1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 3
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0002 See Block 16C 4200575643 98966.2
6. ISSUED BY CODE OP-ES 7. ADMINISTERED BY (If other than Item 6) CODE
Same as block 6
John F. Kennedy Space Center, NASA Procurement Office, OP-ES-A Kennedy Space Center, FL 32899
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code) 9A. AMENDMENT OF SOLICITATION.
X NNK16575643R
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[ X ]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [X ] is extended, [ ] is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning _1___ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor [ ] [ ] is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this Amendment is to:
1. Extend the proposal due date to May 18, 2016 by 3:00 pm
2. Make changes to the RFP.
3. Incorporate the Question Answer Log titled “PPI Log NNK16575643R 5.5.2016” dated 5/5/2016
See Attached Pages
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Sherry Gasaway, Contracting Officer
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY 5/5/2016
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
1. The following documents are attached to this Amendment and are hereby incorporated into this solicitation:
“PPI Log NNK16575643R 5.5.2016” dated 5/5/2016
2. The following changes are hereby made to the solicitation;
SF1442 Block 13: Delete paragraph A. and replace with the following:
A. Sealed offers in original and 2 copies to perform the work required are due at the place specified in Item 8 by 3:00 P.M. local time May 18, 2016. If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
Solicitation NNK16575643R, Section C.1 SCOPE OF WORK (MAY 2014) Line Item 0003 Option 1:
Replace Subline item 1) with the following correction
1) Demolition of existing M7-355 (O&C Building) Substation C and B.
Solicitation NNK16575643R, Section C. 2 CONTRACT DRAWINGS, MAPS, SPECIFICATIONS, AND/OR STATEMENTS OF WORK (MAY 2014), Section (b)
Add the following paragraphs after item 19.:
20. Base Bid (CLIN-0001) Specification 79K39951 and Option 1/Option 2 (CLIN-0003/CLIN-0004) Specification 79K39774, Revision A. - Revise the 11th sentence of Section 02 41 00 SELECTIVE DEMOLITION, sub-section 3.2.2a as follows:
FROM: “Demolished cable that is not released to the Contractor shall, when directed to do so by KSC, be transported by the Contractor to the KSC Recycling Center on Ransom Road for disposal by KSC.”
TO: “Demolished cable that is not released to the Contractor shall be sealed and containerized in Government provided containers for disposal by the Government.”
21. Option 1 (CLIN-0003) Drawing 79K39772, Revision A, Sheet H-011, Zone F/4 – Add specific note (flag note) F indication to the “2.0 DETAILED FINDINGS” for transformer oil testing. Add Specific (flagged) Note F as follows:
F. NOTIFY THE CONTRACTING OFFICER 30-DAYS PRIOR TO REMOVING EXISTING
SUBSTATION B, C, D, E, F, AND EE EQUIPMENT. UPON REMOVAL THE
GOVERNMENT WILL INSPECT AND, IF REQUIRED, SAMPLE THE CONCRETE PAD
FOR PCB CONTAMINATION. THE CONTRACTOR SHALL NOT REMOVE ANY
CONCRETE UNTIL SAMPLE RESULTS ARE RETURNED WITHIN 21 DAYS OF THE
SAMPLE BEING TAKEN. FOR BIDDING PURPOSES THE CONTRACT SHALL ASSUME
4 CUBIC YARDS OF PCB CONTAMINATED CONCRETE AND SOIL MATERIAL ARE TO
BE CONTAINERIZED IN GOVERNMENT PROVIDED CONTAINERS AS PCB
CONTAMINATED WASTE FOR DISPOSAL BY THE GOVERNMENT.
22. Base Bid (CLIN-0001) Drawing 79K39, Sheet E-502, Zone D/1 – Add specific note (flag note) D indication to the Detail 4 “CABLE RACK INSTALLATION IN MANHOLES - DETAIL”. Add Specific (flagged) Note D as follows:
F. ASSUME NEW RACKING IN EXISTING 10-FOOT BY 10-FOOT OCTAGONAL
MANHOLES IS REQUIRED FOR ALL NEW CABLES INSTALLED.
All other terms and conditions remain unchanged.
ACKNOWLEDGEMENT OF THIS AMENDMENT IS REQUIRED WITH YOUR PROPOSAL.
(End of Summary of Changes)