Q&A 3/28/21
Question:
For clarity is the testing to occur on only these two listed testing events or will it also be thru out the period of performance through September
Answer:
We have two anticipated testing events scheduled which have been provided below. However we have a large period of performance in case there are additional testing events required, or slight changes to the ship’s schedule. The period of performance takes us through the end of the fiscal year.