Node 24 Underground Repairs - Pal Dr.pdf
PDF 134 KB Posted
- Solicitation number
- BD-22-1324-SELCO-SELCO-67208
- Issued by
- Worcester County, Massachusetts
About this file
This document is a Scope of Work for an underground repairs project issued by SELCO (Shrewsbury Electric and Cable Operations) in Shrewsbury, MA. The project involves the repair of damaged or broken conduit that houses active coax hardline along Pal Dr. in Shrewsbury. The contractor will be responsible for excavating, repairing the conduit, and restoring the work areas to pre-excavation conditions. SELCO will provide the necessary conduit materials, while the contractor must supply all labor, tools, equipment, and consumables. The contractor must adhere to all safety requirements and OSHA regulations, and coordinate with SELCO representatives before removing any existing coax cables. Upon completion, the contractor must submit written certification that the work was done in accordance with the contract documents and that all equipment and systems have been tested and are operational.
The pricing terms and funding sources are not specified in this document. There are no details provided regarding any set-asides, incumbents, or the current contracting environment. The document focuses on the technical requirements and scope of work for the underground repairs project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SELCO- Shrewsbury Electric and Cable Operations Node 24 “Underground Repairs” Pal Dr.
Underground/ Digging Construction: Conduit repair around multiple locations in Pal Dr. Shrewsbury MA.
CONTRACTOR REQUIREMENTS:
Contractor to Adhere to all safety requirements and OSHA Regulations, The Contractor shall be responsible for developing, implementing, and managing all safety protections, work flow, precautions and programs to prevent damage, injury, or loss to all employees on the work site and other persons that may be affected thereby; and all work, materials, and equipment to be incorporated therein, whether in storage on or off site.
*Dig-safe pre-marked areas of possible damaged or broken schedule 40 conduit areas before any work is performed.
WORK SCOPE:
• Contractor will dig and or excavate to repair existing- damaged or broken conduit which houses active Coax Hardline to make conduit passable.
• Contractor needs to be aware of the existing Coax and not remove or cut existing cable which will affect customer services. In the case the Contractor needs to remove coax they must contact SELCO representatives before doing so.
• Contractor will supply all the Labor, tools and equipment needed to repair the conduit. SELCO will supply scheduled 40 conduit solid or split duct. Consumables such as glue and or miscellaneous items are Contractors responsibilities.
• When Contractor has finished repairing conduit they need to rod and rope the repaired duct with mule-tape provided by SELCO in the span of conduit ensuring a reliable pull rope for later cable installation.
Contractor will keep all disturbances of property to a minimum and will return all excavated areas to "pre-excavation" condition after the conduit is in place. This may require sod to be laid and concrete and asphalt to be repaired. Work areas to be cleaned of debris daily by the Contractor. Contractor shall be responsible for protection of landscape and plants and surrounding structures.
FINAL INSPECTION: When the Contractor considers the work complete, the Contractor shall submit written certification that:
1. Contract Documents have been reviewed.
2. Work has been inspected for compliance with Contract Documents.
3. Work has been completed in accordance with Contract Documents.
4. Equipment and systems have been tested in the presence of the SELCO representative and are operational.