Questions_and_Answers.pdf

PDF 149 KB Posted

Attached to
Structural Integrity Study of the Aircraft Parking Ramp at Hangar 4802
Solicitation number
NND16575398Q
Issued by

About this file

Questions and Answers

View the file

Other files

File Type Posted
Building_4802_Ramp_Briefing_for_Contractors.pptx PPTX presentation
B4802_North_Ramp_Scaled_Drawing.pdf PDF
Sign-In_Sheet.pdf PDF
Soil_Boring_Location_Map.pdf PDF
Past_Performance_Questionnaire_Rating_Guidelines.pdf PDF
Soil_Boring_Logs.pdf PDF
SOW_Rev._1.pdf PDF
NND16575398Q_-_Combined.pdf PDF
Past_Performance_Questionnaire.pdf PDF
Visit_Request.pdf PDF
SOW.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers

Q.1: Can a scaled Adobe pdf map of the north ramp area be provided as part of the solicitation documents, prior to preparation of our proposals?

A.1: Yes, see attached B4802 North Ramp Scaled Drawing.

Q.2: Will a site map be available at the time of the field investigation showing subsurface utilities, pipelines, and Hanger 4802 foundation structures?

A.2: Yes, NASA will provide the site map to the successful offeror after the award.

Q.3: Is there existing geotechnical information available (such as boring logs) on subsurface conditions near the north ramp area that would be useful for our field investigation?

A.3: Yes, see attached Soil Boring Location Map and Soil Boring Logs.

Q.4: Can we assume that the objects on the ground surface covering the asphalt paved area will be removed prior to our field investigation?

A.4: No.

Q.5: Do you need a detailed work plan for the video inspection of the pipeline as part of our proposals, or can we provide this after contract award?

A.5: A detailed work plan for the video inspection of the pipeline is not required as part of offeror’s proposal. It can be provided after the contract award.

Q.6 Can you extent this period of performance by three weeks to allow more time for the field investigation phase?

A.6: No.

File details come from the government source that posted it. Updated .