Novato Security Fence Site Layout Final Rev1.pdf
PDF 2 MB Posted
- Solicitation number
- 31090PR260000124
About this file
This document is a site layout and utilities guide for a fencing and gate installation project. The project involves installing ornamental fencing, chain-link fencing, vehicle gates, and pedestrian gates at a property with significant elevation changes. Key fencing components include a lockable swinging vehicle gate, a manual cantilever vehicle gate, and three pedestrian gates. The back gate fence shall extend from the top of a cliff on the property to the midpoint of water in a ditch, with an amendment requiring approximately 140 linear feet of fence extension along a path to meet existing fencing. The site contains existing chain-link fence that new fencing must tie into at designated locations.
The document identifies critical utility infrastructure present on the site, including sanitary sewer, electric, potable water, natural gas, and storm water lines. Site utilities are noted as approximate, and the contractor bears full responsibility for obtaining utility locates, marking locations to prevent interference, and repairing any utility damage resulting from construction activities. Site photographs document existing conditions, including areas where back gate posts and vehicle gates are to be removed, vegetation coverage, topography, and access points. The contractor is expected to manage site logistics around existing improvements and account for elevation transitions throughout the project area.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Novato Housing Fencing Questions and Answers.pdf | ||
| Novato Security Fence Site Layout Final.pdf | ||
| Construction Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Site Layout
Back Gate
Tie into existing chain-link fence
Ornamental Fence Lockable Swinging vehicle gate
Chain link fence Manual cantilever vehicle gate
Back Gate
Pedestrian Gate (3)
Elevation Transitions
Note: Back gate fence shall run from top of cliff on CG property to midpoint of water in ditch
Extend to mid point of ditch
Amendment – Extend fence along path to meet existing fence Approximately 140 L.F.
Site Utilities
Sanitary Sewer
Electric
Potable Water Natural Gas
Potable Water
Storm Water
Site utilities are approximate. It is contractor’s responsibility to provide utility locates and mark locations to avoid interferences. It is the contractor’s responsibility to repair any damage to utilities that result from their work.
Site Photos
Back Gate Posts and Vehicle Gate to be removed