NPS Northville Addendum #1 201215.pdf
PDF 3 MB Posted
- Solicitation number
- RFP NVS 210000000327 3
- Issued by
- Wayne County, Michigan
About this file
This is Addendum #1 to the bidding documents for Northville Public Schools' 2021 Tennis Court & Baseball Renovations project, issued by Foresite Design, Inc. on December 14, 2020. The addendum modifies the original bidding documents released November 30, 2020, and applies to renovations at Northville High School. The project encompasses two primary bid categories: Proposal A (Site Work) and Proposal B (Fencing). Proposal A includes site preparation, demolition, concrete and asphalt paving, net tension system installation, acrylic tennis court surfacing, landscaping, and electrical work. Proposal B covers removal of existing fencing and practice boards, installation of new vinyl chainlink fencing, tennis practice boards, and batting cage structures. A pre-bid meeting was held with attendee documentation required, and all bidders must acknowledge receipt of this addendum on their proposal forms or face potential disqualification. The addendum includes clarifications to scope items, revised specifications for post-tension concrete tennis courts and hot mix asphalt paving, a new specification for standard asphalt under batting cages, updated drawings with detail revisions, and responses to eight requests for information addressing concrete surface preparation, stain-blocking materials, fence specifications, and asphalt mix designs.
The project requires contractors to obtain all necessary permits, with Proposal A contractors providing a $5,000 allowance for permits and inspections. Site work contractors must achieve strict compaction standards (95% standard proctor for fills, 95% maximum dry density for aggregate base), maintain erosion control systems throughout construction, and coordinate multiple mobilizations with fencing contractors. Material submissions require five sets of documentation with MSDS sheets. Contractors guarantee their work for two years, with five-year warranties on tennis court surfaces. The concrete paving specifications require 4,000 psi compressive strength after 28 days, post-tensioning standards conforming to PTI Guide Specifications with specific cable spacing and tensioning procedures, and concrete surface preparation to CSP-3 profile for Alternate #2. Asphalt paving must meet Michigan Department of Transportation specifications with specific mix designs for tennis courts (MDOT 1100 T-36A) and standard paving (MDOT 13A leveling, 36A wearing course), compacted to 95% bulk density with planarity tolerances of 1/8 inch in 10 feet. Tennis court surfacing shall be Laykold acrylic in Pro Blue (playing court) and Medium Green (outer court) with stain-blocking material Qualipur 152, applied after minimum 14-day asphalt or 28-day concrete curing periods.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3269 Coolidge Highway Berkley, Michigan 48072
Phone 248-547-7757 Fax 248-547-0218
Website: www.foresitedesign.com
Athletic Facility Planning Site Planning Consulting Landscape Architecture
ADDENDUM
ADDENDUM No: #1 PAGES: 30
PROJECT: Northville Public Schools Northville High School – 2021 Tennis Court & Baseball Renovations
DATE: December 14, 2020
TO: All Bidders
This Addendum is issued prior to the Bid Opening to clarify or change the Bid Documents. This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents issued November 30, 2020.
All requirements contained in the Contract Documents shall apply to this Addendum. All incidental work necessary to complete the work shall be included in the Contractor’s Proposal even though not particularly mentioned. Parts of the Specifications and Drawings referred to herein supersede previously issued data and shall form a part of the Bid Documents.
Receipt of this Addendum should be noted on the proposal form; failure to do so may subject Bidder to disqualification.
General:
GN-1 Insert Pre-Bid Meeting Sign-In Sheet
GN-2 Insert Current Request for Information Log
Specifications:
SC-1 Refer to Specification Section 00 1115 Scope of Work (Re-issued):
A. Reissued specification includes the following revisions:
1. Clarified Proposal A Scope Items
2. Clarified Proposal B Scope Items
SC-2 Refer to Specification Section 03 3800 Post Tension Concrete – Tennis Court (Re-issued):
B. Reissued specification includes the following revisions:
1. Clarified Quality Assurance Requirements
2. Included Submittal Requirements
3. Added notes clarifying mix-design
4. Added notes for vapor barrier material
SC-3 Refer to Specification Section 32 1217 Hot Mix Asphalt - Tennis (Re-issued):
C. Reissued specification includes the following revisions:
1. Revised Mix Design
ADDENDUM NO. 1
Northville Public Schools NHS 2021 Tennis & Baseball Renovations
December 15, 2020
SC-4 Insert Specification Section 32 1233 Hot Mix Asphalt - Standard (New Issue):
A. Specification and associated Mix Design applicable to asphalt paving under baseball/softball batting cages only.
SC-5 Refer to Specification Section 32 1834 Acrylic Tennis Court Surface (Re-issued):
A. Reissued specification includes the following revisions:
1. Clarified Stainblocking Material
2. Insert requirements for surface preparation for Alternate #2.
Drawings:
DC-1 Refer to Sheet LD1.02 Post-Tension Tennis Court Details (Re-issued):
A. Reissued sheet includes revisions to all details.
DC-2 Refer to Sheet LD1.03 Baseball & Softball Details (Re-issued):
B. Reissued sheet includes the following revisions:
1. Revise Detail #5 to remove chainlink fence around batting cage.
2. Insert Detail #10 for asphalt mix design under batting cage.
END OF ADDENDUM #1
NORTHVILLE PUBLIC SCHOOLS - RFI LOG
Project Name: 2021 Tennis & Baseball Renovations Date: 12/14/2020
RFI # Date Question Response Response By & Date
1 12/7/2020 Is there something other than peastone that existing net post foundations can be filled with after they are pulled?
Sand or gravel can be used as backfill, provided it meets the compaction requirements as noted in the specifications in terms of lifts and compaction proctor
Michael Sims, 12/10/20
2 12/7/2020 Can Laykold Qualipur 152 also be acceptable as the required Stain Blocker? Laykold Qualipur 152 is acceptable Michael Sims, 12/10/20
3 12/7/2020
There is no specification provided for necessary concrete prep pertaining to the post tension concrete. Can you please clarify how you would like the surface of the concrete prepped?
This will be clarified with Addendum. Michael Sims, 12/10/20
4 12/9/2020 Regarding the curb drops, are we to cut those out and replace them so new walk is flush with top of curb?
The curb drops are existing and you are to pave new concrete flush with edge of top of curb Michael Sims, 12/9/20
5 12/10/2020
Sheet LD1.03, Detail #5 shows fence fabric on the outside of the batting cage posts. Detail #4 does not show any chainlink. Please clarify
There is no new planned chainlink fence around the new batting cage. Michael Sims, 12/10/20
6 12/10/2020
I assume the new concrete walk will match the top of curb along the roadway when it dips down to meet the existing curb, it may not be in ADA spec.
You are correct, it may not meet ADA. Michael Sims, 12/10/20
7 12/10/2020
If we are to put in new curb, should we match what's there (looks like straight face curb) or install 18" curb and gutter and match the existing asphalt
We shouldn't need any new curb, but if new is needed for your work, plan on a straight face curb to match existing. Michael Sims, 12/10/20
8 12/10/2020 Are you looking for a tennis court mix below the synthetic turf in the baseball area?
No, we will clarify this with Addendum to be a general paving mix Michael Sims, 12/10/20
FORESITE DESIGN, INC. NORTHVILLE PUBLIC SCHOOLS
SECTION 00 1115
SCOPE OF WORK
ADDENDUM #1
SCOPE OF WORK
00 1115 - Page 1 of 4
NORTHVILLE HS TENNIS & BASEBALL RENOVATIONS 2021
GENERAL NOTES (Applicable to All Bid Categories)
1. Bidder/Contractor shall be aware of and include the cost for, all State and Local laws, codes, ordinances, building rules and regulations, as are or may become applicable to the Work.
2. Contractor shall coordinate with other trades that affect the installation of the Work.
3. Bidders shall exclude costs of testing from bid unless required on the proposal form.
Independent testing will be hired directly by the Owner/Owner’s Representative and contractor shall cooperate with the testing agency.
4. Each contractor/subcontractors shall coordinate and cooperate with other contractors for expedient completion of the work of this project.
5. Each contractor shall be solely responsible and make every effort to locate existing underground utilities. This shall include consulting with all local utility companies, using a signal locator prior to excavation for private utility lines, or consulting with a private utility locating company.
6. The Scope of Work for each Bid Category includes cleaning and maintaining streets free of dirt, debris, mud, gravel caused by the construction operations as it pertains to their scope of work. Contractors shall be aware that local authorities intend to enforce local ordinances in this regard. Penalties resulting from contractor negligence in adhering to the State and Local ordinances, laws, codes shall be the responsibility of the Contractor.
7. The Scope of Work for each Bid Category includes strict adherence to the safety requirements as defined in the General Conditions and Supplementary General Conditions.
8. Each Contractor shall review existing building and site conditions prior to commencement of work and advise the Owner’s Representative of any claim of changes in the work within seventy-two (72) hours therefore, or waive its right for claim of changes in the existing site conditions. Each Contractor shall be responsible for restoring site to its original conditions upon completion of their respective work.
9. All excess materials shall be legally disposed of off-site unless indicated otherwise.
SCOPE OF WORK
ADDENDUM #1
SCOPE OF WORK
00 1115 - Page 2 of 4
NORTHVILLE HS TENNIS & BASEBALL RENOVATIONS 2021
PROPOSAL A: SITE WORK
CM Supplementary Conditions General Conditions Division 1 General Requirements Division 2 Existing Conditions
Specification Section 02 2110 Salvage & Relocation Specification Section 02 4113 Demolition Specification Section 03 3010 Portland Cement Concrete Specification Section 03 3800 Post Tension Concrete (Alternate 1) Specification Section 11 6826 Net Tension System Specification Section 11 6838 Baseball Equipment Specification Section 31 1000 Site Preparation Specification Section 31 1500 Site Clearing Specification Section 31 2000 Earthwork Specification Section 31 3500 Slope Protection and Erosion Control Specification Section 32 1124 Aggregate Base Course Specification Section 32 1217 Hot Mix Pavement – Tennis Specification Section 32 1233 Hot Mix Pavement - Standard Specification Section 32 1834 Acrylic Tennis Court Surface Specification Section 32 9119 Topsoil Specification Section 32 9227 General Lawn Restoration Specification Section 32 9300 Exterior Plants Specification Section 33 4615 Subdrainage Systems
General Scope of Work:
1. Requirements of items included under General Work to be completed by all contractors.
2. Provide engineering and layout as required to complete this work.
3. Include all required permits and bonds.
4. Perform earthwork as necessary to establish grades, and site grading to within 0.1 feet of the sub-grades indicated.
5. Coordinate work with other trades on site.
6. Strict enforcement of this contractor’s requirement to provide timely clean-up, removal and disposal of all rubbish and debris generated by this trade during the work. Maintain a clean condition at all areas on site and free from dirt, mud, and gravel.
7. Provide all permits required as part of this work. Contractor shall provide an allowance in the amount of $5,000.00 for permits and inspections. Provide supporting documentation related to fees incurred. Unused monies will revert back to Owner.
8. Provide and install complete soil erosion control measures, including permits, bonds and maintenance. Maintain system including system log and remove system at the completion of the project or until approved to remove by governing authorities.
9. Provide all labor and equipment necessary for the complete site demolition as shown within the Construction Limits unless specifically noted to be completed by others. Work includes but not limited to: landscaping, concrete, asphalt, stone, trees, baseball equipment tennis net tension system, topsoil and unsuitable soil. Prepare and proof roll sub-grades, including sub-grade for paving and site concrete contractors.
SCOPE OF WORK
ADDENDUM #1
SCOPE OF WORK
00 1115 - Page 3 of 4
NORTHVILLE HS TENNIS & BASEBALL RENOVATIONS 2021
10. Relocate existing storage building offsite to prep for new construction. Replace storage building at location as noted on plans.
11. Salvage items noted and turn over to Owner.
12. Remove and legally dispose of all excess materials and debris generated by scope of work, including topsoil, unless noted to stockpile.
13. Provide necessary dewatering associated with this work division.
14. Saw cut and remove existing asphalt and/or concrete paving (walks, parking areas and driveways) as necessary.
15. Provide temporary pavement measures for vehicle or walkway traffic.
16. Provide all earthwork as shown unless specifically noted to be completed by others. Work includes but not limited to subgrade fine grading, installation of aggregate base course under new asphalt, and positive drainage swales to existing and proposed catch basins as shown on drawings.
17. Furnish and install new site utilities as shown. Work includes, but not limited to, perforated draintile and drainage structures as noted on plans.
18. Provide labor, materials and equipment necessary for new asphalt paving as indicated.
19. Provide labor, materials and equipment necessary for new concrete paving, base material, and sawcutting as noted on plans.
20. Alternate #2: Provide all necessary work associated with the Post-Tension Concrete paving at the tennis courts. Work shall include all required cabling/tendons, anchors and chairs, stressing of concrete, and concrete paving. Provide required foam wrapping around net tension posts, center anchor, and foam wrapping around fence posts. Coordinate installation of with all other trades.
21. As part of Alternate #2, this trade shall be responsible for prepping concrete for surface coatings complying with Concrete Surface Profile #3 (CSP-3), as recommended by surfacing manufacturer.
22. Furnish and install new net tension system, concrete footings, and t-plugs.
23. Contractor shall be aware that this scope of work will require returning to site(s) after fencing has been installed to top gate and bracing fence posts with asphalt. Refer to details.
24. Provide labor, materials and equipment necessary to install new trees as noted on plans.
25. Furnish and install new wood timbers, home plates, and synthetic turf for softball bullpens.
26. Furnish and install new asphalt, stone base, and synthetic turf for the baseball/softball batting cage. Please note the large asphalt size for the Alternate No. 1 batting cage. Coordinate batting cage work with Proposal B Contractor.
27. Provide sawcut relief joints and acrylic caulking as noted on plans.
28. Provide stain-blocking material, acrylic tennis court surface and markings as specified.
29. Provide all electrical work as noted on Electrical Drawings. Work is to include all required permits with the State of Michigan. Electrical permit costs are to be included with the Permit Allowance as indicated in Item #7, this Bid Category.
30. Strict enforcement of this contractor’s requirement to provide timely clean-up, removal and disposal of all rubbish and debris generated by this trade during the work. Maintain a clean condition at all areas on site and free from dirt, mud, and gravel.
31. Provide all required closeout documents upon completion of project.
32. Provide five sets of material submittal for approval and MSDS Sheets.
33. Topsoil and seed all areas disturbed by construction.
34. Clean up and remove from site all debris associated with this work. Include sweeping of parking lots and public and private streets.
35. Provide five sets of material submittal for approval. If submittals comply with specifications, “Material
Compliance Certificate” shall be used.
36. Note: Milestone Schedule. This trade will be required to confirm a detailed schedule prior to award of this contract.
Excluded Work:
1. Demolition of Existing Fence and Practice Board
SCOPE OF WORK
ADDENDUM #1
SCOPE OF WORK
00 1115 - Page 4 of 4
NORTHVILLE HS TENNIS & BASEBALL RENOVATIONS 2021
2. New Fencing and Tennis Practice Boards
3. Furnish and installation of baseball/softball batting cages.
PROPOSAL B: FENCING
CM Supplementary Conditions General Conditions Division 1 General Requirements Division 2 Existing Conditions
Specification Section 11 6828 Tennis Practice Board Specification Section 11 6838 Baseball Equipment Specification Section 32 3130 Chainlink Fence – Vinyl
General Scope of Work:
1. Requirements of items included under General Work to be completed by all contractors.
2. Provide engineering and layout as required to complete this work.
3. Include all required permits and bonds.
4. Coordinate work with other trades on site.
5. Contractor shall be aware that this scope of work may require multiple mobilizations and installation times.
6. Provide labor, materials and equipment necessary for the removal of the existing fence and practice boards. Work includes necessary backfill from footing removal. Remove and salvage existing signage and turn over to Owner.
7. Furnish and install new 4’ and 10’ black vinyl chainlink fence and gates at tennis courts.
8. Furnish and install new Tennis Practice Boards.
9. Caulk around all driven fence posts as specified.
10. As part of Alternate #2, coordinate installation and foam wrapping with Proposal A
Contractor.
11. Furnish and install batting cages, to include footings, netting, and related hardware for a complete installation. Scope item applies to Base Bid and Alternate Bid.
12. Strict enforcement of this contractor’s requirement to provide timely clean-up, removal and disposal of all rubbish and debris generated by this trade during the work. Maintain a clean condition at all areas on site and free from dirt, mud, and gravel as it pertains to scope of work.
13. Provide all required closeout documents upon completion of project.
14. Provide five sets of material submittal for approval.
15. Note: Milestone Schedule. This trade will be required to confirm a detailed schedule prior to award of this contract.
END OF SECTION 00 1115
SECTION 03 3800
POST TENSION CONCRETE- TENNIS COURT
ADDENDUM #1
POST TENSION CONCRETE - TENNIS COURT
03 3800 - Page 1 of 5
NORTHVILLE HS TENNIS & BASEBALL RENOVATIONS 2021
PART 1 - GENERAL
1.1 SUMMARY
A. This section is a part of the entire set of Contract Documents and shall be coordinated with the applicable provisions of the other parts.
B. Related Sections:
1. Section 32 1124 Aggregated Base Course
1.2 SCOPE
A. The contract work to be performed under the specification consists of furnishing all of the required labor, materials, equipment, implements, parts, and supplies necessary for or appurtenant to the construction of post tension concrete tennis courts in accordance with the specifications and drawings.
1.3 QUALITY ASSURANCE
A. The contract work to be done in a thorough, workmanship manner by qualified contractors and shall conform to standards for tennis court construction. Contractors will provide proof of insurance and bonds requested by the owner. Prime contractor will perform at least eighty-five percent (85%) of the work with his own forces.
B. Warranty Guarantee: The contractors guarantee their respective work against defective materials or faulty workmanship for a period of two (2) years; five (5) years for the surface.
C. This specification section is performance based. If the design recommendations of the Contractor’s Structural Engineer conflict with this specification, the Structural Engineer’s recommendations shall take precedence.
1.4 SUBMITTALS
A. The Post-Tensioning Contractor is responsible to provide shop drawings which detail the proposed arrangement and spacing of tendons and details associated with the proposed design. Provide product data related to the encapsulated anchors proposed.
B. Stressing logs are a requirement to be provided to the Landscape Architect to verify conformance.
C. Contractor shall provide all required certification of stressing equipment and required calibration of stressing equipment.
D. Contractor shall be responsible to provide complete structural drawings and structural calculations, prepared by a Structural Engineer. Drawings shall include perimeter beam, concrete design, and rebar layout. Drawings and calculations shall be signed and sealed by a Registered Structural Engineer licensed in the State of Michigan.
PART 2 - PRODUCTS
2.1 SITE PREPARATION
POST TENSION CONCRETE- TENNIS COURT
ADDENDUM #1
POST TENSION CONCRETE - TENNIS COURT
03 3800 - Page 2 of 5
NORTHVILLE HS TENNIS & BASEBALL RENOVATIONS 2021
A. Rough Grading
1. Trees, bushes and other growing vegetation will be removed from the site. The area will be graded to plus or minus one inch (1”) to provide a uniform one percent (1%) slope in one plane.
All fills will be placed in six inch (6”) layers and will be compacted to ninety-five percent (95%) standard proctor at optimum moisture. The rough grade will be done so as to provide positive drainage away from the tennis court and, if needed, to provide intercepting swales to prevent drainage onto the court.
B. Fine Grading
1. Fine grading will be done with automatic laser regulated equipment capable of providing a true accurate plane to plus or minus one fourth inch (1/4”).
BASE COURSES - GRADATION LIMITS
Sieve Size Percent Passing 2" 100 1/2" 50 - 85 No. 4 40 - 75 No. 50 8 - 28 No. 200 0 - 5
2.2 COURT PAVING
A. Description of Work: Work covered by this specification concerns all labor, material and equipment necessary for construction of a four inch (4") thick post-tensioned concrete slab for.
B. Vapor Barrier: Place a two-layer six (6) mill polyethylene vapor barrier over the base material and extend it up to the perimeter beam.
C. Forming: Forms shall be accurately set to the lines and to plus or minus one-fourth inch (1/4") of finished grades indicated on drawings and be securely staked to prevent settlement or movement during placement of concrete. Forms shall remain until concrete has taken final set.
D. Tensioning Cables and Anchors: Post tensioning standards shall conform to the “PTI Guide Specifications for Post-Tensioning Materials”:
1. The tensioning standards shall consist of one-half inch (1/2”) diameter, 7-wire, stress relieved standards, having a guaranteed minimum ultimate tensile strength of 270,000 psi (270 kips).
Strands shall conform to ASTM A-416. Cables shall be fabricated to proper length for each slab, coated with a permanent rust preventative lubricant and encased in slippage sheathing. All breaks in the sheathing shall be repaired with tape prior to concrete placement. A maximum of six (6) inches exposed strands is permitted at the dead-end Anchor.
2. All cables shall be supported on chairs and loosely tied two inches (2”) high at all intersections (too tightly tied, tendon friction will increase when tensioning) to prevent vertical and horizontal movement during concrete placement. Strands shall be placed with no greater spacing that two feet (2’) six inches (6”) wide in both directions. See drawing details for cable spacing.
3. After the forms are removed and the concrete has set to a minimum of 2,000 psi, the tensioning procedure may be applied.
4. Each tendon may initially be tensioned to a maximum of eighty percent (80%) of ultimate breaking strength and anchored at a minimum of seventy percent (70%) of ultimate breaking strength.
POST TENSION CONCRETE- TENNIS COURT
ADDENDUM #1
POST TENSION CONCRETE - TENNIS COURT
03 3800 - Page 3 of 5
NORTHVILLE HS TENNIS & BASEBALL RENOVATIONS 2021
Ultimate Breaking Strength 80% 70%
41,300 33,000 28,900
The cable ends shall be cut off and cone holes grouted flush with edge of slab.
E. Joints: Between each court, plus or minus one foot (1’), there shall be a 3 ½ metal keyway keyed construction joint. (See plans for location and detailed drawing.) At a one-foot (1’) offset from net line there shall be a 3 ½ metal keyway. (See drawings for location and detail.)
F. Placing: A full court shall be placed in one (1) continuous operation without intervening joints of any kind. The four inch (4”) thick slab will be placed with a sixty-foot (60’) mechanical screed capable of providing a surface true to three-eights inch (3/8”) in sixty feet (60’) and not vary more than one-eighth inch (1/8”) under a ten foot (10’) straight edge in all directions.
G. Curing: Immediately after finishing, the concrete shall be kept moist by covering with polyethylene, sprinkling, ponding or curing compound (Promulsion 200 by Protex).
H. Concrete Compressive Strength: The concrete shall have a compressive strength of not less than 4,000 psi after twenty-eight (28) days. Ready-mixed concrete shall be mixed and delivered according to ASTM C-94 specifications for ready-mixed concrete with a four-inch (4”) maximum slump.
1. Additives containing fly-ash or chloride ions shall not be permitted.
PART 3 - EXECUTION
3.1 INSPECTION
A. Verify the earthwork is completed to correct line and grade. Notify the Owner/Architect of any incomplete work by previous contractors.
B. Check that sub-grade us smooth, compacted and free of frost or excessive moisture.
C. Do not commence work until conditions are satisfactory.
3.2 WEATHER PROTECTION
A. Cold weather: When the mean daily air temperature is 40°F. or below, provide suitable protection for concrete work to maintain a minimum concrete temperature of 50°F. for five (5) days (or 70°F. for three (3) days). After the protection period do not let concrete cool more than 20°F. in each successive day.
B. Hot weather: Employ suitable means to prevent too rapid drying. Shade fresh concrete as soon as possible without marring surface.
C. Wet weather: Unless adequate protection is provided, do not place concrete in rain sleet, or snow.
3.3 INSTALLATION
A. Contractor shall install the first section of sidewalk/slab/foundation as a quality sample in place.
Upon approval of sample by Architect, further installation can proceed.
POST TENSION CONCRETE- TENNIS COURT
ADDENDUM #1
POST TENSION CONCRETE - TENNIS COURT
03 3800 - Page 4 of 5
NORTHVILLE HS TENNIS & BASEBALL RENOVATIONS 2021
B. The sub-grade upon which concrete is to be placed shall be prepared by excavation or filling with suitable earth to such depth below the finished grade line, that when tamped or rolled until smooth, firm and hard, the sub-grade will be uniform and at the required depth below finished grade line.
C. Unsuitable sub-grade soils shall be replaced as directed.
D. Gravel backfill, when specified in the drawings, shall be constructed to the required depth and thoroughly compacted.
E. Cast in Place Concrete:
1. Set forms to line grade
2. Install forms over full length of walk and oil before use.
3. Forms shall be set accurately to line and grade. If the forms are set more than 0.01 foot (3mm) above or below grade or more than 0.01 foot (6mm) from prescribed alignment, they shall be corrected before any concrete is placed.
4. Flexible or curved forms of proper radii shall be used on all curves having a radius of 100 feet or less.
5. Place concrete with mechanical vibrators.
6. Consolidate concrete with mechanical vibrators.
7. Finished exposed walk surface with wood float followed by brushing with broom, smooth band of
12”, unless otherwise shown on drawings.
8. Apply plastic sheeting or curing material and cure for (7) days.
9. Replace sections that pocket water.
10. Do not allow free drop of more than five (5) feet. Use elephant trunk when necessary.
3.4 FIELD QUALITY CONTROL
A. Slump Tests: Make slump tests whenever concrete is being poured at the direction of the Owner.
B. Compression Tests: Prepare standard test cylinders during the placing of concrete in accordance with ASTM 31 and ASTM 172. One set (three (3) cylinders) is required for each day’s pour.
C. Maintain two (2) cylinders at 50 to 70°F. and protect from loss of moisture at the job site for a period of not over 48 hours, then deliver to the laboratory for curing and testing at seven (7) and twenty-eight (28) days, respectively. Place third cylinder near the in place concrete and cure completely at the job in the same manner as the in place concrete. Deliver this cylinder to the laboratory for testing at twenty-eight (28) days. Cure and test cylinders in accordance with ASTM C31, C39 and C192.
Submit test reports to the Architect in duplicate.
3.5 PROTECTION OF FINISHED SURFACE
A. All finished surfaces of concrete shall be protected so as to prevent damage. Making temporary nailing or other damaging use of surface will be prohibited.
3.6 PATCHING
A. Patch to match material, color and texture of surrounding area.
B. Replace defective work if patching is not acceptable to the Architect.
3.7 CLEAN UP
A. The contractor shall remove excess excavated material from the site of the work. Spread and finish grade topsoil within five (5) feet of pad edge. Topsoil is incidental to concrete installation. Contractor
POST TENSION CONCRETE- TENNIS COURT
ADDENDUM #1
POST TENSION CONCRETE - TENNIS COURT
03 3800 - Page 5 of 5
NORTHVILLE HS TENNIS & BASEBALL RENOVATIONS 2021
shall clean up and dispose of rubble and construction debris satisfactory of the Owner and the Architect.
END OF SECTION 03 3800
SECTION 32 1217
HOT MIX PAVEMENT – TENNIS
ADDENDUM #1
HOT MIX PAVEMENT - TENNIS
32 1217 - Page 1 of 6
NORTHVILLE HS TENNIS & BASEBALL RENOVATIONS 2021
PART 1 - GENERAL
1.1 SUMMARY
A. This Section is a part of the entire set of Contract Documents and shall be coordinated with the applicable provisions of the other parts.
B. Related Sections:
1. Section 32 1124 Aggregate Base Course
1.2 SCOPE
A. The work under this section of specifications shall include the furnishing of all labor, materials and equipment necessary to produce, place, spread, compact and finish to proper grade and cross section all plant mix bituminous pavement as shown on the drawings and as specified herein.
1.3 QUALITY ASSURANCE
A. Reference Standards:
1. Michigan Department of Transportation
a. All work done under this section of the specifications except as amended herein, shall be in accordance with current edition of the Michigan Department of Transportation Standard Specifications for Highway Construction, referred to hereafter as the MDOT Specifications.
2. National Asphalt Paving Association (NAPA)
3. Asphalt Institute (AI)
4. National Highway Institute (NHI)
5. American Sports Builders Association (ASBA)
6. National Federation of State High School Association (NFSHSA)
B. Acceptability of the Work:
1. Grade: Grade conformance tests shall be conducted on both the leveling and wearing courses.
The entire surface shall have positive drainage, 1% lateral inclination and 0.1% in running direction.
2. Planarity: After completion of the finish rolling operations on each course, the compacted surface shall be tested with a 10’ straightedge. Measurements shall be made perpendicular to and across all mats at a distance not to exceed 25 feet. The maximum allowable planarity deviation within a pass shall be no more than 1/8” in 10’ when measured in any direction.
1.4 SUBMITTALS
A. Contractor shall submit mix designs for approval prior to placement which includes the exact proportions of bituminous material and mineral filler.
PART 2 - PRODUCTS
2.1 PLANT MIX
A. Leveling Course: The bituminous plant mix base course shall meet the requirements of MDOT Division 5 – Hot Mix Asphalt. The specific mix and cross sections are as follows.
1. Thickness: Not less than 2 ½ inches when compacted
HOT MIX PAVEMENT – TENNIS
ADDENDUM #1
HOT MIX PAVEMENT - TENNIS
32 1217 - Page 2 of 6
NORTHVILLE HS TENNIS & BASEBALL RENOVATIONS 2021
2. Liquid Asphalt or Bitumen: 4% ~ 6% by weight
3. Asphalt Binder Grade: (PG-64-22)
4. Target Air Void = 3.5%
5. Aggregate Type: Crushed limestone or natural aggregate. Slag, iron pyrites and dust balls are unacceptable.
6. No R.A.P. or concrete
7. MDOT Mix: 1100 L - 20AA
Aggregate Sieve Analysis Percent Passing
¾” 100 ½” 90-100 ⅜” 65-80
No. 8 25-55 No. 30 19 No. 200 3-10
B. Wearing Course: The bituminous plant mix base course shall meet the requirements of MDOT Division 5 – Hot Mix Asphalt. The specific mix and cross sections are as follows.
1. Thickness: Not less than 1 ½” inches when compacted
2. Liquid Asphalt/Bitumen: 4% ~ 6% by weight (+1½%)
3. Asphalt Binder Grade: (PG-64-22)
4. Target Air Void = 3.5%
5. Aggregate Type: Crushed limestone or natural aggregate. Slag iron pyrites and dust balls are unacceptable.
6. No R.A.P. or concrete
7. MDOT Mix: 1100 T - 36-A
Tennis Court Mix as produced by Ajax Aggregate Screen Size Percent Passing
1-1/2” 100 1” 100 ¾” 100 ½” 100 3/8” 70-100 #4 60-80 #8 50-70 #16 30-50 #30 20-40 #50 5-15 #100 0-8 #200 0-4
Crush Count 60 min.
- OR -
Tennis Court Mix as produced by Cadillac Asphalt Aggregate Screen Size Percent Passing
1-1/2” 100 1” 100 ¾” 100 ½” 100
HOT MIX PAVEMENT – TENNIS
ADDENDUM #1
HOT MIX PAVEMENT - TENNIS
32 1217 - Page 3 of 6
NORTHVILLE HS TENNIS & BASEBALL RENOVATIONS 2021
3/8” 90-100 #4 90 Max.
#8 32-67 #16 #30 #50 #100 #200 2-10
PART 3 - EXECUTION
3.1 LIMITATIONS OF OPERATIONS
A. Bituminous tack coat shall be applied only when surface and weather conditions are favorable.
B. Bituminous plant mix shall be placed only during daylight hours when the temperature of a shaded portion of the aggregate base is 40F. or higher and when the surface upon which it is to be constructed is dry.
C. The entire leveling course shall be installed in a single day to avoid cold joints. If rain is expected, contractor shall reschedule installation.
D. The entire wearing course shall be installed in a single day to avoid cold joints. If rain is expected, contractor shall reschedule installation
3.2 SUB-GRADE AND BASE COURSE PREPARATION
A. Prepare sub-grade and aggregate base course in accordance with these specifications. The subgrade shall be proof compacted loaded rubber tired equipment and witnessed by a representative of the design team. Areas that exhibit significant deflection or pumping shall be removed and replaced with compacted granular material. Aggregate base course shall be compacted to 95% of the maximum dry density as determined by ASTM D698 (AASHTO T99) procedures.
B. At the time of applying bituminous material, the sub-grade surface shall be dry and clean, and all necessary repairs or reconditioning work shall have been completed.
C. All objectionable foreign matter dirt, debris, etc. on the asphalt surface shall be removed and disposed by the Contractor.
3.3 BITUMINOUS TACK COAT
A. Bituminous tack coat shall be applied at a rate of 0.10 gallons per square yard to existing bituminous surfaces and to successive plant mix surfaces. The tack coat may be waived by the Landscape Architect where successive plant mix courses are to be placed during one day's operation.
B. The bituminous tack coat shall be applied uniformly to the clean, dry surface with a pressure distributor. Pools of bituminous material shall not be allowed to remain on the surface. The tack coat material shall be applied far enough ahead of the paving operation to allow it to cure before placing the subsequent plant mix bituminous material.
3.4 TEMPERATURE
HOT MIX PAVEMENT – TENNIS
ADDENDUM #1
HOT MIX PAVEMENT - TENNIS
32 1217 - Page 4 of 6
NORTHVILLE HS TENNIS & BASEBALL RENOVATIONS 2021
A. The temperature of bituminous material at the time of application shall be as approved by the Landscape Architect within the limits specified below.
SS-1h 105-180 degrees F.
Plant Mix 270-300 degrees F.
B. The Landscape Architect may reject any load of plant mix bituminous material whose temperature is outside the temperature limits identified in 3.4A
3.5 PLACEMENT AND COMPACTION
A. Paving operations shall provide a mat that is smooth, dense and of the proper thickness, slope and planarity. The plant mix bituminous material shall be compacted to 95% of the bulk density as determined by 50 blows-per -side Marshall procedures, OR 95% of Theoretical Maximum Density.
B. The wearing course shall be placed such that the longitudinal joints of the wearing course are offset from that of the leveling course. Transverse joints shall be off set a minimum of 24”.
C. In placing each succeeding pass after the initial one, the screed of the paver should be set so that it overlaps the preceding pass by 2” and be sufficiently high so that when compacted, a smooth joint is produced. Prior to pinching the joint, the excess material shall be pushed onto the edge of the new pass with a lute. Excess material shall be removed from the pass.
D. Deficient areas within the base course shall be corrected by sawcutting or milling to a depth equal to the thickness of the mat. Tack coat shall be applied to all edges and the pavement shall be replaced. Skin patching of the wearing course shall only be done with materials acceptable to the surfacing contractor.
3.6 BITUMINOUS PAVING
A. After completion and acceptance of the stone base course, install 1½” of leveling course and 1½” of wearing asphalt materials.
B. Installation shall be in two (2) separate courses of 1½” and 1½” after compaction. Each asphalt lift shall be installed using automated laser grade control, self-propelled paving equipment, with dual-slope capabilities.
C. Edge Shaping: While surface is being compacted and finished, trim edges of pavement for proper alignment, bevel edges of asphalt and compact thoroughly.
D. The plant mix bituminous material shall be compacted to 95% of the bulk density as determined by 50 blows-per-side Marshall procedures, OR 95% of Theoretical Maximum Density.
E. Plant mix shall be placed and compacted in accordance with current MDOT Guidelines, Division No. 5 - Hot-Mix Asphalt Pavements and Surface Treatments. The initial contact with the hot mixture leveling course shall be made by the power or driving roll of the steel roller, weighing not less than six (6) tons. The finish surface of the leveling course shall not vary more than 1/4” in 10 feet when measured in any direction. The finish surface of the wearing course shall not vary more than 1/8” in 10 feet when measured in any direction.
3.7 TESTS AND SAMPLES
A. At the direction of the Landscape Architect, the Contractor shall cut samples from any course or finished pavement not to exceed five (5) in number from any days run for tests of density and composition. These samples shall be taken at points designated by the Landscape Architect by sawing with a power driven masonry saw or diamond core drill. Samples shall be sufficiently large to
HOT MIX PAVEMENT – TENNIS
ADDENDUM #1
HOT MIX PAVEMENT - TENNIS
32 1217 - Page 5 of 6
NORTHVILLE HS TENNIS & BASEBALL RENOVATIONS 2021
meet the needs of the testing laboratory.
B. The Owner will hire an independent testing laboratory to perform field density testing with a nuclear density gage, a Correlated Pavement Quality Indicator, or PaveTracker (non-nuclear) to verify that the specified density requirements are being met.
C. The surface from which samples are taken shall be restored by the Contractor not later than the next succeeding day of plant operation.
D. All test results will be available to the Contractor.
E. All testing samples will be paid for in accordance with these specifications.
F. Asphalt paving contractor shall power-wash asphalt prior to installation of tennis court or all weather track surface. Contractor shall flood the asphalt to identify all potential “Bird Bath” areas prior to surface application. Bird bath areas will be repaired as directed by the Landscape Architect.
END OF SECTION 32 1217
HOT MIX PAVEMENT – TENNIS
ADDENDUM #1
HOT MIX PAVEMENT - TENNIS
32 1217 - Page 6 of 6
NORTHVILLE HS TENNIS & BASEBALL RENOVATIONS 2021
FORESITE DESIGN, INC. NORTHVILLE PUBLIC SCHOOLS PUBLIC SCHOOLS
SECTION 32 1233
HOT MIX PAVEMENT – STANDARD
ADDENDUM #1
HOT MIX PAVEMENT - STANDARD
32 1233 - Page 1 of 5
NORTHVILLE HS TENNIS & BASEBALL RENOVATIONS 2021
PART 1 - GENERAL
1.1 SUMMARY
A. This Section is a part of the entire set of Contract Documents and shall be coordinated with the applicable provisions of the other parts.
B. Related Sections:
1. Section 32 1124 Aggregate Base Course
C. Tack coat courses between lifts of new asphalt shall be incidental to the cost of asphalt installation.
1.2 SCOPE
A. The work under this section of specifications shall include the furnishing of all labor, materials and equipment necessary to produce, place, spread, compact and finish to proper grade and cross section all plant mix bituminous pavement as shown on the drawings and as specified herein.
B. Hot-mix patching and repairs.
C. Painted pavement markings
1.3 DEPARTMENT OF TRANSPORTATION (DOT) SPECIFICATIONS
A. Reference Standards:
1. Michigan Department of Transportation
a. All work done under this section of the specifications except as amended herein, shall be in accordance with current edition of the Michigan Department of Transportation Standard Specifications for Highway Construction, referred to hereafter as the MDOT Specifications.
2. National Asphalt Paving Association (NAPA)
3. Asphalt Institute (AI)
4. National Highway Institute (NHI)
1.4 ACCEPTABILITY OF THE WORK
A. Grade: Grade conformance tests shall be conducted on both the leveling and wearing courses. The entire surface shall have positive drainage, 1% lateral inclination.
B. Planarity: After completion of the finish rolling operations on each course, the compacted surface shall be tested with a 10’ straightedge. Measurements shall be made perpendicular to and across all mats at a distance not to exceed 25’ feet. The maximum allowable planarity deviation within a pass shall be no more than ¼” in 10’ when measured in any direction.
C. All work shall meet the applicable recommendations of the following industry associations:
1. Michigan Department of Transportation (MDOT)
2. American Society for Testing and Materials (ASTM 04.03)
3. Asphalt Institute - "The Asphalt Handbook"
1.5 SUBMITTALS
A. Submit aggregate and bituminous mx designs for review. Contractor shall confirm that the materials
HOT MIX PAVEMENT – STANDARD
ADDENDUM #1
HOT MIX PAVEMENT - STANDARD
32 1233 - Page 2 of 5
NORTHVILLE HS TENNIS & BASEBALL RENOVATIONS 2021
provided meet the required specifications and provide material certification to be verified by the Landscape Architect. Material certification shall state the products meet or exceed the requirements indicated on the planks and the requirements of the regulating authority.
1.6 QUALITY ASSURANCE
A. Manufacturer Qualifications:
1. Manufacturer shall be a paving-mix manufacturer registered with and approved by authorities having jurisdiction or the DOT of the state in which Project is located.
B. Testing Agency Qualifications:
1. Qualified according to ASTM D 3666 for testing indicated, as documented according to ASTM E 548.
C. Regulatory Requirements:
1. Comply with Michigan Department of Transportation’s current Standard Specification for Construction for asphalt paving work.
PART 2 - MATERIALS
2.1 PLANT MIX
A. Leveling Course: The bituminous plant mix base course shall meet the requirements of MDOT Division 5 – Hot Mix Asphalt. The specific mix and cross sections are as follows.
Thickness: Not less than 2-½” inches.
Liquid Asphalt or Bitumen: 6% by weight (+ 0.5%) Asphalt Cement: 64-22 Aggregate for Leveling Course: Confirm with DOT Standards.
Fine Aggregate: Confirm with DOT Standards R.A.P. not to exceed 10% MDOT Mix: 13A
B. Wearing Course: The bituminous plant mix base course shall meet the requirements of MDOT Division 5 – Hot Mix Asphalt. The specific mix and cross sections are as follows.
Thickness: Not less than 1-½” inches.
Liquid Asphalt/Bitumen: 6% by weight (+ 0.5%) Asphalt Cement: 64-22 Aggregate for Leveling Course: Confirm with DOT Standards.
Fine Aggregate: Confirm with DOT Standards R.A.P. not exceed 30% MDOT Mix: 36A
C. The Contractor shall submit to the Landscape Architect a job mix formula prepared by an independent testing laboratory, including the exact proportions of bituminous material and mineral filler. The Contractor shall pay for all samples, reports and tests required to develop the job mix.
D. No bituminous surface shall be placed prior to approval of the job mix design by the Engineer/Landscape Architect.
HOT MIX PAVEMENT – STANDARD
ADDENDUM #1
HOT MIX PAVEMENT - STANDARD
32 1233 - Page 3 of 5
NORTHVILLE HS TENNIS & BASEBALL RENOVATIONS 2021
PART 3 - EXECUTION
3.1 LIMITATIONS OF OPERATIONS
A. Bituminous tack coat shall be applied only when surface and weather conditions are favorable.
Tack coat material shall conform to DOT Standards, B. Bituminous plant mix shall be placed only during daylight hours when the temperature of a shaded portion of the base is 40F. or higher and when the surface upon which it is to be constructed is dry.
C. Place bituminous asphalt mixture when temperature is not more than 15 F degrees below bitumen supplier’s bill of lading and not more than maximum specified temperature.
D. The entire leveling course shall be installed in a single day to avoid cold joints. If rain is expected, contractor shall reschedule installation.
E. The entire wearing course shall be installed in a single day to avoid cold joints. If rain is expected, contractor shall reschedule installation
3.2 SUB-GRADE AND BASE COURSE PREPARATION
A. Prepare sub-grade and aggregate base course in accordance with these specifications.
B. At the time of applying bituminous material, the sub-grade surface shall be dry and clean, and all necessary repairs or reconditioning work shall have been completed.
C. All objectionable foreign matter on the asphalt surface shall be removed and disposed by the Contractor.
3.3 BITUMINOUS TACK COAT
A. Bituminous tack coat shall be applied between each lift of asphalt of ss-1h at the rate of one tenth (0.1) gallon, per square yard to bituminous surfaces and to successive plant mix surfaces. The tack coat may be waived by the Landscape Architect where successive plant mix courses are to be placed during one day's operation.
3.4 TEMPERATURE
A. The temperature of bituminous material at the time of application shall be as approved by the Landscape Architect within the limits specified below.
MC-70 105-180 degrees F.
Plant Mix 270-330 degrees F.
B. Succeeding loads of plant mix when delivered to the paver shall not vary more than 20F. from the preceding or succeeding load of plant mix.
3.5 BITUMINOUS PAVING
A. After completion and acceptance of the stone base course, install 3” of hot mix asphalt materials.
B. Installation shall be in two (2) separate courses, as indicated on plans and details. Each asphalt lift shall be installed using self-propelled paving equipment.
C. Edge Shaping: While surface is being compacted and finished, trim edges of pavement for proper
HOT MIX PAVEMENT – STANDARD
ADDENDUM #1
HOT MIX PAVEMENT - STANDARD
32 1233 - Page 4 of 5
NORTHVILLE HS TENNIS & BASEBALL RENOVATIONS 2021
alignment, bevel edges of asphalt and compact thoroughly.
D. The plant mix bituminous material shall be compacted to 95% of the bulk density as determined by 50 blows-per-side Marshall procedures or 95% of Theoretical Maximum Density.
E. Plant mix shall be placed and compacted in accordance with current MDOT Guidelines, Division No. 5 - Hot-Mix Asphalt Pavements and Surface Treatments. The initial contact with the hot mixture leveling course shall be made by the power or driving roll of the steel roller, weighing not less than six (6) tons. The finish surface of the leveling course shall not vary more than 1/4” in 10 feet when measured in any direction. The finish surface of the wearing course shall not vary more than 1/8” in 10 feet when measured in any direction.
3.6 TESTS AND SAMPLES
A. At the direction of the Landscape Architect, the Contractor shall cut samples from any course or finished pavement not to exceed five (5) in number from any days run for tests of density and composition. These samples shall be taken at points designated by the Landscape Architect by sawing with a power driven masonry saw or diamond core drill. Samples shall be sufficiently large to meet the needs of the testing laboratory.
B. The Owner will hire an independent testing laboratory to perform field density testing with a nuclear density gage, a Correlated Pavement Quality Indicator, or PaveTracker (non-nuclear) to verify that the specified density requirements are being met.
C. The surface from which samples are taken shall be restored by the Contractor not later than the next succeeding day of plant operation.
D. All test results will be available to the Contractor.
E. All testing samples will be paid for in accordance with these specifications.
3.7 PATCHING AND REPAIRS
A. Patching: Saw cut perimeter of patch and excavate existing pavement section to sound base.
Recompact new subgrade. Excavate rectangular or trapezoidal patches, extending 12 inches (300 mm) into adjacent sound pavement, unless otherwise indicated. Cut excavation faces vertically.
1. Tack coat faces of excavation and allow to cure before paving.
2. Partially fill excavation with dense-graded, hot-mix asphalt base mix and compact while still hot. Cover asphalt base course with compacted, hot-mix surface layer finished flush with adjacent surfaces.
B. Leveling Course: Install and compact leveling course consisting of dense-graded, hot-mix asphalt surface course to level sages and fill depressions deeper than 1 inch (25 mm) in existing pavements.
1. Install leveling wedges in compacted lifts not exceeding 3 inches (75 mm) thick.
C. Crack and Joint Filling: Remove existing filler material from cracks or joints to a depth of 1/4 inch (6 mm). Refill with asphalt joint-filling material to restore watertight condition. Remove excess filler that has accumulated near cracks or joints.
D. Tack Coat: Apply uniformly to existing surfaces of previously constructed asphalt or portland cement concrete paving and to surfaces abutting or projecting into new, hot-mix asphalt
HOT MIX PAVEMENT – STANDARD
ADDENDUM #1
HOT MIX PAVEMENT - STANDARD
32 1233 - Page 5 of 5
NORTHVILLE HS TENNIS & BASEBALL RENOVATIONS 2021
pavement. Apply at a uniform rate of 0.05 to 0.15 gal./sq.yd. (0.2 to 0.7 L/sq.m) of surface.
1. Allow tack coat to cure undisturbed before paving.
2. Avoid smearing or staining adjoining surfaces, appurtenances, and surroundings. Remove spillages and clean affected surfaces.
END OF SECTION 32 1233
SECTION 32 1834
ACRYLIC TENNIS COURT SURFACE
ADDENDUM #1
ACRYLIC TENNIS COURT SURFACE
32 1834 - Page 4 of 4
THIS PAGE IS INTENTIONALLY LEFT BLANK
ACRYLIC TENNIS COURT SURFACE
ADDENDUM #1
ACRYLIC TENNIS COURT SURFACE
32 1834 - Page 1 of 4
NORTHVILLE HS TENNIS & BASEBALL RENOVATIONS 2021
PART 1 - GENERAL
1.1 SUMMARY
A. This Section is a part of the entire set of Contract Documents and shall be coordinated with the applicable provisions of the other parts.
B. Related Sections:
1. Section 03 3800 Post Tension Concrete - Tennis
2. Section 32 1218 Hot Mix Asphalt Pavement
3. Section 32 3130 Vinyl Clad Chainlink Fence
1.2 SCOPE
A. The work under this section of the specifications shall consist of furnishing all labor, materials and equipment necessary for acrylic tennis court surfacing and line markings.
1.3 QUALITY ASSURANCE
A. Reference Standards:
1. American Sports Builders Association (ASBA)
B. Each Bidder shall submit color samples with their bid.
C. The installation contractor must be able to supply the Owner, upon request, a list of twenty (20) outdoor tennis courts surfaces with the material accepted over the last five (5) years and have required no maintenance.
1.3 SUBMITTALS:
A. COLOR SAMPLES MUST BE PROVIDED WITH BID.
B. Contractor shall submit manufacturer's data sheets and color samples for all materials.
C. Contractor must submit copies of the Material Data Safety Sheets (MSDS) for all products to be used, before materials are delivered to the site.
PART 2 - PRODUCTS
2.1 TENNIS COURT SURFACE MATERIAL
A. This material shall be a fully pigmented system in-depth color. The material shall be from one of the following approved manufacturers:
1. LAYKOLD, by Advanced Polymer Technology, Harmony, PA (888) 266-4221
B. Acrylic Coloring of Courts shall be as follows:
1. Inner (Playing) Court Color: Pro Blue
2. Outer (Non-Playing) Court Color: Medium Green
ACRYLIC TENNIS COURT SURFACE
ADDENDUM #1
ACRYLIC TENNIS COURT SURFACE
32 1834 - Page 2 of 4
NORTHVILLE HS TENNIS & BASEBALL RENOVATIONS 2021
C. Asphalt or tar in any form will not be permitted in any coating. The color shall be pure acrylic-type containing no asphalt or tar emulsions and no vinyls, alkyds or non-acrylic resins.
This is the start of the file's text. The full file is on GovTribe.