Novato Security Fence Site Layout Final.pdf
PDF 2 MB Posted
- Solicitation number
- 31090PR260000124
About this file
This document is a site layout and utilities diagram for a fencing and gate installation project at a property with significant elevation changes. The project requires installation of ornamental fence, chain-link fence, three pedestrian gates, one lockable swinging vehicle gate, and one manual cantilever vehicle gate. Existing back gate posts and vehicle gate structures are to be removed. The back gate fence shall extend from the top of a cliff on the property to the midpoint of water in an adjacent ditch, and ornamental fence shall tie into existing chain-link fence at another location. The site plan indicates elevation transitions requiring careful construction planning across the varied topography.
The site contains multiple utilities including sanitary sewer, electric, potable water, natural gas, and storm water infrastructure shown on the utilities diagram. The contractor bears full responsibility for obtaining utility locates, marking utility locations to prevent interference during construction, and repairing any damage to utilities resulting from the work. The site utilities map indicates these are approximate locations, making contractor due diligence in utility identification critical before commencing fence installation and ground disturbance activities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Site Layout
Back Gate
Tie into existing chain-link fence
Ornamental Fence Lockable Swinging vehicle gate
Chain link fence Manual cantilever vehicle gate
Back Gate
Pedestrian Gate (3)
Elevation Transitions
Note: Back gate fence shall run from top of cliff on CG property to midpoint of water in ditch
Extend to mid point of ditch
Site Utilities
Sanitary Sewer
Electric
Potable Water Natural Gas
Potable Water
Storm Water
Site utilities are approximate. It is contractor’s responsibility to provide utility locates and mark locations to avoid interferences. It is the contractor’s responsibility to repair any damage to utilities that result from their work.
Site Photos
Back Gate Posts and Vehicle Gate to be removed
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
File details come from the government source that posted it. Updated .