Addendum No. 4
4 MB Posted
- Attached to
- Burke Street Sewer Rehabilitation
- Solicitation number
- 2021-0009
- Issued by
- Henry County, Georgia
About this file
Addendum No. 4 to Invitation to Bid No. 2021-0009 for Burke Street Sewer Rehabilitation
This addendum modifies the bidding documents for the City of Stockbridge, Georgia's Burke Street Sewer Rehabilitation project, administered by the Purchasing Division with engineering support from Carter & Sloope, Inc. The project scope includes furnishing labor, equipment, and materials to install approximately 1,650 linear feet of 8" and 10" DIP/PVC and FPVC sewer by open-cut method, 900 linear feet of cured-in-place pipe lining, 100 linear feet of jack and bore work, construction of four new manholes and rehabilitation of eleven existing manholes, bypass pumping operations, roadway and pavement replacement, earthwork, grassing, and soil erosion and sediment control measures. The critical change in Addendum No. 4 is the extension of the bid due date from September 30, 2021, to October 7, 2021, at 3:00 p.m. EDT, while the deadline for submitting questions remained unchanged at September 3, 2021. The addendum adds six new specification sections covering notice to proceed, modifications to existing structures and equipment, flow diversion systems, removal and replacement of pavement, and sidewalk and curb construction. All bidders must acknowledge receipt of this addendum in their bid submissions to avoid disqualification.
The project is funded with local funds from the City of Stockbridge. Sealed unit price bids are required, and contractors must provide proof of a valid Georgia State Utility Contractor license and employ a certified Utility Manager to oversee all work. Prospective bidders must submit their contractor license number on both the bid envelope and bid form along with proof of valid licensure. Bid documents are available on the City of Stockbridge website, the Georgia Procurement Registry, and the Georgia Municipal Association portal. All other terms, conditions, and specifications of the original solicitation remain unchanged unless further modified by subsequent addenda.
Text of this file
City of Stockbridge Purchasing Division__________________________________________________ City of Stockbridge City Hall 4640 North Henry Boulevard Stockbridge, Ga 30281
Invitation To Bid (ITB) No. 2021-0009 – Burke Street Sewer Rehabilitation Addendum No. 4
ADDENDUM NO. 4
Solicitation No.: INVITATION TO BID (ITB) NO. 2021- 0009
Solicitation Title: City of Stockbridge Burke Street Sewer Rehabilitation
ATTENTION ALL POTENTIAL BIDDERS:
MUST ADDENDUM. READ CAREFULLY AND FOLLOW ALL INSTRUCTIONS.
This addendum forms a part of the contract documents, modifies the original bidding documents and shall be as binding as if contained therein.
Return Addendum with Bid Submittal. Failure to do so may subject the Bidder to disqualification.
Return Completed Revised Bid Pricing Sheets with Bid Submittal.
TO ALL PROSPECTIVE BIDDERS, PLEASE NOTE THE FOLLOWING CHANGES AND
CLARIFICATIONS:
Words in strikethrough type are deletions from existing text. Words in bold, underlined type are additions to existing text.
1. The ITB Due Date has changed. The ITB Due Date is 3:00 p.m. EDT on Thursday, September 30th, October 7, 2021.
2. The deadline for questions has not changed. The deadline for questions was September 3, 2021 (12:00 noon, EDT)
QUESTIONS AND RESPONSES/ CLARIFICATIONS / CORRECTIONS
Please see the attached specifications additions.
x
City of Stockbridge Purchasing Division__________________________________________________ City of Stockbridge City Hall 4640 North Henry Boulevard Stockbridge, Ga 30281
Invitation To Bid (ITB) No. 2021-0009 – Burke Street Sewer Rehabilitation
The City of Stockbridge website is the official location for the posting of all solicitation addenda and contract award results. It is the obligation of each Prospective Provider to frequently monitor the
City’s website in order to obtain complete and timely information. The City’s website is located at https://www.cityofstockbridge.com/default.aspx and Georgia Procurement Registry website https://ssl.doas.state.ga.us/PRSapp/PR_index.jsp and the Georgia Municipal Association https://www.glga.org/SubmitListing. All other terms, conditions, and specifications of the solicitation remain unchanged.
Name of Company / Firm / Organization
Printed Name of Authorized Rep. / Title Signature of Authorized Representative / Date https://www.cityofstockbridge.com/default.aspx https://ssl.doas.state.ga.us/PRSapp/PR_index.jsp https://www.glga.org/SubmitListing
DATE: September 27, 2021
OWNER: City of Stockbridge
PROJECT: Burke Street Sewer Rehabilitation
C & S PROJECT NO.: S9100.035
ENGINEER: CARTER & SLOOPE, INC.
P.O. Box 534
Watkinsville, Georgia 30677
TO ALL BIDDERS:
ACKNOWLEDGE RECEIPT OF THIS ADDENDUM BY INSERTING ITS NUMBER IN YOUR BID FORM –
SECTION 00400. FAILURE TO DO SO MAY SUBJECT BONA FIDE BIDDERS TO DISQUALIFICATION.
THIS ADDENDUM FORMS A PART OF THE BIDDING DOCUMENTS WHICH ARE HEREBY MODIFIED IN
THE FOLLOWING RESPECTS:
I. CONTRACT DOCUMENTS AND SPECIFICATIONS
A. Contract Specifications
1. Replace Section 00003 – Table of Contents with the attached 00003 – Table of Contents
2. Insert the following Specification sections in the Contract Documents in accordance with the attached Section 00003 - Table of Contents:
a. 00622 – Notice to Proceed
b. 02264 – Modifications to Existing Structures, Piping and
Equipment
c. 02534 – Flow Diversion
d. 02741 – Removal and Replacement of Existing Pavement
e. 02775 – Sidewalks, Driveways, Curbs and Gutters
f. Appendix A – Sewer Main Assessment
END OF ADDENDUM NO. 4
SECTION 00003-1
TABLE OF CONTENTS
City of Stockbridge C & S Project No.: S9100.035
Burke Street Sewer Rehabilitation July 2021
Addendum #4
SECTION 00003
TABLE OF CONTENTS
DIVISION 00 – CONTRACTING REQUIREMENTS
Section No. Title
00003 - Table of Contents
00100 - Invitation to Bid
00200 - Instructions to Bidders
00400 - Bid Form
00460 - Bid Bond
00470 - Qualifications of Bidder
00481 - Noncollusion Affidavit of Prime Bidder
00483 - Contractor Affidavit for E-Verify Contractor
00484 - Sub-Contractor Affidavit
00485 - SAVE Affidavit
00500 - Agreement
00610 - Performance Bond
00615 - Payment Bond
00620 - Certificate of Owner’s Attorney
00621 - Notice of Award
00622 - Notice to Proceed
00700 - General Conditions
00800 - Supplementary Conditions
00840 - Administrative and Procedural Items and Forms
DIVISION 01 – GENERAL REQUIREMENTS
Section No. Title
01020 - Allowances
01025 - Measurement and Payment
01050 - Surveying and Field Engineering
01060 - Safety and Health
01070 - Abbreviations
01200 - Project Meetings
01300 - Submittals
01400 - Quality Control
01410 - Testing Services
01510 - Temporary Utilities
01560 - Environmental Controls
01569 - Safety in Wastewater Works
01570 - Traffic Control
01605 - Shipment, Protection, and Storage
01700 - Restoration of Improvements
SECTION 00003-2
City of Stockbridge C & S Project No.: S9100.035
Burke Street Sewer Rehabilitation July 2021
Addendum #4
01701 - Contract Close-out Procedures
01710 - Final Cleanup
01720 - Project Record Documents
01730 - Operations and Maintenance Data
01740 - Warranties and Bonds
DIVISION 02- SITE CONSTRUCTIONS
Section No. Title
02230 - Site Clearing
02264 - Modifications to Existing Structures, Piping and Equipment
02300 - Earthwork
02315 - Excavation, Trenching, and Backfill for Utility Systems
02316 - Rock Removal
02350 - Sheeting, Shoring and Bracing
02370 - Soil Erosion & Sediment Control
02445 - Jack & Bore Crossings
02530 - Sanitary Sewer Collection System
02534 - Flow Diversion
02535 - Closed Circuit Television Inspection
02537 - Manhole Rehabilitation
02539 - Cured in Place Pipe
02741 - Removal and Replacement of Existing Pavement
02775 - Sidewalks, Driveways, Curbs and Gutters
02920 - Grassing
DIVISION 03 – CONCRETE
Section No. Title
03100 - Concrete Formwork
03150 - Concrete Accessories
03200 - Concrete Reinforcements
03300 - Cast-in-Place Concrete
DIVISION 04 – MASONRY – NOT USED
DIVISION 05 – METALS – NOT USED
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES – NOT USED
DIVISION 07 – THERMAL AND MOISTURE PROTECTION – NOT USED
DIVISION 08 – OPENINGS – NOT USED
DIVISION 09 – FINISHES – NOT USED
SECTION 00003-3
City of Stockbridge C & S Project No.: S9100.035
Burke Street Sewer Rehabilitation July 2021
Addendum #4
DIVISION 10 – SPECIALTIES – NOT USED
DIVISION 11 – EQUIPMENT – NOT USED
DIVISION 12 – FURNISHINGS – NOT USED
DIVISION 13 – SPECIAL CONSTRUCTION – NOT USED
DIVISION 14 – CONVEYING EQUIPMENT – NOT USED
DIVISION 15 – MECHANICAL – NOT USED
DIVISION 16 – ELECTRICAL – NOT USED
APPENDIX A – SEWER MAIN ASSESSMENT
END OF SECTION
SECTION 00622-1
NOTICE TO PROCEED
City of Stockbridge C & S Project No. S9100.035
Burke Street Sewer Rehabilitation July 2021
EJCDC C-550 Copyright © 2007 National Society of Professional Engineers. All rights reserved. Addendum #4
NOTICE TO PROCEED
Date: _________________
Project Burke Street Sewer Rehabilitation
Owner: City of Stockbridge Owner's Contract No.:
Contract: Engineer's Project No.: S9100.035
Contractor:
Contractor's Address:
You are notified that the Contract Times under the above Contract will commence to run on
. On or before that date, you are to start performing your obligations under the Contract Documents. In accordance with Article 4 of the Agreement, the date of Substantial
Completion and readiness for final payment is .
Before you may start any Work at the Site, Paragraph 2.01.B of the General Conditions provides that you and Owner must each deliver to the other (with copies to Engineer and other identified additional insureds and loss payees) certificates of insurance which each is required to purchase and maintain in accordance with the Contract Documents.
Owner
Authorized Signature
Title
Date
Accepted By:
Contractor
Authorized Signature
Title
Date
SECTION 02264-1
MODIFICATION TO EXISTING STRUCTURES, PIPING, AND EQUIPMENT
City of Stockbridge C & S Project No. S9100.035
Burke Street Sewer Rehabilitation July 2021
Addendum #4
SECTION 02264
MODIFICATION TO EXISTING STRUCTURES, PIPING, AND EQUIPMENT
INDEX
PART 1. GENERAL
1.1 SCOPE
PART 2. PRODUCTS (Not Used)
PART 3. EXECUTION
3.1 GENERAL
3.2 CONNECTING TO EXISTING PIPING AND EQUIPMENT
3.3 CLEANUP
SECTION 02264-2
City of Stockbridge C & S Project No. S9100.035
Burke Street Sewer Rehabilitation July 2021
Addendum #4
SECTION 02264
MODIFICATION TO EXISTING STRUCTURES, PIPING, AND EQUIPMENT
PART 1. GENERAL
1.1 SCOPE
A. Furnish all labor, materials, equipment, and incidentals required to modify, alter and/or convert existing structures as shown or specified herein. Work shall be performed within the requirements of the Special Project Procedures, Section 01030 and required construction scheduling in Section 01310. Existing piping and equipment shall be removed and dismantled as necessary for the performance of structural alterations in accordance with the requirements herein specified. Any and all modifications to existing structures, piping, equipment and other facilities shall be done only after approval by the Engineer.
PART 2. PRODUCTS (Not Used)
PART 3. EXECUTION
3.1 GENERAL
A. The Contractor shall cut, repair, reuse, excavate, demolish, or otherwise remove parts of the existing structures or appurtenances, as indicated on the Contract
Drawings, herein specified, or necessary to permit completion of the work under this
Contract. He shall dispose of surplus materials resulting from the above work in an approved manner. The work shall include all necessary cutting and bending of reinforcing steel, structural steel, or miscellaneous metal work found embedded in the existing structures.
B. No existing structure, equipment, or appurtenance shall be shifted, cut, removed, or otherwise altered except with the express approval of and to the extent approved by the Engineer.
C. When removing materials or portions of existing structures and when making openings in walls and partitions, the Contractor shall take all precautions and use all necessary barriers and other protective devices so as not to damage the structures beyond the limits necessary for the new work, and not to damage the structures or contents by falling or flying debris. Unless otherwise permitted, line drilling will be required in cutting existing concrete.
D. Materials and equipment removed in the course of making alterations and additions shall become the property of the Contractor to be disposed of by him off the work
SECTION 02264-3
City of Stockbridge C & S Project No. S9100.035
Addendum #4 site at his own place of disposal. Operating equipment shall be thoroughly cleaned, lubricated, and greased for protection during prolonged storage. Storage of equipment shall be performed in accordance with the provisions of Section 01605 –
Shipment, Protection and Storage.
E. All alterations to existing structures shall be done at such time and in such manner as will comply with the approved time schedule, and with the construction sequence described in Section 01310. So far as possible before any part of the work is started, all tools, equipment, and materials shall be assembled and made ready so that the work can be completed without delay.
F. All workmanship and new materials involved in constructing the alterations shall conform to the General Specifications for the classes of work insofar as such specifications are applicable.
G. All cutting of existing concrete or other material to provide suitable bonding to new work shall be done in a manner to meet the requirements of the respective section of these Specifications covering the new work. When not covered, the work shall be carried on in the manner and to the extent directed by the Engineer.
H. Surfaces of seals visible in the completed work shall be made to match as nearly as possible the adjacent surfaces.
I. Non-shrink grout shall be used for setting wall castings, sleeves, leveling pump bases, doweling anchors into existing concrete and elsewhere as shown.
J. Where necessary or required for the purpose of making connections, the Contractor shall cut existing pipelines in a manner to provide an approved joint. Where required, he shall weld beads, flanges, provide Dresser Couplings, or provide
Uniflange Couplings, all as required.
K. The Contractor shall provide flumes, hoses, piping, and other related items to divert or provide suitable plugs, bulkheads, or other means to hold back the flow of water or other liquids, all as required in the performance of the work under this Contract.
L. Blasting will not be permitted to complete any work under this Contract.
3.2 CONNECTING TO EXISTING PIPING AND EQUIPMENT
A. The Contractor shall verify exact location, material, alignment, joint, etc. of existing piping and equipment prior to making the connections called out in the Drawings.
The verifications shall be performed with adequate time to correct any potential alignment or other problems prior to the actual time of connection.
SECTION 02264-4
City of Stockbridge C & S Project No. S9100.035
Addendum #4
B. The Contractor shall dismantle and remove all existing equipment, piping and other appurtenances required for the completion of the work. Where called for or required, he shall cut existing pipelines for the purpose of making connections thereto. Anchor bolts for equipment and structural steel removed shall be cut off one inch below the concrete surface. Surface shall be finished as specified in Division 3.
C. At the time that a new connection is made to an existing pipeline, additional new piping, extending to and including the most convenient new valve, shall be installed.
D. Where necessary or required for the purpose of making connections, the Contractor shall cut existing pipe lines in a manner to provide an approved joint. Where required, he shall weld beads, flanges, provide Dresser Couplings, or provide
Uniflange Couplings, all as required.
3.3 CLEANUP
A. At the end of each work day or upon stopping work for more than four (4) hours, the
Contractor shall clean all work areas in and around the existing buildings and shall leave all work areas neat and orderly. The Contractor shall put in place temporary shields, tarps, curtains, screens, etc. as necessary to confine dust, water, dirt, and debris to the area immediately adjacent to work area. Special precautions shall be taken to protect existing facilities in the work areas.
SECTION 02534-1
FLOW DIVERSION
City of Stockbridge C & S Project No. S9100.035
Burke Street Sewer Rehabilitation July 2021
Addendum #4
SECTION 02534
FLOW DIVERSION
INDEX
PART 1. GENERAL
1.1 SCOPE
PART 2. PRODUCTS (Not Used)
PART 3. EXECUTION
3.1 PUMPING AND FLOW DIVERSION
3.2 FLOW CONTROL PRECAUTIONS
SECTION 02534-2
City of Stockbridge C & S Project No. S9100.035
Burke Street Sewer Rehabilitation July 2021
Addendum #4
SECTION 02534
PART 1. GENERAL
1.1 SCOPE
A. Under this heading shall be furnished all equipment, labor and materials to provide for diverting flow around a section of the sewer system upon which rehabilitation work is being performed including, but not limited to pumps, power and conduits for flow diversion.
PART 2. PRODUCTS (Not Used)
PART 3. EXECUTION
3.1 PUMPING AND FLOW DIVERSION
A. When adequate flow control cannot be obtained by plugging influent lines, pumps shall be used to divert all of the flow from that section of the sewer being rehabilitated. Flow diversion will be required for pump station rehabilitation and manhole replacement.
B. The Contractor shall supply the necessary pumps, conduits and other equipment to divert the flow of sewage around the sewer system section in which work is to be performed. The diversion system shall be of sufficient capacity to handle existing flows plus additional flow that may occur during period of a rain storm or peak flows. The Contractor will be responsible for furnishing the necessary labor and supervision to set up and operate the pumping and flow diversion system. If pumping is required on a 24-hour basis, all engines shall be equipped in a manner to keep the pump noise at a minimum. See Drawings for additional information.
C. In no case shall bypassing to any watercourse, storm sewer or other point where pollution may result be permitted.
3.2 FLOW CONTROL PRECAUTIONS
A. Whenever flows in a sewer line are blocked, plugged or diverted precautions must be taken by the Contractor to protect the sewer lines from damage that might be inflicted by excessive sewer surcharging. Further, the Contractor must take precautions to ensure that sewer flow control operations do not cause flooding or damage to public or private property.
SECTION 02741-1
REMOVAL AND REPLACEMENT OF EXISTING PAVEMENT
City of Stockbridge C & S Project No. S9100.035
Burke Street Sewer Rehabilitation July 2021
Addendum #4
SECTION 02741
REMOVAL AND REPLACEMENT OF EXISTING PAVEMENT
INDEX
PART 1. GENERAL
1.1 SCOPE
1.2 RELATED WORK
1.3 WEATHER CONDITIONS
1.4 SPECIFICATIONS
PART 2. PRODUCTS
2.1 ROADWAY SURFACE
2.2 TEMPORARY PAVEMENT
2.3 CONCRETE PAVEMENT BASE
PART 3. EXECUTION
3.1 CUTTING PAVEMENT
3.2 HOT MIX ASPHALT PAVEMENT CONSTRUCTION, REPAIR AND
REPLACEMENT
3.3 PLACEMENT
3.4 CONCRETE PAVEMENT
3.5 CLEAN-UP
3.6 MAINTENANCE OF REPAIR
SECTION 02741-2
City of Stockbridge C & S Project No. S9100.035
Burke Street Sewer Rehabilitation July 2021
Addendum #4
SECTION 02741
A. The Contractor shall furnish all labor, materials, equipment and appurtenances required to remove and replace existing pavements as required for the construction of new pipelines and structures. Two types of pavement which are to be removed and replaced are asphalt roadway surface pavement and concrete paving for curbs, sidewalks and driveways.
B. Remove existing pavements as directed. After pipe laying and backfilling operations are completed, place the pavement.
C. The Contractor will be required to hose clean all road surfaces after backfilling and before any surfacing, but in no case will pavement be placed until the trench material is dry.
D. The Contractor shall maintain pavement under this Contract during the guarantee period of one (1) year and shall promptly refill and repave areas which have settled or are otherwise unsatisfactory for traffic.
E. The Contractor shall furnish and spread calcium chloride on disturbed surfaces to allay dust conditions. Calcium chloride shall conform to AASHO M-144, except that the pellet or flake shall be equally acceptable.
F. Permanent pavement shall be placed over a backfilled trench promptly after completion of the backfilling. Repaving may be delayed if the Engineer so directs, but in such case temporary pavement replacement shall be required.
G. If, in the opinion of the Engineer, the placing of temporary pavement is necessary, the Contractor shall place the temporary pavement as described hereinafter.
1.2 RELATED WORK
A. Section 02530 – Sanitary Sewer Collection System
1.3 WEATHER CONDITIONS
A. Do not place asphalt mixture when ambient air temperature is less than that indicated in the Table nor when the surface is wet or frozen.
Lift Thickness Min. Air Temperature, Degrees F.
1” or less 55
SECTION 02741-3
City of Stockbridge C & S Project No. S9100.035
Burke Street Sewer Rehabilitation July 2021
Addendum #4
1.1” to 2” 45
2.1” to 3” 35
3.1” to 4” 30
4.1” to 8” Contractor’s Discretion
B. Mixture shall be delivered to the spreader at a temperature between 250 degrees F and 325 degrees F. Place mixture when temperature of the mixture is not more than
15 degrees F below bitumen supplier’s bill of lading and not more than the maximum specified temperature.
C. Do not mix or place asphalt concrete when the existing surface is wet or frozen.
1.4 SPECIFICATIONS
A. Except as otherwise specified herein, the Standard Specifications for Highway
Construction as issued by the State of Georgia, Department of Highways and Public
Transportation, Section 400, shall apply to material requirements for temporary and permanent replacement of pavements removed in excavation of trenches.
PART 2. PRODUCTS
2.1 ROADWAY SURFACE
A. Hot Mix Asphalt Concrete Surface Courses shall consist of fine and course aggregate and mineral filler uniformly mixed with hot mix asphalt cement in an approved mixing plant. The job mix shall be 12.5 mm or matches existing and shall be a minimum of 2 inches thick conforming to Section 828, Department of
Transportation, State of Georgia, Standard Specifications, current edition.
2.2 TEMPORARY PAVEMENT
A. Where directed by the Engineer (typically if a cut’s to remain open for a period longer than 1 week), the Contractor shall place temporary pavement with top matching the grade of existing pavement. The material shall be 1-1/2” of Hot Laid
Asphaltic Concrete Surface Course and 6” of Stabilized Aggregate Base Course.
2.3 CONCRETE PAVEMENT BASE
A. Concrete Pavement used for the concrete cap shall conform to Class A concrete as defined in Section 500, Department of Transportation, State of Georgia, Standard
Specification, current edition.
3.1 CUTTING PAVEMENT
SECTION 02741-4
City of Stockbridge C & S Project No. S9100.035
Burke Street Sewer Rehabilitation July 2021
Addendum #4
A. The Contractor shall cut and remove pavement as necessary for installing the new pipe lines and appurtenances and for making connections to existing pipe lines.
B. Before removing pavement, the pavement shall be marked for cuts nearly paralleling pipe lines and existing street lines. All pavement cuts shall be made by sawing prior to excavation to eliminate uneven and ragged edges. Concrete pavement, and asphalt pavement on concrete base, shall be scored to a depth approximately two (2) inches below the surface. The concrete or asphalt pavement may be broken below the scoring with a jackhammer or other suitable equipment.
C. No pavement shall be machine pulled until completely broken and separated along the marked cuts.
D. The pavement adjacent to pipeline trenches shall neither be disturbed nor damaged.
If the adjacent pavement is disturbed or damaged, irrespective of cause, the
Contractor shall remove the damaged pavement and shall replace it at his own expense.
3.2 HOT MIX ASPHALT PAVEMENT CONSTRUCTION, REPAIR AND REPLACEMENT
A. All existing pavement cut or damaged by construction under this contract shall be repaired to match the original surface material and original grade unless otherwise specified or shown on the Drawings. Materials and construction procedures for base course and pavement repair shall conform to the GA DOT Specifications for the type of original surface. When asphalt type is unknown, 12.5 mm shall be used.
B. The work for new or for repair of existing pavement shall include the placing and compacting of the base course, the placing of the Portland Cement Concrete at the thickness specified in the details, the application of prime and tack coats where required, the placing and maintaining of the hot mix asphalt surface course at the thickness specified in the details, and all special requirements specified herein.
C. The backfill shall be thoroughly compacted prior to concrete base.
D. The asphalt surface course shall be thoroughly rolled or tamped with a mechanical roller or tamper. Rolling of patches with truck tires will not be permitted.
3.3 PLACEMENT
A. Construction shall be in accordance with Section 400 – Hot Mix Asphaltic Concrete
Surface Construction of the Department of Transportation, State of Georgia, Standard Specifications, current edition.
MIX TYPE MIN LAYER
THICKNESS
MAX LAYER
THICKNESS
MAX TOTAL
THICKNESS
9.5 mm 1 1/8” 2” 4”
12.5 mm 1 3/8” 2 ¼” 8”
SECTION 02741-5
City of Stockbridge C & S Project No. S9100.035
Burke Street Sewer Rehabilitation July 2021
19 mm 1 ¾” 3” -
B. Asphaltic concrete shall not be placed on a surface that is wet or frozen.
C. Compaction shall commence as soon as possible after the mixture has been spread to the desired thickness. Compaction shall be continuous and uniform over the entire surface. Do not displace or extrude pavement from position. Hand compact in areas inaccessible to rolling equipment. Perform rolling with consecutive passes to achieve even and smooth finish without roller marks. Compaction rolling shall be complete before material temperature drops below 185° F.
D. Areas of pavement with deficient thickness or density shall be removed and replaced at no additional cost to the Owner.
E. All asphalt road cuts shall have an eight (8) inch concrete cap which shall extend not less than twelve (12) inches beyond the edges of the backfilled ditch. The top elevation of the concrete cap shall be two inches below the finished grade of the adjacent asphalt surface.
3.4 CONCRETE PAVEMENT
A. Where the installation of pipe involves the cutting of concrete, the cutting shall be kept to a minimum. Once the pipe is installed, the Contractor shall compact the trench to 95% density according to the modified proctor. After compaction, Contractor shall install and compact a 6” thick graded aggregate base course. The base shall be poured and finished. Concrete shall be 3,000 psi and shall be equal or better than original pavement.
B. When sidewalks are removed and replaced, match the existing dimensions, thickness and finish and construct sidewalks as detailed on the plans.
3.5 CLEAN-UP
A. After all repair and restoration or paving has been completed, all excess asphalt, dirt, rock and other debris shall be removed from the roadways. All existing storm sewers and inlets shall be checked and cleaned of any construction debris.
3.6 MAINTENANCE OF REPAIR
SECTION 02741-6
City of Stockbridge C & S Project No. S9100.035
Burke Street Sewer Rehabilitation July 2021
Addendum #4
A. All wearing surfaces shall be maintained by the Contractor in good order and be suitable for traffic at all times for a period of one year after completion and acceptance of the work. Approximately at the end of the maintenance period a final inspection will be made of the repaired surface and any settlement or depressions shall be adjusted as previously noted herein.
SECTION 02775-1
SIDEWALKS, DRIVEWAYS, CURBS, & GUTTERS
City of Stockbridge C & S Project No. S9100.035
SECTION 02775
INDEX
PART 1. GENERAL
1.1 SCOPE
1.2 RELATED SECTIONS
1.3 REFERENCES
1.4 REGULATORY REQUIREMENTS
1.5 TESTING
1.6 SUBMITTALS
1.7 WEATHER CONDITIONS
PART 2. PRODUCTS
2.1 FORM MATERIALS
2.2 REINFORCING STEEL
2.3 CONCRETE MATERIALS
2.4 JOINT SEALERS
2.5 CONCRETE MIX-BY PERFORMANCE CRITERIA
2.6 SOURCE QUALITY CONTROL AND TEST
PART 3. EXECUTION
3.1 CONSTRUCTION OBSERVATION
3.2 SUBBASE
3.3 PREPARATION FOR PLACEMENT
3.4 FORMING
3.5 REINFORCING
3.6 PLACING CONCRETE
3.7 JOINTS
3.8 FINISHING
3.9 CONCRETE CURING
3.10 FIELD QUALITY CONTROL
3.11 PROTECTION
SECTION 02775-2
City of Stockbridge C & S Project No. S9100.035
Burke Street Sewer Rehabilitation July 2021
Addendum #4
SECTION 02775
A. The work included in this section includes furnishing all materials, equipment, and labor necessary to construct Portland Cement Concrete sidewalks, driveways, curbs, and gutters, as shown on the construction plans.
1.2 RELATED SECTIONS
A. Section 01410 – Testing Services
B. Section 02300 – Earthwork
1.3 REFERENCES
A. ACI031 – Specifications for Concrete Buildings.
B. ACI304 – Recommended Practice for Measuring, Measuring, Mixing, Transporting, and Placing Concrete.
C. ASTM A 185-94 – Steel Welded Wire Fabric, Plain, for Concrete Reinforcement.
D. ASTM A 497-94 – Steel Welded Wire Fabric, Deformed, for Concrete
Reinforcement.
E. ASTM A 615-95 – Deformed and Plain Billet-Street Bars for Concrete
Reinforcement.
F. ASTM C 33-93 – Concrete Aggregates.
G. ASTM C 39-94 – Compressive Strength of Cylindrical Concrete Specimens
H. ASTM C 94-94 – Ready-Mixed Concrete.
I. ASTM C 150-05 – Portland Cement
J. ASTM C 260-94 – Air – Entraining Admixtures for Concrete.
K. ASTM C 309-94 – Liquid Membrane – Forming Compounds for Curing Concrete.
L. ASTM C 494-92 – Chemical Admixtures for Concrete
SECTION 02775-3
City of Stockbridge C & S Project No. S9100.035
Burke Street Sewer Rehabilitation July 2021
Addendum #4
M. ASTM D 1751-83 (1991) – Preformed Expansion Joint Filler for Concrete Paving and Structures Construction. (Nonextruding and Resilient Bituminous Type).
N. ASTM D 1752-84 (1992) – Performed Sponge Rubber and Cork Expansion Joint
Fillers for Concrete Paving and Structural Construction.
O. ASTM D 3740-94 – Minimum Requirements for Agencies Engaged in the Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction.
P. ASTM E 329-93 – Agencies Engaged in the Testing and/or Inspection of Materials used in construction.
1.4 REGULATORY REQUIREMENTS
A. Perform work in accordance with State of Georgia, City of Cornelia, and the
Department of Transportation, State of Georgia, Standard Specifications, Current
Edition.
B. Conform to applicable standards for paving work on public property.
1.5 TESTING
A. Testing laboratory shall operate in accordance to ASTM D 3740 and E 329 and shall be accepted by the Engineer.
B. The testing laboratory and Project Engineer/Project Representative shall be given a minimum of 48 hours’ notice prior to taking any of the tests.
C. The Contractor shall use the service of a certified testing service to perform all density and/or compaction tests specified herein. The cost of these services shall be paid for in accordance with Section 01410.
D. The Contractor shall submit for review a design mix for concrete proposed for use.
The mix shall be prepared by an approved testing laboratory. Compressive strength of at least four (4) specimens of the design mix shall indicate 15% higher than 28 days strengths specified. During the work, the Contractor shall make 3 test cylinders for each 75 cubic yards, or fraction thereof, of concrete placed each day. One cylinder shall be tested at 7 days and the other two at 28 days in accordance with
ASTM C-39. Copies of all test reports shall be furnished to the Engineer.
1.6 SUBMITTALS
A. Product Data: Provide data on joint filler, admixtures, and curing compounds.
B. Concrete Mix Design.
SECTION 02775-4
City of Stockbridge C & S Project No. S9100.035
Burke Street Sewer Rehabilitation July 2021
1.7 WEATHER CONDITIONS
A. Do not place concrete when base surface temperature is less than 40 F, or surface is wet or frozen.
PART 2. PRODUCTS
2.1 FORM MATERIALS
A. Shall conform to ACI301.
B. Shall be wood, plywood, metal or other accepted material and shall be of the grade or type suitable to obtain the finish specified. The material should be of size and strength to resist movement during concrete placement and to retain horizontal and vertical alignment until removed. Use straight forms, free of distortion and defects.
C. Use flexible spring steel forms or laminated boards to form radius bends as required.
D. Form Ties: Removable or snap-off type, galvanized metal, adjustable length, free of defects that could leave holes larger than 1-inch in concrete surface.
E. Form Release Agent: Colorless mineral oil, which will not stain concrete, or absorb moisture, or impair natural bonding or color characteristics of coating intended for use on concrete.
2.2 REINFORCING STEEL
A. Reinforcing Steel: ASTM A 615, Grade 60 billet steel deformed bars; uncoated finish.
B. When specifically called for on the plans, reinforcing bars shall be epoxy-coated in accordance with ASTM A775.
2.3 CONCRETE MATERIALS
A. Concrete Materials: “Class A” and “Class B” concrete as defined by the Standard
Specifications of the Department of Transportation of Georgia.
B. Fine and Coarse Mix Aggregates: ASSTM C33.
C. Water: Potable, not detrimental to concrete
D. Air Entrainment: ASTM C260.
2.4 JOINT SEALERS
SECTION 02775-5
City of Stockbridge C & S Project No. S9100.035
Burke Street Sewer Rehabilitation July 2021
Addendum #4
A. Joint Fillers: [ASTM D1751] Asphalt impregnated fiberboard or felt, tongue and grove profile.
B. Sealant: Joints shall be sealed per detail on project drawings. ASTM C 920-94, Type S or M, Grade P or NS, Class 25.
2.5 CONCRETE MIX-BY PERFORMANCE CRITERIA
A. Concrete mixed at the job site shall be mixed in a batch mixer in accordance with
American Concrete Institution Standard A.C.I 318, and in a similar manner subject to acceptance. Ready-mixed concrete shall conform to A.S.T.M. Standard C-94.
Mixing time for stationary mixers over 1 cubic yard in capacity shall be increased 15 seconds for each additional ½ cubic yard or fraction thereof materials mixed.
Construction shall be in accordance with applicable portions of “Building Code
Requirements for Concrete” (A.C.I. – 318).
B. Provide concrete to the following criteria:
Sidewalks &
Driveways Curbs & Gutters
1. Minimum Content Factor 611 lbs/yd3 470 lbs/yd3
2. Compressive Strength 3,000 psi 2,200 psi
3. Slump 2 to 4 inches 0 – 2.5 inches
4. Air Content 2.5% to 6% 0% - 6.0%
5. Course Aggregate Size No. 56, 57, 67 57
C. Use accelerating admixtures in cold weather only when approved by Engineer. Use of admixtures will not relax cold weather placement requirements.
D. Use calcium chloride only approved by Engineer.
E. Use set retarding admixtures during hot weather only when approved by Engineer.
2.6 SOURCE QUALITY CONTROL AND TEST
A. All sampling and testing services shall be performed at the Contractor’s expense, by a testing laboratory which operates in accordance with ASTM D 3740 and E 329 latest edition and accepted by the Engineer.
B. The Contractor shall submit for review a design mix for each class of concrete proposed for use. The mix shall be prepared by an approved testing laboratory.
Compressive strength of a least four specimens of the design mix shall indicate 15% higher than 28 days strength specified. During the work, the Contractor shall make
SECTION 02775-6
City of Stockbridge C & S Project No. S9100.035
Burke Street Sewer Rehabilitation July 2021
Addendum #4
3 test cylinders for each 75 cubic yards, or fraction thereof, of concrete placed each day. One cylinder shall be tested at 7 days and the other two at 28 days in accordance with ASTM C 39. Copies of all test reports shall be furnished to the
Engineer in duplicate.
3.1 CONSTRUCTION OBSERVATION
A. Verify compacted subgrade & granular base are acceptable and ready to support paving and imposed loads.
B. Verify gradients and elevations of base are correct.
C. The Engineer will have the right to require that any portion of the work be done in his presence and if the work is covered up after such instruction, it shall be exposed by the Contractor for observation. However, if the Contractor notifies the Engineer that such work is scheduled, and the Engineer fails to appear within 48 hours, the
Contractor may proceed without him. All work done and materials furnished shall be subject to review by the Engineer or Project Representative. Improper work shall be reconstructed. All materials, which do not conform to the requirements of the specifications, shall be removed from the work upon notice being received from the
Engineer for the rejection of such materials. The Engineer shall have the right to mark rejected materials so as to distinguish them as such.
3.2 SUBBASE
A. Prepare subbase in accordance with Section 300 - Standard Specifications for Base and Subbase Courses, Department of Transportation, State of Georgia, current
Edition.
B. Remove loose material from compacted subbase surface immediately before placing concrete.
C. Proof-roll prepared subbase surface to check for unstable areas and need for additional compaction. Do not begin paving work until such conditions have been corrected and area is ready to receive paving.
3.3 PREPARATION FOR PLACEMENT
A. Water shall be removed from excavations before concrete is deposited. Hardened concrete debris, and other foreign materials shall be removed from the interior of forms and from the inside of mixing and conveying equipment. The reinforcement shall be made secure in position and shall be subject to examination and acceptance.
SECTION 02775-7
City of Stockbridge C & S Project No. S9100.035
Burke Street Sewer Rehabilitation July 2021
B. Moisten base to minimize absorption of water from fresh concrete.
C. Notify Engineer minimum 48 hours prior to commencement of concreting operations.
3.4 FORMING
A. Place and secure forms to correct location, dimension, profile, and gradient.
B. Assemble formwork to permit easy stripping and dismantling without damaging concrete.
C. Place joint filler in position, in straight lines. Secure to formwork during concrete placement.
D. Forms shall be constructed to the shape, form line, and grade required and shall be maintained sufficiently rigid to prevent deformation under load. Formwork and details of construction shall conform to ACI-318, Chapter 6.
E. Check completed formwork for grade and alignment to following tolerances:
Top of forms not more than 1/8” in 10’.
Vertical face on longitudinal axis, not more than ¼” in 10’.
3.5 REINFORCING
A. Place Reinforcement as indicated.
B. Interrupt reinforcement at expansion joints.
3.6 PLACING CONCRETE
A. Placing of concrete shall conform to Chapter 5 of the American Concrete Institution
Standard A.C.I. 318. Concrete having attained initial set or having contained water for more than 45 minutes shall not be used in the work. Concrete shall not be dropped freely more than 3 feet. Concrete shall be mixed and placed only when the temperature is at least 40 degrees F and rising. Concrete shall be placed only upon surfaces that are free from frost, ice, mud and other detrimental circumstances.
When placed on dry soil or previous materials, waterproof paper or polyethylene sheeting shall be laid over the surfaces that are to receive the concrete.
B. Ensure reinforcement, inserts, embedded parts, and formed joints are not disturbed during concrete placement.
C. Place concrete continuously over the full width of the panel and between predetermined construction joints. Do not break or interrupt successive pours such
SECTION 02775-8
City of Stockbridge C & S Project No. S9100.035
Burke Street Sewer Rehabilitation July 2021 that cold joints occur.
3.7 JOINTS
A. Place expansion and/or contraction joints at 20-foot intervals. Align curb, gutter, and sidewalk joints.
B. Place joint filler between paving components and building or other appurtenances.
Recess to of filler ¼ inch.
C. Provide swan joints at 3 feet intervals between sidewalks and curbs.
D. Saw cut contraction joints 3/16-inch-wide at an optimum time after finishing. Cut ⅓ into depth of slab.
E. Finishing: After striking-off and consolidating concrete, smooth surface by screeding and floating. Use hand methods only where mechanical floating is not possible. Adjust floating to compact surface and produce uniform texture.
After floating, test surface for trueness with a 10’ straightedge. Distribute concrete as required to remove subsurface irregularities and refloat areas to provide a continuous smooth finish.
3.8 FINISHING
A. Concrete Finishing: After striking-off and consolidating concrete, smooth surface by screeding and floating. Use hand methods only where mechanical floating is not possible. Adjust floating to compact surface and produce uniform texture.
B. After floating, test surface for trueness with a 10’ straightedge. Distribute concrete as required to remove surface irregularities and refloat repaired areas to provide a continuous smooth finish.
C. Work edges of gutters, back top edge of curb, and formed joints with an edging tool, and round to ½” radius, unless otherwise indicated. Eliminate tool marks on concrete surface.
D. Do not remove forms for 24 hours after concrete has been placed. After form removal, clean ends of joints and point-up any minor honeycombed areas. Remove and replace areas or sections with major defects, as directed by Architects.
3.9 CONCRETE CURING
A. Immediately after placement and finishing, concrete shall be protected from moisture loss for not less that 7 days. For concrete surfaces not in contact with forms, white-pigmented curing compound shall be uniformly applied after water sheen disappears from the concrete surface. Formed surfaces shall receive an
SECTION 02775-9
City of Stockbridge C & S Project No. S9100.035
Burke Street Sewer Rehabilitation July 2021
Addendum #4 application of curing compound if forms are removed during the 7-day curing period. Curing compound shall not be applied during rainfall.
B. Curing compound shall be applied under pressure at the rate of 1 gallon to not more than 150 square feet by mechanical sprayers. The spraying equipment shall be of the fully atomizing type. At the time of use, the compound shall be thoroughly mixed with white pigments uniformly dispersed throughout the sprayer. Care shall be taken to prevent application to joints where concrete bond is required for reinforcing steel and to joints where joint sealer is to be placed. The compound shall form a uniform continuous coherent film that will not crack or peel and shall be free from pinholes and other imperfections. Concrete surfaces that are subjected to heavy rainfall within 3 hours after curing compound has been applied shall be resprayed by the above method and at the above coverage at no additional expense to the Owner.
C. No pedestrian or vehicular traffic shall be allowed over the surface for seven days unless the surface is protected by planks, plywood, or sand. The protection shall not be placed until at least 12 hours after the application of the curing compound.
D. Protect concrete by suitable methods to prevent damage by mechanical injury or excessively hot or cold temperatures.
3.10 FIELD QUALITY CONTROL
A. Three concrete cylinders will be taken every 75 cubic yards of concrete placed each day.
B. One additional test cylinder will be taken during cold weather and cured on site under same conditions as concrete it represents, if accelerating mixture used.
C. One slump test will be taken for each set of test cylinders taken.
D. Maintain records of placed concrete items. Record date, location of pour, quantity, air temperature, and test samples taken.
3.11 PROTECTION
A. Immediately after placement, protect pavement from premature drying, excessive hot or cold temperatures, and mechanical injury.
B. Repair or Replace broken or defective concrete, as directed by Engineer.
C. Allow testing company to drill test cores where directed by Engineer, when necessary to determine magnitude of cracks or defective areas. Fill drilled core holes in satisfactory pavement areas with portland cement concrete bonded to pavement with epoxy adhesive.
SECTION 02775-10
City of Stockbridge C & S Project No. S9100.035
D. Protect concrete from damage until acceptance of work. Exclude traffic from pavement for at least 14 days after placement. When construction traffic is permitted, maintain pavement as clean as possible by removing surface stains and spillage of materials as they occur.
E. Sweep concrete curb and gutter and wash free of stains, discolorations, dirt, and other foreign material just prior to final inspection.
VideoCount CD Code Fr To RemarksImRefIn1 % JntIn2
0.0 ST Start of Survey
0.0 AMH Manhole MH 2
0.0 MWL Water Level 10
0.0 S01 DAE Deposits Attached Encrustation 7 520
66.4 F01 DAE Deposits Attached Encrustation 7 520
66.5 MMC Material change DUCTILE IRON
107.1 MMC Material change CAST IRON
107.1 S02 DAE Deposits Attached Encrustation 7 515
126.5 F02 DAE Deposits Attached Encrustation 7 515
126.5 MMC Material change PVC
127.9 LR Alignment Right 25
137.3 AMH Manhole MH 1
137.3 FH End of Survey
Total Length Surveyed137.3 Ft
137.3 2020/03/11Date Cleaned
P/O #
Media No
Date 2020/03/11
Setup 14 Surveyor CLH/SPS Drainage
Street Davis Rd and Parkwood Dr
Weather Light Rain
City Stockbridge
Flow control Plugged
Location Light Highway
CatPurpose
Use Sanitary Shape Circular Material Cast Iron Lining
Total length Height 8 Width ins
Joint length
Up MH 2 Rim to invert 6.50 Ft Down MH 1 Rim to invert 6.10 Ft
Direction Down Preclean J
Year rehabilitated
Additional info Line Goes in the park
Further location details
Structural Miscellaneous
O & M Constructional
System Owner City of Stockbridge
Year laid
Tabular Report of PSR MH 2 X Carter and Sloopefor Certificate # U-716-07003469
Time 9:03 Survey Customer Carter and Sloope
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 137.3
Pressure 0.000
Northing Easting Elevation Coordinate System GPS Accuracy
Project Tv and Clean Work Order GAM20009
Ft Ft Ft
Southeast Pipe Survey, Inc.
Phone:(912) 647-2847 Fax:(912) 647-2869
0.0 AMH Manhole MH 2
0.0 MWL Water Level 10
0.0 S01 DAE Deposits Attached Encrustation 7 510
141.4 F01 DAE Deposits Attached Encrustation 7 510
141.4 MSA Abandoned Survey TUBERCULATION STOPS CAMERA18
Total Length Surveyed141.4 Ft
297.0 2020/03/11Date Cleaned
P/O #
Media No
Date 2020/03/11
Setup 15 Surveyor CLH/SPS Drainage
Street Davis Rd and Parkwood Dr
Weather Light Rain
City Stockbridge
Flow control Plugged
Location Other
CatPurpose
Use Sanitary Shape Circular Material Cast Iron Lining
Total length Height 8 Width ins
Joint length
Up MH 3 Rim to invert 9.10 Ft Down MH 2 Rim to invert 6.50 Ft
Direction Up Preclean J
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Constructional
System Owner City of Stockbridge
Year laid
Tabular Report of PSR MH 3 A Carter and Sloopefor Certificate # U-716-07003469
Time 9:35 Survey Customer Carter and Sloope
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 141.4
Pressure 0.000
Northing Easting Elevation Coordinate System GPS Accuracy
Project Tv and Clean Work Order GAM20009
Ft Ft Ft
Southeast Pipe Survey, Inc.
0.0 AMH Manhole MH 3A
0.0 MWL Water Level 10
13.5 MMC Material change CAST IRON
13.5 S01 DAE Deposits Attached Encrustation 7 570
23.1 MWLS Water Level Sag 40
32.8 OBN Obstacles Construction Debris 7 PIECE OF CLAY PIPE310
34.1 F01 DAE Deposits Attached Encrustation 7 570
34.1 MSA Abandoned Survey PIECE OF CLAY PIPE STOPS CAME...
Total Length Surveyed34.1 Ft
54.7 2020/02/28Date Cleaned
P/O #
Media No
Date 2020/02/28
Setup 2 Surveyor CLH/SPS Drainage
Street Davis Rd and Parkwood Dr
Weather Dry
City Stockbridge
Flow control Not Controlled
Location Light Highway
CatPurpose
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length Height 8 Width ins
Joint length
Up MH 3A Rim to invert Ft Down MH 4 Rim to invert 9.10 Ft
Direction Down Preclean J
Year rehabilitated
Additional info LINE HAS A FORCE MAIN
Further location details MANHOLE 3A IS BURIED
Structural Miscellaneous
O & M Constructional
System Owner City of Stockbridge
Year laid
Tabular Report of PSR MH 3A X Carter and Sloopefor Certificate # U-716-07003469
Time 9:23 Survey Customer Carter and Sloope
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 34.1
Pressure 0.000
Northing Easting Elevation Coordinate System GPS Accuracy
Project Tv and Clean Work Order GAM20009
Ft Ft Ft
Southeast Pipe Survey, Inc.
0.0 AMH Manhole MH 4
0.0 MWL Water Level 10
0.0 MGO General Observation CAST IRON
0.0 S01 DAE Deposits Attached Encrustation 7 545
20.6 F01 DAE Deposits Attached Encrustation 7 545
20.6 MSA Abandoned Survey LINE COMPLETED
Total Length Surveyed20.6 Ft
54.7 2020/02/28Date Cleaned
P/O #
Media No
Date 2020/02/28
Setup 3 Surveyor CLH/SPS Drainage
Street Davis Rd and Parkwood Dr
Weather Dry
City Stockbridge
Flow control Not Controlled
Location Light Highway
CatPurpose
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length Height 8 Width ins
Joint length
Up MH 3A Rim to invert Ft Down MH 4 Rim to invert 9.10 Ft
Direction Up Preclean J
Year rehabilitated
Additional info Reverse set up on sheet:2
Further location details MANHOLE 3A IS BURIED
Structural Miscellaneous
O & M Constructional
System Owner City of Stockbridge
Year laid
Tabular Report of PSR MH 3A X Carter and Sloopefor Certificate # U-716-07003469
Time 9:40 Survey Customer Carter and Sloope
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 20.6
Pressure 0.000
Northing Easting Elevation Coordinate System GPS Accuracy
Project Tv and Clean Work Order GAM20009
Ft Ft Ft
Southeast Pipe Survey, Inc.
0.0 AMH Manhole MH 5
0.0 MWL Water Level 10
1.0 CC Crack Circumferential 12 5J
8.9 S01 MWLS Water Level Sag 25
16.7 F01 MWLS Water Level Sag 25
70.4 S02 MWLS Water Level Sag 25
73.7 MMC Material change PVC
76.6 MMC Material change CLAY
76.6 F02 MWLS Water Level Sag 25
99.4 TF Tap Factory 6.000 10 CLAY
151.6 AMH Manhole MH 4
151.6 FH End of Survey
Total Length Surveyed151.6 Ft
151.6 2020/02/28Date Cleaned
P/O #
Media No
Date 2020/02/28
Setup 4 Surveyor CLH/SPS Drainage
Street 175 Burke St
Weather Dry
City Stockbridge
Flow control Not Controlled
Location Light Highway
CatPurpose
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length Height 8 Width ins
Joint length
Up MH 5 Rim to invert 5.90 Ft Down MH 4 Rim to invert 9.10 Ft
Direction Down Preclean J
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Constructional
System Owner City of Stockbridge
Year laid
Tabular Report of PSR MH 5 X Carter and Sloopefor Certificate # U-716-07003469
Time 10:27 Survey Customer Carter and Sloope
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 151.6
Pressure 0.000
Northing Easting Elevation Coordinate System GPS Accuracy
Project Tv and Clean Work Order GAM20009
Ft Ft Ft
Southeast Pipe Survey, Inc.
0.0 AMH Manhole MH 6
0.0 MWL Water Level 10
4.0 FC Fracture Circumferential 5 7J
100.3 TF Tap Factory 6.000 3 CLAY
112.8 TF Tap Factory 6.000 10 CLAY
155.9 TF Tap Factory 6.000 3 CLAY
168.4 TF Tap Factory 6.000 10 CLAY
225.8 CL Crack Longitudinal 8J
294.1 AMH Manhole MH 5
294.1 FH End of Survey
Total Length Surveyed294.1 Ft
294.1 2020/02/28Date Cleaned
P/O #
Media No
Date 2020/02/28
Setup 5 Surveyor CLH/SPS Drainage
Street 174 Burke St
Weather Dry
City Stockbridge
Flow control Not Controlled
Location Light Highway
CatPurpose
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length Height 8 Width ins
Joint length
Up MH 6 Rim to invert 7.80 Ft Down MH 5 Rim to invert 5.90 Ft
Direction Down Preclean J
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Constructional
System Owner City of Stockbridge
Year laid
Tabular Report of PSR MH 6 X Carter and Sloopefor Certificate # U-716-07003469
Time 11:03 Survey Customer Carter and Sloope
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 294.1
Pressure 0.000
Northing Easting Elevation Coordinate System GPS Accuracy
Project Tv and Clean Work Order GAM20009
Ft Ft Ft
Southeast Pipe Survey, Inc.
0.0 AMH Manhole MH 7
0.0 MWL Water Level 10
3.0 FC Fracture Circumferential 5 7J
83.6 CL Crack Longitudinal 9J
94.9 TF Tap Factory 6.000 9 CLAY
116.0 TB Tap Break-in 4.000 9 CLAY
173.7 TF Tap Factory 6.000 3 CLAY
191.3 TF Tap Factory 6.000 9 CLAY
2…
This is the start of the file's text. The full file is on GovTribe.
Other files
| File | Type | Posted |
|---|---|---|
| Addendum No. 2 | — | |
| Addendum No. 3 | — | |
| Addendum 1Sewer Rehabilitation | — | |
| Award Information | — | |
| ITB No. 2021-0009 Burke Street | — | |
| NOIA - Bid Tabulation | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .