches long.
E. Tension and Brace Bands: Pressed steel.
F. Tension Bars: Steel, length not less than 2 inches shorter than full height of chain-link fabric.
Provide one bar for each gate and end post, and two for each corner and pull post, unless fabric is integrally woven into post.
G. Truss Rod Assemblies: Steel, hot-dip galvanized after threading rod and turnbuckle for adjustment.
H. Barbed Wire Arms: Pressed steel or cast iron, with clips, slots, or other means for attaching strands of barbed wire; for each post unless otherwise indicated, and as follows:
1. Provide line posts with arms that accommodate top rail or tension wire.
2. Provide corner arms at fence corner posts, unless extended posts are indicated.
3. Arms to be permanently affixed to the fence posts with tamper-proof screws or by spot welding.
4. Type I, single slanted arm.
I. Tie Wires, Clips, and Fasteners: According to ASTM F 626.
1. Standard Round Wire Ties: For attaching chain-link fabric to posts, rails, and frames, complying with the following:
a. Hot-Dip Galvanized Steel: 9 gauge wire; galvanized coating thickness matching coating thickness of chain-link fence fabric.
CHAIN LINK FENCES AND GATES 323113 - 4
J. Finish:
1. Metallic Coating for Pressed Steel or Cast Iron: Not less than 1.2 oz. /sq. ft. zinc.
2.6 BARBED WIRE
A. Steel Barbed Wire: Comply with ASTM A 121, for two-strand barbed wire, 0.099-inch-diameter line wire with 0.080-inch-diameter, four-point round barbs spaced not more than 5 inches (+/- 1 inch) o.c.
1. Aluminum Coating: Type A.
2. Zinc Coating: Type Z, Class 3.
2.7 CONCRETE POST ANCHORAGE
A. Concrete shall be placed in equal or greater depth and diameter as shown for the application in the plans. Concrete mix, placement and cure procedures shall conform with Section 033000, except as otherwise described herein. Post may be anchored with either a PCC mix or an Engineer-approved commercial rapid set grout. Unusually dry post holes shall be saturated prior to placement of concrete. The concrete shall be adequately braced to prevent movement during the cure period. The concrete or grout shall be crowned and smoothly contoured around the posts to enhance drainage. The concrete and grout shall not shrink or crack. Posts shall not be loaded or stressed prior to curing the anchorage.
2.8 FENCE GROUNDING
A. Conductors: Bare, solid wire for No. 6 AWG and smaller; stranded wire for No. 4 AWG and larger.
1. Material above Finished Grade: Copper.
2. Material on or below Finished Grade: Copper.
3. Bonding Jumpers: Braided copper tape, 1 inch wide, woven of No. 30 AWG bare copper wire, terminated with copper ferrules.
B. Connectors and Grounding Rods: Comply with UL 467.
1. Grounding Rods: Copper-clad steel, 5/8 by 96 inches.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine areas and conditions, with Installer present, for compliance with requirements for a verified survey of property lines and legal boundaries, site clearing, earthwork, pavement work, and other conditions affecting performance of the Work.
CHAIN LINK FENCES AND GATES 323113 - 5
1. Do not begin installation before final grading is completed unless otherwise permitted by Architect.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Stake locations of fence lines and terminal posts. Do not exceed intervals of 500 feet or line of sight between stakes. Indicate locations of utilities, lawn sprinkler system, underground structures, benchmarks, and property monuments.
3.3 INSTALLATION, GENERAL
A. Install chain-link fencing to comply with ASTM F 567, UFC 4-022-03 (Section 2-2.1.1 – Additional Fencing Fabric Requirements) and more stringent requirements indicated.
3.4 CHAIN-LINK FENCE INSTALLATION
A. Post Excavation: Drill or hand-excavate holes for posts to diameters and spacings indicated, in firm, undisturbed soil.
B. Post Setting: Set posts in concrete at indicated spacing into firm, undisturbed soil.
1. Verify that posts are set plumb, aligned, and at correct height and spacing, and hold in position during setting with concrete or mechanical devices.
2. Concrete Fill: Place concrete around posts to dimensions indicated and vibrate or tamp for consolidation. Protect aboveground portion of posts from concrete splatter.
a. Exposed Concrete: Extend 2 inches above grade; shape and smooth to shed water.
3. Mechanically Driven Posts: Drive into soil to the depth specified on the plans. Protect post top to prevent distortion.
C. Terminal Posts: Locate terminal end and corner posts per ASTM F 567 and terminal pull posts at changes in horizontal or vertical alignment of 15 degrees or more.
D. Line Posts: Space line posts uniformly at 10 feet o.c.
E. Post Bracing and Intermediate Rails: Install according to ASTM F 567, maintaining plumb position and alignment of fencing. Diagonally brace terminal posts to adjacent line posts with truss rods and turnbuckles. Install braces at end and gate posts and at both sides of corner and pull posts.
1. Locate horizontal braces within 6 inches from the top of the fabric. Install so posts are plumb when diagonal rod is under proper tension.
F. Tension Wire: Install according to ASTM F 567, maintaining plumb position and alignment of fencing. Pull wire taut, without sags. Fasten fabric to tension wire with 9-gage hog rings of same material and finish as fabric wire, spaced a maximum of 24 inches (610 mm) o.c. Install
CHAIN LINK FENCES AND GATES 323113 - 6
tension wire in locations indicated before stretching fabric. Provide horizontal tension wire at the following locations:
1. Extended along top and bottom of fence fabric. Install top tension wire through post cap loops. Install bottom tension wire within 6 inches of bottom of fabric and tie to each post with not less than same diameter and type of wire.
G. Chain-Link Fabric: Apply fabric to outside of enclosing framework. Leave 2 inches between finish grade or surface and bottom selvage unless otherwise indicated. Pull fabric taut and tie to posts, rails, and tension wires. Anchor to framework so fabric remains under tension after pulling force is released. Provide additional anchoring as required to prevent fencing fabric from being lifted by hand more than 5 inches (125 mm) in height.
H. Tension or Stretcher Bars: Thread through fabric and secure to end, corner, pull, and gate posts with tension bands spaced not more than 15 inches o.c.
I. Tie Wires: Use wire of proper length to firmly secure fabric to line posts and rails. Attach wire at one end to chain-link fabric, wrap wire around post a minimum of 180 degrees, and attach other end to chain-link fabric per ASTM F 626. Bend ends of wire to minimize hazard to individuals and clothing.
1. Maximum Spacing: Tie fabric to line posts at 12 inches o.c. and to braces at 24 inches o.c.
J. Fasteners: Install nuts for tension bands and carriage bolts on the side of the fence opposite the fabric side. Peen ends of bolts or score threads to prevent removal of nuts.
K. Barbed Wire: Install barbed wire uniformly spaced, angled toward threat side of fence. Pull wire taut, install securely to extension arms, and secure to end post or terminal arms.
3.5 GATE INSTALLATION
A. Install gates according to manufacturer's written instructions, level, plumb, and secure for full opening without interference. Attach fabric as for fencing. Attach hardware using tamper-resistant or concealed means. Install ground-set items in concrete for anchorage. Adjust hardware for smooth operation.
3.6 GROUNDING AND BONDING
A. Fence Grounding: Install at maximum intervals of 500 feet.
B. Protection at Crossings of Overhead Electrical Power Lines: Ground fence at location of crossing and at a maximum distance of 150 feet on each side of crossing.
C. Grounding Method: At each grounding location, drive a grounding rod vertically until the top is 6 inches below finished grade. Connect rod to fence with No. 6 AWG conductor. Connect conductor to each fence component at the grounding location, including the following:
1. Make grounding connections to each barbed wire strand with wire-to-wire connectors designed for this purpose.
CHAIN LINK FENCES AND GATES 323113 - 7
2. Make grounding connections to each barbed tape coil with connectors designed for this purpose.
D. Bonding Method for Gates: Connect bonding jumper between gate post and gate frame.
E. Connections: Make connections to minimize possibility of galvanic action or electrolysis. Select connectors, connection hardware, conductors, and connection methods so metals in direct contact will be galvanically compatible.
1. Use electroplated or hot-tin-coated materials to ensure high conductivity and to make contact points closer in order of galvanic series.
2. Make connections with clean, bare metal at points of contact.
3. Make aluminum-to-steel connections with stainless-steel separators and mechanical clamps.
4. Make aluminum-to-galvanized-steel connections with tin-plated copper jumpers and mechanical clamps.
5. Coat and seal connections having dissimilar metals with inert material to prevent future penetration of moisture to contact surfaces.
3.7 FIELD QUALITY CONTROL
A. Grounding-Resistance Testing: Engage a qualified testing agency to perform tests and inspections.
1. Grounding-Resistance Tests: Subject completed grounding system to a megger test at each grounding location. Measure grounding resistance no fewer than two full days after last trace of precipitation, without soil having been moistened by any means other than natural drainage or seepage and without chemical treatment or other artificial means of reducing natural grounding resistance. Perform tests by two-point method according to
IEEE 81.
2. Excessive Grounding Resistance: If resistance to grounding exceeds specified value (25 ohms), notify Engineer promptly. Include recommendations for reducing grounding resistance and a proposal to accomplish recommended work.
3. Report: Prepare test reports certified by a testing agency of grounding resistance at each test location. Include observations of weather and other phenomena that may affect test results.
3.8 DEMONSTRATION
A. Engage a factory-authorized service representative to train Owner's personnel to adjust, operate, and maintain chain-link fences.
END OF SECTION 323113
CHAIN LINK FENCES AND GATES 323113 - 8
SECTION 334200 - STORMWATER CONVEYANCE
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Concrete pipe and fittings.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Shop Drawings:
1. Headwalls.
1.4 INFORMATIONAL SUBMITTALS
A. Coordination Drawings: Show pipe sizes, locations, and elevations. Show other piping in same trench and clearances from storm drainage system piping. Indicate interface and spatial relationship between manholes, piping, and proximate structures.
B. Field quality-control reports.
1.5 QUALITY ASSURANCE
A. Piping materials shall bear label, stamp, or other markings of specified testing agency.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Protect pipe, pipe fittings, and seals from dirt and damage.
STORMWATER CONVEYANCE 334200 - 1
PART 2 - PRODUCTS
2.1 CONCRETE PIPE AND FITTINGS
A. Reinforced-Concrete Sewer Pipe and Fittings: ASTM C76.
1. Class III.
2.2 PIPE OUTLETS
A. Head Walls: Cast-in-place reinforced concrete, with apron and tapered sides.
PART 3 - EXECUTION
3.1 EARTHWORK
A. Excavation, trenching, and backfilling are specified in Section 312000 "Earth Moving."
3.2 PIPING INSTALLATION
A. General Locations and Arrangements: Drawing plans and details indicate general location and arrangement of underground storm drainage piping. Location and arrangement of piping layout take into account design considerations. Install piping as indicated, to extent practical. Where specific installation is not indicated, follow piping manufacturer's written instructions.
B. Install piping beginning at low point, true to grades and alignment indicated with unbroken continuity of invert. Place bell ends of piping facing upstream. Install gaskets, seals, sleeves, and couplings in accordance with manufacturer's written instructions for use of lubricants, cements, and other installation requirements.
C. Install manholes for changes in direction unless fittings are indicated. Use fittings for branch connections unless direct tap into existing sewer is indicated.
D. Install proper size increasers, reducers, and couplings where different sizes or materials of pipes and fittings are connected. Reducing size of piping in direction of flow is prohibited.
E. When installing pipe under streets or other obstructions that cannot be disturbed, use pipe-jacking process of microtunneling.
F. Install gravity-flow, nonpressure drainage piping in accordance with the following:
1. Install piping pitched down in direction of flow.
2. Install reinforced-concrete sewer piping in accordance with ASTM C1479 and ACPA's
"Concrete Pipe Installation Manual."
STORMWATER CONVEYANCE 334200 - 2
3.3 PIPE JOINT CONSTRUCTION
A. Join gravity-flow, nonpressure drainage piping in accordance with the following:
1. Join reinforced-concrete sewer piping in accordance with ACPA's "Concrete Pipe
Installation Manual" for rubber-gasketed joints.
3.4 FIELD QUALITY CONTROL
A. Inspect interior of piping to determine whether line displacement or other damage has occurred.
Inspect after approximately 24 inches of backfill is in place, and again at completion of Project.
1. Submit separate reports for each system inspection.
2. Defects requiring correction include the following:
a. Alignment: Less than full diameter of inside of pipe is visible between structures.
b. Deflection: Flexible piping with deflection that prevents passage of ball or cylinder of size not less than 92.5 percent of piping diameter.
c. Damage: Crushed, broken, cracked, or otherwise damaged piping.
d. Infiltration: Water leakage into piping.
e. Exfiltration: Water leakage from or around piping.
3. Replace defective piping using new materials, and repeat inspections until defects are within allowances specified.
4. Reinspect and repeat procedure until results are satisfactory.
B. Leaks and loss in test pressure constitute defects that must be repaired.
C. Replace leaking piping using new materials, and repeat testing until leakage is within allowances specified.
3.5 CLEANING
A. Clean interior of piping of dirt and superfluous materials. Flush with water.
END OF SECTION 334200
334200 - 2