Summary

This is a Request for Qualifications (RFQ) issued by the City of Greensboro, North Carolina, for nuisance abatement and property securing services. The City seeks to award contracts to up to twenty qualified contractors to provide on-as-needed basis services including mowing and vegetative growth removal, trash and debris collection, tree removal, appliance and tire disposal, swimming pool water removal, graffiti removal, boarding and securing of structures, and other exterior abatement work throughout Greensboro in support of Code Compliance Division enforcement. The RFQ was issued on August 20, 2026, with a question and answer period closing on August 31, 2026, and proposals due by September 15, 2026, at 2:00 PM EST. The anticipated contract term is three years, running from November 1, 2026, through October 31, 2029. Service assignments will be distributed through written work orders with response times varying by assignment type: routine assignments require acceptance or rejection within 24 hours with 48-hour completion deadlines, urgent assignments require acknowledgment within 2 hours and mobilization within 24 hours, and emergency securing requires immediate acknowledgment and mobilization within 4 hours.

Contractors must submit pricing on City-established fee schedules contained in Appendices B and E, with rates covering all labor, equipment, materials, disposal, permits, and overhead costs unless expressly stated otherwise in the work order. The City reserves the right to conduct separate competitive quote processes for assignments exceeding $5,000 in contractor compensation. No minimum work volume or contract value is guaranteed. Award selection will be based on an evaluation matrix scoring experience (35 points), qualifications including staffing and equipment capacity (45 points), references (15 points), and local preference policy compliance (5 points). Contractors must be actively registered with the North Carolina Secretary of State, provide certificates of insurance with required endorsements, and meet all licensing and safety requirements. Existing nuisance abatement contractors are not automatically renewed and must submit complete responses to this RFQ to be considered for continued work.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUALIFICATIONS

Event # 12475

Nuisance Abatement and Securing Services

Executive Department

Code Compliance Division

SECTION 1

OVERVIEW

1. Request for Qualifications (“RFQ” or “Event”): The City of Greensboro (“City”) hereby solicits and invites proposals from qualified Companies and Businesses (“Contractor”) with proven experience and expertise in nuisance abatement, property cleanup, securing, and related services to submit a response to the requirements outlined in this RFQ.

Services are on an as-needed basis for properties throughout Greensboro. Services support Code Compliance enforcement when responsible parties do not complete required corrective work.

The City may award contracts to up to twenty (20) qualified contractors to maintain sufficient capacity, equipment, geographic coverage, and response capability. An award does not guarantee a minimum number of work orders or a minimum contract value.

2. Period and Terms of Contractual Agreement: The selected Contractor(s) will enter into a service agreement with the City to cover the proposed scope of work outlined in Section 2 of this RFQ. The contract term will be for three (3) years. Services shall begin approximately on November 1, 2026 through October 31, 2029.

3. Selection Process: After the close of this RFQ, Contractor proposals will be reviewed and evaluated for responsible and responsive submissions, and that all proposals have the required documents as outlined in the RFQ (if required). The award will be made to the best qualified Contractor(s), based on Award Matrix scores (see page 11).

A Contractor that wishes to be considered for selection shall submit a complete, concise, and comprehensible proposal in the form and manner required by this RFQ.

All proposals, inquiries, or correspondence relating to this RFQ, as well as all reports, displays, schedules, attachments, exhibits, and other documentation submitted by any Contractor, will become the property of the City upon receipt. All proposals received are subject to North Carolina Public Records laws found in Chapter 132 of the North Carolina General Statutes and the Public Records Confidentiality Clause in this RFQ regarding public access to such documents, and any statements or endorsements inconsistent with therewith will be disregarded. All proprietary information disclosed to the City shall be held to Chapter 132 of the North Carolina General Statute and the Public Records Confidentiality Clause.

4. Minimum Requirements: Contractors must meet the minimum specifications and requirements contained in the RFQ. Contractors are required to acknowledge all exceptions to the minimum specifications, terms, and conditions in their proposals. Failure to do so may result in the response being deemed nonresponsive.

5. Awarded Contractor Responsibilities:

• Provide a Certificate of Insurance with Endorsements covering the minimum insurance requirements

• Actively registered with the NC Secretary of State.

6. RFQ Questions: Questions regarding this event may be submitted through the Greensboro eProcurement System (“GePS”). Answers will be posted in GePS within one week of the close of the Question and Answer Period; see Item 12: Submission and Response Schedule.

For the duration of this bid process, all correspondence regarding this RFQ must be directed to Procurement Services. If it is determined that a Contractor fails to comply to this requirement and initiates correspondence with any other City staff, local elected officials, or representative about this bid process, they may be subject to disqualification.

7. Rights of the City – Proposals and Additional Documentation: As a result of this RFQ, the

City reserves the right to accept or reject any and all proposals received in whole or in part, to waive minor technicalities, or to negotiate with responsive and responsible Contractors. The City also reserves the right to request financial documentation, such as independently audited financial statements, most recent tax returns, or profit loss statements, before awarding this contract.

8. Rights of the City – Multiple Awards: The City reserves the right to award contract(s) in whole or in part, whichever is in the City’s best interest as it determines in its sole discretion.

The City reserves the right to award multiple contracts.

9. Terms and Conditions: Contractor will abide by all the Terms and Conditions posted on the event. It is the Contractor’s responsibility to read the Terms and Conditions as they are incorporated into the final contract. Within the Terms and Conditions, you will find insurance requirements and reference to the North Carolina State Statutes regarding confidentiality requirements.

10. Due Date: Submittals in response to this RFQ must be submitted to the City’s Procurement Services Division via GePS no later than September 15, 2026, by 2:00 PM EST, as determined by the City’s computer server. Although the City tries to maintain continuous access to the GePS website, service may be interrupted. Therefore, suppliers are encouraged to submit proposals 24 hours before the event closes.

11. Submission and Response Schedule RFQ Issuance August 20, 2026 Question and Answer Period Closes August 31, 2026 2:00 PM EST Submission Period Ends September 15, 2026 2:00 PM EST Anticipated Start Date November 1, 2026

*Some awards may require Council approval

12. Submittal Requirements: Contractors submitting a proposal must meet the minimum requirements outlined in Section 2: Scope of Work, Section 4: Submittal Materials, and submit the following information with their response:

• Answer all questions on the Event.

• Complete Appendix A - Qualification Response Sheet and Certification.

• Complete (sign) Appendix B - Pricing sheet for nuisance abatement and securing services.

• Complete (sign) Appendix E -Tree removal services price list.

• Three (3) references for comparable public-sector, property-management, community-development, or high-volume service work completed within the past five years.

• Bidders shall submit additional supporting documents if the required information is not already addressed in Appendix A.

13. The Contractor will bear all costs associated with preparing the bid response.

14. Any proposals may be withdrawn or modified prior to the RFQ Submission Period End date and time stated in the Submission and Response Schedule.

15. Non-Discrimination:

It is the policy of the City to ensure that all businesses, including Small Business Enterprises, are afforded the maximum practical opportunity to participate in the City’s purchasing and contracting processes. Therefore, the City will not enter into a contract or be engaged in a business relationship with any business entity that has discriminated in the solicitation, selection, hiring, or commercial treatment of vendors, suppliers, subcontractors, or commercial customers on the basis of race, color, religion, national origin, sex, age or on the basis of handicap or any otherwise unlawful use of characteristics regarding the vendor's, supplier's or commercial customer's employees or owners; provided that nothing in this policy shall be construed to prohibit or limit otherwise lawful efforts to remedy the effects of discrimination that have occurred or are occurring.

SECTION 2

SCOPE OF WORK

2.1 Purpose

The City of Greensboro invites qualification responses from contractors capable of providing nuisance abatement, property cleanup, securing, and related services on an as-needed basis for properties throughout Greensboro. Services support Code Compliance enforcement when responsible parties do not complete required corrective work.

The City may award contracts to up to twenty (20) qualified contractors to maintain sufficient capacity, equipment, geographic coverage, and response capability. An award does not guarantee a minimum number of work orders or a minimum contract value.

2.2 Code Compliance Division

The Code Compliance Division investigates property conditions, issues notices and orders, coordinates authorized corrective work, and documents abatement costs. Contractors shall perform only work specifically authorized by the City and shall not independently determine whether a property requires abatement.

2.3 Contract term

The anticipated initial contract term is three (3) years. Any extension, renewal, or change to the term must be approved in writing in accordance with the final contract and City requirements.

2.4 Contract structure

● Work will be assigned through written scopes of work, work orders, or other City-approved authorization.

● The City may distribute assignments based on availability, response time, service category, equipment, location, workload, past performance, or specialized capability.

● Existing nuisance abatement contractors are not automatically renewed. Current contractors must submit a complete response to this RFQ to be considered for continued work.

● The City may obtain separate quotes for unusual, high-risk, or nonstandard work and may use City forces or other contracts when appropriate.

2.5 General requirements

The Contractor shall furnish all labor, supervision, tools, equipment, vehicles, fuel, materials, safety devices, transportation, loading, hauling, disposal, permits, fees, and incidentals required for each authorized assignment, unless the work order expressly states otherwise.

2.6 Service categories

Mowing and vegetative growth removal: Mow, cut, trim, collect, and remove grass, weeds, vines, brush, and other vegetative growth. Work may include dense growth, fallen limbs, mixed debris, limited access, fencing, steep terrain, or conditions requiring heavy-duty mowing equipment.

Trash, debris, limbs, and brush: Collect, load, haul, and legally dispose of loose trash, household debris, construction or demolition debris, limbs, vines, and brush. Quantities will generally be measured by cubic yard.

Tree removal: Cut, remove, load, haul, and dispose of trees authorized by the City. Tree measurement and payment shall follow the Tree Removal Services Price List in Appendix E.

Appliances and tires: Remove and legally dispose of appliances and tires identified in the work order.

Disposal documentation shall be provided when requested.

Swimming pool water removal: Drain above-ground swimming pools within the size ranges listed in the pricing sheet and leave the area in a safe condition.

Graffiti removal: Remove graffiti from unpainted brick by approved power-washing methods, or cover graffiti on painted surfaces with self-priming exterior acrylic paint that matches the existing surface, as directed by the inspector.

Boarding and securing: Secure residential and commercial doors, windows, oversized openings, and unsafe areas using City-approved materials and methods. Appendix C contains the required boarding and securing standards.

Other exterior abatement: Remove or relocate authorized obstructions, including basketball goals located in streets or public rights-of-way, and perform other site-specific abatement expressly stated in the work order.

2.7 Excluded or separately quoted work

● Hazardous materials, asbestos, biohazards, chemicals, contaminated soil, or regulated waste not identified in the work order.

● Demolition of structures or other work not expressly authorized by the City.

●Work requiring cranes, specialty engineering, utility relocation, environmental remediation, or unusual traffic control unless specifically authorized.

●Any condition outside the established fee schedules that the City designates for a written, inspector-approved quote.

The Contractor shall stop work and contact the assigned inspector immediately if an unknown hazard or materially different site condition is discovered. Extra costs shall not be incurred without written authorization.

2.8 Measurement and payment standards

● Mowing will be measured in 0.10-acre increments unless the work order states another basis.

● Debris, limbs, brush, and similar materials will be measured in cubic yards. Cubic yards = length × width × average height or depth ÷ 27, using feet for each dimension.

●When material is chipped or mulched, and the work order authorizes weight-based measurement, payment will be based on verified weight documentation.

● Tree diameter will be measured as stated in the Tree Removal Services Price List or as otherwise specified by the inspector.

● Percentage adjustments apply only to the related mowing charge and require inspector documentation and approval.

● Final payment will be based on accepted before-and-after photographs, the assigned inspector's verified quantities and calculations, and the applicable contract rate. The City may require field measurements, load tickets, weight tickets, or disposal receipts.

2.9 Work-order process

1. The City issues a written assignment identifying the property, authorized services, estimated quantities, completion deadline, and not-to-exceed amount when applicable.

2. The Contractor accepts or rejects the assignment within the required response period and reports any access issue, hazard, quantity concern, or pricing discrepancy before beginning work.

3. The Contractor performs only the authorized work. Any change in quantity, price, or scope requires written approval from the assigned inspector or contract administrator before the additional work begins.

4. After completion, the Contractor submits required photographs, measurements, receipts, and an itemized invoice after City inspection or acceptance.

5. The Contractor is responsible for required project permits, applicable fees, disposal fees, landfill charges, and supporting receipts unless the work order states otherwise.

2.10 Response and completion standards

Assignment type Required response Routine Accept or reject within 24 hours of the assignment notice. Complete within

48 hours after acceptance unless the work order states another deadline.

Urgent Acknowledge within 2 hours and mobilize within 24 hours, or as stated in the work order.

Emergency securing Acknowledge immediately and mobilize within 4 hours when the City identifies an immediate safety or access concern.

Code Compliance Inspectors must obtain Abatement Warrants prior to the start of a scope. Once the Contractor accepts the job, they must contact the Inspector to determine when the warrant will be posted.

Once the warrant is posted, Contractors have 48 hours to complete the Scope of Work. If the Contractor is unable to complete the assigned scope within that timeframe, it is imperative to notify the Inspector immediately as a new warrant must re-written and re-issued from the magistrate.

A Contractor shall not begin work until the assignment has been formally accepted. Any discrepancy in scope or pricing must be resolved with the assigned inspector before work begins.

2.11 Work hours and delays

Work shall normally be performed Monday through Friday between 7:30 a.m. and 5:00 p.m., or as otherwise directed by the Code Compliance Division. With written supervisor approval, work may continue beyond those hours but not later than 5:00 p.m. The Contractor is responsible for all costs associated with work performed outside the normal schedule. Delays caused by weather, access, utilities, law-enforcement activity, disposal-facility closures, or other conditions outside the Contractor's control shall be reported promptly.

2.12 Site protection and safety

● Protect residents, pedestrians, workers, adjoining property, utilities, vehicles, structures, landscaping designated to remain, and public rights-of-way.

● Use appropriate barricades, cones, warning signs, personal protective equipment, spotters, and traffic controls.

●Verify the property and authorized work area before beginning. The Contractor is responsible for work performed outside the authorized area.

●Do not block streets, sidewalks, driveways, fire lanes, or emergency access unless the City has approved the closure or control plan.

● Repair, at the Contractor's expense, damage caused by the Contractor, its employees, subcontractors, vehicles, or equipment.

2.13 Disposal and cleanup

● Transport and dispose of waste only at lawful facilities that accept the material.

●Do not dump, bury, burn, relocate, or leave collected material on another property unless the City gives written direction and the action is lawful.

● Collect loose material from streets, sidewalks, driveways, and adjoining areas affected by the work.

● Do not take any property for personal use or to be sold as scrap to receive any compensation. All items removed from the property of an abatement must be properly disposed of.

● Leave the property in a safe and orderly condition after each visit.

2.14 Documentation

●Before photographs showing the overall site and each condition to be corrected.

●After photographs taken from comparable viewpoints.

● Measurements and quantity calculations when actual quantities differ from the work-order estimate.

● Disposal receipts, weight tickets, load tickets, or landfill documentation when required.

●A written explanation of any incomplete item, access issue, hazard, or requested change.

2.15 Correction of deficient work

The Contractor shall correct incomplete, unsafe, damaged, or nonconforming work at no additional cost when the deficiency results from the Contractor's performance. Unless the City approves another schedule, corrective work shall begin within one (1) business day after notice and shall be completed promptly.

2.16 Competitive bidding for assignments over $5,000

Any single nuisance abatement assignment that is expected to exceed $5,000 in contractor compensation will be subject to a separate competitive quote process. All approved nuisance abatement contractors will be given an opportunity to submit a sealed quote by the deadline established by the Code Compliance Manager. The assignment will be awarded to the lowest-priced contractor determined qualified to perform that scope of work. An assignment awarded through this process will not affect the contractor's position in the regular assignment rotation.

2.17 Invoicing and final payment

The Contractor shall submit a separate or clearly itemized invoice for each work order (invoice forms can be found and downloaded in the Contractor Portal on the Code Compliance website).

The City may reject an invoice that does not match the authorized scope or lacks required documentation. Each invoice shall include:

● Contractor name and remittance address; invoice number and date.

● City scope of work order.

● Property address and date(s) of service.

● Service line, verified quantity, unit, contract rate, and extended amount.

● Approved adjustment, minimum charge, or lump-sum quote when applicable.

● Before-and-after photographs and required measurement or disposal documentation.

● Total amount due and certification that the work is complete.

Before beginning an approved assignment, the Contractor shall assess the property. If the Contractor believes the cost will exceed the approved scope, the Contractor must contact the assigned inspector and receive written authorization for revised pricing before work begins. The same requirement applies to additional work discovered during the assignment.

Invoices shall not be submitted until the authorized pricing is final. Billing invoices and digital before-and-after photographs shall be submitted through the Contractor Portal on the Code Compliance website.

Final payment will be based on accepted work, photographic proof, the assigned inspector's verified quantities and calculations, and the applicable contract prices. The City will not pay for unauthorized work, unapproved extra work, duplicate charges, or rejected services.

2.18 Subcontractors

The Contractor remains responsible for all work performed by subcontractors. Subcontractors shall meet applicable licensing, insurance, safety, and documentation requirements. A listed subcontractor may not be replaced without City approval when the contract requires approval.

2.19 Compliance with laws and City direction

The Contractor shall comply with applicable federal, state, and local laws, ordinances, safety standards, disposal rules, traffic requirements, wage obligations, and permit requirements. City inspection, direction, or acceptance does not relieve the Contractor of responsibility for safe and lawful performance.

2.20 Records and audit

The Contractor shall retain work orders, invoices, photographs, measurements, disposal receipts, and other contract records for the period stated in the final contract. Records shall be available for City review or audit upon reasonable notice.

2.21 Performance management

The City may track response time, completion time, documentation quality, quantity accuracy, invoice accuracy, property damage, safety incidents, complaints, and correction requests. Repeated performance failures may result in reduced assignments, corrective action, suspension, nonrenewal, or termination as permitted by the contract.

2.22 Boarding and securing methods and requirements

See Appendix C

2.23 Code Compliance mowing descriptions

See Appendix D

SECTION 3

SUBMITTAL OF PRICING AND AWARD PROCESS

All responses to the requested information should be answered thoroughly, but be as succinct as possible. Additional information may be included as an appendix, but the responses to information requested in Section 4: Submittal Materials should be fully contained within the body of the response. No Contractor may submit more than one RFQ.

The City reserves the right to accept any proposal deemed to be in City's best interest, waive any irregularities in any response, reject any or all responses, and re-advertise for new responses. The City intends to proceed with the proposal review and selection process, then enter into a contract without negotiation, while reserving the right to negotiate at any time. Any and all RFQ dates are subject to change.

Evaluation Criteria

The City's Selection Committee will evaluate all submissions. All responses properly submitted and received will be evaluated against the criteria outlined below. The absence of required information may result in the response being excluded from further analysis or evaluation. The responses must meet the following minimum qualifications to be considered for selection:

• Complete and accurate submittal of the specific proposal components

• Contractor must demonstrate the ability to staff and supply the services proposed

Award Process

Selection of Award: Contractor must meet all requirements and the minimums listed in the RFQ and attached appendices (if applicable). The City may engage in discussions with any potential Contractor prior to final determination and award. The City will award this contract to the best qualified Contractor(s).

Pricing

The City-established fee schedules included in Appendices B and E will govern payment for listed services. By submitting a response, the respondent acknowledges the applicable established rates and pricing methods. Routine labor, supervision, tools, equipment, fuel, travel within Greensboro, loading, hauling, cleanup, overhead, profit, and other ordinary costs are included in the applicable rate unless the fee schedule or work order expressly allows a separate charge.

Award Matrix

Available

Points Selection Criteria

35 Experience– Business description and relevant experience.

Qualifications - Description of relevant experience, staffing, equipment, and current workload capacity.

15 References: Three references meeting the requirements 5 Meets Local Preference Policy

100 Total Score

SECTION 4

SUBMITTAL MATERIALS

Contractors submitting a proposal must meet the minimum requirements and submit the following information with their response:

Contractor should respond to each of the following requirements in a clear, concise, and comprehensive manner. The Contractor should carefully review the Public Records Confidentiality Clause when submitting information for this RFQ.

Each proposal submitted for consideration must comply with the stipulations set forth in this RFQ as well as any addenda and any written responses from the City to Contractor inquiries.

Contractor’s submission shall identify a single contact person for receipt of responses and information from the City. The method of receipt and distribution of information will be by e-mail. Therefore, include a contact name, phone number, mailing address, and e-mail address with the proposal.

All relevant information must accompany the proposal. The Contractor shall include the information below in its submission:

1. Qualifications and Experience: Bidders shall submit additional supporting documents if the required information is not already addressed in Appendix A.

• Each respondent shall demonstrate the staffing, equipment, experience, financial capacity, and management controls needed to perform concurrent nuisance abatement assignments throughout Greensboro.

• Sufficient personnel, trucks, trailers, mowing equipment, saws, loaders, hand tools, safety equipment, and securing materials for the services offered.

• Ability to receive, track, document, and invoice multiple work orders by property address and City reference number.

• All licenses, vehicle registrations, permits, disposal arrangements, and insurance required for the proposed services.

• A responsible safety record and procedures for employee training, incident reporting, equipment operation, and site hazards.

• Disclosure of proposed subcontractors and the services each subcontractor will perform.

• Description of relevant experience, staffing, equipment, and current workload capacity.

• Three references meeting the requirements.

• List of proposed subcontractors, if any, with the services each will perform.

• Copies or evidence of applicable licenses, registrations, permits, and required insurance, or ability to obtain required coverage before contract execution.

• The City may request clarification or supplemental information during evaluation.

Material omissions may cause a response to be rejected.

2. Completed Appendix A — Qualification Response Sheet and Certification.

3. Completed (signed) Appendix B - Pricing sheet for nuisance abatement and securing services.

4. Completed (signed) Appendix E -Tree removal services price list.

File details come from the government source that posted it. Updated .