This federal contract opportunity notice seeks bids for construction services. The Department of Transportation Federal Highway Administration solicitation number 6982AF20B000040 aims to improve the NM FTFW RIMO 10(1) Entrance Road and Parking Areas. Bidders should review the attached Invitation for Bid located in the Attachments/Links section, which provides additional details on the project scope, response requirements and dates, and terms of award. Construction will involve work on entrance roads and parking areas to upgrade facilities. The response deadline and anticipated award date are not specified in this notice.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hydraulic Report
Entrance Road and Parking Areas
Rio Mora National Wildlife Refuge
NM FTFW RIMO 10(1)
Federal Highway Administration
Central Federal Lands Highway Division
US Fish & Wildlife Service
Mora County, New Mexico
August 7, 2020
August 7, 2020 | i
Table of Contents
Executive Summary
1 Introduction
2 Drainage Basins
3 Drainage Design Assumptions
4 Culverts
4.1 Hydraulic Design Standards and Methods for Culverts
4.2 Culvert Analysis and Results
5 Ditches
5.1 Roadway Hydraulics
5.2 Hydraulic Design Standards and Methods
5.3 Hydraulic Analysis and Results
6 Outlet Protection
7 References
Tables
Table 1 Peak discharge calculations for a 25 year storm event using TR-55 method ……… ................…..4
Table 2 Culverts Design Criteria
Table 3 – Culverts Summary
Table 4 – Design Criteria for Ditches
Figures
Figure 1 – Project Location – Rio Mora National Wildlife Refuge in Mora County, NM
Figure 2 – Site Photos of the Culvert Channel Bottom (Outlet Left, Inlet Right)
Figure 3 – Table 3-4 of FHWA Urban Drainage Design Manual
Figure 4 – Site Photos of Channel Bottom for Ditches
This page is intentionally left blank.
August 7, 2020 | 1
Executive Summary
The proposed project is the rehabilitation of the existing Rio Mora National Wildlife Refuge (RIMO) main entrance road from New Mexico 161 (NM161), administration parking area, Thaw lodge parking area, bunkhouse parking area, environmental education parking area, and additional roads to these parking areas. It is located in Mora County, northwest of Interstate 25, in northern New
Mexico. All existing vehicular access roadway surfaces are gravel, native soil, or a combination of the two. The main entrance road length is approximately 1.58 miles and mostly two-way roadway with a graveled width of 18 to 22 feet. This Hydraulic Report provides a summary of the hydraulic and hydrologic analysis of the existing drainage impacting the project and the drainage conveyance design for proposed improvements.
During large storm events, the existing stock pond overflows around the existing embankment adjacent to the roadway and causes erosion and washout of the roadway and downstream channel.
Four (4) 24 inch diameter culverts have been proposed to convey the 25 year design storm flow for this locaton without overflowing the road. A 20’ wide opening ditch is proposed from the stock pond bottom through berm toward the proposed culvert inlets location.
The profile of the proposed road was designed to mimic the horizontal alignment and vertical profile of the existing road to reduce the need for new ditches and stormwater management and reduce the overall ground disturbance and project costs. Pavement base course materials and subgrade at the low-water crossings will be protected from erosion with concrete barrier installed below the concrete pavement to mitigate soil erosion and prevent loss of roadway base materials during runoff events which exceed the design capacity of the four (4) 24 inch diameter culverts.
Other existing culverts within the project limits will remain, be extended, or be replaced with new culverts. All Existing culverts were analyzed to determine their capacity before overtopping and where necessary, new culverts were added to the project. To mitigate potential scour, riprap will be installed at the existing and proposed culvert outlets.
Roadside ditches are provided to match the existing conveyance as applicable. The capacity of the ditches was determined by comparing maximum flows the ditches can convey to a downstream culvert for the 10-year event contributing from the drainage sub-basin created by the ditches and roadway cross slope and profile. The existing upland section of the entrance road has limited ditches on either side of the roadway to allow overland dispersion of stormwater runoff without creating concentrated flow conditions. Overland dispersion is a preferred stormwater disposal method and was requested to be perpetuated by Refuge staff. On the narrow canyon descent roadway section there is a ditch on the uphill side of the roadway with culvert crossings out letting on the on the downhill side similar to existing conditions. The proposed canyon descent roadway design enhances the existing uphill side ditch with rock armoring to prevent erosion and loss of the roadway shoulder materials. Riprap and/or check dams will be required to mitigate erosion and reduce velocities where determined necessary.
2 | August 7, 2020
This page is intentionally left blank
August 7, 2020 | 3
1 Introduction
The scope of work for this project is to perform engineering, surveying, hydraulic, and project management services towards delivery of a final set of plans, specifications and estimate for the Federal Highway Administration, Central Federal Lands Highway
Division (CFLHD) for proposed improvements to Rio Mora National Wildlife Refuge
Entrance Road and Visitor Center Parking Lots.
The existing two main roadways (10 AZ and 10 BZ) are varying width two-way gravel surface roadway with a width of 18 to 22 feet. 10AZ road is approximately 1.58 miles and
10BZ is approximately 0.3 miles in length which are located in Mora County, northwest of
Interstate 25, in northern New Mexico (Figure 1).
Rio Mora National Wildlife Refuge is currently closed to the public and only accessible by appointment. The proposed improvements to the access roads and parking areas are intended to improve car and bus accessibility for use by the public.
Figure 1 – Project Location – Rio Mora National Wildlife Refuge in Mora County, NM
The purpose of this Hydraulic Report is to provide a summary of the hydraulic analysis of the existing roadway and impoundment drainage, along with the proposed roadway and drainage improvements. Assessment of the existing drainage was performed to identify
Project Location
4 | August 7, 2020 conditions or performance problems and determine whether existing drainage structures and features would need to be replaced, rehabilitated, or modified (FLH, 2014). Design of the proposed drainage improvements includes replacing culverts, extending culverts, installing culvert outlet erosion protection, placing and armoring roadside ditches along the side of the roadway to convey runoff, and other safety-related features necessary to meet current design practice.
2 Drainage Basins
Five (5) drainage basins were identified along the length of the project requiring a hydraulic road crossing as identified in table 1. Appendix A exhibits the Basin delineations along with the drainage path. Following HEC-22 the time of concentration (Tc) was computed for the large sized basins. The NRCS TR-55
Method was used to determine the peak runoff hydrographs flowing to the Basins during the 2, 10, and 25, 100-year storm events. An NRCS Type II storm event is valid for this region of New Mexico. Storm depths were obtained from NOAA Atlas
14, Volume 1 for the 24-hour runoff depths (Appendix E).
Table 1: Peak discharge calculations for a 25 year storm event using TR-55 method
Basin ID Existing Culvert
Station
Area
(ac) q
(cfs)
Remarks
A 136+77 90.9 77.01 NRCS Method
B 159+25 8.1 7.94 NRCS Method
C 166+50 10.7 4.77 NRCS Method
D 173+72 32.0 10.69 NRCS Method
E 182+56 5.1 1.99 NRCS Method
3 Drainage Design Assumptions
The following assumptions were used to layout and design the proposed drainage system. These include:
1. The NRCS TR-55 Method was used to perform the calculations of peak discharge of the drainage Basins for the 2, 10, 25 and 100-year events which was used for analysis and design of the project culverts, based on the consistent ground cover and the basin sizes.
2. The 10-year design frequency is used for calculating flow rates for ditch.
3. All existing culverts that cross main roadway will remain or be extended, except the 18” culvert at 136+77 which would be removed and replaced with 4 of 24” culverts to be located at 136+46, 136+50, and 136+54, 136+58. Also the existing
24” culvert at 182+56 would be replaced in-kind. The capacity of the new and
August 7, 2020 | 5 existing culverts to remain were analyzed for capacity before overtopping the road.
4 Culverts
4.1 Hydraulic Design Standards and Methods for Culverts
Design Flood
According to Project Development and Design Manual (PDDM), culverts are to be designed based on the roadway classification. Since the roadway for this project is not a critical access road, it is classified as a low-standard road. Culverts for low-standard roads are designed to convey runoff from the 25-year flood without creating a headwater effect. Headwater elevation for existing culverts should not be greater than the edge of the paving improvements hinge point at the roadway low point (FLH, 2014).
Stability Design
The stability design flood standard refers to the ability of roadway culverts and embankments at culvert locations to be stable for the 25-year flood.
Design Criteria Summary
According to the PDDM, culverts are to be designed with the design criteria summarized in Table 1.
Table 2 – Culverts Design Criteria
Criteria Standard
Design Standards 25-year flood
Stability Design 25-year flood
Headwater
New: WSEL ≤ bottom of aggregate base layer Existing: WSEL ≤ shoulder hinge point.
HW/D ratio: 48” or smaller = 1.5 Larger than 48” = 1.2
Minimum Size Cross-road culvert = 24” Parallel culvert = 18”
Slope Stream Crossings: Match streambed Ditch Relief: Min. = 2%, Max. = 25% for metal pipes
4.2 Culvert Analysis and Results
For this project, four (4) new culverts are proposed at the low point of 10AZ road near the existing stock pond. Other existing culverts will be maintained or replaced with new culverts. Existing and new culverts were analyzed to determine their capacity before overtopping with HY8. Reports from HY8 are included in Appendix C. Manning’s
6 | August 7, 2020 roughness coefficients were assigned based on information gathered during the site inspection and Table 3-4 of FHWA Urban Drainage Design Manual to determine the appropriate coefficient. The channel bottoms were classified as a small open channel with bare soil and some vegetation. Manning’s ‘n’ values of 0.020 for channel and 0.024 for CMP were used for the design. Photos of the channel used as reference for determining the roughness coefficient are provided below in Figure 2, and a written description of the channel material is shown in Table 3-4 in Figure 3. The existing culverts capacity and characteristics are summarized in Table 3. Proposed culverts will require riprap at culvert outlets. See Section 6 of this report for outlet protection at the culverts.
Figure 2 – Site Photos of the Open Channel Bottom (Outlet Left, Inlet Right)
Figure 3 – Table 3-4 of FHWA Urban Drainage Design Manual
August 7, 2020 | 7
On the east side of the roadway at station 136+50 there is a stock pond for livestock and wildlife in the Rio Mora National Wildlife. During large storm events the pond overflows the impoundment berm and causes erosion and washout of the roadway and downstream channel.
The drainage basin contributing to the existing stock pond is approximately 91 acres in size, and the maximum pond storage capacity is approximately 62,000 cubic feet. During small events runoff enters the pond and infiltrates or evaporates.
Four (4) 24 inch diameter culverts have been included at the roadway to convey the 25 year design storm flow without overflowing the road. A 20’ wide opening ditch is proposed from the stock pond bottom through berm toward the proposed culvert inlets location. Drainage basin runoff calculations are provided in Appendix B. HY-8 culvert capacity analysis reports are included in Appendix C.
8 | August 7, 2020
Table 3 – Culverts Summary
Station Design
Flow
(Basin
Discharge) cfs
Pipe
Material
Existing Condition Proposed Condition
Pipe
Dia.
HW Slope Length No of
Barrels
Flow
Capacity at
HW/D = 1.5
Roadway
Discharge
Control Pipe
Dia.
HW Slope Length No of
Barrels
Flow Capacity at HW/D = 1.5
Roadway
Discharge
Control
(ft) (ft) (%) (ft.) (Each) (cfs) (cfs) Inlet/
Outlet
(ft) (ft) (%) (ft.) (Each) (cfs) (cfs) Inlet/
Outlet
136+77 77.01 CMP 1.50 2.25 0.44 20.68 1 8.73 68.32 Inlet
136+50 77.01 CMP 2.00 3.00 2.20 57.0 4 84.86 0.00 Inlet
159+25 7.94 CMP 2.00 3.00 3.21 20.29 1 16.21 0.00 Inlet 2.00 3.00 3.21 23.00 1 16.23 0.00 Inlet
166+50 4.77 CMP 2.00 3.00 5.41 27.93 1 11.69 0.00 Inlet 2.00 3.00 5.41 28.05 1 11.73 0.00 Inlet
173+72 10.69 CMP 2.00 3.00 6.21 25.66 1 15.97 0.00 Inlet 2.00 3.00 6.21 26.05 1 15.96 0.00 Inlet
182+56 1.99 CMP 2.00 3.00 1.02 35.27 1 19.14 0.00 Outlet 2.00 3.00 1.14 37.00 1 19.15 0.00 Outlet
August 7, 2020 | 9
5 Ditches
Roadsides within the upland portion of the access road will not have ditches and continue to allow overland dispersion of runoff from the roadway. The portion of the access road descending into the canyon will utilize existing ditch along the uphill side of the road to convey roadway runoff and contributing overland runoff from uphill slopes to cross culverts as at existing culvert locations. No new ditch will be graded as part of the roadway construction. However near the canyon descend landing, new ditch will be graded from 182+81 to 186+00 to convey roadway runoff and contributing overland runoff to the nearby culver location.
5.1 Roadway Hydraulics
The proposed ditches will generally match the existing ditch size, location and grade due to existing conditions and topography constraints. Areas of sedimentation and existing check dams were observed onsite within the ditch system. Existing ditches along the canyon descent section will be enhanced with riprap lining and culvert inlets will be re-graded to improve hydraulics.
5.2 Hydraulic Design Standards and Methods
Stability Design
According to PDDM, roadside ditches are to be designed for stability based on the 10-year design event for both High and Low-Standard roadways. Temporary linings will be needed to protect ditches from erosion. The ditches along the canyon descent section are proposing to be lined with riprap.
Design Criteria Summary
The design depth of new ditches is to be limited to a depth of 1-foot from the top of road surfacing to limit cut/excavation of the existing rock cut along the canyon descent section which will nearly match the existing ditch along this section of roadway. Depth of the ditch is defined as the allowable depth of flow relative to the ditch invert. Considering limited area with the presence of the rock cut, it was determined to use 1:2 slopes on both sides of the ditch. The design criteria for ditch is summarized in Table 4.
Table 4 – Design Criteria for Ditches
Criteria Standard
Capacity Design 10-year event
Stability Design 10-year event
10 | August 7, 2020
5.3 Hydraulic Analysis and Results
Since all basins for ditch design are smaller than 200 acres, time of concentration and
Rational Peak Flow Method described in FHWA Urban Drainage Design Manual was used to analyze ditch capacity. The roadside ditch capacities were analyzed for a 10 year event flow contributed from corresponding basins (Appendix B). Considering a ditch side slope 2:1 for the design event, the ditch flow appears to be supercritical in nature.
The depth of flow (super critical) varies in the range of 0.3’ to 0.5’ where the subcritical flow depth of the respective ditches varies in the range of 0.75’ to 1.35’. The analysis results are summarized in Appendix D.
Manning’s roughness coefficients were assigned based on examination of site photos and aerial image and using Tables 3-2 and 3-4 of FHWA Urban Drainage Design
Manual. Figure 4 shows existing conditions of the channel for ditch. The channel bottom for ditch is classified as a bare soil with some vegetation. Manning’s ‘n’ value for open channel flow is 0.023.
Figure 4 – Site Photos of Channel Bottom for Ditches
Intensity-duration-frequency curves based on precipitation frequency depths from NOAA
Atlas were used for value of rain intensity and are shown in Appendix E.
6 Outlet Protection
The culverts were analyzed for outlet protection for the design event. At the stock pond location the approximated 25-year exit flow rate of was assumed as 19.3 cfs through each of the 4 culvert barrels. Equation 10.4 from HEC-14 was used to calculate the resulting D50 for the riprap aprons. The calculated D50 sizes varied from 0.24 to 6.12 inch. Due to the project size and small quantity a single riprap size of Class 2 was selected for the project. Class 2 has an approximate D50 size of 6 inches. The gradation will provide adequate scour protection of the culverts installed on the project. HEC-14 calculations are provided in Appendix C.
August 7, 2020 | 11
7 References
EPA. (2013, October 30). Water: Rivers & Streams . Retrieved from United States
Environmental Protection Agency:
https://archive.epa.gov/water/archive/web/html/streams.html
FLH. (2014, 12 29). Project Development and Design Manual (PDDM). Retrieved from USDOT, Federal Highway Administration: https://flh.fhwa.dot.gov/resources/design/pddm/
12 | August 7, 2020
Appendix A.
Drainage Basins
August 7, 2020 | 13
Appendix B.
TR-55 Analyses
Note: Estimates the direct runoff using the NRCS Curve Number Method (HEC-22, Manual)
Project: Rio Mora NWR Project No: NM FTFW RIMO10(1)
Location: New Mexico Designer: Utpal Datta
HDR Engineering, Inc.
Return Frequency 24-Hour Precip
Depth (in) 100 4.52 50 4.01 25 3.53 10 2.92 5 2.49 2 1.96
From NOAA ATLAS 2, Volume 1
Project Sub-Basin Name A
Curve Number Area (ft2) CN x Area Grassland or Range 81 3,970,993 321,650,433
Total 3,970,993 321,650,433 Total Area (ac) 91.161 Weighted CN 81.00
SR 2.35
Basin Area 0.142439774 mi2
DIRECT RUNOFF BY THE NRCS PEAK FLOW METHOD
Pre-Development Post-Developed
Ia = 0.2SR : 0.469
Pre-Developed Post-Developed P Ia/P
(Calculated) Ia/P
(Selected)
100 Year 2.57 4.52 0.10 0.1
50 Year 2.13 4.01 0.12 25 Year 1.73 3.53 0.13 0.1 10 Year 1.25 2.92 0.16 0.1 5 Year 0.94 2.49 0.19 2 Year 0.58 1.96 0.24 0.3
PEAK OUTFLOW BY THE TABULAR HYDROGRAPH METHOD
Direct Runoff, QD (in)
Project Sub-Basin Name A
Basin Area: 0.142439774 mi2
ActualTravel Time: 0.38 QD QD QD QD QD QD QD
Selected Travel Time: 0.40 0.00 0.00 0.00 0.58 1.25 1.73 2.57
Time Unit Discharge
(csm/in) 2-Year Flow (cfs) 10-Year Flow
(cfs) 100-Year Flow
(cfs) 2-Year Flow
(cfs) 10-Year
Flow (cfs) 25-Year
Flow (cfs) 100-Year Flow (cfs)
9 18.00 1.485 3.211 4.443 6.577
9.3 25.00 2.063 4.459 6.171 9.135
9.6 34.00 2.806 6.065 8.392 12.424
9.9 46.00 3.796 8.205 11.354 16.809
10 53.00 4.374 9.454 13.082 19.367
10.1 66.00 5.446 11.773 16.291 24.117
10.2 96.00 7.922 17.124 23.696 35.079
10.3 157.00 12.956 28.005 38.752 57.369
10.4 255.00 21.043 45.486 62.942 93.180
10.5 312.00 25.747 55.654 77.011 114.008
10.6 300.00 24.756 53.513 74.049 109.623
10.7 251.00 20.713 44.773 61.955 91.718
10.8 199.00 16.422 35.497 49.119 72.717
11 126.00 10.398 22.476 31.101 46.042
11.2 90.00 7.427 16.054 22.215 32.887
11.4 73.00 6.024 13.022 18.019 26.675
11.6 64.00 5.281 11.416 15.797 23.386
Pre-Developed Post-Developed
11.8 59.00 4.869 10.524 14.563 21.559 12 56.00 4.621 9.989 13.823 20.463
12.3 52.00 4.291 9.276 12.835 19.001
12.6 48.00 3.961 8.562 11.848 17.540
13 44.00 3.631 7.849 10.861 16.078
13.5 40.00 3.301 7.135 9.873 14.616
14 36.00 2.971 6.422 8.886 13.155
14.5 32.00 2.641 5.708 7.899 11.693
15 30.00 2.476 5.351 7.405 10.962
15.5 29.00 2.393 5.173 7.158 10.597
16 28.00 2.311 4.995 6.911 10.232 17 26.00 2.146 4.638 6.418 9.501 18 25.00 2.063 4.459 6.171 9.135 20 21.00 1.733 3.746 5.183 7.674 24 14.00 1.155 2.497 3.456 5.116
Note: Curve Number was determined from Natural Resources Conservation Service, U.S. Department of Agriculture, Technical Release, TR-55, Urban Hydrology for Small Watersheds. Second edition 1986.
9 10 11 12 13 14 15
Fl ow
(c fs
Time (hours)
Hydrographs
Post-Dev 2-year
Post-Dev 10-Year
Post-Dev 100-Year
Post-Dev 25 Year
Note: Estimates the time of concentration using equations from HEC-22
Project Sub-Basin: BASIN A
Time of Concentration
Sheet Flow Tc Eq 3.3
For this Basin:
n = 0.15 L = 80 ft I = 4.13 inches/hr s = 0.013 ft/ft
Tt = 8.65 Min
Shallow Concentrated Tc
Eq 3.4
Tc = L/(60V) Eq 3.6
Ku 3.28 k 0.213 s = 0.85 % V = 0.64 ft/s L= 300.00
Tc = 7.76 min
Open Channel (Channel and/or Pipe) Tc
V = (1.486R2/3 s1/2)/n Eq 3.5
Tc = L/(60V) Eq 3.6
V = average velocity, ft/s R = hydraulic radisus = A/WP, ft
A = flow area = [Bd]+[d2/2(Z1+Z2)], ft
WP = wetted perimeter of channel = bd +[d/sin(tan-1(1/Z1))+d/sin(tan-1(1/Z2))], ft B = bottom width of gutter or ditch, ft d = depth of flow in channel, ft - 10-year depth
Z1 = inverse of cross slope one of channel Z2 = inverse of cross slope two of channel s = land slope, ft/ft n = Manning's roughness coefficient
Tc = time of concentration, min L = flow length, ft D= Pipe Diameter, ft
For this Basin: Open Channel L = 2000 ft
Z1 = 35 Z2 = 35 B = 0 ft n = 0.035 s = 0.03 ft/ft d* = 0.6420 ft
A = 14.43 ft2
WP = 23.23 ft R = 0.621 ft Open Channel V = 5.34 ft/s Q (assumed) = 77.01 cfs
Open Channel Tc = 6.24 min Q (actual) = 77.09 cfs
*Iterate this depth until Q(assumed) = Q(actual)
Sheet Flow Tc + Shallow Concentrated Tc + Open Channel Tc = 22.65 min
Return Frequency 24-Hour Precip Depth
(in) 100 4.52 50 4.01 25 3.53 10 2.92 5 2.49 2 1.96
Project Sub-Basin Name B
Grassland or Range 81 353,800 28,657,800
Total 353,800 28,657,800 Total Area (ac) 8.122 Weighted CN 81.00
SR 2.35
Basin Area 0.012690829 mi2
Ia = 0.2SR : 0.469
Ia/P
(Calculated) Ia/P
(Selected)
100 Year 2.57 4.52 0.10 0.1
50 Year 2.13 4.01 0.12 25 Year 1.73 3.53 0.13 0.1 10 Year 1.25 2.92 0.16 0.1 5 Year 0.94 2.49 0.19 2 Year 0.58 1.96 0.24 0.3
Project Sub-Basin Name B
Basin Area: 0.012690829 mi2
ActualTravel Time: 0.25 QD QD QD QD QD QD QD
Selected Travel Time: 0.20 0.00 0.00 0.00 0.58 1.25 1.73 2.57
Time Unit Discharge
(csm/in) 2-Year Flow
(cfs) 10-Year Flow
(cfs) 100-Year Flow
(cfs) 2-Year Flow
(cfs) 10-Year
Flow (cfs) 25-Year
Flow (cfs) 100-Year Flow (cfs)
9 23.00 0.169 0.366 0.506 0.749
9.3 30.00 0.221 0.477 0.660 0.977
9.6 41.00 0.301 0.652 0.902 1.335
9.9 60.00 0.441 0.954 1.320 1.953
10 82.00 0.603 1.303 1.803 2.670
10.1 129.00 0.948 2.050 2.837 4.200
10.2 227.00 1.669 3.608 4.992 7.390
10.3 361.00 2.654 5.737 7.939 11.753
10.4 360.00 2.647 5.721 7.917 11.720
10.5 269.00 1.978 4.275 5.916 8.758
10.6 194.00 1.426 3.083 4.266 6.316
10.7 147.00 1.081 2.336 3.233 4.786
10.8 118.00 0.868 1.875 2.595 3.842
11 85.00 0.625 1.351 1.869 2.767
11.2 71.00 0.522 1.128 1.561 2.312
11.4 63.00 0.463 1.001 1.385 2.051
11.6 58.00 0.426 0.922 1.276 1.888
11.8 55.00 0.404 0.874 1.210 1.791
12 53.00 0.390 0.842 1.166 1.726
12.3 49.00 0.360 0.779 1.078 1.595
12.6 46.00 0.338 0.731 1.012 1.498
13 43.00 0.316 0.683 0.946 1.400
13.5 39.00 0.287 0.620 0.858 1.270
14 35.00 0.257 0.556 0.770 1.139
14.5 31.00 0.228 0.493 0.682 1.009
15 29.00 0.213 0.461 0.638 0.944
15.5 29.00 0.213 0.461 0.638 0.944
16 28.00 0.206 0.445 0.616 0.912 17 26.00 0.191 0.413 0.572 0.846 18 24.00 0.176 0.381 0.528 0.781 20 21.00 0.154 0.334 0.462 0.684 24 14.00 0.103 0.222 0.308 0.456
Note: Curve Number was determined from Natural Resources Conservation Service, U.S. Department of Agriculture, Technical Release, TR-55, Urban Hydrology for Small Watersheds. Second edition 1986.
9 10 11 12 13 14 15
Fl ow
(c fs
Time (hours)
Hydrographs
Post-Dev 2-year
Post-Dev 10-Year
Project Sub-Basin: BASIN B
L = 80 ft I = 4.78 inches/hr s = 0.022 ft/ft
Tt = 6.96 Min
Ku 3.28 k 0.213 s = 2.2 % V = 1.04 ft/s L= 300.00
Tc = 4.83 min
Open Channel (Channel and/or Pipe) Tc
V = (1.486R2/3 s1/2)/n Eq 3.5
Tc = L/(60V) Eq 3.6
V = average velocity, ft/s R = hydraulic radisus = A/WP, ft
A = flow area = [Bd]+[d2/2(Z1+Z2)], ft
WP = wetted perimeter of channel = bd +[d/sin(tan-1(1/Z1))+d/sin(tan-1(1/Z2))], ft B = bottom width of gutter or ditch, ft d = depth of flow in channel, ft - 10-year depth
Z1 = inverse of cross slope one of channel
L = flow length, ft D= Pipe Diameter, ft
For this Basin: Open Channel segment 1 L = 355 ft
Z1 = 10 Z2 = 10 B = 0 ft n = 0.032 s = 0.06 ft/ft d* = 0.1000 ft
A = 0.10 ft2
WP = 1.11 ft R = 0.090 ft V = 2.27 ft/s
Open Channel Tc = 2.60 min
For this Basin: Open Channel segment 2 L = 675 ft
Z1 = 2 Open Chan Z2 = 2 Q (assumed) = 7.94 cfs B = 0 ft Q (actual) = 7.93 cfs n = 0.023 *Iterate this depth until Q(assumed) = Q(actual) s = 0.082 ft/ft d* = 0.5600 ft
A = 0.63 ft2
WP = 1.11 ft R = 0.567 ft V = 12.65 ft/s
Open Channel Tc = 0.89 min
Tc= 3.4931
Sheet Flow Tc + Shallow Concentrated Tc + Open Channel Tc = 15.28 min
24-Hour Precip Depth
(in) 100 4.52 50 4.01 25 3.53 10 2.92 5 2.49 2 1.96
Project Sub-Basin Name C
Range/Grassland 81 155,269 12,576,789 Mountain brush mixture 63 311,657 19,634,391
Total 466,926 32,211,180 Total Area (ac) 10.719 Weighted CN 68.99
SR 4.50
Basin Area 0.016748666 mi2
Ia = 0.2SR : 0.899
Ia/P
(Calculated)
Ia/P (Selected)
100 Year 1.62 4.52 0.20 0.1
50 Year 1.27 4.01 0.22 25 Year 0.97 3.53 0.25 0.3 10 Year 0.63 2.92 0.31 0.1 5 Year 0.42 2.49 0.36 2 Year 0.20 1.96 0.46 0.3
Note: Estimates the peak flow using the NRCS Tabular Hydrograph Method (HEC-22, Manual)
Project Sub-Basin Name C
Basin Area: 0.016748666 mi2
ActualTravel Time: 0.64 QD QD QD QD QD QD QD
Selected Travel Time: 0.50 0.00 0.00 0.00 0.20 0.63 0.97 1.62
Time Unit Discharge
(csm/in) 2-Year Flow (cfs) 10-Year Flow
(cfs) 100-Year Flow
(cfs) 2-Year Flow
(cfs) 10-Year
Flow (cfs) 25-Year
Flow (cfs) 100-Year Flow (cfs)
9 18.00 0.061 0.189 0.293 0.487
9.3 24.00 0.081 0.252 0.390 0.649
9.6 32.00 0.109 0.336 0.521 0.866
9.9 44.00 0.149 0.462 0.716 1.190
10 50.00 0.170 0.525 0.813 1.353
10.1 61.00 0.207 0.640 0.992 1.650
10.2 84.00 0.285 0.882 1.366 2.273
10.3 133.00 0.451 1.396 2.163 3.598
10.4 214.00 0.726 2.246 3.481 5.789
10.5 280.00 0.950 2.939 4.555 7.575
10.6 293.00 0.994 3.075 4.766 7.927
10.7 265.00 0.899 2.781 4.311 7.169
10.8 221.00 0.750 2.320 3.595 5.979
11 144.00 0.488 1.511 2.342 3.896
11.2 99.00 0.336 1.039 1.610 2.678
11.4 77.00 0.261 0.808 1.253 2.083
11.6 66.00 0.224 0.693 1.074 1.786
11.8 60.00 0.204 0.630 0.976 1.623
12 56.00 0.190 0.588 0.911 1.515
12.3 52.00 0.176 0.546 0.846 1.407
12.6 49.00 0.166 0.514 0.797 1.326
13 45.00 0.153 0.472 0.732 1.217
13.5 41.00 0.139 0.430 0.667 1.109
14 37.00 0.126 0.388 0.602 1.001
14.5 32.00 0.109 0.336 0.521 0.866
15 30.00 0.102 0.315 0.488 0.812
15.5 29.00 0.098 0.304 0.472 0.785
16 28.00 0.095 0.294 0.455 0.758 17 27.00 0.092 0.283 0.439 0.730 18 25.00 0.085 0.262 0.407 0.676 20 21.00 0.071 0.220 0.342 0.568 24 14.00 0.047 0.147 0.228 0.379
9 10 11 12 13 14 15
Fl ow
(c fs
Time (hours)
Hydrographs
Post-Dev 2-year
Post-Dev 10-Year
Project Sub-Basin: BASIN C n = 0.4 L = 80 ft I = 2.93 inches/hr s = 0.012 ft/ft
Tt = 18.30 Min
Ku 3.28 k 0.152 s = 1.4 % V = 0.59 ft/s L= 300.00
Tc = 8.48 min
Open Channel (Channel and/or Pipe) Tc
V = (1.486R2/3 s1/2)/n Eq 3.5
Tc = L/(60V) Eq 3.6
V = average velocity, ft/s R = hydraulic radisus = A/WP, ft
A = flow area = [Bd]+[d2/2(Z1+Z2)], ft
WP = wetted perimeter of channel = bd +[d/sin(tan-1(1/Z1))+d/sin(tan-1(1/Z2))], ft B = bottom width of gutter or ditch, ft d = depth of flow in channel, ft - 10-year depth
Z1 = inverse of cross slope one of channel
L = flow length, ft D= Pipe Diameter, ft
For this Basin: Open Channel Segment 1 L = 1220 ft
Z1 = 30 Z2 = 30 B = 0 ft n = 0.035 s = 0.05 ft/ft d* = 0.1000 ft
A = 0.30 ft2
WP = 3.11 ft R = 0.096 ft V = 1.98 ft/s
Open Channel Tc1 = 10.27 min
Open Channel Segment 2
L = 165 Z1 = 10 Z2 = 10 B = 0 n = 0.035 s = 0.18 d* = 0.3500 A = 1.23
WP = 3.11
R = 0.393 V = 9.64
Open Channel Tc2 = 0.29
Open Channel Segment 3 L = 465
Z1 = 2 Z2 = 2 B = 0 n = 0.023 s = 0.12 d* = 0.5590 A = 0.62
WP = 3.11
R = 0.201 V = 7.63
Open Channel Tc3 = 1.02
Open Chan Tc= 11.57 min Q (assumed) = 4.77 cfs
Q (actual) = 4.77 cfs
Sheet Flow Tc + Shallow Concentrated Tc + Open Channel Tc = 38.35 min
24-Hour Precip Depth
(in) 100 4.52 50 4.01 25 3.53 10 2.92 5 2.49 2 1.96
Project Sub-Basin Name D
Range/Grassland 81 283,000 22,923,000 Mountain brush mixture 63 1,109,554 69,901,902
Total 1,392,554 92,824,902 Total Area (ac) 31.969 Weighted CN 66.66
SR 5.00
Basin Area 0.049951001 mi2
Ia = 0.2SR : 1.000
Ia/P
(Calculated) Ia/P
(Selected)
100 Year 1.45 4.52 0.22 0.1
50 Year 1.13 4.01 0.25 25 Year 0.85 3.53 0.28 0.3 10 Year 0.53 2.92 0.34 0.1 5 Year 0.34 2.49 0.40 2 Year 0.15 1.96 0.51 0.3
Note: Estimates the peak flow using the NRCS Tabular Hydrograph Method (HEC-22, Manual)
Project Sub-Basin Name D
Basin Area: 0.049951001 mi2
ActualTravel Time: 0.68 QD QD QD QD QD QD QD
Selected Travel Time: 0.75 0.00 0.00 0.00 0.15 0.53 0.85 1.45
Time Unit Discharge
(csm/in) 2-Year Flow (cfs) 10-Year Flow
(cfs) 100-Year Flow
(cfs) 2-Year Flow
(cfs) 10-Year
Flow (cfs) 25-Year
Flow (cfs) 100-Year Flow (cfs)
9 14.00 0.108 0.372 0.594 1.017
9.3 19.00 0.147 0.505 0.806 1.380
9.6 25.00 0.193 0.665 1.061 1.815
9.9 34.00 0.262 0.904 1.443 2.469
10 38.00 0.293 1.011 1.613 2.759
10.1 43.00 0.332 1.143 1.825 3.122
10.2 49.00 0.378 1.303 2.080 3.558
10.3 62.00 0.478 1.649 2.631 4.502
10.4 88.00 0.679 2.340 3.735 6.390
10.5 134.00 1.034 3.563 5.687 9.730
10.6 190.00 1.466 5.053 8.063 13.796
10.7 234.00 1.805 6.223 9.931 16.991
10.8 252.00 1.944 6.701 10.695 18.298
11 221.00 1.705 5.877 9.379 16.047
11.2 162.00 1.250 4.308 6.875 11.763
11.4 115.00 0.887 3.058 4.881 8.351
11.6 87.00 0.671 2.314 3.692 6.317
11.8 71.00 0.548 1.888 3.013 5.156
12 63.00 0.486 1.675 2.674 4.575
12.3 56.00 0.432 1.489 2.377 4.066
12.6 52.00 0.401 1.383 2.207 3.776
13 47.00 0.363 1.250 1.995 3.413
13.5 43.00 0.332 1.143 1.825 3.122
14 39.00 0.301 1.037 1.655 2.832
14.5 35.00 0.270 0.931 1.485 2.541
15 31.00 0.239 0.824 1.316 2.251
15.5 29.00 0.224 0.771 1.231 2.106
16 29.00 0.224 0.771 1.231 2.106 17 27.00 0.208 0.718 1.146 1.961 18 25.00 0.193 0.665 1.061 1.815 20 22.00 0.170 0.585 0.934 1.597 24 15.00 0.116 0.399 0.637 1.089
Note: Curve Number was determined from Natural Resources Conservation Service, U.S. Department of Agriculture, Technical Release, TR-55, Urban Hydrology for Small Watersheds. Second edition 1986.
9 10 11 12 13 14 15
Fl ow
(c fs
Time (hours)
Hydrographs
Post-Dev 2-year
Post-Dev 10-Year
Project Sub-Basin: BASIN D
Time of Concentration n = 0.4 L = 80 ft I = 2.75 inches/hr s = 0.01 ft/ft
Tt = 19.83 Min
Ku 3.28 k 0.152 s = 1 % V = 0.50 ft/s L= 300.00
Tc = 10.03 min
Open Channel (Channel and/or Pipe) Tc
V = (1.486R2/3 s1/2)/n Eq 3.5
Tc = L/(60V) Eq 3.6
V = average velocity, ft/s R = hydraulic radisus = A/WP, ft
A = flow area = [Bd]+[d2/2(Z1+Z2)], ft
WP = wetted perimeter of channel = bd +[d/sin(tan-1(1/Z1))+d/sin(tan-1(1/Z2))], ft B = bottom width of gutter or ditch, ft d = depth of flow in channel, ft - 10-year depth
Z1 = inverse of cross slope one of channel
L = flow length, ft D= Pipe Diameter, ft
For this Basin: Open Channel L = 927 ft
Z1 = 30 Z2 = 30 B = 0 ft n = 0.023 s = 0.04 ft/ft d* = 0.1500 ft
A = 0.68 ft2
WP = 4.67 ft R = 0.144 ft V = 3.54 ft/s
Open Channel Tc1 = 4.37 min
For this Basin: Open Channel L = 490 ft
Z1 = 10 Z2 = 10 B = 0 ft n = 0.035 s = 0.25 ft/ft d* = 0.1000 ft
A = 0.10 ft2
WP = 4.67 ft R = 0.021 ft V = 1.62 ft/s
Open Channel Tc2 = 5.05 min
For this Basin: Open Channel L = 640 ft
Z1 = 2 Z2 = 2 B = 2 ft n = 0.023 s = 0.07 ft/ft Open Channel d* = 0.5300 ft Q (assumed) = 10.69 cfs
A = 1.62 ft2 Q (actual) = 10.75 cfs WP = 6.67 ft *Iterate this depth until Q(assumed) = Q(actual)
R = 0.243 ft V = 6.63 ft/s
Open Channel Tc3 = 1.61 min
Tc 11.03 min
Sheet Flow Tc + Shallow Concentrated Tc + Open Channel Tc = 40.89 min
24-Hour Precip Depth
(in) 100 4.52 50 4.01 25 3.53 10 2.92 5 2.49 2 1.96
Project Sub-Basin Name E
Grassland or Range (HSG C) 63 227,895 14,357,385
Total 227,895 14,357,385 Total Area (ac) 5.232 Weighted CN 63.00
SR 5.87
Basin Area 0.008174608 mi2
Ia = 0.2SR : 1.175
Ia/P
(Calculated) Ia/P
(Selected)
100 Year 1.21 4.52 0.26 0.1
50 Year 0.92 4.01 0.29 25 Year 0.67 3.53 0.33 0.3 10 Year 0.40 2.92 0.40 0.1 5 Year 0.24 2.49 0.47 2 Year 0.09 1.96 0.60 0.3
Note: Estimates the peak flow using the NRCS Tabular Hydrograph Method (HEC-22, Manual)
Project Sub-Basin Name E
Basin Area: 0.008174608 mi
ActualTravel Time: 0.14 QD QD QD QD QD QD QD
Selected Travel Time: 0.20 0.00 0.00 0.00 0.09 0.40 0.67 1.21
Time
Unit Discharge
(csm/in) 2-Year Flow (cfs)
10-Year Flow
(cfs)
100-Year Flow
(cfs)
2-Year Flow
(cfs)
10-Year
Flow (cfs)
25-Year
Flow (cfs)
100-Year
Flow (cfs)
9 23.00 0.017 0.075 0.127 0.228
9.3 30.00 0.023 0.098 0.165 0.298
9.6 41.00 0.031 0.134 0.226 0.407
9.9 60.00 0.045 0.196 0.331 0.595
10 82.00 0.062 0.268 0.452 0.814
10.1 129.00 0.098 0.422 0.711 1.280
10.2 227.00 0.172 0.742 1.251 2.253
10.3 361.00 0.273 1.180 1.990 3.583
10.4 360.00 0.273 1.177 1.984 3.573
10.5 269.00 0.204 0.879 1.483 2.670
10.6 194.00 0.147 0.634 1.069 1.925
10.7 147.00 0.111 0.481 0.810 1.459
10.8 118.00 0.089 0.386 0.650 1.171
11 85.00 0.064 0.278 0.468 0.844
11.2 71.00 0.054 0.232 0.391 0.705
11.4 63.00 0.048 0.206 0.347 0.625
11.6 58.00 0.044 0.190 0.320 0.576
11.8 55.00 0.042 0.180 0.303 0.546
12 53.00 0.040 0.173 0.292 0.526
12.3 49.00 0.037 0.160 0.270 0.486
12.6 46.00 0.035 0.150 0.254 0.457 13 43.00 0.033 0.141 0.237 0.427
13.5 39.00 0.030 0.127 0.215 0.387 14 35.00 0.027 0.114 0.193 0.347
14.5 31.00 0.023 0.101 0.171 0.308 15 29.00 0.022 0.095 0.160 0.288
15.5 29.00 0.022 0.095 0.160 0.288 16 28.00 0.021 0.092 0.154 0.278 17 26.00 0.020 0.085 0.143 0.258 18 24.00 0.018 0.078 0.132 0.238 20 21.00 0.016 0.069 0.116 0.208 24 14.00 0.011 0.046 0.077 0.139
Note: Curve Number was determined from Natural Resources Conservation Service, U.S. Department of Agriculture, Technical Release, TR-55, Urban Hydrology for Small Watersheds. Second edition 1986.
9 10 11 12 13 14 15
Fl ow
(c fs
Time (hours)
Hydrographs
Post-Dev 2-year
Post-Dev 10-Year
Project Sub-Basin: BASIN E
L = 80 ft I = 6.1 inches/hr s = 0.3 ft/ft
Tt = 2.88 Min
Ku 3.28 k 0.213 s = 35 % V = 4.13 ft/s L= 300.00
Tc = 1.21 min
Open Channel (Channel and/or Pipe) Tc
V = (1.486R2/3 s1/2)/n Eq 3.5
Tc = L/(60V) Eq 3.6
V = average velocity, ft/s R = hydraulic radisus = A/WP, ft
A = flow area = [Bd]+[d2/2(Z1+Z2)], ft
WP = wetted perimeter of channel = bd +[d/sin(tan-1(1/Z1))+d/sin(tan-1(1/Z2))], ft B = bottom width of gutter or ditch, ft d = depth of flow in channel, ft - 10-year depth
Z1 = inverse of cross slope one of channel
L = flow length, ft D= Pipe Diameter, ft
For this Basin: Open Channel L = 960 ft
Z1 = 10 Z2 = 10 B = 0 ft n = 0.023 s = 0.025 ft/ft d* = 0.2350 ft
A = 0.55 ft2
WP = 2.60 ft R = 0.212 ft Open Channel V = 3.62 ft/s Q (assumed) = 1.99 cfs
Open Channel Tc = 4.42 min Q (actual) = 2.00 cfs
Sheet Flow Tc + Shallow Concentrated Tc + Open Channel Tc = 8.52 min
14 | August 7, 2020
Appendix C.
Culvert Analyses
Outlet Protection Calculations
HY-8 Culvert Analysis Report
Crossing Discharge Data
Discharge Selection Method: Specify Minimum, Design, and Maximum Flow
Minimum Flow: 1 cfs
Design Flow: 77.01 cfs
Maximum Flow: 80 cfs
Table 1 - Summary of Culvert Flows at Crossing: STA 136+77_Ex_Culvert
Headwater Elevation
(ft) Total Discharge (cfs) Culvert 1 Discharge
(cfs) Roadway Discharge
(cfs) Iterations
6788.09 1.00 1.00 0.00 1
6789.53 8.90 7.50 1.32 34
6789.61 16.80 7.70 8.97 6
6789.66 24.70 7.91 16.57 4
6789.71 32.60 8.09 24.41 4
6789.75 40.50 8.23 32.23 4
6789.78 48.40 8.35 39.91 3
6789.82 56.30 8.46 47.75 3
6789.85 64.20 8.54 55.61 3
6789.90 77.01 8.73 68.32 3
6789.91 80.00 8.73 71.21 2
6789.50 7.40 7.40 0.00 Overtopping
Table 2 - Culvert Summary Table: Culvert 1
Straight Culvert
Inlet Elevation (invert): 6787.48 ft, Outlet Elevation (invert): 6787.39 ft
Culvert Length: 20.68 ft, Culvert Slope: 0.0044
Total Discharge
(cfs)
Culvert Discharge
(cfs)
Headwater Elevation
(ft)
Inlet Control
Depth (ft)
Outlet Control
Depth (ft) Flow Type
Normal Depth (ft)
Critical Depth (ft)
Outlet Depth (ft)
Tailwater Depth (ft)
Outlet Velocity
(ft/s)
Tailwater Velocity
(ft/s)
1.00 1.00 6788.09 0.550 0.612 2-M2c 0.528 0.373 0.373 0.027 2.918 1.462
8.90 7.50 6789.53 1.946 2.050 7-M2c 1.500 1.061 1.061 0.097 5.615 3.296
16.80 7.70 6789.61 1.996 2.132 7-M2c 1.500 1.075 1.075 0.140 5.682 4.116
24.70 7.91 6789.66 2.050 2.181 7-M2c 1.500 1.090 1.090 0.174 5.755 4.688
32.60 8.09 6789.71 2.097 2.226 7-M2c 1.500 1.102 1.102 0.204 5.816 5.138
40.50 8.23 6789.75 2.134 2.267 7-M2c 1.500 1.111 1.111 0.230 5.862 5.512
48.40 8.35 6789.78 2.167 2.305 7-M2c 1.500 1.119 1.119 0.254 5.904 5.836
56.30 8.46 6789.82 2.199 2.340 7-M2c 1.500 1.127 1.127 0.276 5.945 6.119
64.20 8.54 6789.85 2.222 2.374 7-M2c 1.500 1.132 1.132 0.297 5.973 6.373
77.01 8.73 6789.90 2.274 2.423 7-M2c 1.500 1.143 1.143 0.328 6.037 6.739
80.00 8.73 6789.91 2.276 2.435 7-M2c 1.500 1.144 1.144 0.335 6.040 6.816
Water Surface Profile Plot for Culvert: Culvert 1
Site Data - Culvert 1
Site Data Option: Culvert Invert Data
Inlet Station: 0.00 ft
Inlet Elevation: 6787.48 ft
Outlet Station: 20.68 ft
Outlet Elevation: 6787.39 ft
Number of Barrels: 1
Culvert Data Summary - Culvert 1
Barrel Shape: Circular
Barrel Diameter: 1.50 ft
Barrel Material: Corrugated Steel
Embedment: 0.00 in
Barrel Manning's n: 0.0240
Culvert Type: Straight
Inlet Configuration: Thin Edge Projecting
Inlet Depression: None
Minimum Flow: 1 cfs
Design Flow: 7.94 cfs
Maximum Flow: 25 cfs
Table 4 - Summary of Culvert Flows at Crossing: STA 159+25_Ex_Culvert
(cfs) Roadway Discharge
(cfs) Iterations
6785.99 1.00 1.00 0.00 1
6786.43 3.40 3.40 0.00 1
6786.77 5.80 5.80 0.00 1
6787.04 7.94 7.94 0.00 1
6787.38 10.60 10.60 0.00 1
6787.70 13.00 13.00 0.00 1
6788.07 15.40 15.40 0.00 1
6788.25 17.80 16.48 1.27 11
6788.29 20.20 16.73 3.43 5
6788.32 22.60 16.93 5.62 4
6788.36 25.00 17.10 7.88 4
6788.20 16.21 16.21 0.00 Overtopping
Table 5 - Culvert Summary Table: Culvert 1
Total Discharge
(cfs)
Culvert Discharge
(cfs)
Headwater Elevation
(ft)
Inlet Control
Depth (ft)
Outlet Control
Depth (ft) Flow Type
Normal Depth (ft)
Critical Depth (ft)
Outlet Depth (ft)
Tailwater Depth (ft)
Outlet Velocity
(ft/s)
Tailwater Velocity
(ft/s)
1.00 1.00 6785.99 0.491 0.0* 1-S2n 0.289 0.344 0.289 0.139 3.556 3.157
3.40 3.40 6786.43 0.933 0.045 1-S2n 0.531 0.645 0.531 0.281 5.081 4.723
5.80 5.80 6786.77 1.267 0.347 1-S2n 0.701 0.851 0.701 0.378 5.906 5.562
7.94 7.94 6787.04 1.541 0.626 1-S2n 0.831 1.003 0.836 0.449 6.380 6.104
10.60 10.60 6787.38 1.879 1.003 1-S2n 0.979 1.166 0.987 0.524 6.863 6.633
13.00 13.00 6787.70 2.203 1.379 5-S2n 1.107 1.297 1.116 0.584 7.216 7.027
15.40 15.40 6788.07 2.567 1.792 5-S2n 1.234 1.415 1.242 0.638 7.510 7.368
17.80 16.48 6788.25 2.746 1.990 5-S2n 1.292 1.463 1.301 0.688 7.617 7.669
20.20 16.73 6788.29 2.790 2.037 5-S2n 1.306 1.474 1.315 0.734 7.642 7.941
22.60 16.93 6788.32 2.824 2.074 5-S2n 1.317 1.483 1.325 0.777 7.661 8.186
25.00 17.10 6788.36 2.855 2.107 5-S2n 1.326 1.490 1.335 0.817 7.677 8.413
* Full Flow Headwater elevation is below inlet invert.
Straight Culvert
Inlet Elevation (invert): 6785.50 ft, Outlet Elevation (invert): 6784.85 ft
Culvert Length: 20.29 ft, Culvert Slope: 0.0321
Inlet Station: 0.00 ft
Inlet Elevation: 6785.50 ft
Outlet Station: 20.28 ft
Outlet Elevation: 6784.85 ft
Number of Barrels: 1
Culvert Data Summary - Culvert 1
Barrel Shape: Circular
Barrel Diameter: 2.00 ft
Barrel Material: Corrugated Steel
Embedment: 0.00 in
Barrel Manning's n: 0.0240
Culvert Type: Straight
Minimum Flow: 1 cfs
Design Flow: 4.77 cfs
Maximum Flow: 10 cfs
Table 7 - Summary of Culvert Flows at Crossing: STA 166+50_Ex_Culvert
(cfs) Roadway Discharge
(cfs) Iterations
6726.98 1.00 1.00 0.00 1
6727.17 1.90 1.90 0.00 1
6727.32 2.80 2.80 0.00 1
6727.46 3.70 3.70 0.00 1
6727.61 4.77 4.77 0.00 1
6727.70 5.50 5.50 0.00 1
6727.82 6.40 6.40 0.00 1
6727.94 7.30 7.30 0.00 1
6728.05 8.20 8.20 0.00 1
6728.16 9.10 9.10 0.00 1
6728.28 10.00 10.00 0.00 1
6728.50 11.69 11.69 0.00 Overtopping
Table 8 - Culvert Summary Table: Culvert 1
(cfs)
Culvert Discharge
(cfs)
Headwater Elevation
(ft)
Inlet Control
Depth (ft)
Outlet Control
Depth (ft) Flow Type
Normal Depth (ft)
Critical Depth (ft)
Outlet Depth (ft)
Tailwater Depth (ft)
Outlet Velocity
(ft/s)
Tailwater Velocity
(ft/s)
1.00 1.00 6726.98 0.481 0.0* 1-S2n 0.256 0.344 0.256 0.043 4.261 3.279
1.90 1.90 6727.17 0.672 0.0* 1-S2n 0.349 0.478 0.349 0.062 5.165 4.208
2.80 2.80 6727.32 0.824 0.0* 1-S2n 0.422 0.583 0.422 0.079 5.787 4.874
3.70 3.70 6727.46 0.956 0.0* 1-S2n 0.485 0.674 0.485 0.093 6.276 5.422
4.77 4.77 6727.61 1.106 0.0* 1-S2n 0.552 0.768 0.552 0.108 6.749 5.958
5.50 5.50 6727.70 1.205 0.0* 1-S2n 0.594 0.828 0.594 0.117 7.029 6.289
6.40 6.40 6727.82 1.323 0.0* 1-S2n 0.643 0.896 0.643 0.128 7.335 6.652
7.30 7.30 6727.94 1.438 0.0* 1-S2n 0.689 0.960 0.689 0.138 7.609 6.982
8.20 8.20 6728.05 1.552 0.0* 1-S2n 0.733 1.020 0.741 0.148 7.742 7.283
9.10 9.10 6728.16 1.665 0.0* 1-S2n 0.776 1.077 0.776 0.158 8.081 7.564
10.00 10.00 6728.28 1.779 0.105 1-S2n 0.817 1.131 0.817 0.167 8.289 7.830
Straight Culvert
Inlet Elevation (invert): 6726.50 ft, Outlet Elevation (invert): 6724.99 ft
Culvert Length: 27.93 ft, Culvert Slope: 0.0541
Inlet Station: 0.00 ft
Inlet Elevation: 6726.50 ft
Outlet Station: 27.89 ft
Outlet Elevation: 6724.99 ft
Number of Barrels: 1
Culvert Data Summary - Culvert 1
Barrel Shape: Circular
Barrel Diameter: 2.00 ft
Barrel Material: Corrugated Steel
Embedment: 0.00 in
Barrel Manning's n: 0.0240
Culvert Type: Straight
Minimum Flow: 5 cfs
Design Flow: 10.69 cfs
Maximum Flow: 30 cfs
Table 10 - Summary of Culvert Flows at Crossing: STA 173+72_Ex_Culvert
(cfs) Roadway Discharge
(cfs) Iterations
6656.00 5.00 5.00 0.00 1
6656.33 7.50 7.50 0.00 1
6656.73 10.69 10.69 0.00 1
6656.97 12.50 12.50 0.00 1
6657.34 15.00 15.00 0.00 1
6657.54 17.50 16.23 1.19 12
6657.59 20.00 16.50 3.44 5
6657.63 22.50 16.71 5.72 4
6657.66 25.00 16.89 8.08 4
6657.69 27.50 17.05 10.36 3
6657.71 30.00 17.20 12.73 3
6657.50 15.97 15.97 0.00 Overtopping
Table 11 - Culvert Summary Table: Culvert 1
(cfs)
Culvert Discharge
(cfs)
Headwater Elevation
(ft)
Inlet Control
Depth (ft)
Outlet Control
Depth (ft) Flow Type
Normal Depth (ft)
Critical Depth (ft)
Outlet Depth (ft)
Tailwater Depth (ft)
Outlet Velocity
(ft/s)
Tailwater Velocity
(ft/s)
5.00 5.00 6656.00 1.129 0.0* 1-S2n 0.546 0.788 0.552 0.096 7.078 6.061
7.50 7.50 6656.33 1.455 0.0* 1-S2n 0.674 0.973 0.684 0.118 7.904 6.791
10.69 10.69 6656.73 1.860 0.117 1-S2n 0.816 1.172 0.831 0.141 8.664 7.480
12.50 12.50 6656.97 2.103 0.414 5-S2n 0.890 1.271 0.908 0.152 9.014 7.804
15.00 15.00 6657.34 2.473 0.861 5-S2n 0.988 1.396 1.011 0.166 9.422 8.194
17.50 16.23 6657.54 2.674 1.098 5-S2n 1.036 1.452 1.061 0.179 9.588 8.540
20.00 16.50 6657.59 2.720 1.151 5-S2n 1.046 1.464 1.072 0.191 9.624 8.845
22.50 16.71 6657.63 2.756 1.192 5-S2n 1.054 1.473 1.080 0.201 9.651 9.123
25.00 16.89 6657.66 2.788 1.229 5-S2n 1.061 1.481 1.087 0.211 9.676 9.381
27.50 17.05 6657.69 2.815 1.260 5-S2n 1.067 1.488 1.094 0.221 9.697 9.615
30.00 17.20 6657.71 2.842 1.291 5-S2n 1.073 1.495 1.100 0.230 9.717 9.843
Straight Culvert
Inlet Elevation (invert): 6654.87 ft, Outlet Elevation (invert): 6653.28 ft
Culvert Length: 25.66 ft, Culvert Slope: 0.0621
Inlet Station: 0.00 ft
Inlet Elevation: 6654.87 ft
Outlet Station: 25.61 ft
Outlet Elevation: 6653.28 ft
Number of Barrels: 1
Culvert Data Summary - Culvert 1
Barrel Shape: Circular
Barrel Diameter: 2.00 ft
Barrel Material: Corrugated Steel
Embedment: 0.00 in
Barrel Manning's n: 0.0240
Culvert Type: Straight
Minimum Flow: 1 cfs
Design Flow: 1.99 cfs
Table 13 - Summary of Culvert Flows at Crossing: STA 182+56_Ex_Culvert
(cfs) Roadway Discharge
(cfs) Iterations
6549.19 1.00 1.00 0.00 1
6549.43 1.99 1.99 0.00 1
6549.59 2.80 2.80 0.00 1
6549.74 3.70 3.70 0.00 1
6549.88 4.60 4.60 0.00 1
6550.01 5.50 5.50 0.00 1
6550.13 6.40 6.40 0.00 1
6550.24 7.30 7.30 0.00 1
6550.35 8.20 8.20 0.00 1
6550.46 9.10 9.10 0.00 1
6550.57 10.00 10.00 0.00 1
6552.00 19.15 19.15 0.00 Overtopping
Table 14 - Culvert Summary Table: Culvert 1
Straight Culvert
Inlet Elevation (invert): 6548.64 ft, Outlet Elevation (invert): 6548.28 ft
Culvert Length: 35.27 ft, Culvert Slope: 0.0102
Total Discharge
(cfs)
Culvert Discharge
(cfs)
Headwater Elevation
(ft)
Inlet Control
Depth (ft)
Outlet Control
Depth (ft) Flow Type
Normal Depth (ft)
Critical Depth (ft)
Outlet Depth (ft)
Tailwater Depth (ft)
Outlet Velocity
(ft/s)
Tailwater Velocity
(ft/s)
1.00 1.00 6549.19 0.501 0.550 2-M2c 0.383 0.344 0.344 0.039 2.773 5.572
1.99 1.99 6549.43 0.717 0.789 2-M2c 0.541 0.489 0.489 0.059 3.340 7.303
2.80 2.80 6549.59 0.859 0.946 2-M2c 0.646 0.583 0.583 0.073 3.674 8.334
3.70 3.70 6549.74 0.997 1.099 2-M2c 0.748 0.674 0.674 0.086 3.980 9.271
4.60 4.60 6549.88 1.126 1.238 2-M2c 0.843 0.754 0.754 0.098 4.244 10.082
5.50 5.50 6550.01 1.249 1.366 2-M2c 0.933 0.828 0.828 0.109 4.480 10.801
6.40 6.40 6550.13 1.367 1.487 2-M2c 1.019 0.896 0.896 0.120 4.697 11.434
7.30 7.30 6550.24 1.482 1.602 2-M2c 1.103 0.960 0.960 0.129 4.899 12.012
8.20 8.20 6550.35 1.596 1.714 2-M2c 1.187 1.020 1.020 0.139 5.093 12.555
9.10 9.10 6550.46 1.709 1.822 2-M2c 1.273 1.077 1.077 0.148 5.277 13.058
10.00 10.00 6550.57 1.823 1.930 2-M2c 1.361 1.131 1.131 0.156 5.456 13.531
Inlet Station: 0.00 ft
Inlet Elevation: 6548.64 ft
Outlet Station: 35.27 ft
Outlet Elevation: 6548.28 ft
Number of Barrels: 1
Culvert Data Summary - Culvert 1
Barrel Shape: Circular
Barrel Diameter: 2.00 ft
Barrel Material: Corrugated Steel
Embedment: 0.00 in
Barrel Manning's n: 0.0240
Culvert Type: Straight
Minimum Flow: 1 cfs
Design Flow: 77.01 cfs
Maximum Flow: 80 cfs
Table 16 - Summary of Culvert Flows at Crossing: STA 136+50_Proposed
(cfs) Roadway Discharge
(cfs) Iterations
6787.74 1.00 1.00 0.00 1
6788.25 8.90 8.90 0.00 1
6788.56 16.80 16.80 0.00 1
6788.83 24.70 24.70 0.00 1
6789.08 32.60 32.60 0.00 1
6789.33 40.50 40.50 0.00 1
6789.59 48.40 48.40 0.00 1
6789.87 56.30 56.30 0.00 1
6790.20 64.20 64.20 0.00 1
6790.78 77.01 77.01 0.00 1
6790.93 80.00 80.00 0.00 1
6791.20 84.88 84.88 0.00 Overtopping
Table 17 - Culvert Summary Table: Culvert 1
(cfs)
Culvert Discharge
(cfs)
Headwater Elevation
(ft)
Inlet Control
Depth (ft)
Outlet Control
Depth (ft) Flow Type
Normal Depth (ft)
Critical Depth (ft)
Outlet Depth (ft)
Tailwater Depth (ft)
Outlet Velocity
(ft/s)
Tailwater Velocity
(ft/s)
1.00 1.00 6787.74 0.243 0.0* 1-S2n 0.164 0.171 0.164 0.029 2.033 1.355
8.90 8.90 6788.25 0.752 0.0* 1-S2n 0.477 0.518 0.477 0.106 3.872 3.102
16.80 16.80 6788.56 1.059 0.0* 1-S2n 0.661 0.719 0.661 0.154 4.638 3.897
24.70 24.70 6788.83 1.327 0.0* 1-S2n 0.812 0.879 0.812 0.192 5.156 4.460
32.60 32.60 6789.08 1.578 0.266 1-S2n 0.949 1.016 0.949 0.225 5.546 4.904
40.50 40.50 6789.33 1.828 0.632 1-S2n 1.080 1.139 1.080 0.255 5.852 5.276
48.40 48.40 6789.59 2.089 1.040 5-S2n 1.209 1.250 1.209 0.282 6.096 5.596
56.30 56.30 6789.87 2.371 1.491 5-S2n 1.341 1.351 1.341 0.307 6.286 5.879
64.20 64.20 6790.20 2.684 2.701 7-M2c 1.485 1.444 1.444 0.331 6.607 6.137
77.01 77.01 6790.78 3.276 3.035 7-M2c 2.000 1.578 1.578 0.366 7.242 6.502
80.00 80.00 6790.93 3.431 3.168 7-M2c 2.000 1.606 1.606 0.374 7.397 6.582
Straight Culvert
Inlet Elevation (invert): 6787.50 ft, Outlet Elevation (invert): 6786.30 ft
Culvert Length: 57.01 ft, Culvert Slope: 0.0211
Inlet Station: 0.00 ft
Inlet Elevation: 6787.50 ft
Outlet Station: 57.00 ft
Outlet Elevation: 6786.30 ft
Number of Barrels: 4
Culvert Data Summary - Culvert 1
Barrel Shape: Circular
Barrel Diameter: 2.00 ft
Barrel Material: Corrugated Steel
Embedment: 0.00 in
Barrel Manning's n: 0.0240
Culvert Type: Straight
Minimum Flow: 1 cfs
Design Flow: 7.94 cfs
Maximum Flow: 15 cfs
Table 19 - Summary of Culvert Flows at Crossing: STA 159+25_Pro_Culvert
(cfs) Roadway Discharge
(cfs) Iterations
6785.99 1.00 1.00 0.00 1
6786.27 2.40 2.40 0.00 1
6786.49 3.80 3.80 0.00 1
6786.68 5.20 5.20 0.00 1
6786.87 6.60 6.60 0.00 1
6787.04 7.94 7.94 0.00 1
6787.22 9.40 9.40 0.00 1
6787.40 10.80 10.80 0.00 1
6787.59 12.20 12.20 0.00 1
6787.79 13.60 13.60 0.00 1
6788.00 15.00 15.00 0.00 1
6788.20 16.23 16.23 0.00 Overtopping
Table 20 - Culvert Summary Table: Culvert 1
(cfs)
Culvert Discharge
(cfs)
Headwater Elevation
(ft)
Inlet Control
Depth (ft)
Outlet Control
Depth (ft) Flow Type
Normal Depth (ft)
Critical Depth (ft)
Outlet Depth (ft)
Tailwater Depth (ft)
Outlet Velocity
(ft/s)
Tailwater Velocity
(ft/s)
1.00 1.00 6785.99 0.489 0.0* 1-S2n 0.280 0.344 0.280 0.139 3.741 3.157
2.40 2.40 6786.27 0.771 0.0* 1-S2n 0.430 0.539 0.430 0.231 4.834 4.229
3.80 3.80 6786.49 0.985 0.0* 1-S2n 0.542 0.683 0.542 0.299 5.519 4.890
5.20 5.20 6786.68 1.182 0.076 1-S2n 0.637 0.804 0.637 0.356 6.032 5.383
6.60 6.60 6786.87 1.366 0.257 1-S2n 0.723 0.910 0.728 0.406 6.389 5.781
7.94 7.94 6787.04 1.536 0.437 1-S2n 0.799 1.003 0.799 0.449 6.777 6.104
9.40 9.40 6787.22 1.720 0.644 1-S2n 0.877 1.095 0.885 0.492 7.013 6.409
10.80 10.80 6787.40 1.900 0.854 1-S2n 0.949 1.178 0.959 0.529 7.253 6.669
12.20 12.20 6787.59 2.087 1.077 5-S2n 1.020 1.255 1.029 0.565 7.488 6.904
13.60 13.60 6787.79 2.285 1.312 5-S2n 1.089 1.328 1.100 0.598 7.679 7.118
15.00 15.00 6788.00 2.498 1.561 5-S2n 1.158 1.396 1.170 0.629 7.860 7.315
Straight Culvert
Inlet Elevation (invert): 6785.50 ft, Outlet Elevation (invert): 6784.65 ft
Culvert Length: 23.02 ft, Culvert Slope: 0.0370
Inlet Station: 0.00 ft
Inlet Elevation: 6785.50 ft
Outlet Station: 23.00 ft
Outlet Elevation: 6784.65 ft
Number of Barrels: 1
Culvert Data Summary - Culvert 1
Barrel Shape: Circular
Barrel Diameter: 2.00 ft
Barrel Material: Corrugated Steel
Embedment: 0.00 in
Barrel Manning's n: 0.0240
Culvert Type: Straight
Minimum Flow: 1 cfs
Design Flow: 4.77 cfs
Maximum Flow: 20 cfs
Table 22 - Summary of Culvert Flows at Crossing: STA 166+50_Pro_Culvert
(cfs) Roadway Discharge
(cfs) Iterations
6726.98 1.00 1.00 0.00 1
6727.33 2.90 2.90 0.00 1
6727.60 4.77 4.77 0.00 1
6727.85 6.70 6.70 0.00 1
6728.10 8.60 8.60 0.00 1
6728.34 10.50 10.50 0.00 1
6728.52 12.40 11.90 0.42 14
6728.56 14.30 12.20 2.04 5
6728.59 16.20 12.43 3.72 4
6728.62 18.10 12.63 5.45 4
6728.65 20.00 12.79 7.14 3
6728.50 11.73 11.73 0.00 Overtopping
Table 23 - Culvert Summary Table: Culvert 1
(cfs)
Culvert Discharge
(cfs)
Headwater Elevation
(ft)
Inlet Control
Depth (ft)
Outlet Control
Depth (ft) Flow Type
Normal Depth (ft)
Critical Depth (ft)
Outlet Depth (ft)
Tailwater Depth (ft)
Outlet Velocity
(ft/s)
Tailwater Velocity
(ft/s)
1.00 1.00 6726.98 0.478 0.0* 1-S2n 0.248 0.344 0.248 0.043 4.446 3.279
2.90 2.90 6727.33 0.834 0.0* 1-S2n 0.418 0.594 0.418 0.080 6.087 4.940
4.77 4.77 6727.60 1.099 0.0* 1-S2n 0.536 0.768 0.542 0.108 6.922 5.958
6.70 6.70 6727.85 1.355 0.0* 1-S2n 0.639 0.917 0.639 0.132 7.742 6.766
8.60 8.60 6728.10 1.595 0.0* 1-S2n 0.729 1.045 0.729 0.153 8.297 7.406
10.50 10.50 6728.34 1.837 0.0* 1-S2n 0.813 1.161 0.824 0.172 8.608 7.965
12.40 11.90 6728.52 2.022 0.226 5-S2n 0.872 1.239 0.884 0.189 8.886 8.458
14.30 12.20 6728.56 2.063 0.276 5-S2n 0.884 1.255 0.897 0.206 8.936 8.893
16.20 12.43 6728.59 2.095 0.316 5-S2n 0.893 1.267 0.907 0.221 8.975 9.297
18.10 12.63 6728.62 2.122 0.350 5-S2n 0.901 1.278 0.915 0.236 9.008 9.663
20.00 12.79 6728.65 2.145 0.380 5-S2n 0.908 1.286 0.923 0.250 9.025 10.009
Straight Culvert
Inlet Elevation (invert): 6726.50 ft, Outlet Elevation (invert): 6724.80 ft
Culvert Length: 28.05 ft, Culvert Slope: 0.0607
Inlet Station: 0.00 ft
Inlet Elevation:…