North-Texas-Electric-Vehicle-Infrastructure-Call-for-Projects-Application-Additional-Locations-Attachment.pdf

PDF 3 MB Posted

Attached to
North Texas Electric Vehicle Infrastructure Call for Projects
Solicitation number
CFP-2025-TR1
Issued by
Tarrant County, Texas

About this file

This is a Project Activity Details Form issued by the North Central Texas Council of Governments (NCTCOG) for the North Texas Electric Vehicle Infrastructure Call for Projects. The form serves as an application template for organizations seeking funding to install electric vehicle (EV) charging stations at specific locations within the region. Applicants are required to complete detailed information for each proposed charging station site, including site descriptions, charger specifications, environmental compliance documentation, and scoring criteria responses. The form accommodates multiple sites per application, with applicants able to submit additional sites using supplementary forms. All federally funded charging stations must comply with 23 CFR Part 680 requirements and must be open to the public at minimum during business operating hours, with DC Fast Charging (DCFC) stations within a mile of designated alternative fuel corridors required to operate 24/7.

The form requires applicants to provide comprehensive project budgets including equipment, design, engineering, construction, and installation costs, with the example application citing total estimated eligible costs of $352,000 in grant funding. Applicants must identify the Electric Interconnection Provider (such as Oncor), confirm electrical service availability through utility company documentation, and demonstrate project feasibility and readiness. The form addresses environmental considerations through National Environmental Policy Act (NEPA) compliance questions covering right-of-way acquisition, excavation depth, vegetation impacts, flood plains, historical properties, and traffic effects. Applicants are encouraged to work with NCTCOG's procured Deployment Dream Team (Kimley-Horn and Associates, Inc.) for technical assistance, and must demonstrate community engagement, fleet utilization plans, multi-modal hub potential, and support for emerging technologies such as bi-directional vehicle-to-grid capabilities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Station Location Information Example

1 Provide a brief site description:

Chargers will be added in front of City Hall, with one dual port DCFC and one dual port

Level 2 charger. Overall, the entire site will be capable of charging 4 vehicles simultaneously.

2 Location/facility name: City Hall 3 Physical Address: 3100 Place St.

4 City: Anytown 5 Zip Code: 12345 6 County: Square

7 Does this location currently have charging equipment? No

8 What brings visitors to this location? Residents coming to City Hall

Are the chargers intended to serve the local community, or drivers traveling through the community?

Local community

Approximately how many visitors come to the site or nearby destinations per day, if known?

11 Days/Hours site facility is open: M-F, 8:00 am - 5:00 pm

Days/Hours station will be publicly available:

Federal regulations laid out in 23 CFR Part 680 require federally funded EV charging stations to be open to the public at least as frequently as the business operating hours of the site host.

DCFC stations installed within a mile of a designated alternative fuel corridor and intended to serve travelers through the community must be open 24/7.

Are there any physical barriers that prevent access to the charging station? If so, when are they deployed?

Yes; parking lot gate closed at 7:00 pm daily

North Central Texas Council of Governments North Texas Electric Vehicle Infrastructure Call for Projects

Part 3: Site Information

Complete the fields for "Station Location Information", “Charger Information”, "Consistency with National Environmental Policy Act (NEPA) Clearance", and "Scoring Criteria". Complete a Site for each location at which chargers will be installed. Complete a column for each site proposed in your application. If you require additional sites, please download an additional Project Activity Details Form from our webpage and attach to your application. Applicants are encouraged to review the EV charging station requirements outlined in 23 CFR Part 680 as all federally funded charging stations must meet these requirements. Please complete all fields to the best of your ability.

6:00 am - 7:00 pm daily12

NCTCOG, 1

Site Number:Site Number: Site Number:

Charger Information Example

14 How many Level 2 ports are planned? 2 15 How many DCFC ports are planned? 2

16 Total number of charging ports (Must total at least 4): 4

Minimum number of ports interested in receiving funding for at location:

Desired Level 2 charger power level (kW) (Must be a minimum of 6 kW per port):

12 kW

Desired DCFC power level (kW) (Must be a minimum of 150 kW per port):

150 kW

20 Number of SAE J1772 connectors: 2 21 Number of SAE J3400 Level 2 connectors: 0 22 Number of SAE CCS connectors: 2 23 Number of SAE J3400 DCFC connectors: 2 24 Total number of charging connectors: 6

25 How many vehicles will be able to charge at one time? 4

26 Total development phase costs: $0

If development phase costs are expected, please explain why these services can't be provided by the NCTCOG procured Deployment Dream Team.

N/A

28 Total estimated equipment cost: $224,000 29 Total estimated design cost: $41,000 30 Total estimated engineering cost: $20,000 31 Total estimated construction cost: $3,000 32 Total estimated installation cost: $64,000 33 Total estimated eligible costs: $352,000 34 Total grant funding expected: $352,000

35 How was the project budget determined?

Estimates were provided by the Deployment Dream Team

A charging station is defined as the area in the immediate vicinity of a group of chargers and includes the chargers, supporting equipment, charging areas adjacent to the chargers, and lanes for vehicle ingress and egress. A charging port is defined as the system within a charger that charges one EV. A charging port may have multiple connectors, but it can provide power to charge only one EV through one connector at a time. Federal regulations laid out in 23 CFR Part 680 require federally funded EV charging stations to have at least 4 network-connected ports capable of dispending power simultaneously. The SAE J1772 connector is the standard for Level 2 stations and SAE CCS for DCFC stations. It is expected that all DCFC stations will offer at least one SAE J3400/North American Charging Standard (NACS) connector.

NCTCOG will administer the procurement of the EV charging vendor to ensure compliance with all federal requirements on the chargers. Selected applicants will have the opportunity to provide input on the charger procurement.

NCTCOG, 2

Site Number: Site Number:Site Number:

Consistency with National Environmental Policy Act (NEPA) Clearance

Example

36 Is any right-of-way acquisition needed? No

Is the applicant the permitting authority? If no, has the applicant confirmed the project is consistent with zoning and permitting of the Authority Having Jurisdiction?

Yes; Coordinated and confirmed permit process with Anytown.

38 Is the installation within an existing paved area? Yes

39 What is the approximate depth of excavation needed? Under 5 feet

What are the required modifications to install an EV Station? (Does it require relocation or installation of new utilities, reconfiguration of a parking lot or driveways or changes in access, or additional pavement and/or removal of trees?)

Installation of new conduit to parking lot, additional pavement slab for the charging station.

Please describe any impacts to vegetation in the installation area.

Regularly mowed grass will be removed for new concrete pads.

Is the site within the flood plain or on a regulated material site?

No

Is the site at or near a historical property (45 years old or older)?

No

Will additional lighting be needed and will it be nearby residential properties?

No, site has lighting.

Will traffic increase to the site and cause an increase in noise levels?

Possible slight increase in road noise or site traffic, though EVs are quiet.

Scoring Criteria Example

Closest existing public access EV charging station (address and driving distance):

Nearby stations can be found using a number of different mapping tools, including PlugShare, ChargeFinder, and the Alternative Fuels Data Center (AFDC) Station Locator. If you know of any existing sites that are not currently listed on the AFDC Station Locator, please send those details to cleancities@nctcog.org.

Please provide additional reasons any existing charging stations may not support the area’s needs.

Available chargers are at hotels that intend them for guests, not truly "public"

1. Areas with Insufficient Charging

3.5 miles, 123 Nowhere St., Anytown, TX, 1234546

NCTCOG, 3

Site Number:

Site Number: Site Number:Site Number:

Site Number: Site Number:

Who do you anticipate will be the primary users of the site and how do you expect they will use the site?

Please attach supporting letters as appropriate.

To be answered by applicant

Please describe any plans for this station to serve public or private fleets operating in the area.

Please attach letters from other organizations as appropriate.

If you plan for this station to serve your organization's fleet, it is highly encouraged that the agency adopt NCTCOG's Clean Fleet Policy, located at https://nctcog.org/clean-fleet-policy. For agencies who plan for organizational fleet use, adoption of the Clean Fleet Policy will be factored into the scoring of this section. Please attach relevant documentation to your application.

Please describe any plans for the station serve as a multi-modal hub to support other modes of transportation.

Examples of multi-modal hubs include stations located at transit park-and-rides and stations that can serve rideshare drivers at airports or train stations.

Please describe any other ways in which this site will contribute to success, goals, or plans of the applicant or region.

To be answered by applicant

50 To be answered by applicant

2. Areas with Potential Demand

To be answered by applicant

NCTCOG, 4

https://www.nctcog.org/trans/quality/air/for-fleets/clean-fleet-policy https://www.nctcog.org/trans/quality/air/for-fleets/clean-fleet-policy https://www.nctcog.org/trans/quality/air/for-fleets/clean-fleet-policy https://www.nctcog.org/trans/quality/air/for-fleets/clean-fleet-policy https://www.nctcog.org/trans/quality/air/for-fleets/clean-fleet-policy https://www.nctcog.org/trans/quality/air/for-fleets/clean-fleet-policy https://www.nctcog.org/trans/quality/air/for-fleets/clean-fleet-policy https://www.nctcog.org/trans/quality/air/for-fleets/clean-fleet-policy

Please describe any public engagement you did as part of developing this application and how that contributed to your project.

Please attach any other information indicating public engagement or support.

To be answered by applicant

Please describe any other community input you've received that is relevant to your application.

To be answered by applicant

3. Public Engagement

As part of the public engagement assessment, NCTCOG will be evaluating public feedback received via the Texas Department of Transportation Interactive Map and the Regional EV Charging Station Projects website (www.publicinput.com/nctcogEVcharging) among other factors. Applicants are encouraged to spread the word about these feedback opportunities to their residents to increase feedback by the application deadline.

NCTCOG, 5

https://www.publicinput.com/nctcogEVcharging https://www.publicinput.com/nctcogEVcharging https://www.publicinput.com/nctcogEVcharging https://www.publicinput.com/nctcogEVcharging https://www.publicinput.com/nctcogEVcharging https://www.publicinput.com/nctcogEVcharging

What steps have you taken to ensure project readiness and station utilization?

Please attach any relevant materials to your application if applicable.

To be answered by applicant

What physical safety features will be included to prevent damage to the station?

To be answered by applicant

56 What security or surveillance measures be implemented?

To be answered by applicant

57 What resiliency features will the station include? To be answered by applicant

What is the estimated additional cost of these resiliency features?

$0

Are you willing to support chargers that support bi-directional capabilities (vehicle to grid, vehicle to building, etc.)?

Yes

Who is the site Electric Interconnection Provider (such as Oncor, Texas-New Mexico Power, CoServ, etc.)?

Oncor

Is a new or upgraded electrical service required as part of the installation?

New service

If new service, has the electrical utility company been contacted to confirm capacity?

Yes

If an existing service in need up upgrades, what is the existing capacity of the service, and what additional capacity is needed?

N/A

Has the utility company provided any documentation or correspondence (such as a "Will-Serve" letter) confirming project feasibility and available electric capacity for the site? Please attach any available documents.

Will-Serve letter attached

Did you work with the NCTCOG procured Deployment Dream Team, Kimley-Horn and Associates, Inc., to develop your application, in part or in whole?

Yes

If not, did you receive assistance from another consultant or similar entity? What entity?

No

4. Feasibility and Risk

NCTCOG, 6

Instructions
Part 1 & 2
Part 3
Part 4
Site 1Chargers will be added in front of City Hall with one dual port DCFC and one dual port Level 2 charger Overall the entire site will be capable of charging 4 vehicles simultaneously:
Site 2Chargers will be added in front of City Hall with one dual port DCFC and one dual port Level 2 charger Overall the entire site will be capable of charging 4 vehicles simultaneously:
Site 3Chargers will be added in front of City Hall with one dual port DCFC and one dual port Level 2 charger Overall the entire site will be capable of charging 4 vehicles simultaneously:
Site 1City Hall:
Site 2City Hall:
Site 3City Hall:
Site 13100 Place St:
Site 23100 Place St:
Site 33100 Place St:
Site 1Anytown:
Site 2Anytown:
Site 3Anytown:
Site 112345:
Site 212345:
Site 312345:
Site 1Square:
Site 2Square:
Site 3Square:
Site 1No:
Site 2No:
Site 3No:
Site 1Residents coming to City Hall:
Site 2Residents coming to City Hall:
Site 3Residents coming to City Hall:
Site 1Local community:
Site 2Local community:
Site 3Local community:
Site 150:
Site 250:
Site 350:
Site 1MF 800 am 500 pm:
Site 2MF 800 am 500 pm:
Site 3MF 800 am 500 pm:
Site 1600 am 700 pm daily:
Site 2600 am 700 pm daily:
Site 3600 am 700 pm daily:
Site 1Yes parking lot gate closed at 700 pm daily:
Site 2Yes parking lot gate closed at 700 pm daily:
Site 3Yes parking lot gate closed at 700 pm daily:
Site 1No_2:
Site 2No_2:
Site 3No_2:
Site 1Yes Coordinated and confirmed permit process with Anytown:
Site 2Yes Coordinated and confirmed permit process with Anytown:
Site 3Yes Coordinated and confirmed permit process with Anytown:
Site 1Yes:
Site 2Yes:
Site 3Yes:
Site 1Under 5 feet:
Site 2Under 5 feet:
Site 3Under 5 feet:
Site 1Installation of new conduit to parking lot additional pavement slab for the charging station:
Site 2Installation of new conduit to parking lot additional pavement slab for the charging station:
Site 3Installation of new conduit to parking lot additional pavement slab for the charging station:
Site 1Regularly mowed grass will be removed for new concrete pads:
Site 2Regularly mowed grass will be removed for new concrete pads:
Site 3Regularly mowed grass will be removed for new concrete pads:
Site 1No_3:
Site 2No_3:
Site 3No_3:
Site 1No_4:
Site 2No_4:
Site 3No_4:
Site 1No site has lighting:
Site 2No site has lighting:
Site 3No site has lighting:
Site 1Possible slight increase in road noise or site traffic though EVs are quiet:
Site 2Possible slight increase in road noise or site traffic though EVs are quiet:
Site 3Possible slight increase in road noise or site traffic though EVs are quiet:
To be answered by applicant_2:
To be answered by applicant_3:
To be answered by applicant_4:
Yes_2:
NA_2:
Yes_3:
p4c1r1:
p4c1r2:
p4c1r3:
p4c1r4:
p4c1r5:
p4c1r6:
p4c1r7:
p4c1r8:
p4c1r10:
p4c1r9:
p4c1r11:
p4c1r12:
p4c1r13:
p4c1r14:
p4c1r15:
p4c1r16:
p4c1r17:
p4c1r18:
p4c1r19:
p4c1r20:
p4c1r21:
p4c2r4:
p4c2r5:
p4c2r6:
p4c2r7:
p4c2r8:
p4c2r9:
p4c2r10:
p4c1r22:
p4c2r11:
p4c2r12:
p4c2r13:
p4c2r14:
p4c2r15:
p4c2r16:
p4c2r17:
p4c2r18:
p4c2r19:
p4c2r20:
p4c2r21:
p4c2r22:
p4c3r1:
p4c3r2:
p4c3r3:
p4c3r4:
p4c3r5:
p4c3r6:
p4c3r7:
p4c3r8:
p4c3r9:
p4c3r10:
p4c3r11:
p4c3r12:
p4c3r13:
p4c3r14:
p4c3r15:
p4c3r16:
p4c3r17:
p4c3r18:
p4c3r19:
p4c3r20:
p4c3r21:
p4c3r22:
Available chargers are at hotels that intend them for guests not truly public 1:
35 miles 123 Nowhere St Anytown TX 12345 1:
35 miles 123 Nowhere St Anytown TX 12345 2:
35 miles 123 Nowhere St Anytown TX 12345 3:
Available chargers are at hotels that intend them for guests not truly public 2:
Available chargers are at hotels that intend them for guests not truly public 3:
p6c1r1:
p6c2r1:
p6c3r1:
p6c1r2:
p6c2r2:
p6c3r2:
p6c1r3:
p6c2r3:
p6c3r3:
p6c1r4:
p6c2r4:
p6c3r4:
p7c1r1:
p7c2r1:
p7c3r1:
p7c1r2:
p7c2r2:
p7c3r3:
To be answered by applicant_1:
To be answered by applicant_5:
To be answered by applicant_6:
To be answered by applicant_7:
To be answered by applicant_8:
To be answered by applicant_9:
To be answered by applicant_10:
To be answered by applicant_11:
To be answered by applicant_12:
0_3_1:
Yes_1:
Oncor_1:
New service_1:
0_3_2:
0_3_3:
Oncor_2:
Oncor_3:
New service_2:
NA_1:
WillServe letter attached_1:
WillServe letter attached_2:
Yes_4:
Yes_5:
Yes_6:
New service_3:
Yes_7:
Yes_8:
No_1:
No_2:
No_3:
NA_3:
WillServe letter attached_3:
Yes_9:
p4c2r1:
p4c2r2:
p4c2r3:
Site 1: #
Site 2: #
Site 3: #

File details come from the government source that posted it. Updated .