NM FTFW RIMO 10(1) Plans.pdf
PDF 14 MB Posted
- Solicitation number
- 6982AF20B000040
About this file
This notice provides details for a federal solicitation seeking construction services. The Department of Transportation Federal Highway Administration is soliciting bids for the NM FTFW RIMO 10(1) Entrance Road and Parking Areas project through solicitation number 6982AF20B000040. Bids are due as indicated in the attached Invitation for Bid located in the file NM FTFW RIMO 10(1) Plans.pdf. The solicitation seeks construction services to build an entrance road and parking areas. No other details on products, services, pricing, terms, timelines, or awardees are provided in this notice.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(By Letter Dated 8/3/2020) Anna Weyers, Refuge Manager 8/3/2020
Hahn, Philip R
Digitally signed by Hahn, Philip R
Date: 2020.08.14
09:12:37 -06'00'
CURTIS R SCOTT Digitally signed by CURTIS R SCOTT
Date: 2020.09.10 12:33:44 -06'00'
Sheet 1 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
A2
ABBREVIATIONS DRAINAGE SYMBOLS
GEOLOGIC SYMBOLS
DI
FENCE & CATTLEGUARD SYMBOLS
Cattleguard (Existing, Proposed)
Fence w/ Gate (Existing, Proposed)
Fence (Existing, Proposed)
Material Source
Boring Location (Existing, Proposed)
Riprap Apron (Proposed)
Underdrain (Existing, Proposed)
With Drop Inlet (Existing, Proposed)
With Headwalls (Existing, Proposed)
With End Sections (Existing, Proposed)
Pipe Culvert (Existing, Proposed)
Box Culvert (Existing, Proposed)
Bridge (Existing, Proposed)
Spring
River
Wetland
Large Creek
Lake, Pond or Reservoir
Drainage or Small Creek
Flow Arrow
Ditch (Existing, Proposed)
SPRING
D jt.J int.
incr.
incl.
IDI
hwy.
HW
horiz.
hex.
HES
hdwl.H gdr.
galv.
ga.G ftg.
fin.
FES
Fed.
f.f.F ext.
exp. jt.
exc.
EW
et ux et al
ER
EQ or eq.
EOP
engr(s).
emb.
elev.
El. 94.066 e
EE
dwg(s).
DLC
Dist.
dist.
diaph.
diag.
dia. or D
DI
DHV
decr.D culv.
CTSM
ctrs.
CS
cr.
corr.
cont.
constr. jt.
constr.
conc.
col.
Co.
CMP
clr.
c-c
CBCC
brg.
br.
BP
BM
BK
beg.
b.f.B asph.
appr.
alt.
AH
aggr.
ADT
abut.A west vertical point of intersection vehicles per hour vertical design speed typical point of tangent to spiral transverse temporary construction easement temporary bench mark tangent township tangent length symmetrical structural straight stiffener standard station point of spiral to tangent street specification spacing, Spaces or Spaced shoulder section point of spiral to curve seasonal average daily traffic south route right reference hub retaining wall
Reservation reservoir required reinforcement reconstruction roadway road right-of-way range radius quantities pavement point of tangent pounds per square inch project point on tangent point on spiral point on curve plate point of intersection perforate point of compound curve point of curve outside diameter other face on centers number negative normal crown north mountain(s) monument minimum maximum material maintenance magnetic low water left lump sum longitudinal latitude lamination length of curve
WW
VPI
vph vert.
VV
typ.
TS
transv.
TCE
TBM
tan.
T.
TT
sym.
struc.
str.
stiff.
std.
sta.
ST
st.
spec.
spa.
shldr.
sec.
SC
SADT
SS
rte.
Rt. or RT
RH
ret. wall
Res.
res.
reqd.
reinf.
reconst.
rdwy.
rd.
R/W
R.
RR
quant., QtyQ pvmt.
PT
psi proj.
POT
POS
POC
pl.
PI
perf.
PCC
PCP
OD
o.f.
o.c.O
no. or # neg.
NC
NN
mtn(s).
mon.
min.
max.
matl.
maint.
mag.M
LW
Lt. or LT
LPSM
long.
lat.
lam.
LL
EROSION & SEDIMENT CONTROL SYMBOLS
joint interior increment inclusive,including inside diameter highway high water horizontal hexagon homestead entry survey headwall girder galvanized gage (gauge) footing finish flared end section federal fill face exterior expansion joint excavation edge of water and wife and others edge of road equation edge of pavement
Engineer(s) embankment elevation elevation with number superelevation rate east drawing(s) donation land claim district distance diaphragm diagonal diameter drop inlet design hour volume decrement culvert contingent sum centers point of curve to spiral creek corrugated continuous construction joint construction concrete column county corrugated metal pipe clear center to center concrete box culvert bearing bridge balance point bench mark back beginning,begin both faces asphalt approach alternate ahead aggregate average daily traffic abutment diameter curve delta centerline
Ø
Riprap
Rolled Erosion Control Product
Diversion Berm
Check Dam
Bonded Fiber Matrix Mulching
Fiber Roll (Slope Protection)
Temporary Inlet Protection
Silt Fence
Fiber Roll (Ditch and/or Cut Slope)
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d S
Y M N
M F T F
W R I
M O .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NM NM FTFW RIMO 10(1)
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
Sheet 2 of 2
A3
Seasonal Construction Buffer
ADA Parking Symbol (Proposed)
Post and Cable Fence (Proposed)
36 31
36 31
6 1
ˆ
Treeline
Tree
MAPPING SYMBOLS
LANDSCAPING & VEGETATION SYMBOLS PROJECT SPECIFIC SYMBOLS
RIGHT-OF-WAY SYMBOLS
ROADWAY SYMBOLS
SIGN SYMBOLS
UTILITY SYMBOLS
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
Guardwall (Existing, Proposed)
Guardrail (Existing, Proposed)
GUARDRAIL, BARRIER & WALL SYMBOLS
Post Mounted (Existing, Proposed)
Portable (Proposed)
Delineator (Existing, Proposed)
Commercial (Existing, Proposed)
Signs
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone
Sanitary Sewer
Power
Oil
Gas
Fiber Optic
CATV
Underground Utility (Existing, Proposed)
Telephone Pedestal (Existing, Proposed)
Telephone Booth (Existing, Proposed)
Street Light (Existing, Proposed)
Support Pole Anchor (Existing, Proposed)
Support Pole (Existing, Proposed)
Surface (Existing, Proposed)
Underground (Existing, Proposed)
Irrigation Ditch
999.9
Roadway Obliteration
Roadway Centerline (With Station ticks)
Proposed
Existing
Edge of Roadway
Toe of Fill
Transition
Top of Cut
Slope Stake Limits
Clearing/Construction Limits
Survey Control Point
Trail
Spot Elevation
Double Track
Single Track
Railroad
North Arrow
Coordinate Grid Tick
Building (Existing, Proposed)
Section Corner (Found)
Section Corner (Found, Projected)
Section Corner (Found, Projected)
Right-of-Way Line (Proposed)
Right-of-Way Line (Existing)
Property Line
Parcel Number
Monument (As described)
Temporary (Proposed)
Permanent (Proposed)
Permanent (Existing)
Easements
National Wildlife Refuge
National Park
National Forest
Bureau of Land Management
Bureau of Indian Affairs
Section
Section
Section
Township or Range Line
City
County
State
National
Boundaries
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d S
Y M N
M F T F
W R I
M O .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SURVEY CONTROL
A4
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d C
T L N
M F T F
W R I
M O .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
A5
SITE MAP
3002 3003
0+
5+
190+00
195+00
1200'600'0
Scale in Feet
N ew M ex ic o
Building
Environmental Educational
Administration
Thaw Lodge
Bunkhouse
Station 100+22.00
Main Entrance Road "A" (010AZ)
NM FTFW RIMO 10(1)
Begin Project
Station 196+59.62
Main Entrance Road "A" (010AZ)
NM FTFW RIMO 10(1)
End Project m ile s
W at ro u s m il e s
G o lo n d ri n a s
Station 200+20.00
Main Entrance Road "B" (010BZ)
Begin
Station 215+56.46
Main Entrance Road "B" (010BZ)
End
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d S
T E N
M F T F
W R I
M O .d
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
NO SCALE
NOTE:
MAINLINE
TYPICAL SECTIONS
Average 18 ft
Existing width varies depth varies. Native soil in locations
Existing aggregate surfacing
(CANYON DESCENT)
EXISTING TYPICAL SECTION
1:
2Fil l s lop e
1' 8' 8' 1'
1'
Traveled way Traveled way
1.5%
3.
1.5%
3.
Subgrade
10'
Subgrade
9'
Clearing and construction limits
2.2.
ground
Existing ground
Existing
Cu t s lo pe
1:
4.
1:2
Hinge point
1.
A7
4.
course
6" Aggregate surface surfacing)
(top of
Profile grade
192+50 to 196+60
Pullout Widening from 179+25 to 180+46
175+25 to 179+25
Pullout Widening from 174+35 to 175+25
171+40 to 174+35
Pullout Widening from 170+10 to 171+40
165+15 to 170+10
Pullout Widening from 163+95 to 165+15
158+75 to 163+95
TYPICAL SECTION
5.
4.
3.
2.
1.
per Plan Dimensions
(1.5% Target, 2% Max.)
See Plan
215+00
192+00
ADA Parking Pad Section
Pavement, Plain
6" Minor Concrete
Course
4" Aggregate Surface
Provide flush transition
See Plan for adjacent Surfacing.
See Pullout Widening Details on sheet A8 for additional information.
See Typical Sections Details for Special End Conditions and locations.
and superelevation rates for the roadway.
See the cross sections and PNP sheets for cross slopes
See the cross sections for cut and fill slope ratios.
necessary. See end condition details on sheet A8.
Provide a 0.5' deep ditch on the left side and a 0.5' deep ditch on the right side, as slope ratios may be adjusted by the CO to assure adequate drainage and stability.
The gradient and width of roadway ditches and the excavation and embankment
1V:
2H
DETAIL C T12 to T14 for guardrail system details
See sheet B6 for guardrail summary and guardrail locations only
1' widening at
See Detail C grade
Finished tr a v e le d w a y
E d g e o f
Hinge point
8" block
See Sheet T12 For Details
Guardrail Mount
Flexible Delineator mulching limits seeding and
Conserved topsoil, mulching limits seeding and
Conserved topsoil, STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d T
Y P N
M F T F
W R I
M O
.d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
T2LT1
W
Mainline
Edge of travel lane
TYPICAL WIDENING AND PULLOUT PLAN
Station to Station
PULLOUT SUMMARY
R
R T
Y P .T
Y P
Side (ft)
W
(ft)
T2
(ft)
L
(ft)
T1
LT
LT
RT
LT
RT
179+25 to 180+46
174+35 to 175+25
170+10 to 171+40
163+95 to 165+15
101+00 to 102+98
DETAILS
TYPICAL SECTIONS
A8
-1.5%
-1.5%
-1.5%
-1.5%
-1%
1:2
Existing Ground end condition varies for locations where
See cross sections
RIGHT DITCH END CONDITION
right side of roadway
Detail applies to the
1:
Cu t s lop e 1.5%
1:2
154+50 to 159+25 d it c h
.5 m in for extent of riprap ditch
See drainage summary ground
Existing
1:4
1.5%
Cu t s lo pe1:
end condition varies for locations where
See cross sections d it c h
.5 m in
RIGHT DITCH END CONDITION
right side of roadway
Detail applies to the
136+60 to 137+00
136+00 to 136+40
1:4
Fill slope Existing Ground end condition varies for locations where
See cross sections
END CONDITION
133+30 to 139+20
Except 136+00 to 137+00 of right side and left sides of roadway
Detail applies to both right
1:2
Existing Ground end condition varies for locations where
See cross sections
RIGHT DITCH END CONDITION
right side of roadway
Detail applies to the
1:
Cu t s lop e
1.5% 1:2
1'
180+26 to 180+43
166+57 to 166+88 d it c h
.5
1:4
1.5%
Cut s lope
10% end condition varies for locations where
See cross sections right side of roadway
Detail applies to the
1.5% to 4% Varies
1:
1:2
1:2
Cut slope
Existing Ground
1:
d it c h
.5 left side of roadway
Detail applies to the
LEFT DITCH END CONDITION
182+81 to 186+00
RIGHT END CONDITION
136+40 to 136+60
NOTE:
See A6 and A7
1. Pavement section depth and materials to match adjacent mainline section.
pond bottom
Existing
Cross Slope
Begin Pullout
End Pullout
R
T Y P . 2
R T
Y P seeding and mulching limits Conserved topsoil, Construct 1:4 slope seeding and mulching limits Conserved topsoil, seeding and mulching limits Conserved topsoil, seeding and mulching limits Conserved topsoil, seeding and mulching limits
Conserved topsoil, .0 seeding and mulching limits Conserved topsoil, extent of riprap ditch summary for
See drainage
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d T
Y P N
M F T F
W R I
M O
.d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
Sheet and Description
B3 B4 B5 B6 B7
Erosion Control, Clearing, Removal
Summaries
Grading and Utilities
Summaries Surfacing Summary
Drainage, Guardrail, Fence, Curb, Seeding
Summaries
Signing, Marking, TTC
Summaries Allowance
Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15205-0000 SLOPE, REFERENCE, AND CLEARING AND
GRUBBING STAKE LPSM ALL
A0060 15215-3000 SURVEY AND STAKING, DRAINAGE
STRUCTURE EACH 8
A0080 15236-2000 SURVEY CONTROL, GRADE FINISHING MILE 2.100
A0100 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0120 15401-0000 CONTRACTOR TESTING LPSM ALL
A0140 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0160 15701-0000 SOIL EROSION CONTROL (TEMPORARY
CONSTRUCTION CONTROLS) LPSM ALL
A0180 15720-0000 STORM WATER POLLUTION PREVENTION PLAN LPSM ALL
A0200 20101-0000 CLEARING AND GRUBBING ACRE 4 4
A0220 20301-0600 REMOVAL OF CATTLE GUARD EACH 1 1
A0240 20301-1100 REMOVAL OF GATE EACH 3 3
A0260 20301-2400 REMOVAL OF SIGN EACH 6 6
A0280 20302-0700 REMOVAL OF FENCE LNFT 685 685
A0300 20302-2100 REMOVAL OF PIPE CULVERT LNFT 57 57
A0320 20315-0000 SAWCUTTING PAVEMENT LNFT 65 65
A0340 20401-0000 ROADWAY EXCAVATION CUYD 4,651 349 5,000
A0360 20441-0000 WASTE CUYD 2,066 2,066
A0380 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 CUYD 39 39
A0400 25120-0200 RIPRAP DITCH, METHOD A, CLASS 2 LNFT 523 27 550
A0420 25125-0000 BOULDER EACH 70 5 75
A0440 30110-0000 AGGREGATE SURFACE COURSE TON 12,254 746 13,000
A0480 40301-0000 ASPHALT CONCRETE PAVEMENT TON 22 3 25
A0500 40601-0000 FOG SEAL TON 0.06 0.04 0.10
A0520 41101-1000 PRIME COAT, METHOD 1 TON 0.16 0.04 0.20
A0540 41105-0000 BLOTTER TON 0.2 0.2
A0560 41201-0000 TACK COAT TON 0.06 0.04 0.10
A0580 50101-2600 MINOR CONCRETE PAVEMENT, PLAIN,
6-INCH DEPTH SQYD 89 89
A0600 60201-0800 24-INCH PIPE CULVERT LNFT 268 12 280
A0620 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT EACH 7 7
A0640 60915-1000 WHEELSTOP, CONCRETE EACH 2 2
A0660 61701-5150 GUARDRAIL SYSTEM MGS, TYPE 4, CLASS
B WOOD POSTS LNFT 2,125 2,125
A0680 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT EACH 2 2
A0700 61901-1000 FENCE, BARBED WIRE, 5 STRAND LNFT 440 25 465
A0720 61902-0900 GATE, METAL EACH 1 1
MileStone: 100% Estimate
Date Completed: 08/07/20
Report Date: 08/07/20
A
M
E
N
D
Line
Item
No.
Pay Item
Number
SUMMARY OF QUANTITIES - Schedule A -A u g -2
:2
A
M
Remarks and/or
Determination of Estimated
Quantity
Pay Item Description Unit
Estimated
Quantities
C
U s e rs
\u d a tt a \D e s k to p \R
IM
O
\A ft e r
Q C \P la n s
R
IM
O S O
Q .x ls m
]S h e e t
STATE PROJECT
B1NM FTFW RIMO 10(1)NM
NUMBER
Sheet and Description
B3 B4 B5 B6 B7
Erosion Control, Clearing, Removal
Summaries
Grading and Utilities
Summaries Surfacing Summary
Drainage, Guardrail, Fence, Curb, Seeding
Summaries
Signing, Marking, TTC
Summaries Allowance
Bid
Schedule
A0740 61902-1800 GATE, METAL, 24 FEET WIDTH
(AUTOMATIC) EACH 1 1
A0760 61903-0700 CATTLE GUARD, 24 FEET BISON GATE EACH 4 4
A0780 62406-0300 PLACING CONSERVED TOPSOIL, 4-INCH
DEPTH ACRE 4.16 0.34 4.50
A0800 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 4.16 0.34 4.50
A0820 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 4.16 0.34 4.50
A0840 63301-0000 SIGN SYSTEM EACH 11 11
A0860 63309-0200 DELINEATOR, TYPE 2 EACH 80 80
A0880 63401-0000 PAVEMENT MARKINGS LNFT 278 278
A0900 63405-0850 PAVEMENT MARKINGS, TYPE B,
ACCESSIBILITY SYMBOL EACH 2 2
A0920 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 200 200
A0940 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 125 125
A0960 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 80 80
A0980 63610-1600 CONDUIT, 2-INCH, PVC LNFT 11,971 11,971
A1000 63621-1000 UTILITY BOX, PULLBOX EACH 22 22
A1020 63622-0000 UTILITY TRENCH LNFT 6,111 6,111
-A u g -2
:2
A
M
MileStone: 100% Estimate
Date Completed: 08/07/20
Report Date: 08/07/20
C
U s e rs
\u d a tt a \D e s k to p \R
IM
O
\A ft e r
Q C \P la n s
R
IM
O S O
Q .x ls m
]S h e e t
(2
SUMMARY OF QUANTITIES - Schedule A
A
M
E
N
D
Line
Item
No.
Pay Item
Number Pay Item Description Unit
Estimated
Quantities Remarks and/or
Determination of Estimated
Quantity
STATE PROJECT
B2NM FTFW RIMO 10(1)NM
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d T
A B N
M F T F
W R I
M O
.d
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NM NM FTFW RIMO 10(1) B3
SUMMARY
CLEARING, REMOVAL
EROSION CONTROL,
P
M c p w w o r k in g c e n tr a l0 d T
A B N
M F T F
W R I
M O
.d
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NM NM FTFW RIMO 10(1) B4
UITILITIES SUMMARIES
GRADING AND
P
M c p w w o r k in g c e n tr a l0 d T
A B N
M F T F
W R I
M O
.d
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NM NM FTFW RIMO 10(1) B5
SURFACING SUMMARY
,7
.4
V P I
E L
,7
.0
-0.440%
100' VC
V P I
E L
,7
.2
+1.120%
+0.670%
100' VC
V P I
E L
,7
.0
+1.320%
100' VC
V P I
E L
,7
.3
+1.900%
100' VC
V P I
E L
,7
.9
100' VC
V P I
E L
,7
.5
+3.520
100' VC
V P I
E L
,7
.5
+2.030%
100' VC
V P I
E L
,7
.8
+1.430%
200' VC
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d P
N P N
M F T F
W R I
M O
.d g n
U
S E
R
NUMBER
SHEET
Superelevation Diagram
NM NM FTFW RIMO 10(1)
SPEED
LIMIT
R2-1
STOP
R1-1
Curve = CA1
PI 100+47.92
D
R = 150.00'
T = 18.37'
L = 36.56'
Curve = CA2
PI 101+71.94
D
R = 1,000.00'
T = 79.77'
L = 159.21'
Curve = CA3
PI 103+16.59
D
R = 350.00'
T = 33.70'
L = 67.20'
Curve = CA4
PI 108+41.47
D
R = 2,000.00'
T = 108.50'
L = 216.78'
Curve = CA5
PI 113+31.71
D
R = 5,000.00'
T = 61.70'
L = 123.39'
P O
B
.0
P C
.5
P T
.1
P
C
.1
P T
.3
P
C
.8
P T
.0
P C
.9
P T
.7
P C
.0
P T
.4
5%
0%
-5%
5%
0%
-5%
100+00 101+00 102+00 103+00 104+00 105+00 106+00
Match Existing
Main Entrance Road "A" (010AZ)
NM FTFW RIMO 10(1)
100+22.00
Begin Project
107+00 108+00 109+00 110+00 111+00 112+00 113+00
200'100'0
Scale in Feet
RIO MORA ENTRANCE ROAD (010AZ) - PLAN AND PROFILE
C1
E = 327846.56
N = 1754730.80
Main Entrance Road "A" (010AZ)
NM FTFW RIMO 10(1)
100+22.00
Begin Project
N e w M e x ic o
S H
E E
T C
M A
T C
H L I N
E
+1.5% RT
-1.5% LT
+1.5% RT
-1.5% LT
0.0% RT
-1.0% LT
R
R
CA1
CA2
CA3
CA5
(Match Existing)
Salvage to Refuge Gateway Arch and Remove Existing and Salvage to Refuge Remove Existing Sign to Refuge Gate and Salvage Remove Existing
See special detail 619-A with Bison Gate Cattle Guard and replace Remove Existing
N 31°30'54" E
(By Others) Future Entrance Kiosk
(Speed Limit) Remove Existing Sign
HCL Entrance Road (010AZ) and Salvage to Refuge Remove Existing Sign axis of rotation
Profile grade and sheet G2 for details.
Place boulders, see
Boulders, LT/RT (See Sheet G2) install at spacing noted on B4.
details. Pull Boxes not shown, See sheets T17 and T18 for
Electrical and Spare conduit.
Gate (Automatic) Metal Vehicle
+0.220%
V P I
E L
,7
.5
+1.780%
100' VC
V P I
E L
,8
.4
100' VC
V P I
E L
,8
.2
+1.000% +1.900%
100' VC
V P I
E L
,8
.4
100' VC
V P I
E L
,8
.5
+0.020%
100' VC
-0.680%
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d P
N P N
M F T F
W R I
M O
.d g n
U
S E
R
NUMBER
SHEET
Superelevation Diagram
NM NM FTFW RIMO 10(1)
Curve = CA6
PI 119+16.18
D
R = 5,000.00'
T = 24.70'
L = 49.39'
Curve = CA7
PI 126+84.65
D
R = 10,000.00'
T = 106.36'
L = 212.71'
P C
.4
P T
.8
P C
.2
5%
0%
-5%
5%
0%
-5%
114+00 115+00 116+00 117+00 118+00 119+00 120+00 121+00 122+00 123+00 124+00 125+00
200'100'0
Scale in Feet
RIO MORA ENTRANCE ROAD (010AZ) - PLAN AND PROFILE
C2
126+00 127+00113+00
S H
E E
T C
M A
T C
H L I N
E
S H
E E
T C
M
A T
C H L I N
E
+1.5% RT
-1.5% LT
HCL Entrance Road (010AZ) axis of rotation
Profile grade and spacing noted on B4.
Pull Boxes not shown, install at sheets T17 and T18 for details.
Electrical and Spare conduit. See
P I
E L
,8
.4
-0.680%
+0.830%
100' VC
V P I
E L
,8
.4
+0.240%
100' VC
V P I
E L
,8
.9
200' VC V
P I
E L
,8
.0
-3.500%
100' VC
V P I
E L
,7
.1
-4.690% +4.25 0%
275' VC
V P I
E L
,8
.6
100' VC
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d P
N P N
M F T F
W R I
M O
.d g n
U
S E
R
NUMBER
SHEET
Superelevation Diagram
NM NM FTFW RIMO 10(1)
6795 6795
67956795
Curve = CA8
PI 132+30.28
D
R = 850.00'
T = 91.91'
L = 183.10'
Curve = CA11
PI 140+19.20
D
R = 800.00'
T = 97.93'
L = 194.89'
Curve = CA7
PI 126+84.65
D
R = 10,000.00'
T = 106.36'
L = 212.71'
P T
.0
P C
.3
P T
.4
P C
.2
P T
.1
Curve =
CA8
PI 132+30.28
R = 850.
00'
T = 91.9 1'
L = 183.1 0'
P C
.0
D
P T
.1
Curve =
CA9
PI 134+96.12
R = 900.
00'
T = 110.
11'
L = 219.1 2'
L = 115.58'
Curve = CA10
PI 138+45.29
R = 1,000.00'
T = 57.85'
D
D
P T
.0
P C
.4
200'100'0
Scale in Feet
RIO MORA ENTRANCE ROAD (010AZ) - PLAN AND PROFILE
C3
5%
0%
-5%
5%
0%
-5%
127+00
128+00 129+00 130+00 131+00 132+00 133+00 134+00 135+00 136+00 137+00 138+00 139+00 140+00 141+00
6830 6830
S H
E E
T C
M A
T C
H L I N
E
S H
E E
T C
M A
T C
H L
IN
E
-1.5% LT
+1.5% RT
Pond
Existing
HCL Entrance Road (010AZ)
Riprap, Class 2
Culvert
Remove Existing see sheet D1 for details proposed 24" culvert Inlets, existing pond bottom to
20' wide opening ditch from axis of rotation
Profile grade and
C u lv e r t
R e m o v e E x is ti
E d S e c t i o n s L
T
P la c e
C
M P spacing noted on B4.
Pull Boxes not shown, install at sheets T17 and T18 for details.
Electrical and Spare conduit. See on limits of fill placement
Contractor to coordinate with CO shown by the dashed line here.
Place waste materials within the limits
See sheet B4 for waste quantities.
Fill the existing pond with waste generated fron the project.
+3.320
V P I
E L
,8
.0
+1.500%
80' VC
V P I
E L
,8
.7
-0.170%
130' VC
V P I
E L
,8
.1
120' VC
V P I
E L
,8
.7
-0.740% -1.670%
80' VC
V P I
E L
,8
.9
-0.910%
70' VC
V P I
E L
,8
.0
60' VC
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d P
N P N
M F T F
W R I
M O
.d g n
U
S E
R
NUMBER
SHEET
Superelevation Diagram
NM NM FTFW RIMO 10(1)
AHEAD
ONE LANE
ROAD
W20-4
R1-1
STOP
0+
Curve = CA12
PI 142+38.34
D
R = 2,000.00'
T = 76.76'
L = 153.45'
Curve = CA13
PI 146+08.83
D
R = 1,700.00'
T = 152.28'
L = 303.75'
Curve = CA14
PI 148+17.74
D
R = 775.00'
T = 55.85'
L = 111.51' Curve = CA15
PI 151+32.82
D
R = 900.00'
T = 163.18'
L = 322.85'
Curve = CA16
PI 153+64.19
D
R = 800.00'
T = 24.50'
L = 48.97'
T
.0
L
.8
P T
.1
P C
.5
P T
.0
P C
.5
P T
.3
P C
.8
P T
.4
P C
.6
4 P T
.4
P C
.6
P T
.6
POT 2
+00 .00
200'100'0
Scale in Feet
RIO MORA ENTRANCE ROAD (010AZ) - PLAN AND PROFILE
141+00 142+00 143+00 144+00 145+00 146+00 147+00 148+00 149+00 150+00 151+00 152+00 153+00 154+00 155+00
-5%
5%
0%
5%
0%
-5%
S H
E E
T C
M A
T C
H L I N
E
S H
E E T C
M A
T C
H L
IN
E
See Sheet C8 for 010BZ Profile.
+1.5% RT
-1.5% LT
-1.5% RT
+1.5% LT
R
R
Overhead Power Crossing
146+50 C4 and Salvage to Refuge
Remove Existing Sign
(010BZ)
HCL Entrance Road
(010AZ)
HCL Entrance Road and Reseeded.
Entire Area to be Restored
Staging Area.
axis of rotation
Profile grade and
E n tra n c e R o a d
B Z
Sta. 200+12.77 = 010BZ
Sta. 147+74.74 = 010AZ at spacing noted on B4.
Boxes not shown, Install and T18 for details. Pull conduit. See sheets T17
Electrical and Spare
Corral
Gates. See Section 619.
Connection for Automatic
Electrical Service
(Manual)
Metal Vehicle Gate limits.
with CO on waste disposal
Contractor to coordinate limits of fill placement.
details and sheet C8 for
B4 for waste quantity existing pond. See sheet waste after filling the to be filled with remaining
Existing depression limits
-7.730%
VPI 162+45
EL 6,753.25
-11.650%
110' VC
V P I
E L
,7
.9
130' VC
V P I
E L
,7
.2
-1.610%
-5.460%
135' VC
V P I
E L
,7
.8
-13.710%
60' VC
V P I
E L
,7
.1
-11.760%
30' VC
V P I
E L
,7
.7
30' VC
-15.280%
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d P
N P N
M F T F
W R I
M O
.d g n
U
S E
R
NUMBER
SHEET
Superelevation Diagram
NM NM FTFW RIMO 10(1)
E L
,8
.0
60' VC
VPI 156+30
EL 6,810.01-1.530%
-5.470%
50' VC
VPI 157+30
EL 6,804.54
-8.930%
100' VC
V P I
E L
,7
.4
40' VC
V P I
E L
,7
.5
-7.050%
40' VC
V P I
E L
,7
.9
-10.060%
80' VC
VPI 161+00
EL 6,767.48
-15.000% -13.240%
50' VC
VPI 161+55
EL 6,760.20 -7.730%
60' VC
SPEED
LIMIT
R2-1
SPEED
LIMIT
R2-1
155+00
Curve = CA18
PI 157+46.76
D
R = 300.00'
T = 55.76'
L = 110.25'
Curve = CA17
PI 156+15.38
D
R = 125.00'
T = 63.06'
L = 116.81'
Curve = CA19
PI 160+07.62
D
R = 800.00'
T = 80.19'
L = 159.85'
Curve = CA20
PI 161+68.17
D
R = 250.00'
T = 59.97'
L = 117.72'
Curve = CA21
PI 163+78.98
D
R = 225.00'
T = 99.09'
L = 186.68'
Curve = CA22
PI 167+78.92
D
R = 925.00'
T = 175.27'
L = 346.44'
155+00
PC 155+52.32
P T
.1
P C
.0
P T
.2
P C
.4
P T
.2
P C
.1
P T
.9
P C
.8
P T
.5
P C
.6
P T
.0
200'100'0
Scale in Feet
RIO MORA ENTRANCE ROAD (010AZ) - PLAN AND PROFILE
C5
155+00 156+00 157+00 158+00 159+00 160+00 161+00 162+00 163+00 164+00 165+00 166+00 167+00 168+00 169+00
-5%
5%
0%
5%
0%
-5%
SHEET C4
MATCH LINE 155+00
S H
E E
T C
M A
T C
H L I N
E
+1.5% LT
-1.5% RT
CA17
CA18
-15.280%
Guardrail System, Lt (See sheet T12-T13) of rotation
Profile grade and axis
(See sheet T14)
Guardrail Terminal Section, Lt
N o E n d S e c ti o n
E x is ti n g
C
M P
E n d S e c ti o n L
T
E x te n d E x is ti n g
C
M P
Remove Existing Sign
Riprap, Class 2
N 45°25'21" E for Wildlife)
Existing Sign (Watch
Remove and Reset
(010AZ)
HCL Entrance Road
Riprap, Class 2
Fence
Remove Existing
N 12°55'04" E for Details
Section See sheet T14
Guardrail Terminal for Details
See Sheet T12-T13
Guardrail System
Detail
See sheet T19 for
Delineator, Type 2.
Mount See sheet T12 for Details
Flexible Delineators Guardrail
See pullout details this sheet
Pullout Widening
-14.580%
P I
E L
,5
.1
-9.760%
45' VC
V P I
E L
,5
.5
30' VC
VPI 182+10
EL 6,556.82
-13.860%
50' VC
VPI 182+60
EL 6,551.65
30' VC
-10.330%
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d P
N P N
M F T F
W R I
M O
.d g n
U
S E
R
NUMBER
SHEET
Superelevation Diagram
NM NM FTFW RIMO 10(1)
VPI 174+55
EL 6,654.17
80' VC
V P I
E L
,6
.8
-7.760% -12.680%
70' VC
V P I
E L
,6
.5
-1 .0
50' VC
V P I
E L
,6
.5
70' VC
V P I
E L
,6
.0
-15.280%
-9.220%
80' VC
V P I
E L
,6
.7
-9.880%
30' VC
V P I
E L
,6
.3
0 -3.220%
110' VC
V P I
E L
,6
.0
-8.670%50' VC
VPI 173+45
EL 6,658.38
-3.820%
120' VC
10661
0 1
Curve = CA23
PI 171+09.56
D
R = 450.00'
T = 95.50'
L = 188.21'
Curve = CA24
PI 173+49.27
D
R = 500.00'
T = 35.95'
L = 71.77'
Curve = CA25
PI 175+51.51
D
R = 325.00'
T = 53.22'
L = 105.51'
Curve = CA26
PI 178+38.46
D
R = 325.00'
T = 15.51'
L = 31.00'
Curve = CA27
PI 179+49.45
D
R = 275.00'
T = 36.42'
L = 72.42'
Curve = CA28
PI 180+82.86
D
R = 400.00'
T = 47.86'
L = 95.27'
Curve = CA29
PI 181+87.90
D
R = 250.00'
T = 24.14'
L = 48.13'
C u r v e C
A
C u r v e C
A
P T
.0
P C
.0
P T
.2
P C
.3
P T
.1
P C
.2
P T
.8
P C
.9
P T
.9
P C
.0
P T
.4
P C
.0
P T
.2
P C
.7
P T
.8
P C
.2
P T
.7
P C
.9
PT 1
85+
71.8
200'100'0
Scale in Feet
RIO MORA ENTRANCE ROAD (010AZ) - PLAN AND PROFILE
C6
169+00 170+00 171+00 172+00 173+00 174+00 175+00 176+00 177+00 178+00 179+00 180+00 181+00 182+00 183+00
-5%
0%
5%
-5%
0%
5%
S H E E T C
M A T C
H L
IN
E
+1.5% LT
-1.5% RT
+4.0% RT
-4.0% LT
Overhead Power Crossing
182+98
Guardrail System, Lt (See sheet T12-T13)
E n d S e c ti o n L
T
E x is ti n g
C
M P
Section, Lt (See sheet T14)
Guardrail Terminal
E n d S e c ti o n L
T
P la c e
C
M P
R e m o v e E x is ti n g C u lv e r t
Buffer, See SCRs
Construction
Seasonal
174+70.34
Remove Existing Gate
Riprap, Class 2 HCL Entrance Road (010AZ)
619-A special details
Bison Gate see
Ditch to Drain
Field Grade for Curve Data
See Sheet C7
Riprap, Class 2 5 Strand
Fence, Barbed Wire, Fence
Remove Existing rotation
Profile grade and axis of for Details
Sheet T12-T13
System See
Guardrail
See Sheet T12 for Details
Guardrail mount
Flexible Delineators
T14 for Details
Section, See Sheet
Guardrail Terminal
See Sheet T19 for Detail
Delineator, Type 2
See Sheet T19 for Detail
Delineator, Type 2
See pullout details this sheet
Pullout Widening
See pullout details this sheet
Pullout Widening
See pullout details this sheet
Pullout Widening
I
E L
,5
.1
90' VC
V P I
E L
,5
.1
+0.630% +0.310%
100' VC
V P I
E L
,5
.2
100' VC
V P I
E L
,5
.1
+0.770% -0.280%
100' VC
V P I
E L
,5
.5
120' VC
V P I
E L
,5
.3
+0.440% -0.310%
90' VC
V P I
E L
,5
.8
+0.940%
100' VC
,5
.6
-7.880%
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d P
N P N
M F T F
W R I
M O
.d g n
U
S E
R
NUMBER
SHEET
Superelevation Diagram
NM NM FTFW RIMO 10(1)
VENT
6550 6550
AHEAD
ONE LANE
ROAD
W20-4
RESERVED
PARKING
VAN
ACCESSIBLE
R7-8
R7-8P
OUTLET
NO
W14-2
C u r v e C
A
Curve = CA31
PI 185+39.68
D
R = 75.00'
T = 37.74'
L = 69.94'
Curve = CA32
PI 187+39.94
D
R = 5,000.00'
T = 84.76'
L = 169.50'
Curve = CA33
PI 190+84.29
D
R = 5,000.00'
T = 181.45'
L = 362.74'
Curve = CA34
PI 193+70.49
D
R = 2,000.00'
T = 84.55'
L = 169.00'
Curve = CA35
PI 195+83.46
D
R = 500.00'
T = 60.36'
L = 120.14'
Curve = CA30
PI 185+45.83
D
R = 60.00'
T = 262.61'
L = 161.54'
PT 182+11.89
PC 182+83.22
PT
.7
PC
.9
P T
.8
P C
.1
P T
.6
P C
.8
P T
.5
P C
.9
P T
.9
P C
.1
P T
.2
P O
T
.6
200'100'0
Scale in Feet
RIO MORA ENTRANCE ROAD (010AZ) - PLAN AND PROFILE
C7
Match Existing
Main Entrance Road "A" (010AZ)
NM FTFW RIMO 10(1)
196+59.62
End Project
E = 327803.59
N = 1762098.26
Main Entrance Road "A" (010AZ)
NM FTFW RIMO 10(1)
196+59.62
End Project
183+00 184+00 185+00 186+00 187+00 188+00 189+00 190+00 191+00 192+00 193+00 194+00 195+00 196+00 197+00
-5%
5%
0%
5%
0%
-5%
+4.0% RT
-4.0% LT
+1.5% LT
-1.5% RT
Thaw House
Bunk House
Hay Barn
Maintenance
Educational Building
Environmental
Parking Area
Resurface Gravel
Parking Area
Resurface Gravel
Parking Area
Gravel
Resurface
Overhead Power Crossing
189+29
Overhead Power Crossing
189+14
Overhead Power Crossing
187+52
Overhead Power Crossing
186+93
Overhead Power Crossing
185+96
Overhead Power Crossing
185+25
Overhead Telephone Crossing
189+14
100')
(Appoximately
Resurfacing
End
Existing Gate
Resurfacing at
End
As Shown
Road Each Way
Resurface Access details
See sheet C10 for
Accessible Parking Area, Area Layout, Typical
Sheet C10 Parking
Parking Area. See
Resurface Gravel to be relocated by Refuge staff
Historical plow and wagon wheel
(010AZ)
HCL Entrance Road per Subsection 201.04.
Trim/prune branches
. Existing Tree
Preserve and Protect
Riprap, Class 2 axis of rotation
Profile grade and
,8
.7
V P I
E L
,8
.0
80' VC
V P I
E L
,8
.3
100' VC
V P I
E L
,8
.8
+2.020% +1.700%
100' VC
V P I
E L
,8
.5
+1.700% +0.250%
120' VC
+1.41%
+2.90%
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d P
N P N
M F T F
W R I
M O
.d g n
U
S E
R
NUMBER
SHEET
Superelevation Diagram
NM NM FTFW RIMO 10(1)
R
S
TO
P
+00
R
.0
T
.8
Curve = CB1
PI 205+68.50
D
R = 2,750.00'
T = 301.32'
L = 600.24'
PT 147+60.30
PC
7+ .8
PT
8+ .40
PC 1
+69 .64
P O
T
.0
P C
.1
P T
.4
C8
S H
E E
T C
M
A T
C H L I N
E
209+00208+00207+00206+00205+00204+00203+00202+00201+00200+00
-5%
5%
0%
-5%
5%
0%
RIO MORA ENTRANCE ROAD (010BZ) - PLAN AND PROFILE
+1.5% RT
-1.5% LT
200'100'0
Scale in Feet
+0.17% RT
-0.17% LT
A Z
E n tr a n c e R o a d
200+12.77 = 010BZ
147+74.74 = 010AZ
HCL Entrance Road (010BZ) axis of rotation
Profile grade and spacing noted on B4.
Pull boxes not shown, install at sheets T17 and T18 for details.
Electrical and Spare conduit. See
Contractor to coordinate with CO on waste disposal limits.
quantity details and sheet C4 for limits of fill placement.
waste after filling the existing pond. See sheet B4 for waste
Existing depression limits to be filled with remaining
P
M c p w w o r k in g c e n tr a l0 d P
L A N
M F T F
W R I
M O
.d g n
U
S E
R
NUMBER
SHEET
NM NM FTFW RIMO 10(1)
VENT
C10
100'50'0
Scale in Feet
Thaw House
Bunk House
Hay Barn
Maintenance
Building
Educational
Environmental
LAYOUT
PARKING AREA
Building
Administration
A1-1
A1-5
A1-4
A1-2
A1-3
A2-1
A2-2
A2-3
A2-4
A2-5
A2-6
300+00
301+00
A4-1
A4-2
A4-3
A4-4
A4-5
A3-1
A3-2
A3-3
A3-4
A3-5
A3-6
A3-7
A3-8
B1-1
B1-2
B1-3
B1-4
B2-1
B2-2
B2-3
B2-4
B2-5
B2-6
B2-7
B2-8 B2-9
B2-10
B2-11
B2-12
B2-13
B2-14
B2-15
B2-16 B2-17 B2-18
20'
.0
.9
20.1'
.5
11.7'
11.7'
20'
.5
20'
B2-19
Trees to Remain
Protect Existing Fence and
B2-20
B2-21
B2-22
A1-6
100'50'0
Scale in Feet
Slope in Any Direction
Pad, Not to Exceed 2% sheet T1 and T2 for details)
6" Plain Minor Concrete (see
Slope in Any Direction
Pad, Not to Exceed 2% sheet T1 and T2 for details)
6" Plain Minor Concrete (see
NOTE:
°0 '0 directed by the CO after resurfacing.
temporarily relocated, then reset with new rebar stakes as
Existing railroad tie "wheel stops" shall be protected, parking area shall be stripped of existing vegetation and weeds.
2. Prior to placement of new aggregate surface course, the areas.
1. 6" aggregate surface course shall be provided for the parking
P
M c p w w o r k in g c e n tr a l0 d P
N P
C N
M F T F
W R I
M O
.d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NM NM FTFW RIMO 10(1)
PT 136+05.14
-40
D1
-20 0
40'20'0
Scale in Feet
Remove Existing Culvert
A
A
32.33' LT
136+58.00
32.33' LT
136+54.00
32.33' LT
136+50.00
32.33' LT
136+46.00
Ditch opening
B
B
Identical Profile for Flanking Culverts
20 40-60 60
:3
:3
Elevation
Top of Berm
Elevation
Ditch Bottom
SECTION B-B
20' m a x
136+50
SECTION A-A
136+46
136+50
136+54
136+58
Existing pond bottom for Ditch Grading
Cut Slopes Detail
Inlet Treatment in
See Pipe Culvert
Elev. 6787.50
25.69' RT
136+40.00 Elev. 6791.00
60.01' RT
136+40.00
136+46 TO 136+58
CULVERTS- PLAN AND PROFILE
Slope = 0.43%
Length = 21 FT.
Existing 18" CMP
136+77
Proposed End Section
I.E. = 6786.50 ground
Existing pond bottom
Existing
Ditch opening bottom
I.E. = 6787.50
Slope = 1.8%
Length = 57 FT.
Proposed 24" CMP for underground power line
Proposed 2" PVC conduit waste fill area per section B-B shown below.
Maintain 20' wide channel thru
Elev. 6791.64
111.97' RT
136+40.00
P
M c p w w o r k in g c e n tr a l0 d P
N P
C N
M F T F
W R I
M O
.d g n
U
S E
R
NUMBER
SHEET
NM NM FTFW RIMO 10(1)
-40 0-20 0-20-40 0-20-40
CULVERTS - PLAN AND PROFILE
D2
6787 6726
Existing Ground
I.E. = 6724.99
I.E. = 6726.50
Slope = 5.41%
Length = 28 FT.
Existing 24" CMP
Existing Ground
I.E. = 6653.28
I.E. = 6654.87
I.E. = 6724.80
2:1 Slope
Regrade Inlet Ditch, 20 40
I.E. = 6785.50
I.E. = 6784.85
I.E. = 6784.65
2:1 Slope
Regrade Inlet Ditch, Existing Ground
Section
Proposed End
End Section
Proposed
20 40
20 40
A A
Detail for Ditch Grading
Treatment in Cut Slopes
See Pipe Culvert Inlet 40'20'0
Scale in Feet
B B
40'20'0
Scale in Feet
C C
Detail for Ditch Grading
Treatment in Cut Slopes
See Pipe Culvert Inlet
40'20'0
Scale in Feet
Skew = 2.85°
159+25
11.23' RT
159+24.56
15.38' LT
159+25.88
Slope = 3.21%
Length = 20 FT.
Existing 24" CMP
Slope = 3.21%
Length = 3 FT.
Proposed 24" CMP Extension
Existing
Regrade Outlet Ditch, Match
159+25
SECTION A-A
166+50
SECTION B-B
173+72
SECTION C-C
10.87' RT
173+71.21
14.67' LT
173+73.02
Skew = 18.65°
173+72
15.61' LT
166+58.17
Skew = 26.51°
166+50
12.45' RT
166+44.15
Slope = 6.21%
Length = 26 FT.
Existing 24" CMP
P
M c p w w o r k in g c e n tr a l0 d P
N P
C N
M F T F
W R I
M O
.d g n
U
S E
R
NUMBER
SHEET
NM NM FTFW RIMO 10(1)
-40 0-20
CULVERTS - PLAN AND PROFILE
D3
Existing Ground
I.E. = 6548.28
Slope = 1.02%
Length = 35 FT.
Existing 24" CMP
I.E. = 6548.24
Proposed End Section
Slope = 1.02%
Length = 37 FT.
Proposed 24" CMP
I.E. = 6548.66
I.E. = 6548.64
20 40
A A
40'20'0
Scale in Feet
18.35' LT
182+50.19
19.93' RT
182+63.11
Skew = 18.65°
182+56
182+56
SECTION A-A
Edge of pavement
Boulder (typ.)
Boulder (typ.)
0.5' to 2'
5' max. spacing 5' max. spacing between boulders
Proposed roadway for structural section details See typical section height boulder of3
Proposed roadway
NOTES:
(Without roadside ditch) (With roadside ditch)
A
A
7.7.
pavement Clear from pavement Clear from
BARRIER BOULDER PLACEMENT
Elevation
Plan
SECTION A-A SECTION A-A
randomly in clusters Place Boulders
251-A
10' min.
m in m in . with ground (typ.)
native material and blend Fill up to boulder with m in
5' min. 5' min.
BOULDER PLACEMENT DETAIL
placement detail, this sheet Boulder, see Boulder placement detail, this sheet Boulder, see Boulder
BOULDER PLACEMENT
details for structural section See typical section
25% to be approx. 4' x 4'
25% to be approx. 2' x 2'
50% to be approx. 3' x 3'
8.
7.
6.
5.
4.
3.
2.
1.
8.
8.
6.
7.
6.
detail, this sheet Boulder, see Boulder placement
Finished grade m in
G2
Vary adajcent boulders in size and dimension.
will be 5' min. or as determined by CO.
Distance from edge of pavement to face of boulders traffic use.
directions between the boulders to deter vehicular is complete, rip surfaces 10" in depth in opposite After embankment, excavation, and boulder placement the plans.
of the roadway, apply to either side as called out on The boulder placement plan, while shown on one side the terrain.
the characteristics of boulders indigenous to Boulders to be provided from local source. Match
Vary number of boulders as directed by CO.
Place boulders randomly within the maximum spacing.
Place boulders weathered side up.
Place as directed by the CO in coordination with the Refuge.
Boulder locations shown on the plans are approximate.
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d S p e c ia l-
A .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
SPECIAL
U.S. CUSTOMARY SPECIAL
U
S E
R
NUMBER
501-1
STANDARD APPROVED FOR USE --/----
REVISED: 9/2016
MINOR CONCRETE PAVEMENT
STATE PROJECT
NUMBER
SHEET
T1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NM FTFW RIMO 10(1)NM
U S
C c p w w o r k in g c e n tr a l0 d S td
.d g n
M
A u g u s t
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
NOTE:
1.
2.
3.
PLAN PLAN
PROFILE PROFILE
REINFORCED MINOR CONCRETE PAVEMENTPLAIN MINOR CONCRETE PAVEMENT
Traffic Traffic
Transverse contraction joint
PAVEMENT
THICKNESS
TRANSVERSE
JOINT SPACING
See Note 2See Note 2
Provide the same type of dowel assemblies and tie bars for joints in plain portland cement concrete pavement as shown for joints in reinforced pavement.
Lap longitudinal and transverse reinforcement not
Transverse joint
Longitudinal joint
Tie bar
Dowel bar Dowel bar
See Standard 501-2 for joint and joint sealing details.
less than 15 inches.
(in) (ft)
6 = T <12
T < 6
(typ.)
24" ty p typ.
2" clear ty p c le a r ty p c le a r typ.
2" clear welded wire reinforcement or No. 4 bars
Slab reinforcement 4" x 4" - W6 x W6 reinforcement or No. 4 bars
W6 x W6 welded wire
Slab reinforcement 4" x 4" -
#6
#5
#5
(inches) (inches)
10 < T = 12
8 < T = 10
T = 8
" typ.8 3" - 8
" typ.8 3" - 8
" typ.8 3" - 8
" typ.8 3" - 8
" typ.8 3" - 8
" typ.8 3" - 8
9"9"
9"9"
18"18"
" - 1" typ.2
9"9"
" - 1" typ.2
18"18"
Smooth dowel @ 12" c-c
Smooth dowel @ 12" c-c
Deformed tie bar @ 30" c-c
" (typ.)8 3" - 8
" (typ.)8 3" - 8
Do not place tie bars within 15" of transverse joints.
" - 1" typ.2
Deformed tie bar @ 30" c-c
Smooth dowel @ 12" c-c
07/2013
C501-50
REVISED: 08/2014
DETAIL APPROVED FOR USE
STATE PROJECT
NUMBER
SHEET
P
M c p w w o r k in g c e n tr a l0 d C .d g n
U
S E
R
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY DETAIL
DETAIL
NM FTFW RIMO 10(1)NM T2
T
T
T/2
T
T/2
T
T/2
T
T/2
T
NOTE:
T/3
T/3
Tie Bar Diameter
Dowel Bar
NO SCALE
T
Thickness (T)
Pavement
T
T/3
T/2
T/3
CONTRACTION JOINT
UNTIED - LONGITUDINAL
UNDOWELED - TRANSVERSE and
See Note 7 Joint Sealant
See Note 7 Joint Sealant
2 x joint width) (Diameter = Backer rod
2 x joint width)
(Diameter =
Backer rod Fixture or structure
Expansion cap
See Note 7 Joint Sealant joint material
Expansion
SAWED OR FORMED JOINT
JOINT SEALING DETAILS
CONSTRUCTION JOINT
CONSTRUCTION JOINT
PLAIN - TRANSVERSE or LONGITUDINAL
7.
6.
5.
4.
3.
2.
1.
is 2:1 or as recommended by sealant manufacturer.
silicone sealant is used, the width to depth shape factor
Maintain joint sealant shape factor of 1:1 except when construction with epoxy resin.
the tie bars and dowels into the existing concrete set into concrete during placement, drill and anchor
For construction joints, if tie bars and dowels are not approval.
planned construction joint locations to the CO for and longitudinal construction joints sparingly. Submit not included in the joint layout plan. Use transverse
Transverse and longitudinal construction joints are and length of the concrete surface.
Use expansion joint material extending the full depth
Install isolation joints when abutting a fixed structure.
Use deformed reinforcing bars for tie bars.
pavement.
and other steel used in the construction of concrete
Use epoxy-coated material for all tie bars, dowels, PAVEMENT JOINTS
MINOR CONCRETE
DOWELED - TRANSVERSE
CONTRACTION JOINT
TIED - LONGITUDINAL
CONTRACTION JOINT
DOWEL BUTT - TRANSVERSE
CONSTRUCTION JOINT
TIED BUTT - LONGITUDINAL
CONSTRUCTION JOINT
DOWELED - TRANSVERSE
ISOLATION JOINT
UNDOWELED - LONGITUDINAL
ISOLATION JOINT
ISOLATION JOINT
Pavement surface
2.
3.
4.
METAL ROUND PIPE CULVERT
METAL PIPE ARCH CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
STEEL ALUMINUM
EQUI-
VALENT
DIAMETER
MINIMUM
CORNER
RADIUS
MINIMUM
COVERSPAN x RISE
PIPE ARCH
SIZE
PIPE ARCH
SIZE
SPAN x RISE
EQUI-
VALENT
DIAMETER
MINIMUM
CORNER
RADIUS
MINIMUM
COVER
MINIMUM
COVERDIAMETER
PIPE
SIZE
PIPE
SIZE
DIAMETER
MINIMUM
COVER
ALUMINUMSTEEL
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
special analysis by the CO.
The fill heights in the table are for helical lockseam and welded seam pipe only.
Fill heights for culvert pipe with annular corrugations are more restrictive than those of helical lockseam and welded seam pipe.
Obtain approval before furnishing annular corrugation pipe.
Measure minimum cover from the top of the pipe culvert to the subgrade for flexible pavements, and to the top of the pavement for rigid pavements. Measure maximum fill height from the top of the pipe to the top of the pavement for both flexible and rigid pavement.
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d S td
.d g n
FEDERAL LANDS HIGHWAY OFFICE
REVISED:
STANDARD
U.S. CUSTOMARY STANDARD
U
S E
R
NUMBER
SHEET
NM NM FTFW RIMO 10(1)
602-1
STANDARD APPROVED FOR USE 12/1993
REVISED: 4/1994 6/2005
METAL PIPE CULVERT
Fill heights exceeding 100 feet require
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.060/160.075/140.105/120.135/10 0.164/8 0.060/160.075/140.105/120.135/10 0.164/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES
INCHES
INCHES
142 x 91
137 x 87
128 x 83
117 x 79
112 x 75
103 x 71
95 x 67
87 x 63
83 x 57
81 x 59
77 x 52
73 x 55
71 x 47
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
INCHES
3.5
INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
5" x 1" CORRUGATIONS
0.064/160.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8 0.079/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.109/120.138/10 0.168/8
INCHES INCHES INCHES
103 x 71
95 x 67
87 x 63
81 x 59
73 x 55
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
3.5
" CORRUGATIONS2
1" x 3
METAL THICKNESS (INCH/GAGE)
3" x 1" CORRUGATIONS
0.135/100.105/120.075/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.060/160.135/100.105/120.075/140.060/16
T3
2.
SMOOTH SLEEVE BAND FLAT BAND
SEMI-CORRUGATED BAND
HELICAL BANDANNULAR BANDSTANDARD BAND CONNECTIONS
SLEEVE JOINT
SIDE VIEW SIDE VIEW SIDE VIEW
END VIEW
END VIEWEND VIEW
Oval Lug
Band Angle
Bar & Strap
Integral Flange Wedge and Strap
Smoother sleeve with center stop.
Stab type joint
ROUND PIPE
DIAMETER
PIPE ARCH
SPAN × RISE
CORRUGATION
W
Band Band
Band Bolts
Pipe
Band
Bolts
Angle
Pipe
BandBand
Bolts
Pipe heel and toe of angle of corrugation at fillet weld at crest
Rivet, spot weld, or
Angle
Wedge
Watertight pipe joints are not required unless specified in the Special Contract Requirements.
Other types of coupling bands or fastening devices that comply with the joint performance criteria of AASHTO Standard specifications for
Highway Bridges, Division II Section 26 may be used.
of corrugation at heel and toe of angle
Rivet, spot weld, or fillet weld at crest strap connector
Bolt, bar and
[1] Fabricate annular, helical and semi-corrugated type coupling bands from the same metal as
[2] For helically corrugated pipe with rerolled ends, the nominal corrugations size refers to the dimension of the end corrugation in the pipe.
COUPLING BANDS FOR METAL PIPE CULVERT [1]
[3] Use annular corrugated bands with pipes having annular corrugations or with helical pipe the connecting pipe. Provide coupling bands not more than 3 nominal sheet thicknesses
ANNULAR
CORRUGATED
HELICALLY
CORRUGATED
BANDS [4]
SEMI-
CORRUGATEDSIZE [2]
BANDS [3] BANDS [5]
Band corrugation in pipe end with second annular around band meshes
Continuous corrugation
W
BoltsBand
WW
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d S td
.d g n
FEDERAL LANDS HIGHWAY OFFICE
U.S. CUSTOMARY STANDARD
U
S E
R
NUMBER
SHEET
NM NM FTFW RIMO 10(1)
602-2
MINIMUM BAND WIDTH (INCHES)
1 × 2
1 × 3
3 × 1
5 × 1 78 to 144
36 to 72
78 to 144
36 to 72
78 to 84
42 to 72
12 to 36
87 × 64 to 142 × 91
60 × 46 to 81 × 59
87 × 64 to 142 × 91
60 × 46 to 81 × 59
49 × 33 to 83 × 57
17 × 13 to 42 × 29
10.5
10.5
10.5
10.5
10.5
10.5
10.5
INCHESINCHESINCHES
rerolled with 3" × 1" pipe corrugations.
COUPLING BAND
METAL PIPE CULVERT
having rerolled end to form annular corrugations. A 10.5 inch band is acceptable on
" corrugations. A 12 inch band is acceptable on pipe ends 2 1" × 3
2pipe ends rerolled with 2 steel or 0.048 inch for aluminum. Fasten coupling bands with the following diameter of bolt:
thinner than the thickness of the pipe to be connected, and no thinner than 0.052 inch for or 0.036 inch for aluminum, or a plastic with an equivalent strength to metal.
Use a matching metal having a nominal thickness of not less than 0.040 inch for steel, Smooth sleeve-type couplers and flat bands may be used for pipe diameters of 12" or less.
"2 1" × 3
2The minimum band widths shown for 3" × 1" and 5" × 1" corrugated sizes apply to 2 corrugations on rerolled pipe ends.
diameter, required above 42" diameter
Second angle connection optional to 42" diameter, required above 42" diameter
Second angle connection optional to 42"
T4
NOTE:
[4] Use helical corrugated bands with pipes having helically corrugated ends.
[5]
[6] underdrain [6]
" for 18" round culvert (21" × 15" pipe arch) or less8
" for 21" round culvert (24" × 18" pipe arch) or more2
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
H equals the diameter of all round pipe culverts or the rise dimension of all pipe arch culverts.
See Section 704 for bedding and backfill requirements.
1.
2.
3.
Construct piping plug of impermeable backfill material at the pipe culvert inlet where granular material is used for backfill. Width may be adjusted to tie into impervious material.
MULTIPLE PIPE INSTALLATION
PIPING PLUG
BELOW NATURAL GROUND OR
TRENCH EXCAVATION IN EMBANKMENT
ON UNSTABLE MATERIAL
ABOVE AND BELOW
NATURAL GROUND
ON NATURAL GROUND
ABOVE NATURAL GROUND
ON UNYIELDING MATERIAL
PIPE BEDDING
ELEVATION
SECTION A-A
LEGEND:
Bedding material (uncompacted)
Impermeable backfill material.
BEDDING DEPTH
MINIMUM SPACING
SPACING
DIAMETER
or SPAN
PIPE SIZE (H) DEPTH
Roadway embankment Roadway embankment
Natural ground
Toe plate Toe plate
Natural ground Natural ground
Roadway embankment
Roadway excavation
Natural ground
H
Width
H H
H H
H H
H H
H
H
H
H
Finished subgrade Finished subgrade
Natural ground
Finished subgrade
Pipe culvert
Embankment slope
High water elevation treatment
Culvert end
Piping plug before trench excavation embankment height
Finished subgrade or
Original natural ground surface
A
A
Finished subgrade
Roadway embankment
Roadway embankment
Finished subgrade trench excavations
Embankment material placed in layers
Compacted backfill material placed in layers not backfill in accordance with Section 614.
depth table
See bedding excavation in trench
HH
compact in layers not over compressible material. Lightly and replace with selected fine
Remove unyielding material fill material properly compacted with approved granular foundation firm bearing soil and replace
Remove unstable material to
Bedding
Bedding
Bedding
Bedding
H
Half diameter or whichever is less
(see table)
Minimum spacing or Span
Diameter or Span
Diameter section
Metal endMetal end section
NUMBER
SHEET
NM NM FTFW RIMO 10(1)
602-3
STANDARD APPROVED FOR USE 12/1993
DRAFT: 10/2017
REVISED: 4/1994 6/2005
or 36" (max.) for embankment installations not exceeding 6" compacted depth.
exceeding 6" compacted depth; or lean concrete
> 54"
12" to 54"
6"
4"
18" (min.)
6" in uncompacted depth.
* Reduce to 18" for
UP to 48"
48" and UP
24" span or 36", PIPE CULVERT BEDDING
METAL AND PLASTIC
2'-0" ±
1'-0" ±
18" ±
18" ±18"±
(min.)
6"
(min.)
6"
12" (min.), 24" (max.)
"/foot of cover,2 minimum
1'-0"
T5NM FTFW RIMO 10(1)NM
STATE PROJECT
U
S C c p w w o r k in g c e n tr a l0 d S td
.d g n
J u ly
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
NOTE:
2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.)
2H or 12' (max.)2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.)
2.
3.
4.
5.
6.
7.
8.
ROUND OR PIPE ARCH CULVERT
PIPE ARCH CULVERTROUND PIPE CULVERT
DESIGN C
CONNECTION TO METAL PIPE
OR OUTLET END OF CONCRETE PIPE
SECTION A-APLAN
ELEVATION ELEVATION
Slope
Toe plateToe plate riveted or welded connection
For all sizes of round pipe and pipe arch
END SECTIONS FOR ROUND PIPE CULVERT
END SECTIONS FOR PIPE ARCH CULVERT
A (min) B (max) H (min) W (max)
SLOPE
Approx.
A (min) B (max) H (min) W (max)
SLOPE
Approx.
A
A
DESIGN B
CONNECTION TO CONCRETE
PIPE INLET END
DESIGN A
CONNECTION TO ANNULAR
CORRUGATED METAL PIPE
diameter
Span or
B
L
AWA
End Section
SpanR is e
Di am et er
Toe plate extension
(min. width A+W)
Toe plate extension
Corner plate
(min. width A+W)
Toe plate extension
Corner plate
Reinforced edge
Pipe coupling band shop bolted to
End section
Pipe culvert
Expander lug End section steel or aluminum pipe
Smooth galvanized
Bolted or welded
Threaded rod
Rod holder connector
Flat strap Pipe culvert Pipe culvert
End section End section
Strap bolt
Pivot bolt
H H reinforcement bolted or riveted under the center panel seam.
Supplement the reinforced edges of end sections for
Variations in design and dimensions are permitted to allow for manufacturer's standards.
Fabricate the diameter of the end section of Design B to match the inside diameter of the concrete pipe culvert.
Design C may be used in lieu of design A for all metal pipe culvert sizes. Coupling bands may be any acceptable type for the pipe culvert specified.
Fabricate multiple piece bodies with lap seams tightly joined attached with bolts or rivets.
Fabricate connector section, corner plate and toe plate extensions from the same metal thickness as the panel body.
Use toe plate extension where shown on the plans.
Warp embankment slopes to match the slope of the flared end sections.
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d S td
.d
FEDERAL LANDS HIGHWAY OFFICE
U.S. CUSTOMARY STANDARD
U
S E
R
NUMBER
SHEET
NM NM FTFW RIMO 10(1)
602-4
STANDARD APPROVED FOR USE 12/1993
DRAFT: 10/2007
REVISED: 4/1994 6/2005
METAL END SECTIONS
60" and larger diameter pipe and 66" and larger
" bolts8 3spacing for
35" × 24" thru 66" × 51" pipe arch
For 30" thru 60" round pipe and
17" × 13" thru 28" × 20" pipe arch
For 12" thru 24" round pipe and
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.079
0.079
0.064
0.064
0.064
0.064
0.064
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.075
0.075
0.060
0.060
0.060
0.060
0.060
112 × 75
103 × 71
95 × 67
87 × 63
83 × 57
81 × 59
77 × 52
73 × 55
71 × 47
66 × 51
64 × 43
60 × 46
57 × 38
49 × 33
42 × 29
35 × 24
28 × 20
24 × 18
21 × 15
17 × 13
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.079
0.079
0.064
0.064
0.064
0.064
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.075
0.075
0.060
0.060
0.060
0.060
INCHES
SPAN × RISE
PIPE SIZE METAL THICKNESS
STEEL ALUMINUM
INCHES GAGE INCHES GAGE
INCHES
DIMENSIONS
L (±2")(INCHES)
DIAM.
VALENT
EQUI-
INCHES
DIAMETER
PIPE SIZE
STEEL
METAL THICKNESS
INCHES GAGE
ALUMINUM
INCHES GAGE
INCHES
DIMENSIONS
L (±2") m in
12" (max.) hole lap after expansion
1" Minimum
13" for 30" dia. and over.
culvert less than 30" dia.
7" for concrete pipe
" bolts8 3spacing for m in
12" (max.) hole at 6" centers (max.) or equivalent
" angle4 1" × 2
1" × 22 1equivalent pipe arch provide 2
" bolts8 3flared end section with
" rivets or bolts. Fabricate end section center panels 8 3by
On end section center panels for 66" and larger from 0.138 inch steel or 0.135 inch aluminum.
for 60" and larger diameter pipe and equivalent pipe arch
" stiffener angles 4 1" × 2
1" × 22 1equivalent pipe arch with 2
T6
NOTE:
Pay Limit
Pipe Culvert edge
Reinforced dimension of all pipe arch culverts.
D equals the diameter of all round pipe or the rise 1.
TYPE II
TYPE I
SECTION B-B
SECTION A-A
N o r m a l d it c h l in e
S u b g r a d e s h o u ld e r
Pipe culvert
E n d o f p ip e
FLOW
Flat b ottom di tch a t culv ert in let
FLOW
Tape r at 1
0:1 r atio
Taper a t 10:1 ratio
FLOW
2D or
FLOW
Taper at 10
:1 rat io
2D or
N o r m a l d it c h l in e subgrade elevation
Maximum 2D or
S u b g r a d e s h o u ld e r…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .