About this file
This is a Notice of Intent to Award issued by Northern Wasco County People's Utility District for the Three Mile Substation Relay and Control Panel project, dated October 2, 2024. The District has selected Schweitzer Engineering Laboratories, Inc. as the apparent successful bidder following evaluation of submitted proposals against established selection criteria. The award is contingent upon execution of a written contract with terms and conditions acceptable to the District, and the notice does not constitute formation of a binding contract until such execution occurs. Should the apparent successful bidder fail to execute a contract, the District reserves the right to revoke the award and select the next highest-ranked bidder or withdraw the solicitation entirely.
The evaluation of six bidders was conducted using a value-based scoring methodology across six criteria: Contractor Experience, Price Schedule, Delivery Schedule, Resumes for Key Personnel, References, and Interview Performance. Schweitzer Engineering Laboratories, Inc. received a total score of 12 points with a proposed price of $43,245.00 and an 18-week delivery schedule. Competing bidders included Birmingham Electric Power Products (8 points, $53,405.00), General Electric (11 points, $49,623.00), Tech Int. (8 points, $97,811.00), SEL (5 points, $93,300.00), and Keltour, which was disqualified as a late proposal. The scoring criteria utilized a scale of 1 to 5 points across each category, with higher scores indicating superior qualifications and value propositions. No information regarding contract term, renewal options, or specific set-aside provisions was included in the notice.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFPAttD - Reference Form.docx | DOCX document | |
| RFPAttC - Proposer Information and Certification.docx | DOCX document | |
| RFPAttE - Cost Proposal Submission Form vf.docx | DOCX document | |
| IRFP Amendment 1 - Q&A.pdf | ||
| AttF - Solution Capabilities_Requirements vf.xlsx | XLSX spreadsheet | |
| Pre-offer Conference Transcript - Social Media Tool.pdf | ||
| InformalRFP Social Media Tool_vf.pdf | ||
| RFPAttB - Disclosure Exemption Affidavit~1.docx | DOCX document | |
| AttA - Sample SaaS Contract vf.docx | DOCX document | |
| AttA_ExI Privacy and Security vf.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revision 2.0; eff. 06/21/17
NOTICE OF INTENT TO AWARD
To: Respondents of Northern Wasco County PUD's RFP/RFQ/ITB for: Three Mile Substation Relay and Control Panel
From: North Wasco County People’s Utility District
Date: 10/02/2024
Subject: Notice of Intent to Award
This Notice is provided to update companies participating in Three Mile Substation Relay and Control Panel regarding the status of the process for this project. After a review of submissions considering selection criteria, Northern Wasco County People’s Utility District’s (hereinafter called the “District”) recommends selecting the following successful responsive Bidder, Schweitzer Engineering Laboratories, Inc., for contract negotiations.
The table attached hereto as Exhibit No. 1 details the value-based scoring for each submitted bid.
Thank you for your company’s participation in this procurement process. We hope that your company will continue to take an interest in future District projects.
This Notice of Intent to Award is subject to execution of a written contract and, as a result, this Notice does NOT constitute the formation of a contract between the District and the apparent successful Bidder. The Bidder shall not acquire any legal or equitable rights relative to the contract services until a contract containing terms and conditions acceptable to the District is executed. If the apparent successful Bidder fails to execute a contract with the District, the District may revoke the award and award the contract to the next highest ranked Bidder or withdraw the Solicitation. The District further reserves the right to cancel this Notice of Intent to Award at any time prior to the execution of a written contract.
Revision 1.0; eff. 06/21/17
EXHIBIT NO. 1
Criteria 5 4 3 2 1
Contractor Experience:
The contractor's extensive experience in comparable projects showcasing a level of proficiency and know-how that exceeds industry standards.
The contractor has significant experience in similar projects, demonstrating a high level of proficiency and know-how that meets industry standards.
The contractor has some relevant experience in similar projects, meeting basic industry standards but lacking in depth compared to competitors.
The contractor's experience in similar projects is limited, meeting only minimum industry standards.
The contractor's experience in similar projects is insufficient and falls below industry standards.
Price Schedule:
The proposed price schedule offers exceptional value, significantly undercutting competitors while still meeting or surpassing all project specifications and quality standards set by the district.
The proposed price schedule offers competitive pricing, slightly lower than competitors, while meeting or surpassing all project specifications and quality standards. This falls within 5 % of low bidder.
The proposed price schedule meets project specifications and quality standards but lacks significant cost competitiveness compared to competitors.This falls within 10 % of low bidder.
The proposed price schedule meets only minimum project specifications and quality standards and is not competitive compared to competitors. This falls within 15 % of low bidder.
The proposed price schedule fails to meet project specifications and quality standards and is uncompetitive compared to competitors.
Delivery Schedule:
The proposed delivery schedule is the fastest available schedule.
The proposed delivery schedule is the next fastest available schedule.
The proposed delivery schedule is the next fastest available schedule.
The proposed delivery schedule is the next fastest available schedule.
The proposed delivery schedule is the next fastest available schedule.
Resumes for Key Personnel:
The resumes provided for key personnel showcase exemplary qualifications, experience, and achievements that greatly surpass the minimum requirements outlined by the district, ensuring a high level of expertise and capability in executing the project.
The resumes of key personnel demonstrate strong qualifications, experience, and achievements meeting or slightly exceeding minimum district requirements, ensuring a high level of expertise and capability in executing the project.
The resumes of key personnel meet minimum district requirements but lack notable qualifications, experience, or achievements beyond these requirements, potentially impacting the execution of the project.
The resumes of key personnel marginally meet minimum district requirements and lack sufficient qualifications, experience, or achievements, raising concerns about the capability to execute the project.
The resumes of key personnel fail to meet minimum district requirements, indicating a lack of necessary qualifications, experience, or achievements essential for executing the project effectively.
References:
The provided references offer overwhelmingly positive endorsements, showcasing numerous achievements and successful project completions that significantly surpass the district's expectations, providing strong confidence in the contractor's ability to deliver exceptional results.
The provided references offer predominantly positive endorsements, highlighting several achievements and successful project completions that exceed the district's expectations, instilling confidence in the contractor's ability to deliver exceptional results.
The provided references offer generally positive endorsements, indicating some achievements and successful project completions that meet the district's expectations, providing moderate confidence in the contractor's ability to deliver satisfactory results.
The provided references offer mixed endorsements, with limited achievements and successful project completions meeting the district's expectations, raising concerns about the contractor's ability to deliver satisfactory results.
The provided references offer negative endorsements, indicating a lack of achievements and successful project completions meeting the district's expectations, undermining confidence in the contractor's ability to deliver satisfactory results.
Interview (if applicable):
In the event of an interview, the contractor's presentation and responses demonstrate a level of preparedness, innovation, and commitment that greatly exceeds the district's expectations, further reinforcing their suitability for the project.
During the interview, the contractor's presentation and responses demonstrate a high level of preparedness, innovation, and commitment, meeting or slightly exceeding the district's expectations and reinforcing their suitability for the project.
During the interview, the contractor's presentation and responses show moderate preparedness, innovation, and commitment, meeting basic district expectations and partially reinforcing their suitability for the project.
During the interview, the contractor's presentation and responses indicate limited preparedness, innovation, and commitment, falling below the district's expectations and raising concerns about their suitability for the project.
During the interview, the contractor's presentation and responses lack preparedness, innovation, and commitment, significantly below the district's expectations, and questioning their suitability for the project.
Birmingham Electric Power Products General Electric Tech Int. SEL Keltour - Late Proposal Void Contractor Experience: 3 5 4 3 5 3 Price Schedule: 1 2 1 1 5 3 Schedule: 4 4 3 1 2 5 Resumes for Key Personnel: NA NA NA NA NA NA References: NA NA NA NA NA NA Interview (if applicable): NA NA NA NA NA NA
Score Total 8 11 8 5 12 11 Price 53,405.00$ 49,623.00$ 97,811.00$ 93,300.00$ 43,245.00$ 46,087.52$ Schedule 16 Weeks 15 Weeks 16 Weeks 40 Weeks 18 Weeks 12 Weeks
19% 13% 56% 54% 0% 6% cole-isaacson Highlight