Attach_3_-_ML_EM-2_Mod_Overview.pdf
PDF 6 MB Posted
- Solicitation number
- NNK17607120R
About this file
Attach 3 - ML EM-2 Mod Overview
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NNK17607120R_-_Amend_003_(ML_A-E).pdf | ||
| NNK17607120R_-_Amend_002_(ML_A-E).pdf | ||
| NNK17607120R_-_Amend_001_(ML_A-E).pdf | ||
| NNK17607120R_-_Synopsis.pdf | ||
| Attach_1_-_Structural_A E_PPQ.docx | DOCX document | |
| Attach_2_-_A E_FAR_Provisions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
National Aeronautics and Space Administration
GSDO-TEMPL-001, Rev. 14, 09/21/2016
EM-2 ML Modification Overview
EM-2 Block 1B Vehicle Configuration
ML GSE Modifications Required to Support EM-2/EUS Configuration
• Significant modifications required to GSE systems on the ML to support EM-2/EUS configuration
– Umbilical System impacts
Shifting of CAA and OSMU higher
• Requires shifting of 18+ fluid and EGSE GSE end items to new levels
• Requires significant demo and tower modifications to support the moves
• Large number of cable and piping/tubing to require removal and re-routing
Major Re-design of VSS required and 20+ supporting fluids and EGSE systems
2 new umbilicals and approx. 30 fluid and EGSE systems that support these systems, 100+new cables and large amount of piping/tubing
Demo and removal of ISCPU
• 20 GSE fluids and EGSE end items will require remove along with large number of cables and tubing
– GSE System impacts
All systems above the 220 ft level will require significant installation redesign
EGSE modifications
Pneumatic system mods and additions
ML has run out of real estate in the base on the tower for new GSE
Moving GSE will drive significant structural changes not accounted for in the study
100s of long run and short run cables impacted
GSELH2/LO2 will require major redesign to support EUS
• New LH2/LO2 skids, VJ piping, support EGSE end items
– Facility System impacts
Major redesign of AC power, lighting, elevator, fire alarm, fire protections, potable/septic water and KCCS
New electrical room required on the 325 ft level
Significant cable plant demo and rework required
• Bottom Line-ML modifications are significant and pose a significant challenge to meet EM-2 schedules
• Approx. 19 month window between EM-1 (H/W availability) and EM-2 need date for ML
Overview of ML Structural Reinforcement Study March 2015
Overview of ML Structural Reinforcement Study March 2015
A&E study completed in 2015 to determine structural feasibility of ML modifications to support 1B
ML reinforcement structurally is feasible, but implementation will be problematic
Adds approx. 530,000 lbs of steel to ML
Tower Impacts
• 8 levels will require diagonal modifications
• 10 levels will require column modifications
• 2 levels will require significant rework to add electrical rooms
• Crew level will need to relocated
• Umbilical Arm mounting will require major structural mods
ML Base Impacts
• Significant Girder reinforcement required
• Truss reinforcement
• Significant demo required to complete
ML Modifications Required for Block 1B
CAA
(moved)
OSMU
(moved)
ICPSU
VSS
CSFSU
CSITU
TSMU (2) VSP (8)ASPU (2)
EFAU (New)
EAFU (New)
ICPSU
LH2 F/D Flow Control (Skid)
EUS
LH2 F/D Flow Control (Skid)
Notional
EUS may require upgrade feed lines and skids (LO2 and LH2) to support timely launch processing.
Incompatible with ICPS configuration.
Propellant quality
Tower increase
Mobile Launcher Mods for Block 1B
SubSystem New
Design and/or
Re-design
Add Level to ML
Tower
Struct
Mods &
Stiffening
Relocate
CAA
Relocate
OSMU
Remove
ICPSU
2 New
EUS
Umbilicals
Mod &
Upgrade
VehStab
Detailed Design X X X X X X X
GSE Installation Design X X X X X X
Construction Contract Scope X X X X X X X
ECS Mods X X X X
GMPS Mods X X
1 new GMPS RIO
New/Mod GSP X X X
X
3 new pwr racks
2 new term dist
1 new RIO
X
HGLDS Mods X X X
HAASP Mods X demo new
Hydraulics X new new design
Pnuematics X 4 new Panels (2 GN2; 2
Ghe)
Struct/Mechanical X X X X X X mod ICPSU hinges new hinges
Major Change from
Passive VS to Active
Hyd Sys
Add new passive stay
New/Mod EGSE X 1 new OSMU RIO
3 new GCS RIOs demo mod/re-use ICPSU RIO
4 new term dist
1 new LH2 RIO
1 new LO2 RIO
1 new LRS RIO
1 new VS RIO
GCS X New
KGCS X
new GCS LCD& PLC new cabling
LACC mods
Pnuem Controls mods
LACC mods
Pnuem Controls mods mod GMPS cabinet
LACC mods
Pnuem Controls new PLCs/networks recording
LACC mods
CRYOs X 2 new upper stage skids
LRS Mods X 1 new Rack
1 new Term Dist
RSCS Mods X
2 mod RIOs
1 RF enclosure
1 new RF tower
SDAS mods X mods demo new new/mods
TCS mods X 1 new RIO
1 pwr dist
New Tubing/Piping/Hoses X X X demo new - a lot new
New Cabling X demo/instl demo/instl demo new - a lot some
LETF Testing (VMS & VSTF) X X2 X
Standalone V&V X X X X X
Fac.Elect. X X
Fire Prot. X X
Elevator X X
Comm. X X
ML EM 2 ScheduleML EM 2 Schedule 2016 2017 2018 2019 2020 2021
A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J
9/30/16
ML EM2 Schedule
ML EM2 Design
EES / Struct. Mods
GSE / EES / Struct.
Pneumatics Panels
LH2/LO2
ML EGSE Design Mods
TCS
SDAS
RSCS
GSP
HGLDS
GMPS
Wx
LRS
KGCS
EGSE Fab
LETF EUS Umbilicals
LETF EUS Umbilical
Struct. Mods, Umbilical & GSE Installation, EES
ML Standalone V&V
Multi-Element V&V
Delta DCRs, Reqs.
A&E / SOW Dev.
Arch / Req. Dev. Studies
EES Reqs Dev. Study
A&A ML A&E
4/13
Start
GSE / EES / Structural Mod / A&E Design
100% Design
7/25
SRD Dev Pneumatics Panel Design 100% Design Release
A&A Panels Fabrication
SRD Dev LH2 / LO2 Design Mods 100% Design Release
A&A LH2/LO2 Fabrication
SRD Dev EGSE Design Mods EGSE Fabrication
TCS Design Mods 100% Release
SDAS Design Mods 100% Release
RSCS Design Mods 100% Release
GSP Design Mods 100% Release
HGLDS Design Mods 100% Release
GMPS Design Mods 100% Release
Wx Design Mods 100% Release
LRS Design Mods 100% Release
KGCS Design Mods 100% Release
A&A EGSE Fabrication
SRD Dev VS / Umbilical Design EUS Fwd/Rear
EUS Rear 100% Design
EUS FWD & VS
100% Design Release
EUS Rear 100% Design
VS / EUS Umbilical Fab
5/11
EUS Umb FWD & RR Fab Start
5/17
VS Umb. Fab Start
GSE Umb. Fab Complete (9/30)
LETF Testing
1/30
Testing Comp.
Const. A&A
ML Available for Mods (Post EM-1) (1/2)
EES / Struct Mods / GSE Install
1/3 Start
Complete
Standalone V&V Start 8/11 10/5 Complete
Multi-Element V&V Start 10/6 11/30 Complete
Delta DCRs, Reqs Closure
DRAFT
File details come from the government source that posted it. Updated .