NP_SER_PMS FY20(5)_BIP_STR 5230-001P.pdf

PDF 3 MB Posted

Attached to
Cumberland Gap National Historical Park
Solicitation number
693C73-21-B-000009
Issued by

About this file

This document provides details for a federal solicitation opportunity and related bridge inspection report. The solicitation is for pavement preservation treatments, asphalt patching, pavement markings, and other miscellaneous work on roads and parking areas within Cumberland Gap National Historical Park. The project will be split into two contract options with a combined estimated price range of $1,000,000 to $5,000,000. The solicitation number is 693C73-21-B-000009 and bids are due on a date specified in Block 13a of the solicitation form SF1442. The bridge inspection report provides condition assessments and recommendations for repairs to Sugar Run Road Bridge No. 5230-001P located within the park. Identified needs include debris removal, vegetation removal, concrete repairs, replacement of missing rail caps, and installation of approach guardrails.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STRUCTURE SUMMARY STRUCTURE NO. 5230-001P

SUGAR RUN ROAD BRIDGE INSPECTION DATE: 5/15/18

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL: ....... CONCRETE NO. OF MAIN SPANS:

MAIN SPAN TYPE: ............... TEE BEAM NO. OF APPR. SPANS:

# OF BEAMS, MAIN SPAN: .. 4 STRUCT. TOTAL LENGTH: .. 225.0 FT (68.6 M)

DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 60.3 FT (18.4 M)

WEARING SURFACE: .......... MODIFIED CONCRETE DECK WIDTH: ...................... 29.6 FT (9.0 M)

ABUT. FOUNDATIONS: ........ SPREAD FOOTING ON PILES CURB TO CURB WIDTH: ..... 24.3 FT (7.4 M)

PIER FOUNDATION(S): ........ SPREAD FOOTING ON PILES YEAR BUILT:

ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A

PROJ./PLAN REF. NO: ......... / NHP-CG SKEW ANGLE: ..................... 12 °

NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO

STRUCTURE HISTORY: ...... 1983-JOINT REPAIR. 2001-DECK EXPANSION JOINT MATERIAL REPLACED, 2006 LATEX

MODIFIED CONCRETE OVERLAY ON DECK & ABUTMENT SLOPE REPAIRS, 2016-ABUTMENT

LOCATION

CUMBERLAND GAP NATIONAL HISTORICAL PARK MILE POINT: ..................... 1.44 (KM PT 2.32)

STATE: ................................. KENTUCKY LOCATION: 2.3 MILES BEFORE PINNACLE

OVERLOOK. FACILITY CARRIED: ............ SKYLAND ROAD

FEATURE INTERSECTED: .. SUGAR RUN ROAD AND STREAM

STRUCTURE EVALUATION SUMMARY

This concrete tee beam bridge is in good condition overall. Problems at this time include spalling with exposed rebar on the south column of the east pier, the south deck overhang in Span #2 near the east pier, and the west pier diaphragm beneath Beam #3; missing bridge rail end caps at the southeast, northeast, and northwest corners; and debris accumulation along the curblines which has clogged the deck drains along the south curbline. In addition, vegetation is growing from the base of several columns which is beginning to encroach the bridge.

The bridge is currently posted for 18 tons at both approaches; vegetation slightly obscures the signage at the northeast corner. It should be noted that the present load rating is sufficient for legal loads, and the bridge does not require posting. However, the bridge may continue to be posted at the discretion of the Park.

Corrective action should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future. Consideration should also be given to installing an approach guardrail system that meets current safety guidelines for traffic barriers.

INSPECTION TEAM: A. IMMEL, P. SWANN (VOLKERT, INC.)

CONDITION ASSESSMENT:

AARON IMMEL, P.E., FIELD TEAM LEADER

REPORT REVIEW:

MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 9/28/18

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5230-001P

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

D226 PRIORITY OF IMPROVEMENT

ITEM

NO.

ROUTINE MAINTENANCE QTY. UNIT UNIT

COST

PRELIM.

COST

ESTIMATE

58.7 REMOVE DEBRIS FROM CURBLINES AND DECK DRAINS. 1 LS

58.1, 59.2, 60.13, 222.7

REMOVE VEGETATION GROWTH ENCROACHING BRIDGE AND SIGNAGE. 1 LS

PRELIM. MAINTENANCE TOTAL :

ITEM

NO.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST

PRELIM. COST

ESTIMATES

REHAB. RECONSTR.

222.3 INSTALL APPROACH GUARDRAIL SYSTEM MEETING CURRENT

SAFETY GUIDELINES FOR TRAFFIC BARRIERS.

1 LS

58.1, 59.6, 60.13

REPAIR CONCRETE AT LOCATIONS WITH EXPOSED REBAR ON

SOUTH COLUMN OF EAST PIER, SOUTH DECK OVERHANG IN SPAN

#2 NEAR EAST PIER, AND DIAPHRAGM AT WEST PIER.

1 LS

58.6 REPLACE MISSING END RAIL CAPS AT SOUTHEAST, NORTHEAST,

AND NORTHWEST CORNERS.

1 LS

CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL,

DESIGN, AND CONSTRUCTION ENGINEERING (APPROXIMATELY

70% TOTAL REHAB COST) PLUS PARK LOCATION FACTOR.

1 LS

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

FIELD INSPECTION REPORT STRUCTURE NO. 5230-001P

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

Fatigue cracks in steel or shear cracks in concrete may be present.

CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.

FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

NOT APPLICABLE

EXCELLENT CONDITION

VERY GOOD CONDITION - no problems noted.

GOOD CONDITION - some minor problems.

SATISFACTORY CONDITION - structural elements show some minor deterioration.

FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.

POOR CONDITION - advanced section loss, deterioration, spalling, or scour.

N

58. DECK ITEM REFERENCE AND REMARKS

OTHER

ALIGNMENT

DEFLECTION AND/OR VIBRATION

FASCIA(E)

DIAPHRAGMS AND BRACING

TRUSSES

FLOOR BEAMS AND STRINGERS

ARCH(ES) OR SLAB(S)

GIRDERS OR BEAMS

BEARING DEVICES

59. SUPERSTRUCTURE

OTHER

DEFLECTION AND/OR VIBRATION

UTILITIES

DRAINS AND DRAINAGE

PARAPETS AND/OR RAILINGS

CURBS, SIDEWALKS, AND MEDIAN

RIDEABILITY

WEARING SURFACE

EXPANSION JOINTS

DECK SLAB

OTHER

SETTLEMENT OR DEFLECTION

EROSION AND/OR SCOUR

FOUNDATIONS

CAPS AND/OR BEARING SEATS

PILE BENTS

WALLS AND/OR COLUMNS

PIER(S)

OTHER

SLOPE PROTECTION

SETTLEMENT OR DEFLECTION

EROSION AND/OR SCOUR

EXPANSION JOINTS

WEEP HOLES

WINGWALLS

FOUNDATIONS

BACKWALLS AND/OR BULKHEADS

CAPS AND/OR BEARING SEATS

PILE BENTS

BREASTWALLS OR COLUMNS

ABUTMENTS

60. SUBSTRUCTURE

1.

10.

2.

3.

4.

5.

6.

7.

8.

9.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

PAINT

11.

(STRIPING)

G G N N N G N N G

N G

G N G G N G N N G G N N

G N G N G G N

11.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

12.

13.

14.

15.

16.

17.

18.

19.

58.1,3 MINOR LONGITUDINAL CRACKING OF LATEX-MODIFIED WEARING

SURFACE AT JOINTS. MINOR SPALLING WITH EXPOSED REBAR ON

SOUTH DECK OVERHANG IN SPAN #2 NEAR EAST PIER AND AT

WEST DECK DRAIN IN SPAN #4. HAIRLINE DIAGONAL CRACKING

WITH EFFLORESCENCE ON DECK UNDERSIDE AT SEVERAL

LOCATIONS.

58.1, 59.2, 60.13, 222.7

VEGETATION GROWING FROM BASE OF SEVERAL COLUMNS AND

DECK SIDES BEGINNING TO ENCROACH BRIDGE AND SIGNAGE.

58.2,7 MINOR TO MODERATE DEBRIS ACCUMULATION ALONG CURBLINES;

DECK DRAINS ALONG SOUTH CURBLINE CLOGGED. MINOR TO

MODERATE DEBRIS ACCUMULATION IN DECK JOINTS; MAINLY

ALONG CURBLINES.

58.6 END CAPS MISSING FROM RAILS AT NORTHWEST, NORTHEAST, AND

SOUTHEAST CORNERS.

58.10 ROADWAY STRIPING BEGINNING TO FADE.

59.2 TWO AREAS WITH EXPOSED FORM TIES ON SOUTH SIDE OF BEAM

#4 NEAR EAST ABUTMENT. MINOR SPALLING OF BEAM #3 (10" WIDE

X 4" HIGH) NEAR EAST ABUTMENT; NO REBAR EXPOSED.

59.6 MINOR VERTICAL CRACKING WITH EFFLORESCENCE ON ABUTMENT

DIAPHRAGMS. MINOR SPALLING WITH EXPOSED REBAR ON WEST

PIER DIAPHRAGM BENEATH BEAM #3.

60.6 "1958 - 15 TONS" STAMPED ON SOUTHEAST WINGWALL.

60.9 MINOR TO MODERATE UNDERMINING OF ALL WINGWALLS (UP TO

5'-3"); HOWEVER, WINGWALLS WERE DESIGNED AS UNSUPPORTED

BY SOIL. PREVIOUSLY NOTED UNDERMINING AND EXPOSURE OF

CONCRETE PILES AT ABUTMENTS HAS BEEN REPAIRED WITH FILL

AND SMALL ROCKS UNDER A GEOTEXTILE NETTING. NETTING IS

SLOUGHING AT TOP OF WEST ABUTMENT.

G G G G F N

F

G

G

G

FIELD INSPECTION REPORT STRUCTURE NO. 5230-001P

ITEM REFERENCE AND REMARKS

61. CHANNEL 7

1. ALIGNMENT F

2. EROSION AND/OR SCOUR G

3. CHANNEL PROTECTION G

4. WATERWAY OBSTRUCTIONS G

5. OTHER N

6. ADEQUACY OF OPENING EXCESS

7. NORMAL VELOCITY LOW

8. AVERAGE CLEAR OPENING 25 FT.

9. STREAM BED COMPOSITION :

SILT, ROCK, CLAY

222. APPROACHES 7

1. APPROACH SLABS

2. RELIEF JOINTS

3. APPROACH GUARDRAIL

4. SURFACING

5. EROSION

6. SETTLEMENT

7. SIGNS

8. ALIGNMENT

9. OTHER

N N G G G G G F N

223. RETAINING WALL 7

1. WALL

2. WEEP HOLES

3. FOUNDATION

4. EROSION AND/OR SCOUR

5. SETTLEMENT OR DEFLECTION

6. OTHER

G N N G G N

36. TRAFFIC AND SAFETY FEATURES

A. BRIDGE RAILINGS

B. TRANSITIONS

C. APPROACH GUARDRAILS

D. APPROACH GUARDRAIL ENDS

N N N

60.13,15 MODERATE SPALLING WITH SMALL AREA OF EXPOSED REBAR ON

SOUTH COLUMN OF EAST PIER, NEAR BASE. MINOR POPOUTS

THROUGHOUT PIERS AND PIER CAPS WITH REBAR ENDS EXPOSED

AND RUSTING. MINOR STAINING ON ALL PIERS. HAIRLINE

CRACKING OF PIER CAPS.

61.1 STREAM FLOWS NEAR WEST PIER.

61.2 SEE BRIDGE FILE FOR SCOUR EVALUATION.

61.3 STONE RIPRAP LINES BOTH BANKS BENEATH BRIDGE.

222.7 REFLECTIVE OBJECT MARKERS AT BRIDGE CORNERS. "WEIGHT

LIMIT 18 TONS" SIGNS AT NORTHEAST AND SOUTHWEST CORNERS;

NORTHEAST SIGN SLIGHTLY OBSCURED BY VEGETATION.

222.8 BRIDGE IN HORIZONTAL CURVE.

TRAFFIC SAFETY RATING CODES

N

Does not meet standards or a safety feature is required and none is provided.

Meets currently acceptable standards.

Not applicable or a safety feature is not required.

STRUCTURE LOAD RATING STRUCTURE NO. 5230-001P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 24 22 41 37

HS 33 30 55 50

TYPE 3 30 27 50 45

TYPE 3S2 45 41 75 68

TYPE 3-3 53 48 88 80

DESIGN LOADING: H15 (M13.5)

CAPACITY MEETS OR EXCEEDS DESIGN LOAD

X CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION: 1/16

LOAD RATING CONTROLLED BY: POSITIVE MOMENT CAPACITY OF GIRDERS

REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS. BRIDGE IS CURRENTLY POSTED FOR AN 18-TON

LOAD LIMIT.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5230-001P

STRUCTURE IDENTIFICATION

(201) PARK: CUMBERLAND GAP NATIONAL HISTORICAL PARK (1) STATE: ....................................... 214 - KENTUCKY (KY)

(202) STRUCTURE NAME: .......... SUGAR RUN ROAD BRIDGE (2) STATE HWY. AGENCY DIST:

(203) STRUCTURE KIND: ............ 1 - BRIDGE (3) COUNTY CODE: ........................ 025 - BREATHITT

(204) STRUCTURE NUMBER: ..... 5230-001P (4) CITY/PLACE CODE:

(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:

(206) ROUTE CODE NUMBER: ... 10 (6) FEATURES INTERSECTED:....... SUGAR RUN ROAD AND STR

(207) ROAD SECTION NO: .......... 001P (7) FACILITY CARRIED: .................. SKYLAND ROAD

(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5230001P0000000

(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 2.3 MILES BEFORE PINNACL

(210) OPERATING UNIT: ............. PARK (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)

(211) PROJECT NO(S): ................ (11) MILE POINT: ............................. 1.44 (KM PT 2.32)

(212) DRAWING NUMBERS: ....... NHP-CG (27) YEAR BUILT:

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD

(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

1 - CONCRETE

04 - TEE BEAM

60.3 FT (18.4 M)

225.0 FT (68.6 M)

3 - SPREAD FOOTING ON PILES

3 - SPREAD FOOTING ON PILES

3 - SPREAD FOOTING ON PILES

3 - SPREAD FOOTING ON PILES

1 - CONCRETE CAST-IN-PLACE

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. 3 - MODIFIED CONCRETE

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION: .............. 0 - NONE

(218) IS SALT USED?: ..................... YES

LOAD RATING AND POSTING

(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION

(66) INVENTORY RATING: ...... 33.0 TONS (29.9 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 55.0 TONS (49.9 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 5/18 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO

INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. NO

(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5230-001P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(51) CURB TO CURB WIDTH: ........... 24.3 FT (7.4 M) (16) LATITUDE: ............................. 36°36'40.20"

(17) LONGITUDE: ......................... 83°40'41.50"

(19) DETOUR LENGTH: ............... 0 MI (0 KM)

(28A) LANES ON STRUCT:

(28B) LANES UNDER STRUCT: ... 02

(42A) SERVICE ON: ..................... 5 - HIGHWAY-PEDESTRIAN

(42B) SERVICE UNDER: .............. 6 - HIGHWAY-WATERWAY

(29) AVG. DAILY TRAFFIC:

(30) YEAR OF ADT:

(114) FUTURE ADT:

(115) YEAR OF FUTURE ADT:

(101) PARALLEL STRUCTURE: ... N - NONE

(38) NAVIGATION CONTROL?: ... N

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)

(111) ABUT. OR PIER PROT:

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 2.0 FT (0.6 M)

(56) LEFT: ......................... 0.0 FT (0.0 M)

(52) DECK WIDTH:

(32) APPR. ROADWAY WIDTH:

(213) APPR. PAVEMENT WIDTH:

LEFT SHOULDER:

RIGHT SHOULDER:

(33) BRIDGE MEDIAN:

(34) SKEW ANGLE:

(35) DECK FLARE?:

(47) TOTAL HORIZ. CLEARANCE:

(50) SIDEWALKS:

LEFT :

RIGHT :

(214) BRIDGE RAIL TYPE:

RAIL CONFIGURATION:

MATERIAL:

DESIGN TYPE:

(215) BRIDGE RAIL HEIGHT:

(53) MIN. VRT. CLEAR. OVER DECK:

(54) MIN. VRT. UNDERCLEARANCE:

29.6 FT (9.0 M)

24.0 FT (7.3 M)

24.0 FT (7.0 M)

0.0 FT (0.0 M)

0.0 FT (0.0 M)

0 - NO MEDIAN

12 °

NO

24.3 FT (7.4 M)

1.6 FT (0.5 M)

1.6 FT (0.5 M)

2 - MOUNTED ON PARAPET

6 - ALUMINUM

1 - CONTINUOUS RAIL

2.25 FT (0.69 M)

99.99 FT (99.99 M)

18.25 FT (5.56 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL:

(62) CULVERT: ........................... N

(222) APPROACHES:

(223) RETAINING WALL:

(36) TRAFFIC SAFETY FEAT: ... 1NNN

(75A) TYPE OF WORK:

(75B) WORK DONE BY:

(76) IMPROVEMENT LENGTH: ..

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

5 - Stable; scour within limits of

2 - REHAB/RECONSTRUCTION

D - MINOR

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1983-JOINT REPAIR. 2001-DECK EXPANSION JOINT MATERIAL REPLACED, 2006 LATEX MODIFIED CONCRETE OVERLAY ON DECK &

ABUTMENT SLOPE REPAIRS, 2016-ABUTMENT SLOPE REPAIRS & DECK RESTRIPING

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

APPENDIX STRUCTURE NO. 5230-001P

PHOTOGRAPHS STRUCTURE NO. 5230-001P

PHOTO #1 - LOOKING EAST TOWARD PINNACLE OVERLOOK

FLOW

PHOTO #2 - NORTH (DOWNSTREAM) SIDE

PHOTO #3 - GENERAL TOP SIDE VIEW LOOKING WEST; NOTE FADING

OF ROADWAY STRIPING

PHOTO #4 - GENERAL UNDERSIDE VIEW OF SPAN #2 LOOKING EAST

PHOTO #5 - SIGNAGE AT EAST APPROACH; NOTE TREE LIMBS

OBSCURE WEIGHT LIMIT SIGN

PHOTO #6 - TREE GROWTH THROUGH SOUTHEAST RAIL END

PHOTO #7 - TYPICAL DEBRIS ACCUMULATION

ALONG CURBLINES, SOUTH CURBLINE

SHOWN

PHOTO #8 - TYPICAL DEBRIS ACCUMULATION

ALONG SOUTH DECK DRAINS

PHOTO #9 - TYPICAL CRACKING OF WEARING SURFACE AT JOINTS,

CENTER JOINT SHOWN

PHOTO #10 - TYPICAL CAP MISSING FROM RAIL ENDS, NORTHWEST

RAIL END SHOWN

PHOTO #11 - SIGNAGE AT WEST APPROACH

PHOTO #12 - SLOUGHING OF GEOTEXTILE NETTING AT WEST

ABUTMENT

PHOTO #13 - TYPICAL UNDERMINING OF

WINGWALLS, NORTHWEST WINGWALL

SHOWN

PHOTO #14 - CRACKING WITH

EFFLORESCENCE ON END DIAPHRAGM IN BAY

#2 AT WEST ABUTMENT

PHOTO #15 - TYPICAL CRACKING WITH EFFLORESCENCE ON DECK

UNDERSIDE, BAY #3 NEAR WEST ABUTMENT SHOWN

PHOTO #16 - SPALLING AROUND WEST DECK DRAIN IN SPAN #4

PHOTO #17 - SPALLING WITH EXPOSED REBAR ON DIAPHRAGM AT

BEARING AREA FOR BEAM #3 IN SPAN #3 OVER WEST PIER

PHOTO #18 - GENERAL VIEW OF CENTER PIER

PHOTO #19 - SPALLING WITH EXPOSED

REBAR ON SOUTH DECK OVERHANG NEAR

EAST PIER

PHOTO #20 - SPALLING WITH EXPOSED

REBAR NEAR BASE OF SOUTH COLUMN FOR

EAST PIER

PHOTO #21 - TYPICAL TREE GROWTH

ENCROACHING BRIDGE, EAST PIER SHOWN

PHOTO #22 - SPALLING ALONG SOUTH SIDE

OF BEAM #3 NEAR EAST ABUTMENT

PHOTO #23 - GENERAL VIEW OF EAST ABUTMENT; NOTE GEOTEXTILE

NETTING

PHOTO #24 - GENERAL VIEW OF UNDERPASS ROADWAY LOOKING

NORTH

PHOTO #25 - UPSTREAM CHANNEL

PHOTO #26 - DOWNSTREAM CHANNEL

File details come from the government source that posted it. Updated .