Safety and Reliability Upgrade, KSC Institutional Power Systems, Phase 2 of 4
Solicitation number
NNK16575643R
Issued by

About this file

Question Answer Log titled PPI Log NNK16575643R 5.5.2016 dated 5/5/2016

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NO. NNK16575643R

PROJECT TITLE/LOCATION: Safety Reliability Upgrade, KSC Institutional Power Systems, Ph 2 of 4

PCN: 98966.2

5/5/2016

GOVERNMENT PRE PROPOSAL INQUIRY FORM

1 79K39772/40231/39950 Please provide the scope of work for any environmental work associated with the asbestos, lead paint, PCB's or any other environmental hazards that must be handled that are associated with this project based on the test report data that has been provided?

Will the Government provide any items such as drums and/or waste containers?

Will we turn over any items to the Government for disposal onsite at the appropriate landfill or for their disposal off-site?

Environmental scope of work includes but is not limited to hazardous material sampling, handling, and disposal in accordance with the contract drawings and contract Division 1 and Division 2 specification sections. Suspected asbestos containing materials are not to be disturbed and any required asbestos abatement will be a contract change.

The Government will provide the Contractor containers for hazardous and controlled wastes.

Large PCB bulk product waste (non-transformer substation sections) shall be handled and transported by the Contractor for disposal on KSC per specification section 02 41 00, sub-section 3.2.2.d.1.

Hazardous/controlled waste drums and transformer oil will be disposed of by the Government.

Transformer carcasses with paint PCB contamination greater than or equal to 50 ppm shall be containerized by the Contractor for transportation and disposal by the Government.

Lead covered power cables with oil contamination greater than or equal to 50 ppm shall be containerized by the Contractor for transportation and disposal by the Government; reference new Addendum Item No. 20.

2 79K39772/40231/39950 Are we required to take additional paint chip and oil samples prior to beginning any work? No for paint samples. Yes for oil samples; reference specific notes C and D on Sheet H-011 of drawing 79K39772, Revision A. 02

3 79K39772/40231/39950 Is there PCB contamination in the paint chip samples or just PCB contamination in the oil samples?

With respect to drawings 79K39772 Revision A, see Sheets H-009 and H-010 for paint chip samples test results, and drawing H-011 for dielectric oil samples test results. SPECIFIC NOTE D on drawings H-009 and -010 identifies the paint chip samples that tested positive for

PCB contamination (≥ 50 ppm). Note that dielectric oil samples tested positive for PCB contamination, but not greater than 50 ppm.

4 79K39772/40231/39950 Where were the paint chip samples pulled from for the first round of PCB testing for Substations

B & C?

Where these units contaminated with PCB's on the outside or is this just the insulating oil on the inside of the units?

All paint chip samples were taken from the exterior of the equipment.

The exterior paint chip samples that tested positive for PCB contamination (≥ 50 ppm) are on the outside. Note that dielectric oil samples from the inside of the unit tested positive for PCB contamination, but not greater than 50 ppm.

5 79K39772/40231/39950 There was a second set of samples taken for Substation B & C that showed levels that were treatable, but we need to understand where the samples where taken to see if our process will work for treatment?

How do handle if the first sample is highly contaminated and the second sample is treatable?

The paint chip samples taken in 2012 were tested for total metals and PCB’s. The paint chip samples taken in 2014 were tested for TCLP and

PCB’s. All paint chip samples were taken from the exterior of the equipment.

With respect to drawing 79K39772, Revision A, no treatment is required. Equipment with PCB content ≥ 50 ppm shall be containerized for transportation and disposal by the Government in accordance with Specification 79K39774 Revision A, Section 2 41 00, sub-section 3.2.2.c.1 and 3.2.2.c.2.

6 79K39772/40231/39950 Why was Substation EE sampled with a second round? Why was Substation D not sampled with a second round?

Paint chip samples taken from the exteriors of substations, EE, B, C, D, E and F were taken in both 2012 and 2014. The paint chip samples taken in 2012 were tested for total metals and PCB’s. Later, the Government requested that paint chip samples be tested for TCLP. The paint chip samples taken in 2014 were tested for TCLP and PCB’s.

Amend No.No. QUESTION Reference

(Section Paragraph/Page)

GOVERNMENT RESPONSE

SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104

PCN: 98966.2

5/5/2016

GOVERNMENT PRE PROPOSAL INQUIRY FORM

Amend No.No. QUESTION Reference

(Section Paragraph/Page)

GOVERNMENT RESPONSE

7 79K39772/40231/39950 Due to the levels in Round 1 of the PCB Testing is removing the concrete pad and any soil required as part of this PCB contaminated scope of work?

Reference, Amendment 0002, Section C.2 (b) Addendum Item No. 21. The Contractor shall notify the Government 30-days prior to removing

Substation B, C, D, E, F, and EE equipment as indicated on drawing 79K39772, Revision A. Upon removing substation equipment the

Government shall inspect and, if required, sample the concrete pad for PCB contamination. The Contractor shall not remove any concrete until sample results are returned within 21 calendar days of the sample being taken. For bidding purposes, the Contractor shall assume 4 cubic yards of PCB contaminated concrete and soil material are to be containerized in Government provided containers as PCB contaminated waste for disposal by the Government.

8 79K39772/40231/39950 Does NASA want the oil handled as a TSCA material from Substations B, C and EE?

Oil results were all less than <50 ppm, but was there any contamination on the outside of the unit

>50 ppm?

Yes, handle all transformer oil as a TSCA material.

The outside is contaminated if the paint samples are indicated to have a PCB content ≥ 50 ppm. Oil was sampled from inside of the unit.

9 79K39772/40231/39950 Is there a detailed report that shows where the test analysis where taken and how the samples where chosen for the items sampled?

How was the equipment selected for the second round of samples?

Available test analysis information is on the drawings and in the specifications as an appendix. Paint samples were taken from the outside exterior of the enclosure or structural steel.

In general, substation equipment was tested in both 2012 as was tested in 2014. The only thing that changed was the form of the heavy metals testing; total metals in 2012 and TCLP in 2014.

10 79K39772/40231/39950 Due to the high levels of contamination reflected in the test reports what levels of PPE will be required when working around the equipment or removing for disposal?

The Contractor is required to determine levels of PPE in accordance with Contract Clause J-A-8. 02

11 79K39772/40231/39950 Has a disposal plan been developed by Environmental for this project that we can review? No. The Contractor shall provide the disposal plan as part of the environmental protection plan submittal in accordance with specification section 01 57 20.00 10 sub-sections 1.6, 1.6.1, 1.6.2, and 1.6.3.

12 79K39772/40231/39950 On Drawing E-502 do we install new manhole racking or can we use existing? Can manhole details be provided showing what primary cable racking is required for the new cable and what is being used for the existing cable?

Reference, Amendment 0002, Section C.2 (b), new Addendum Item No. 22. Existing manhole racking details are not available. With respect to drawing 79K39950 assume for bidding purposes new racking for each manhole assuming a 10 foot by 10 foot octagonal size. Existing racking can be used for new cable if in good condition, adequate space is available, and new cables can be racked without disturbing existing energized cables.

13 79K39772/40231/39950 Drawing C-505 shows a Triton Barrier system. Where is this system required, how much is required and can we use an approved equal?

The system is required to protect the temporary parking lot installation of pad mounted transformer T-SSS227A. The enlarged plan details on drawings C-102 and E-407A specify where the Triton Barrier system is to be installed. The quantity shall be as shown. Approved equal products are acceptable.

14 79K39772/40231/39950 Drawing E-623 shows Substations B and C as existing being removed, but the bid item breakdown on Page 8, Note 1 states "Demo Substation A and B"? Is it correct Substation A and

B are new, with B and C being demolished?

Exterior (outdoor) M7-355 Substations B, C, D, E, and F are existing and to be demolished by the Contractor. Exterior Substation 227 (A-

Side and B-Side) is new and to be provided by the Contractor.

PCN: 98966.2

5/5/2016

GOVERNMENT PRE PROPOSAL INQUIRY FORM

Amend No.No. QUESTION Reference

(Section Paragraph/Page)

GOVERNMENT RESPONSE

15 79K39772/40231/39950 Are there any fault indicators or lightning arrestors required for this project? New voltage (not fault) indicators and surge arrestors are required for this project. Locations and types of new surge arresters, load-break connectors, and dead-break connectors are indicated on the drawings

Note the following with respect to Specification 79K39774, Revision A:

Per specification section 26 05 13.00 98 sub-section. 2.2, new voltage indicators shall be provided on each new dead-front insulated medium-voltage connector provided on this project.

Per specification section 26 05 13.00 98 sub-section. 2.8, one new medium-voltage dead-front surge arrester per phase shall be provided for each new pad-mounted transformer.

Note the following with respect to Specification 79K39951 . . .

Per spec. sect. 26 05 13.00 98 para. 2.2, new voltage indicators shall be provided on each new dead-front insulated medium-voltage connector provided on this project.

Per specification section. 26 11 14.00 98 sub-section 2.8, new station class medium-voltage surge arresters shall be provided in the locations indicated on the drawings.

16 79K39772/40231/39950 In regards to the Engineering Order 1 drawings do we replace the drawings for Task 79K39550 with the applicable Engineering Order 1 drawings?

Yes. Changes from 79K39550 are clouded. 02

17 Drawing 79K40231, E-011, existing Panel CP-1 Who is the manufacturer and what type of breakers are required for this Panel? Reference, Amendment 0002, Section C.2 (b), new Addendum Item No. 23. Panel CP-1 is a GE A-Series II panelboard THHQB Series

22kAIC rated branch circuit breakers.

18 Drawing 79K39950, E-001 Note 21 Possible Lead Since we don't know if it exists can this be consider a change condition? (We will not have to put cost to something that might not exist)

If Possible Lead is found and must be removed to perform the work, this would be considered a Change condition. 02

19 Drawing 79K39950, E-001 Note 22 Possible

Orangeburg

Since we don't know if it exists can this be consider a change condition? (We will not have to put cost to something that might not exist)

If Possible Orangeburg is found and must be removed to perform the work, this would be considered a Change condition. 02

20 Drawing 79K39950, E-001 Note 23 Possible Asbestos Since we don't know if it exists can this be consider a change condition?(We will not have to put cost to something that might not exist)

If Possible Asbestos is found and must be removed to perform the work, this would be considered a Change condition. 02

21 Drawing 79K39950, E-011 existing Cable H and E-

408, Note P.

The cable types for Cable H are different.. What type of cable is Cable H PILC or EPR? The portion of existing cable H to be removed, between Bay 7 (VCB 214) substation non-fused disconnect switch and manhole MH-1, is EPR.

The remaining portion of existing cable H, between manhole MH-1 and substation SS-117A, is PILC. The remaining portion of existing cable

H, between manhole MH-1 and substation SS-117A, is to be spliced to new cable 16 using a trifurcating splice.

22 RFP, line item 0002 and Drawing 79K39950, E-614. The drawing shows VFI-412 as new, but the RFP does not list it. Question: Is it to be included in the scope of work?

Yes it is provided and installed by the Contractor per RFP line item 0001 (Base Bid) as a SF6 vacuum fault interrupter, and all other new switches and vacuum fault interrupters indicated on Drawing 79K39950 are also to be provided. VFI-412 is not included in RFP, line item

0002 (Base Bid Alternate to substitute solid dielectric construction for various switches).

23 Drawing 79K39950, E-510 Note J. Are we to replace all busbar fittings for all Bays? Please clarify what busbar fittings we are to replace.

No. Replace all busbar connectors, couplings, and junctions. Re-use expansion joints, but replace expansion joint insulators (Note L on E-

510). Re-use cable termination pads on existing free-standing vacuum circuit breakers (VCB's); also see responses to questions 25 and 26.

24 Spec 79K39951, Section 26 11 14.00 98 2.9.1.1 Non

Fused Disc, continuous current 600A or 1200A as indicated on drawings.

The drawing shows some 1200A disconnects are we to assume that all others are 600A? If not, for bidding purposes please provide how many are 600A and 1200A.

Yes. Also, reference, Amendment 0002, Section C.2 (b) Addendum Item No. 24 (Changing SW1 in Bay 5 to 1200A). 02

25 Drawing 79K39950, E-510 Note C and Note AJ Are we to provide new terminations at VCB bushings (if so what size is the bussing)? No 02

26 Drawing 79K39950, E-510 Note C and Note AJ Are we to provide new 4-hole pad to cable terms at VCB? No 02

27 Drawing 79K39950, E-617, Note F Can you provide a basis of design for manufacturer and part number for the 600A deadbreak junctions?

Eaton Cooper Power 600 Amp dead-break separable splice; base part number is SSPL625A3. 02

28 CG Transformer is not approved to manufacture FM-approved transformers, as required by the specification. They can provide FM approved fluid, but their units as a whole are not. Will this be acceptable? They are approved to provide a "UL-combo" less-flammable transformer design which is equivalent to FM approved, but will not be labeled as such?

Provide FM approved and labeled transformers. 02

PCN: 98966.2

5/5/2016

GOVERNMENT PRE PROPOSAL INQUIRY FORM

Amend No.No. QUESTION Reference

(Section Paragraph/Page)

GOVERNMENT RESPONSE

29 EO-1-79K39550 Sheet 12 shows terminations for a vault style switch. EO-1-79K39550 Sheet 7 shows a pad mount switch.

What is the correct type of switch? Pad mount switch. Terminations indicated on the drawing are incorrect. Reference Amendment 0001, Section C.2 (b) Addendum Item 16 01

30 RFP Section C Base Bid Alternate does not list LBS- Should we assume this switch does not have a Solid Dielectric Option? Yes. Also see response to Question 22. 02

31 RFP Section C Option 2 Alternate does not list LBS-17 and LBS-78

Should we assume these switches do not have a Solid Dielectric Option? Yes. 02