Burke Street Sewer Rehabilitation - Bid Tabulation Summary
This is a Bid Tabulation document from the City of Stockbridge, Georgia for the "Burke Street Sewer Rehabilitation" project (ITB# 20210009), compiled by C&S Project No. S9100.035. The project encompasses comprehensive sewer infrastructure work including the installation of approximately 1,650 linear feet of 8" and 10" diameter DIP/PVC and FPVC sewer pipe through open-cut methodology, 900 linear feet of cured-in-place pipe lining, 100 linear feet of jack and bore installation, construction of four new 4-foot diameter standard and doghouse manholes, rehabilitation of eleven existing manholes, bypass pumping operations, roadway replacement and repair, earthwork, permanent grassing, and soil erosion and sediment control measures. The work consists of five major item categories: Rock Excavation & Removal, Soil Erosion and Sediment Control, Sanitary Sewerage Collection System, Paving, and Allowances. Sealed bids were received and opened on October 7, 2021 at 3:00 PM at the City of Stockbridge, located at 4640 North Henry Boulevard, Stockbridge, Georgia 30281.
Three responsive bids were received from Helix Group, Inc. (Atlanta, GA), Site Engineering, Inc. (7025 Best Friend Road, Watkinsville, GA), and RDJE, Inc. (679 Highway 29 South). The total base bid amounts were $996,266.15 (Helix Group, Inc.), $1,112,460.00 (Site Engineering, Inc.), and $759,307.00 (RDJE, Inc.), respectively. The project is funded through local City funds. All contractors performing utility contracting work must hold a valid State of Georgia Utility Contractor license and employ a certified Utility Manager to oversee all work. Discrepancies between unit price multiplication and total price additions were resolved in accordance with Instructions to Bidders Article 14.02, with Site Engineering, Inc.'s base bid adjusted from $1,110,460.00 to $1,112,460.00.
Text of this file
BID TABULATION FOR ALL BIDS
RECEIVED AT THE CITY OF STOCKBRIDGE
4640 North Henry Blvd., Stockbridge, GA 30281 On October 7, 2021 @ 3:00 PM Watkinsville, GA 30677
PROJECT:
CITY OF STOCKBRIDGE
C&S PROJECT NO.: S9100.035 ‐ ITB# 2021‐0009
ITEM
NO.
a. 30 CY Rock Removal/Excavation $ 75.00 2,250.00$ $ 75.00 2,250.00$ $ 75.00 2,250.00$
a. 480 LF Sd1‐S, Silt Fence ‐ Sensitive $ 4.50 2,160.00$ $ 8.38 4,022.40$ $ 5.00 2,400.00$
b. 13 EA Sd2‐P ‐ Inlet Sediment Trap, Pigs in Blanket $ 280.00 3,640.00$ $ 254.10 3,303.30$ $ 400.00 5,200.00$
c. 2 EA Construction Exit $ 2,665.00 5,330.00$ $ 3,435.11 6,870.22$ $ 2,000.00 4,000.00$
d. 80 LF Cd‐Fs, Check Dam ‐ Filter Sock $ 11.35 908.00$ $ 25.41 2,032.80$ $ 20.00 1,600.00$
e. 4 EA Cd‐S, Check Dam ‐ Stone $ 506.50 2,026.00$ $ 517.78 2,071.12$ $ 500.00 2,000.00$
f. 320 LF Permanent Grassing $ 1.65 528.00$ $ 2.26 723.20$ $ 8.00 2,560.00$
a. 100 LF 10" Dia. PVC SDR 26 Sanitary Sewer Construction 0.0' ‐ 6.1' Cut
$ 111.00 11,100.00$ $ 156.00 15,600.00$ $ 210.00 21,000.00$
b. 135 LF 10" Dia. PVC SDR 26 Sanitary Sewer Construction 6.1' ‐ 8.0' Cut
$ 115.00 15,525.00$ $ 155.93 21,050.55$ $ 220.00 29,700.00$
c. 130 LF 10" Dia. PVC SDR 26 Sanitary Sewer Construction 8.1' ‐ 10.0' Cut
$ 120.00 15,600.00$ $ 156.15 20,299.50$ $ 230.00 29,900.00$
d. 145 LF 10" Dia. PVC SDR 26 Sanitary Sewer Construction 10.1' ‐ 12.0' Cut
$ 135.00 19,575.00$ $ 165.86 24,049.70$ $ 240.00 34,800.00$
e. 105 LF 10" Dia. PVC SDR 26 Sanitary Sewer Construction 12.1' ‐ 14.0' Cut
$ 149.00 15,645.00$ $ 175.01 18,376.05$ $ 260.00 27,300.00$
f. 80 LF 10" Dia. PVC SDR 26 Sanitary Sewer Construction 14.1' ‐ 16.0' Cut
$ 211.00 16,880.00$ $ 193.98 15,518.40$ $ 280.00 22,400.00$
g. 55 LF 10" Dia. PVC SDR 26 Sanitary Sewer Construction 16.1' ‐ 18.0' Cut
$ 230.00 12,650.00$ $ 194.21 10,681.55$ $ 290.00 15,950.00$
h. 100 LF 10" Dia. PVC SDR 26 Sanitary Sewer Construction 18.1'‐ 20.0' Cut
$ 255.00 25,500.00$ $ 536.67 53,667.00$ $ 310.00 31,000.00$
i. 370 LF 8" Dia. P401 DIP Sanitary Sewer Construction 0.0' ‐ 6.0' Cut
$ 179.00 66,230.00$ $ 199.85 73,944.50$ $ 250.00 92,500.00$
BIDDERS:
Suite A 1375 Oakley Industrial Blvd
Fairburn, GA 30213Burke Street Sewer Rehabilitation Newnan, GA 30263
DESCRIPTIONQUANTITY UNIT
Helix Group, Inc.
Atlanta, GA 30340
TOTAL COSTUNIT PRICE
CARTER & SLOOPE, INC.
CONSULTING ENGINEERS
1031 Stonebridge Parkway
Site Engineering, Inc.
7025 Best Friend Road
RDJE, Inc.
679 Highway 29 South, Item 3 ‐ Sanitary Sewerage Collection System
UNIT PRICE TOTAL COST UNIT PRICE TOTAL COST
Item 2 ‐ Soil Erosion and Sediment Control
Item 1 ‐ Rock Excavation & Removal
PROJECT:
CITY OF STOCKBRIDGE
C&S PROJECT NO.: S9100.035 ‐ ITB# 2021‐0009
ITEM
NO.
BIDDERS:
Suite A 1375 Oakley Industrial Blvd
Fairburn, GA 30213Burke Street Sewer Rehabilitation Newnan, GA 30263
DESCRIPTIONQUANTITY UNIT
Helix Group, Inc.
Atlanta, GA 30340
TOTAL COSTUNIT PRICE
Site Engineering, Inc.
7025 Best Friend Road
RDJE, Inc.
679 Highway 29 South, UNIT PRICE TOTAL COST UNIT PRICE TOTAL COST
j. 40 LF 8" Dia. P401 DIP Sanitary Sewer Construction 6.1' ‐ 8.0' Cut
$ 186.00 7,440.00$ $ 199.85 7,994.00$ $ 260.00 10,400.00$
k. 295 LF 8" Dia. PVC SDR 26 Sanitary Sewer Construction 0.0' ‐ 6.0' Cut
$ 89.00 26,255.00$ $ 140.18 41,353.10$ $ 200.00 59,000.00$
l. 130 LF 10" SDR 26 FPVC $ 200.00 26,000.00$ $ 161.38 20,979.40$ $ 250.00 32,500.00$
m. 860 LF 8" Cured‐in‐Place Pipe $ 37.50 32,250.00$ $ 142.26 122,343.60$ $ 100.00 86,000.00$
n. 60 LF 8" P401 DIP Force Main $ 550.00 33,000.00$ $ 227.01 13,620.60$ $ 250.00 15,000.00$
o. 100 LF Jack & Bore 16" Dia. Steel Casing, 0.250" WT (carrier pipe paid under separate item) $ 558.00 55,800.00$ $ 735.27 73,527.00$ $ 800.00 80,000.00$
p. 3 EA Standard 4.0' Dia. Manhole complete including base, cone, riser, frame & cover, 0.0' ‐ 6.0' depth
$ 4,100.00 12,300.00$ $ 10,378.66 31,135.98$ $ 5,000.00 15,000.00$
q. 2 EA Doghouse 4.0' Dia. Manhole complete including base, cone, riser, frame & cover, 0.0' ‐ 6.0' depth
$ 22,000.00 44,000.00$ $ 6,233.58 12,467.16$ $ 6,000.00 12,000.00$
r. 50 VF Manhole Additional Vertical Feet $ 380.00 19,000.00$ $ 783.10 39,155.00$ $ 400.00 20,000.00$
s. 185 VF Manhole Rehabilitation $ 481.00 88,985.00$ $ 799.96 147,992.60$ $ 600.00 111,000.00$
t. 4 EA Sewer Spot Repair $ 2,300.00 9,200.00$ $ 11,328.24 45,312.96$ $ 15,000.00 60,000.00$
u. 7 EA Cut & Plug Sewer Main $ 1,050.00 7,350.00$ $ 7,891.11 55,237.77$ $ 1,500.00 10,500.00$
v. 1 EA Grout Existing Pipe in Structure $ 300.00 300.00$ $ 632.23 632.23$ $ 5,000.00 5,000.00$
w. 1 EA Adjust Manhole Invert $ 1,150.00 1,150.00$ $ 674.12 674.12$ $ 4,000.00 4,000.00$
x. 3 EA Manhole Frame Grade Adjustment $ 1,300.00 3,900.00$ $ 674.13 2,022.39$ $ 1,500.00 4,500.00$
y. 1 EA Abandon Manhole $ 3,200.00 3,200.00$ $ 5,222.98 5,222.98$ $ 1,200.00 1,200.00$
z. 3 CY Flowable Fill $ 1,200.00 3,600.00$ $ 1,841.16 5,523.48$ $ 4,000.00 12,000.00$
aa. 1 LS Aerial Sewer Creek Crossing $ 20,250.00 20,250.00$ $ 33,864.57 33,864.57$ $ 25,000.00 25,000.00$
bb. 1 LS Demolish Aerial Sewer $ 2,500.00 2,500.00$ $ 4,663.57 4,663.57$ $ 10,000.00 10,000.00$
cc. 40 LF 8" Polyethylene Wrap $ 30.00 1,200.00$ $ 18.17 726.80$ $ 70.00 2,800.00 *$
a. 1275 LF Asphalt Road Repiar/Replacement $ 92.50 117,937.50$ $ 23.53 30,000.75$ $ 140.00 178,500.00$
b. 85 LF 24" Curb & Gutter $ 30.50 2,592.50$ $ 40.88 3,474.80$ $ 100.00 8,500.00$
c. 50 SY Concrete Sidewalk $ 111.00 5,550.00$ $ 77.62 3,881.00$ $ 100.00 5,000.00$
a. 1 EA Testing Allowance $ 5,000.00 5,000.00$ $ 5,000.00 5,000.00$ $ 5,000.00 5,000.00$ Item 5 ‐ Allowances
Item 4 ‐ Paving
PROJECT:
CITY OF STOCKBRIDGE
C&S PROJECT NO.: S9100.035 ‐ ITB# 2021‐0009
ITEM
NO.
BIDDERS:
Suite A 1375 Oakley Industrial Blvd
Fairburn, GA 30213Burke Street Sewer Rehabilitation Newnan, GA 30263
DESCRIPTIONQUANTITY UNIT
Helix Group, Inc.
Atlanta, GA 30340
TOTAL COSTUNIT PRICE
Site Engineering, Inc.
7025 Best Friend Road
RDJE, Inc.
679 Highway 29 South, UNIT PRICE TOTAL COST UNIT PRICE TOTAL COST
b. 1 EA Supplemental Work Allowance $ 15,000.00 15,000.00$ $ 15,000.00 15,000.00$ $ 15,000.00 15,000.00$
* Discrepancies between the multiplicaiton of units of Work and unit prices. Resolved in accordance with Instructions to Bidders Article 14.02 ** Discrepancies with addition of total prices. Resolved in accordance with Instructions to Bidders Article 14.02 Site Engineering, Inc. Base Bid changed from $1,110,460.00 to $1,112,460.00
I hereby certify that this Bid Tabulation is a true and accurate representation of all Bids received on October 7, 2021.
J. Chad Peden, P.E. #42771
996,266.15$ 759,307.00$ 1,112,460.00 **$ Total Contract for Items 1‐5 the amount of:
Other files
| File | Type | Posted |
|---|---|---|
| Addendum No. 2 | — | |
| Addendum No. 4 | — | |
| Addendum No. 3 | — | |
| Addendum 1Sewer Rehabilitation | — | |
| Award Information | — | |
| ITB No. 2021-0009 Burke Street | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .