Attachment_L-5_SHeMA-2_Sample_Task_Cost_Summary_Template_Amend_1.xlsx

XLSX spreadsheet 41 KB Posted

Attached to
Safety, Health, and Mission Assurance (SHeMA-2)
Solicitation number
NNC17ZQ002R
Issued by

About this file

Amendment 1 is the updated L-5 Attachment showing corrected names for Sample Tasks 1-4.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 Sample Task Summary

TOTAL OF SAMPLE TASKS

ElementsYear 1Year 2Total
Sample Task One Estimated Cost Plus Fixed Fee$ -$ -$ -
Sample Task Two Estimated Cost Plus Fixed Fee$ -$ -$ -
Sample Task Three Estimated Cost Plus Fixed Fee$ -$ -$ -
Sample Task Four Estimated Cost Plus Fixed Fee$ -$ -$ -
Total of Sample Tasks$ - 0$ - 0$ - 0

2 Sample Task 1 Costs Sample Task One: Safety & Mission Assurance (S&MA) Support for Electric Propulsion (EP) Engineering Model (EM) Project Total Cost Template

COST PLUS FIXED FEE

BASE PERIOD
ElementsYear 1Year 2Total
Direct Labor Cost from Labor Template$ -$ -$ -
Overhead (List) Cost
1. (Name & Description of Base)$ -$ -
Overhead Rate0.00%0.00%
Overhead Cost$ -$ -$ -
2. (Name & Description of Base)$ -$ -
Overhead Rate0.00%0.00%
Overhead Cost$ -$ -$ -
Total Overhead Cost$ -$ -$ -
Other Direct Costs (ODCs)
1. (ODC Description)$ -$ -$ -
2. (ODC Description)$ -$ -$ -
3. (ODC Description)$ -$ -$ -
Total Other Direct Costs$ -$ -$ -
Subcontractor Costs
1. (Subcontractor Name)$ -$ -$ -
2. (Subcontractor Name)$ -$ -$ -
3. (Subcontractor Name)$ -$ -$ -
Total Subcontract Cost$ -$ -$ -
Material Handling (Pass through costs)
1. (Description of Material Handling Base)$ -$ -
M&H Rate0.00%0.00%
M&H Cost$ -$ -$ -
G&A Cost
1. (Description of G&A Base)$ -$ -
G&A Rate0.00%0.00%
G&A Cost$ -$ -$ -

Subtotal $ - $ - $ -

Facilities Capital Cost of Money (FCCOM)
1. (Description of FCCOM Base)$ -$ -
FCCOM Rate0.00%0.00%
FCCOM Cost$ -$ -$ -
Fixed Fee
1. Subcontractor$ -$ -
Fixed Fee Rate0.00%0.00%
Fixed Fee Amount$ -$ -$ -
2. (Description of Fee Base) less Subcontractor$ -$ -
Fixed Fee Rate0.00%0.00%
Fixed Fee Amount$ -$ -$ -
Total Fixed Fee Amount$ -$ -$ -

Total Estimated Cost Plus Fixed Fee $ - $ - $ -

3 Sample Task 1 Labor Sample Task One: Safety & Mission Assurance (S&MA) Support for Electric Propulsion (EP) Engineering Model (EM) Project Labor Template

CONTRACT YEAR: ONE
Incumbent Labor Classification per RFP Section L.16, Volume III - Cost Proposal InstructionsLabor Category per DOLWD, CBA, GSA. or Offeror's established positionE=Exempt N=Non Exempt U=UnionWYEsProductive Work HoursStandard Labor RateLabor Cost
Safety Engineer0.000.00$0.00$0.00
Safety Specialists and Technicians0.000.00$0.00$0.00
Continuous Risk Management (CRM) Facilitator0.000.00$0.00$0.00
Quality Assurance (QA) Engineer0.000.00$0.00$0.00
Software Assurance Engineer0.000.00$0.00$0.00
System Safety Engineer0.000.00$0.00$0.00
Electric, Electromagnetic & Electrical Engineer0.000.00$0.00$0.00
Reliability and Maintainability (R&M) Engineer0.000.00$0.00$0.00
Systems Engineer/Equipment Manager0.000.00$0.00$0.00
Chemist0.000.00$0.00$0.00
Chemical Hygienist0.000.00$0.00$0.00
Health Physicist0.000.00$0.00$0.00
Certified Industrial Hygienist0.000.00$0.00$0.00
Industrial Hygienists0.000.00$0.00$0.00
Industrial Hygienist Technician0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.00$0.00
CONTRACT YEAR: TWO
Incumbent Labor Classification per RFP Section L.16, Volume III - Cost Proposal InstructionsLabor Category per DOLWD, CBA, GSA. or Offeror's established positionE=Exempt N=Non Exempt U=UnionWYEsProductive Work HoursStandard Labor RateLabor Cost
Safety Engineer0.000.00$0.00$0.00
Safety Specialists and Technicians0.000.00$0.00$0.00
Continuous Risk Management (CRM) Facilitator0.000.00$0.00$0.00
Quality Assurance (QA) Engineer0.000.00$0.00$0.00
Software Assurance Engineer0.000.00$0.00$0.00
System Safety Engineer0.000.00$0.00$0.00
Electric, Electromagnetic & Electrical Engineer0.000.00$0.00$0.00
Reliability and Maintainability (R&M) Engineer0.000.00$0.00$0.00
Systems Engineer/Equipment Manager0.000.00$0.00$0.00
Chemist0.000.00$0.00$0.00
Chemical Hygienist0.000.00$0.00$0.00
Health Physicist0.000.00$0.00$0.00
Certified Industrial Hygienist0.000.00$0.00$0.00
Industrial Hygienists0.000.00$0.00$0.00
Industrial Hygienist Technician0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.00$0.00

4 Sample Task 2 Costs Sample Task Two: Safety & Mission Assurance (S&MA) Support for Assembly, Integration, and Test (AI&T) in the NASA Electric Aircraft Testbed (NEAT) Total Cost Template

COST PLUS FIXED FEE

BASE PERIOD
ElemetsYear 1Year 2Total
Direct Labor Cost from Labor Template$ -$ -$ -
Overhead (List) Cost
1. (Name & Description of Base)$ -$ -
Overhead Rate0.00%0.00%
Overhead Cost$ -$ -$ -
2. (Name & Description of Base)$ -$ -
Overhead Rate0.00%0.00%
Overhead Cost$ -$ -$ -
Total Overhead Cost$ -$ -$ -
Other Direct Costs (ODCs)
1. (ODC Description)$ -$ -$ -
2. (ODC Description)$ -$ -$ -
3. (ODC Description)$ -$ -$ -
Total Other Direct Costs$ -$ -$ -
Subcontractor Costs
1. (Subcontractor Name)$ -$ -$ -
2. (Subcontractor Name)$ -$ -$ -
3. (Subcontractor Name)$ -$ -$ -
Total Subcontract Cost$ -$ -$ -
Material Handling (Pass through costs)
1. (Description of Material Handling Base)$ -$ -
M&H Rate0.00%0.00%
M&H Cost$ -$ -$ -
G&A Cost
1. (Description of G&A Base)$ -$ -
G&A Rate0.00%0.00%
G&A Cost$ -$ -$ -

Subtotal $ - $ - $ -

Facilities Capital Cost of Money (FCCOM)
1. (Description of FCCOM Base)$ -$ -
FCCOM Rate0.00%0.00%
FCCOM Cost$ -$ -$ -
Fixed Fee
1. Subcontractor$ -$ -
Fixed Fee Rate0.00%0.00%
Fixed Fee Amount$ -$ -$ -
2. (Description of Fee Base) less Subcontractor$ -$ -
Fixed Fee Rate0.00%0.00%
Fixed Fee Amount$ -$ -$ -
Total Fixed Fee Amount$ -$ -$ -

Total Estimated Cost Plus Fixed Fee $ - $ - $ -

5 Sample Task 2 Labor Sample Task Two: Safety & Mission Assurance (S&MA) Support for Assembly, Integration, and Test (AI&T) in the NASA Electric Aircraft Testbed (NEAT) Labor Template

CONTRACT YEAR: ONE
Incumbent Labor Classification per RFP Section L.16, Volume III - Cost Proposal InstructionsLabor Category per DOLWD, CBA, GSA. or Offeror's established positionE=Exempt N=Non Exempt U=UnionWYEsProductive Work HoursStandard Labor RateLabor Cost
Safety Engineer0.000.00$0.00$0.00
Safety Specialists and Technicians0.000.00$0.00$0.00
Continuous Risk Management (CRM) Facilitator0.000.00$0.00$0.00
Quality Assurance (QA) Engineer0.000.00$0.00$0.00
Software Assurance Engineer0.000.00$0.00$0.00
System Safety Engineer0.000.00$0.00$0.00
Electric, Electromagnetic & Electrical Engineer0.000.00$0.00$0.00
Reliability and Maintainability (R&M) Engineer0.000.00$0.00$0.00
Systems Engineer/Equipment Manager0.000.00$0.00$0.00
Chemist0.000.00$0.00$0.00
Chemical Hygienist0.000.00$0.00$0.00
Health Physicist0.000.00$0.00$0.00
Certified Industrial Hygienist0.000.00$0.00$0.00
Industrial Hygienists0.000.00$0.00$0.00
Industrial Hygienist Technician0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.00$0.00
CONTRACT YEAR: TWO
Incumbent Labor Classification per RFP Section L.16, Volume III - Cost Proposal InstructionsLabor Category per DOLWD, CBA, GSA. or Offeror's established positionE=Exempt N=Non Exempt U=UnionWYEsProductive Work HoursStandard Labor RateLabor Cost
Safety Engineer0.000.00$0.00$0.00
Safety Specialists and Technicians0.000.00$0.00$0.00
Continuous Risk Management (CRM) Facilitator0.000.00$0.00$0.00
Quality Assurance (QA) Engineer0.000.00$0.00$0.00
Software Assurance Engineer0.000.00$0.00$0.00
System Safety Engineer0.000.00$0.00$0.00
Electric, Electromagnetic & Electrical Engineer0.000.00$0.00$0.00
Reliability and Maintainability (R&M) Engineer0.000.00$0.00$0.00
Systems Engineer/Equipment Manager0.000.00$0.00$0.00
Chemist0.000.00$0.00$0.00
Chemical Hygienist0.000.00$0.00$0.00
Health Physicist0.000.00$0.00$0.00
Certified Industrial Hygienist0.000.00$0.00$0.00
Industrial Hygienists0.000.00$0.00$0.00
Industrial Hygienist Technician0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.00$0.00

6 Sample Task 3 Costs

Sample Task Three: Facility Demolition, Rehabilitation, and New Construction
Total Cost Template

COST PLUS FIXED FEE

BASE PERIOD
ElementsYear 1Year 2Total
Direct Labor Cost from Labor Template$ -$ -$ -
Overhead (List) Cost
1. (Name & Description of Base)$ -$ -
Overhead Rate0.00%0.00%
Overhead Cost$ -$ -$ -
2. (Name & Description of Base)$ -$ -
Overhead Rate0.00%0.00%
Overhead Cost$ -$ -$ -
Total Overhead Cost$ -$ -$ -
Other Direct Costs (ODCs)
1. (ODC Description)$ -$ -$ -
2. (ODC Description)$ -$ -$ -
3. (ODC Description)$ -$ -$ -
Total Other Direct Costs$ -$ -$ -
Subcontractor Costs
1. (Subcontractor Name)$ -$ -$ -
2. (Subcontractor Name)$ -$ -$ -
3. (Subcontractor Name)$ -$ -$ -
Total Subcontract Cost$ -$ -$ -
Material Handling (Pass through costs)
1. (Description of Material Handling Base)$ -$ -
M&H Rate0.00%0.00%
M&H Cost$ -$ -$ -
G&A Cost
1. (Description of G&A Base)$ -$ -
G&A Rate0.00%0.00%
G&A Cost$ -$ -$ -

Subtotal $ - $ - $ -

Facilities Capital Cost of Money (FCCOM)
1. (Description of FCCOM Base)$ -$ -
FCCOM Rate0.00%0.00%
FCCOM Cost$ -$ -$ -
Fixed Fee
1. Subcontractor$ -$ -
Fixed Fee Rate0.00%0.00%
Fixed Fee Amount$ -$ -$ -
2. (Description of Fee Base) less Subcontractor$ -$ -
Fixed Fee Rate0.00%0.00%
Fixed Fee Amount$ -$ -$ -
Total Fixed Fee Amount$ -$ -$ -

Total Estimated Cost Plus Fixed Fee $ - $ - $ -

7 Sample Task 3 Labor

Sample Task Three: Facility Demolition, Rehabilitation, and New Construction
Labor Template
CONTRACT YEAR: ONE
Incumbent Labor Classification per RFP Section L.16, Volume III - Cost Proposal InstructionsLabor Category per DOLWD, CBA, GSA. or Offeror's established positionE=Exempt N=Non Exempt U=UnionWYEsProductive Work HoursStandard Labor RateLabor Cost
Safety Engineer0.000.00$0.00$0.00
Safety Specialists and Technicians0.000.00$0.00$0.00
Continuous Risk Management (CRM) Facilitator0.000.00$0.00$0.00
Quality Assurance (QA) Engineer0.000.00$0.00$0.00
Software Assurance Engineer0.000.00$0.00$0.00
System Safety Engineer0.000.00$0.00$0.00
Electric, Electromagnetic & Electrical Engineer0.000.00$0.00$0.00
Reliability and Maintainability (R&M) Engineer0.000.00$0.00$0.00
Systems Engineer/Equipment Manager0.000.00$0.00$0.00
Chemist0.000.00$0.00$0.00
Chemical Hygienist0.000.00$0.00$0.00
Health Physicist0.000.00$0.00$0.00
Certified Industrial Hygienist0.000.00$0.00$0.00
Industrial Hygienists0.000.00$0.00$0.00
Industrial Hygienist Technician0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.00$0.00
CONTRACT YEAR: TWO
Incumbent Labor Classification per RFP Section L.16, Volume III - Cost Proposal InstructionsLabor Category per DOLWD, CBA, GSA. or Offeror's established positionE=Exempt N=Non Exempt U=UnionWYEsProductive Work HoursStandard Labor RateLabor Cost
Safety Engineer0.000.00$0.00$0.00
Safety Specialists and Technicians0.000.00$0.00$0.00
Continuous Risk Management (CRM) Facilitator0.000.00$0.00$0.00
Quality Assurance (QA) Engineer0.000.00$0.00$0.00
Software Assurance Engineer0.000.00$0.00$0.00
System Safety Engineer0.000.00$0.00$0.00
Electric, Electromagnetic & Electrical Engineer0.000.00$0.00$0.00
Reliability and Maintainability (R&M) Engineer0.000.00$0.00$0.00
Systems Engineer/Equipment Manager0.000.00$0.00$0.00
Chemist0.000.00$0.00$0.00
Chemical Hygienist0.000.00$0.00$0.00
Health Physicist0.000.00$0.00$0.00
Certified Industrial Hygienist0.000.00$0.00$0.00
Industrial Hygienists0.000.00$0.00$0.00
Industrial Hygienist Technician0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.00$0.00

8 Sample Task 4 Costs Sample Task Four: Occupational Health Sample Task – Providing technical support for the use of Carbon Nanotube-based coatings Total Cost Template

COST PLUS FIXED FEE

BASE PERIOD
ElementsYear 1Year 2Total
Direct Labor Cost from Labor Template$ -$ -$ -
Overhead (List) Cost
1. (Name & Description of Base)$ -$ -
Overhead Rate0.00%0.00%
Overhead Cost$ -$ -$ -
2. (Name & Description of Base)$ -$ -
Overhead Rate0.00%0.00%
Overhead Cost$ -$ -$ -
Total Overhead Cost$ -$ -$ -
Other Direct Costs (ODCs)
1. (ODC Description)$ -$ -$ -
2. (ODC Description)$ -$ -$ -
3. (ODC Description)$ -$ -$ -
Total Other Direct Costs$ -$ -$ -
Subcontractor Costs
1. (Subcontractor Name)$ -$ -$ -
2. (Subcontractor Name)$ -$ -$ -
3. (Subcontractor Name)$ -$ -$ -
Total Subcontract Cost$ -$ -$ -
Material Handling (Pass through costs)
1. (Description of Material Handling Base)$ -$ -
M&H Rate0.00%0.00%
M&H Cost$ -$ -$ -
G&A Cost
1. (Description of G&A Base)$ -$ -
G&A Rate0.00%0.00%
G&A Cost$ -$ -$ -

Subtotal $ - $ - $ -

Facilities Capital Cost of Money (FCCOM)
1. (Description of FCCOM Base)$ -$ -
FCCOM Rate0.00%0.00%
FCCOM Cost$ -$ -$ -
Fixed Fee
1. Subcontractor$ -$ -
Fixed Fee Rate0.00%0.00%
Fixed Fee Amount$ -$ -$ -
2. (Description of Fee Base) less Subcontractor$ -$ -
Fixed Fee Rate0.00%0.00%
Fixed Fee Amount$ -$ -$ -
Total Fixed Fee Amount$ -$ -$ -

Total Estimated Cost Plus Fixed Fee $ - $ - $ -

9 Sample Task 4 Labor Sample Task Four: Occupational Health Sample Task – Providing technical support for the use of Carbon Nanotube-based coatings Labor Template

CONTRACT YEAR: ONE
Incumbent Labor Classification per RFP Section L.16, Volume III - Cost Proposal InstructionsLabor Category per DOLWD, CBA, GSA. or Offeror's established positionE=Exempt N=Non Exempt U=UnionWYEsProductive Work HoursStandard Labor RateLabor Cost
Safety Engineer0.000.00$0.00$0.00
Safety Specialists and Technicians0.000.00$0.00$0.00
Continuous Risk Management (CRM) Facilitator0.000.00$0.00$0.00
Quality Assurance (QA) Engineer0.000.00$0.00$0.00
Software Assurance Engineer0.000.00$0.00$0.00
System Safety Engineer0.000.00$0.00$0.00
Electric, Electromagnetic & Electrical Engineer0.000.00$0.00$0.00
Reliability and Maintainability (R&M) Engineer0.000.00$0.00$0.00
Systems Engineer/Equipment Manager0.000.00$0.00$0.00
Chemist0.000.00$0.00$0.00
Chemical Hygienist0.000.00$0.00$0.00
Health Physicist0.000.00$0.00$0.00
Certified Industrial Hygienist0.000.00$0.00$0.00
Industrial Hygienists0.000.00$0.00$0.00
Industrial Hygienist Technician0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.00$0.00
CONTRACT YEAR: TWO
Incumbent Labor Classification per RFP Section L.16, Volume III - Cost Proposal InstructionsLabor Category per DOLWD, CBA, GSA. or Offeror's established positionE=Exempt N=Non Exempt U=UnionWYEsProductive Work HoursStandard Labor RateLabor Cost
Safety Engineer0.000.00$0.00$0.00
Safety Specialists and Technicians0.000.00$0.00$0.00
Continuous Risk Management (CRM) Facilitator0.000.00$0.00$0.00
Quality Assurance (QA) Engineer0.000.00$0.00$0.00
Software Assurance Engineer0.000.00$0.00$0.00
System Safety Engineer0.000.00$0.00$0.00
Electric, Electromagnetic & Electrical Engineer0.000.00$0.00$0.00
Reliability and Maintainability (R&M) Engineer0.000.00$0.00$0.00
Systems Engineer/Equipment Manager0.000.00$0.00$0.00
Chemist0.000.00$0.00$0.00
Chemical Hygienist0.000.00$0.00$0.00
Health Physicist0.000.00$0.00$0.00
Certified Industrial Hygienist0.000.00$0.00$0.00
Industrial Hygienists0.000.00$0.00$0.00
Industrial Hygienist Technician0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.000.00$0.00$0.00
0.00$0.00