NORTHLAND SOS.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
DRY DOCK (DD): USCGC NORTHLAND DD FY24
Solicitation number
70Z08023QMECP0022
Issued by

About this file

This document contains a pricing schedule for drydock availability services for the USCGC Northland. The schedule lists over 40 line items for work including hull plating testing and preservation, appendage preservation, propulsion system inspection and repair, tank preservation, superstructure preservation, and miscellaneous repairs. Unit pricing is requested for each item. The solicitation also seeks an over and above labor rate and material markup percentage for potential growth work. The related federal contract opportunity is for drydock services on the USCGC Northland with solicitation number 70Z08023QMECP0022 issued by the Department of Homeland Security Coast Guard. Offerors are asked to submit pricing to perform maintenance, repairs and inspections during drydocking of the cutter.

View the file

Other files

File Type Posted
NORTHLAND DD FY-24 QA 2.pdf PDF
70Z08023QMECP0022 2.pdf PDF
NORTHLAND DD FY-24 QA SC.pdf PDF
70Z08023QMECP00220001.pdf PDF
NORTHLAND SOW.pdf PDF
70Z08023QMECP0022.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC NORTHLAND (WMEC904) DRYDOCK AVAILABILITY FY2024
Solicitation Number : 70Z08023QMECP0022 ATTACHMENT 1
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Hull Plating, Side Scan, Ultrasonic TestingJOB1
D-002Hull Plating, U/W Body, Ultrasonic TestingJOB1
D-003U/W Body, Preserve, 100 percentJOB1
D-004Hull Plating Freeboard, Preserve, 100 PercentJOB1
D-005Appendages (U/W), Preserve (Internal) and Leak TestJOB1
D-006Propulsion Shaft Fairwaters And Rope Guards, InspectJOB1
D-007Voids (Non-Accessible), Preserve (Internal) and Leak TestJOB1
D-008Mast, Preserve, 100 PercentJOB1
D-009Propulsion Shafting, Strain Gauge Alignment, Drydock, CheckJOB1
D-010Propulsion Propeller Shaft Coating, Inspect and TestJOB1
D-011Propulsion Thrust Shafts, InspectJOB1
D-012Propulsion Shaft Seal (Mechanical And Inflatable) Assemblies, Inspect and Repair or RenewJOB1
D-013Controllable Pitch Propellers, Clean and InspectJOB1
D-014Controllable Pitch Propeller (CPP) Hubs, Remove, Inspect and ReinstallJOB1
D-015Main Diesel Engine, MDE, Exhaust Piping, Commercial CleanJOB1
D-016Ship Service Diesel Generator, SSDG, Exhaust Piping, Commercial CleanJOB1
D-017Fathometer Transducer, RenewJOB1
D-018Doppler Speed Log Transducer, Clean and InspectJOB1
D-019Sea Valves and Waster Pieces, Overhaul Or RenewJOB1
D-020Sea Strainers, Duplex, All Sizes, OverhaulJOB1
D-021Sea Strainers, Simplex, All Sizes, Clean and InspectJOB1
D-022Rudder Assemblies, Inspect and RepairJOB1
D-023Tanks, Potable Water Preserve, 100 PercentJOB1
D-024Superstructure, Preserve, 100 PercentJOB1
D-025Cathodic Protection, Zinc Anodes, Renew,JOB1
D-026DrydockJOB1
D-027Temporary Services, Provide - CutterJOB1
D-028Fantail Embarkation Station & Stanchions, ModifyJOB1
D-029Point of Use Potable Water Filters, InstallJOB1
D-030Bilges, PreserveJOB1
D-031Fan Space, RepairJOB1
D-032Propulsion Shaft Bearings, External, Check ClearancesJOB1
D-033Propulsion Stern Tube Bearings, Check ClearancesJOB1
D-034Emergency Diesel Generator, Exhaust Piping, Clean and InspectJOB1
D-035Kick Pipes and Handrails, RenewJOB1
D-036Helo Hangar Track, RenewJOB1
D-037Tank Risers, RenewJOB1
D-038Watertight Hatches and Scuttles, Internal, DC Deck and Below, RenewJOB1
D-039Controllable Pitch Propeller (CPP) System, Inspect and ServiceJOB1
D-040Watertight Sliding Door, OverhaulJOB1
D-00BGFP ReportNSPEANSP
D-00CTravel and PerdiemJOB
Total Price of Definite Items
Over and Above/Growth Work
The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered.
OA/G-001**Provide breakdown, as follows:

Over and Above/Growth Labor Rate

Unit Price: $________; Quantity: 2910; Unit of Issue: Hour; Extended Price: $____________Hour2910
OA/G-002Over and Above/Growth Material Markup/Handling Fee

Unit Price: $50,000; Quantity: 1; Unit of Issue: Percent ________%;

Extended Price: [$50,000.00 X percentage quoted]: $______________$50,000.00%
Total Price of Over and Above/Growth
THE FOLLOWING RATE USED FOR GROWTH WORK:
LaydayDaily Rate

(5/1/2023)_x000D_ Draft-3 - Page &P of &N