This Mod provides responses to questions that have arisen from this solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Responses to questions that have arisen regarding solicitation NRC-R1-91-14-Q-0005:

1) What is the distance between the work location and the loading dock area where the materials can be cut and stored?

The material preparation area will be on the 1st floor near the loading dock. The work location (room 2088) is on the 2nd floor. See drawings below for additional details.

1st FLOOR

2nd FLOOR

Responses to questions that have arisen regarding solicitation NRC-R1-91-14-Q-0005:

2) Are there any changes of floors between the loading dock and Room 2088? Yes, included in the response to question #1.

a) If so, is there an elevator along the way between the loading dock and Room 2088 that can be used? Yes, included in the response to question #1.

b) If so what are the floor dimensions of the elevator? Included in the response to question #1 (Doors: 42"W x 84"H; Interior Cab: 67"W x 72"L x 89"H).

3) What is the wall construction of room 2088? The general structure is metal studs and painted sheet rock surface.

a) What is the finish that is on the side of the wall that is to receive the shielding? Paint.

4) Is the shielding to be applied to the inside surface of Room 2088 walls? Yes.

5) Please specify finishes to be applied after the shielding is applied. None.

a) Do you desire any finishes that would conceal the shielding such as sheetrock or wall paper? No.

b) Do you simply want it painted? No.

c) Do you want it left as is? Yes.

6) Is the project sales tax exempt? Yes.

7) Is the shielding required to go all the way to the floor and all the way to the ceiling? Yes.

a) Is there a base board around the room? Yes.

b) What is the base board made of? Vinyl.

c) If so, does the base board need to be removed to apply the shielding? Yes.

d) Assuming the base board is to be removed and replaced, what type of base board is to be provided? Vinyl base board will be removed but NOT replaced.

8) Are there any windows in Room 2088? No.

9) Is it possible to forward photos of the inside of all the walls of Room 2088? No. Site visits are permitted.

10) What are the normal working hours for this project? 7:00am to 4:00pm.

11) Since the contractor is charged with moving the furniture and bringing it back:

a) Can you provide a brief description of what this furniture is? One simple 4-leg desk/table.

b) Would you please describe the how far away the location is where the furniture can be stored? The desk/table will be stored in a storage room on the 1st floor near the loading dock.

12) Please provide clarification regarding the level of ballistic performance for the panels … “UL Level 3” for handguns or “NIJ Level III” for assault rifles. UL Level 3 for handguns.

13) Are Davis-Bacon wages required for this project? No.

File details come from the government source that posted it. Updated .