NM FTFS 233(1) Plan Set Final - Schedule A_Option X.pdf
PDF 11 MB Posted
- Attached to
- NM FTFS 233(1) Tularosa AOP Improvements Federal contract opportunity
- Solicitation number
- 6982AF22B000031
About this file
This document provides details on a federal contract opportunity for NM FTFS 233(1) Tularosa AOP Improvements. The Federal Highway Administration is soliciting bids for a project to improve Tularosa Area Operations in New Mexico. A non-mandatory pre-bid virtual meeting will be held on November 15, 2022 to provide an overview of the project and answer questions from potential bidders. Interested parties can request the meeting link by emailing CFLContracts@dot.gov by November 10 with the subject line requesting the virtual meeting link. The invitation for bid is attached and titled IFB NM FTFS 233(1) Tularosa AOP Improvements. The bid due date is not provided. Attendance at the pre-bid meeting is not required to submit a bid for this project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Tabulation of Bids NM FTFS 233(1) Tularosa AOP Improvements.pdf | ||
| Bid Opening Summary_NM FTFS 233(1) Tularosa AOP Improvements.pdf | ||
| Amendment A003 NM FTFS 233(1) Tularosa AOP Improvements.pdf | ||
| Interested Vendors List 11-17-2022.docx | DOCX document | |
| Questions and Answers During Advertisement for NM FTFS 233(1) Tularosa 11-16-2022.pdf | ||
| NM FTFS 233(1) Tularosa AOP_Pre-Bid Meeting Presentation Slides.pdf | ||
| Amendment A002 Tularosa.pdf | ||
| Amendment A001 Tularosa.pdf | ||
| IFB NM FTFS 233(1) Tularosa AOP Improvements.pdf | ||
| Hydraulics Memorandum February 2022.pdf | ||
| FP-14_Eng.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Know what'sbelow.
before you dig.Call
R www.call811.com
R
D E P
A T
M
E
NT
OF TRANSPO
R T
A T I O
N
U N
IT
E
D STATES OF
AME
R I C
A
RATON
ALBUQUERQUE
SANTA FE
SOCORRO
LAS
LAS
CRUCES
VEGAS
Tucumcari
Farmington
Taos
Santa Rosa
Roswell
Carlsbad
Alamogordo
Silver
City
Cuba
Bernalillo
Dulce
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
COLORADO
OKLA.
T E
X A
S
TEXAS
MEXICO
A R I Z
O N
A
KEY MAP OF NEW MEXICO
TULAROSA AOP
PROJECT LOCATION
Scale in Miles
10 2
Option X
Station 18+20 to 26+03
Channel Reconstruction
NM FTFS 233(1)
Schedule A
Station 102+57.50 to 103+60.51
Low Water Crossing Reconstruction
NM FTFS 233(1)
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
OPTION X LENGTH 0.15 miles
SCHEDULE A LENGTH 0.02 miles
CATRON COUNTY
GILA NATIONAL FOREST
Tularosa AOP Improvements
NM FTFS 233(1)
PLANS FOR PROPOSED
PROJECT MANAGER LEAD DESIGNER
DENVER, CO
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PLANS PREPARED BY
BRIDGES ON FEDERAL HIGHWAY PROJECTS, FP-14"
"STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND
SPECIFICATIONS:
Slopes are expressed as RISE:RUN
U.S. CUSTOMARY DIMENSIONS:
N/Ae(max)
30V
1%T
4DHV
44ADT (2042)
32ADT (2022)
DESIGN DESIGNATIONS:
Low water crossing, aquatic organism passage, channel rehabilitation
TYPE OF CONSTRUCTION:
US FOREST SERVICE
CHIEF ENGINEER
DATE:
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
CHIEF OF ENGINEERING
DATE:
APPROVED:
J. HENWOOD J. KAPLAN
125 Miles
Socorro
To
6.3 Miles
US 80
To
T u la r o s a
Ri ve r
T u la r o s a
R iv e r
Reserve
Mountain
Higgins
Mountain
Jon S
GILA
NATIONAL
FOREST
S a n
R iv e r
F r a n c is c o
R iv e r
S a n oc si c n a r
F
:0
P
M u g u s t
F
S
N
N M
\2
(1
R o a d w a y
\C A
D D
S h e e ts
\A -G e n s h t\ T
T L
U
S .d g n
STATE PROJECT
NUMBER
SHEET
NM
NM FTFS 233(1)
A1
TULAROSA AOP
Justin.henwood Typewritten Text Via Letter jointjt.J westWWinteriorint.
vertical point of intersectionVPIincrementincr.
vehicles per hourvphinclusive, includingincl.
verticalvert.inside diameterIDI design speedVVhighwayhwy.
typicaltyp.high waterHW Material Source point of tangent to spiralTShorizontalhoriz.
transversetransv.hexagonhex.
Boring Location (Existing, Proposed) temporary construction easementTCEhomestead entry surveyHES temporary bench markTBMheadwallhdwl.H GEOLOGIC SYMBOLS tangenttan.girdergdr.
townshipT.galvanizedgalv.
tangent lengthTTgage (gauge)ga.G Cattleguard (Existing, Proposed) symmetricalsym.footingftg.
structuralstruc.finishfin.
Fence w/ Gate (Existing, Proposed) straightstr.flared end sectionFES stiffenerstiff.federalFed.
Fence (Existing, Proposed) standardstd.fill facef.f.F stationsta.exteriorext. FENCE & CATTLEGUARD SYMBOLS point of spiral to tangentSTexpansion jointexp. jt.
streetst.excavationexc.
specificationspec.edge of waterEW Fiber Roll (Slope Protection) spacing, Spaces or Spacedspa.and wifeet ux shouldershldr.and otherset al Temporary Inlet Protection sectionsec.edge of roadER point of spiral to curveSCequationEQ or eq.
Silt Fence seasonal average daily trafficSADTedge of pavementEOP southSSEngineer(s)engr(s).
Fiber Roll (Ditch and/or Cut Slope) routerte.embankmentemb.
rightRt. or RTelevationelev.
Riprap reference hubRHelevation with numberEl. 94.066 retaining wallret. wallsuperelevation ratee Rolled Erosion Control Product
ReservationRes.eastEE reservoirres.drawing(s)dwg(s).
Diversion Berm requiredreqd.donation land claimDLC reinforcementreinf.districtDist.
Check Dam reconstructionreconst.distancedist.
roadwayrdwy.diaphragmdiaph.
Bonded Fiber Matrix Mulching roadrd.diagonaldiag.
right-of-wayR/Wdiameterdia. or D EROSION & SEDIMENT CONTROL SYMBOLS rangeR.drop inletDI radiusRRdesign hour volumeDHV quantitiesquant., QtyQdecrementdecr.D Riprap Apron (Proposed) pavementpvmt.culvertculv.
point of tangentPTcontingent sumCTSM Underdrain (Existing, Proposed) pounds per square inchpsicentersctrs.
projectproj.point of curve to spiralCS With Drop Inlet (Existing, Proposed) point on tangentPOTcreekcr.
point on spiralPOScorrugatedcorr.
With Headwalls (Existing, Proposed) point on curvePOCcontinuouscont.
platepl.construction jointconstr. jt.
With End Sections (Existing, Proposed) point of intersectionPIconstructionconstr.
perforateperf.concreteconc.
Pipe Culvert (Existing, Proposed) point of compound curvePCCcolumncol.
point of curvePCPcountyCo.
Box Culvert (Existing, Proposed) outside diameterODcorrugated metal pipeCMP other faceo.f.clearclr.
Bridge (Existing, Proposed) on centerso.c.Ocenter to centerc-c numberno. or #concrete box culvertCBCC negativeneg.bearingbrg.
normal crownNCbridgebr.
Spring northNNbalance pointBP mountain(s)mtn(s).bench markBM River monumentmon.backBK minimummin.beginning, beginbeg.
Wetland maximummax.both facesb.f.B materialmatl.asphaltasph.
Large Creek maintenancemaint.approachappr.
magneticmag.Malternatealt.
Lake, Pond or Reservoir low waterLWaheadAH leftLt. or LTaggregateaggr.
Drainage or Small Creek lump sumLPSMaverage daily trafficADT longitudinallong.abutmentabut.A Flow Arrow latitudelat.diameter� laminationlam.curve delta� Ditch (Existing, Proposed) length of curveLLcenterline
DRAINAGE SYMBOLSABBREVIATIONS
SPRING
DI
:1 e b ru a ry
S h e e t
N M
\2
(1
R o a d w a y \C
A D
D
S h e e ts \A
-G e n s h t\ s y m
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 1 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
STATE PROJECT
NUMBER
SHEET
NM
A2
CP
36 31
36 31
0.00EL.
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone Section Corner (Found)16
Sanitary Sewer Section Corner (Found, Projected)4
PowerSection Corner (Found, Projected)
OilRight-of-Way Line (Proposed)
GasRight-of-Way Line (Existing)
Fiber OpticProperty Line
CATVParcel Number
Underground Utility (Existing, Proposed)Monument (As described)
Telephone Pedestal (Existing, Proposed) Temporary (Proposed)
Telephone Booth (Existing, Proposed) Permanent (Proposed)
Street Light (Existing, Proposed) Permanent (Existing)
Support Pole Anchor (Existing, Proposed)Easements
Support Pole (Existing, Proposed) National Wildlife Refuge
Surface (Existing, Proposed) National Park
Underground (Existing, Proposed) National Forest
Irrigation Ditch Bureau of Land Management
Bureau of Indian Affairs
UTILITY SYMBOLS
1/16 Section
Post Mounted (Existing, Proposed) 1/4 Section
Portable (Proposed) Section
Delineator (Existing, Proposed) Township or Range Line
Commercial (Existing, Proposed) City
Signs County
State
SIGN SYMBOLS
National
Roadway ObliterationBoundaries
Roadway Centerline (With Station ticks)
Proposed
RIGHT-OF-WAY SYMBOLS
ExistingSurvey Control Point
Edge of Roadway Trail
Toe of FillSpot Elevation
Transition Double Track
Top of Cut Single Track
Slope Stake LimitsRailroad
Clearing/Construction LimitsNorth Arrow
Coordinate Grid Tick
ROADWAY SYMBOLS
Building (Existing, Proposed)
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
MAPPING SYMBOLS
Guardwall (Existing, Proposed)Treeline
Articulated Concrete Block (Proposed)Guardrail (Existing, Proposed) Tree
PROJECT SPECIFIC SYMBOLSGUARDRAIL, BARRIER & WALL SYMBOLSLANDSCAPING & VEGETATION SYMBOLS
:3 e b ru a ry
S h e e
N M
\2
(1
R o a d w a y \C
A D
D
S h e e ts \A
-G e n s h t\ s y m
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 2 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
STATE PROJECT
NUMBER
SHEET
NM
A3
SURVEY CONTROL
REVISIONS (OR CHANGE NOTICES)
DESCRIPTION
NO.
DATE INIT.
Created SJS1/25/22
Amend STA & offsets 3/8/22 SJS
:4
A u g u s t
B a s e .B
.U
O R
D
V
.1 \O p e n
R o a d s D e s ig n e r
C E
\C o n fi g u ra ti o n
\O rg a n iz a ti o n
-C iv il \F
L H
S u rv
F t_
S ta n d a rd s -W
S
.1 V
\C e ll
\C F
L -B o rd e rs
.c e l
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
NM
NM FTFS 233(1)
A4
SITE MAP
RECONSTRUCTION
LOW WATER CROSSING
SCHEDULE A
NM FTFS 233(1)
BEGIN PROJECT
102+57.50
RECONSTRUCTION
LOW WATER CROSSING
SCHEDULE A
NM FTFS 233(1)
END PROJECT
103+60.51
RECONSTRUCTION
CHANNEL
OPTION X
NM FTFS 233(1)
END PROJECT
26+03
Potential staging area
CHANNEL RECONSTRUCTION
OPTION X
NM FTFS 233(1)
BEGIN PROJECT
18+20
Reserve, NM
6 Miles to
GILA
NATIONAL
FOREST
ADOPTED FROM US FOREST SERVICE - GILA NATIONAL FOREST
105+00
103+00
104+00
105+00
6+00
0 1
:1 u g u s t
D D e s ig n I n tl
N M
\2 (1
R o a d w a y \C
A D
D S h e e ts
\A -G e n s h t\
S T
E N
M F
T F
S (1 d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
NM
A5
Existing ground
(top of block)
Profile grade
See Detail A
Articulated concrete block, 6" depth
6" Roadway Aggregate, Method 2
Geotextile
Geogrid depth varies from 6" - 8"
Existing concrete surface
See Detail B
(typ. both sides)
Slope Rounding stability.
ratios may be adjusted by the CO to assure adequate drainage and
3. The gradient and width of the excavation and embankment slope summary tables for class and type.
2. Furnish geotextile filter conforming to subsection 714.01(a). See rounding will not be measured for payment.
Excavation associated with the articulated concrete block slope
Place articulated concrete blocks according to Section 253. 1.
:Notes
NO SCALE
TYPICAL CROSS SECTION
ARTICULATED CONCRETE BLOCK
DETAIL A
102+57.50 to 103+60.51
TYPICAL SECTION
shldr shldr 0.3% 0.3%
Flow
Flow
Average existing width
102+57.50 to 103+60.51
EXISTING TYPICAL SECTION
SLOPE ROUNDING
ARTICULATED CONCRETE BLOCK
DETAIL B
1:6 or flatter Fill slope
1:6 or flatter Cut slope
0.150.02TOTALS (mi)
783103.01TOTALS (ft)
783018+20 to 26+03
0103.01 103+60.51
102+57.50 to
Channel (ft)Roadway (ft)Station to Station
LENGTH OF PROJECT
1' 1'6'6'
Construction Limits
1' Clear Zone1' Clear Zone5'
14' ty p and Mulching Limits Clearing, Seeding, and Mulching Limits Clearing, Seeding, 5'
:2 u g u s t
L
W C
T y p S h e e
N M
\2 (1
R o a d w a y \C
A D
D S h e e ts
\A -G e n s h t\
T Y
P L
W C
-R o a d N
M F
T F
S (1 d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
SCHEDULE A
LOW WATER CROSSING
TYPICAL SECTIONS
STATE PROJECT
NUMBER
SHEET
NM
A6
NO SCALE
ADOPTED FROM US FOREST SERVICE - GILA NATIONAL FOREST
:5 u g u s t
C h a n n e l
T y p
S h e e t]
N M
\2
(1
R o a d w a y
\C A
D D
S h e e ts
\A -G e n s h t\ T
Y P
C h a n n e l_
N M
F
T F
S
(1 d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 1 of 3
OPTION X
CHANNEL RECONSTRUCTION
TYPICAL SECTIONS
STATE PROJECT
NUMBER
SHEET
NM
A7
ADOPTED FROM US FOREST SERVICE - GILA NATIONAL FOREST
:4 e p te m b e r
C h a n n e l
T y p
S h e
N M
\2
(1
R o a d w a y
\C A
D D
S h e e ts
\A -G e n s h t\ T
Y P
C h a n n e l_
N M
F
T F
S
(1 d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 2 of 3
OPTION X
CHANNEL RECONSTRUCTION
TYPICAL SECTIONS
STATE PROJECT
NUMBER
SHEET
NM
A8
:2 u g u s t
C h a n n e l
T y p
S h e
N M
\2
(1
R o a d w a y
\C A
D D
S h e e ts
\A -G e n s h t\ T
Y P
C h a n n e l_
N M
F
T F
S
(1 d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 3 of 3
OPTION X
CHANNEL RECONSTRUCTION
TYPICAL SECTIONS
STATE PROJECT
NUMBER
SHEET
NM
TULAROSA AOP
A9
Sheet and Description
B3 B4 B5-B6
Drainage
Summary
Surfacing
Summary
Misc.
Summaries Allowance
Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15210-3000 CENTERLINE, VERIFICATION AND For Low Water
STAKING MILE 0.020 0.020 Crossing work
A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15701-0000 SOIL EROSION CONTROL LPSM ALL
A0140 15702-1000 SOIL EROSION CONTROL,
TEMPORARY DIVERSION CHANNEL LPSM ALL
A0160 20101-0000 CLEARING AND GRUBBING ACRE 0.04 0.01 0.05
A0180 20303-0300 REMOVAL OF CONCRETE Includes portions of existing crossing &
SQYD 340 20 360 ford and all of apron
A0200 25101-2300 PLACED RIPRAP, METHOD B,
CLASS 3 CUYD 20 5 25
A0220 25306-1000 REVETMENT MAT, ARTICULATED
CONCRETE BLOCK (6-INCH DEPTH) SQYD 210 10 220
A0240 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 55 5 60
A0260 62201-0050 DUMP TRUCK, 5 CUBIC YARD
MINIMUM CAPACITY HOUR 30 30
A0280 62201-0900 WHEEL LOADER, 2 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 30 30
A0300 62201-3050 HYDRAULIC EXCAVATOR, RUBBER
TIRED, 1.0 to 1.25 CUBIC YARD
CAPACITY, 140-150HP MINIMUM HOUR 30 30
A0320 62301-0000 GENERAL LABOR HOUR 30 30
A0340 62302-0000 SPECIAL LABOR (BIOLOGICAL
MONITOR) HOUR 100 100
A0360 63301-0000 SIGN SYSTEM EACH 7 7
A0380 63502-0600 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 EACH 4 4
A0400 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 20 20
MileStone: 100% (Schedule A + Option X)
Date Completed: 08/09/22
Report Date: 08/09/22
A
M
E
N
D
Line
Item
No.
Pay Item
Number
SUMMARY OF QUANTITIES - Schedule A -A u g -2
:4 P
M
Remarks and/or
Determination of
Estimated Quantity
Pay Item Description Unit
Estimated
Quantities
N
N M
\2 (1
R o a d w a y \C
A D
D S h e e ts
\B -S u m m \S p re a d s h e e ts s u m m a ry
.x ls m ]S h e e t
STATE PROJECT
B1
NM FTFS 233(1)
TULAROSA AOP
NM
SHEET
NUMBER
Sheet and Description
B3 B4 B5-B6
Drainage
Summary
Surfacing
Summary
Misc.
Summaries Allowance
Bid
Schedule
X0020 15101-0000 MOBILIZATION LPSM ALL
X0040 15210-3000 CENTERLINE, VERIFICATION AND For Channel work
STAKING MILE 0.149 0.149
X0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
X0080 15701-0000 SOIL EROSION CONTROL LPSM ALL
X0100 15702-1000 SOIL EROSION CONTROL,
TEMPORARY DIVERSION CHANNEL LPSM ALL
X0120 20101-0000 CLEARING AND GRUBBING ACRE 0.70 0.05 0.75
X0140 62302-0000 SPECIAL LABOR (BIOLOGICAL
MONITOR) HOUR 140 140
X0160 62510-2000 SEEDING, HYDRAULIC METHOD To be used as needed for the roadway and
ACRE 1.0 1.0 channel
X0180 62515-2000 MULCHING, HYDRAULIC METHOD To be used as needed for the roadway and
ACRE 1.0 1.0 channel
X0200 64702-3600 MITIGATION, STREAMBED CHANNEL
RECONSTRUCTION LNFT 783 17 800
-A u g -2
:4 P
M
MileStone: 100% (Schedule A + Option X)
Date Completed: 08/09/22
Report Date: 08/09/22
N
N M
\2 (1
R o a d w a y \C
A D
D S h e e ts
\B -S u m m \S p re a d s h e e ts s u m m a ry
.x ls m ]S h e e t
(2
SUMMARY OF QUANTITIES - Option X
A
M
E
N
D
Line
Item
No.
Pay Item
Number Pay Item Description Unit
Estimated
Quantities Remarks and/or
Determination of
Estimated Quantity
STATE PROJECT
B2
NM FTFS 233(1)
TULAROSA AOP
NM
:5 u g u s t
D r a in a g e S u m m a r y
N M
\2 \R o a d w a y \C
A D
D S h e e ts
\B S u m m \B
S h e e ts
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DRAINAGE SUMMARY
STATE PROJECT
NUMBER
SHEET
NM
B3 u g u s t
S u r f a c in g S u m m a
N M
\2 \R o a d w a y \C
A D
D S h e e ts
\B S u m m \B
S h e e ts
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
SURFACING SUMMARY
STATE PROJECT
NUMBER
SHEET
NM
B4 u g u s t
M is c e ll a n e o u s S u m m a r ie s
N M
\2 \R o a d w a y \C
A D
D S h e e ts
\B S u m m \B
S h e e ts
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 1 of 2
MISCELLANEOUS SUMMARIES
STATE PROJECT
NUMBER
SHEET
NM
B5 u g u s t
M is c e ll a n e o u s S u m m a r ie s
N M
\2 \R o a d w a y \C
A D
D S h e e ts
\B S u m m \B
S h e e ts
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 2 of 2
MISCELLANEOUS SUMMARIES
STATE PROJECT
NUMBER
SHEET
NM
B6
JH
JHJH
JH
100'50'0
Scale in Feet
(50' L x 5' W x 2' D)
Place riprap, Class 3, Lt.
103+60.51 to 104+10.51
Existing ground
Proposed profile
El. = 5958.00 water crossing
Low point of low
103+23.85
E: 2459408.7713
N: 996119.2474
Station 102+57.50
NM FTFS 233(1)
Reconstruction
Low Water Crossing
Begin Schedule A
E: 2459500.0274
N: 996167.0310
Station 103+60.51
NM FTFS 233(1)
Reconstruction
Low Water Crossing
End Schedule A of the Tularosa River
Ordinary High Water Mark
Tularosa River
Water Mark of the
Ordinary High
Remove existing concrete ford
102+57.50 to 103+60.51 concrete existing
Saw cut
102+00 103+00 104+00 105+00 106+00 107+00
5,950
5,960
5,970 5,970
5,960
5,950
+0.434% -1.432%
.7
V
I
' VC20
2K = 5 ,9
.0
,9
.3
3. See D-Sheets for channel reconstruction work.
for payment.
2. Excavation for placement of riprap will not be measured match existing entering and exiting grades.
Place riprap according to Section 251. Grade riprap to and dispose material in accordance with Section 203.
Prior to placing riprap, remove existing debris material 1.
:Notes
:0 u g u s t
T u la r o s a A
O P
S c a le
S c a le
P la n
S h e
N M
\2 (1
R o a d w a y \C
A D
D S h e e ts
\C -M
L P
P
\P N
P N
M F
T F
S (1
In tl F t.
d g n
STA. 102+57.50 TO 103+60.51
PLAN-PROFILE - SCHEDULE A
LOW WATER CROSSING
STATE PROJECT
NUMBER
SHEET
NM
C1
Station 26+03
Channel Reconstruction
End Option X
Station 18+20
NM FTFS 233(1)
Channel Reconstruction
Begin Option X of the Tularosa River
Ordinary High Water Mark
Do Not Disturb Wetlands
Wetlands
Do Not Disturb
Wetlands
Do Not Disturb
Channel Grading Limits water crossing immediately downstream of low
First constructed riffle to begin
103+00
104+00
NO SCALE
ADOPTED FROM US FOREST SERVICE - GILA NATIONAL FOREST
:0 u g u s t
D D e s ig n I n tl
N M
\2 (1
R o a d w a y \C
A D
D S h e e ts
\D -M in o r_
P
P \P
N P
(C h a n n e l)
N
M F
T F
S (1
In tl F t.
d g n
STA. 18+18 TO 26+03
PLAN-PROFILE - OPTION X
CHANNEL RECONSTRUCTION
STATE PROJECT
NUMBER
SHEET
NM
D1
6.
5.
4.
3.
2.
1.
Control, Temporary Diversion Channel pay item.
channel diversion will be paid for under the 15702-1000 Soil Erosion
All materials and work required for installation of temporary system including sandbag dikes, geotextile mats, hoses, and pumps.
Remove all dewatering components upon removal of dewatering between the ground and the hose.
when installing the dewatering system. Install a geotextile
Reduce temporary impacts to the channel and surrounding area
3 cubic feet per second.
dissipators at outlet, etc. The pump must meet a base flow of containment systems, dikes, hoses, connections, energy
Contractor is responsible for sizing all pumps, secondary saturated soils in the stream after dewatering.
channel is conducted. Geotextile mats may be used for work on
The dewatering system must be in place before any work in the anticipated channel flow volumes in the Dewatering Plan.
equipment, soil erosion and sediment control measures, and
SCR Sections 107 and 157, respectively. Include layout, methods, Fish Salvage Plan and Dewatering Plan to the CO as required by
Dewatering is the responsibility of the Contractor. Submit a
ENVIRONMENT, WATER MANAGEMENT ADMINISTRATION
ADOPTED FROM THE MARYLAND DEPARTMENT OF THE
NO SCALE
NOTE:
CHANNEL DIVERSION
TEMPORARY
157-A
U.S. CUSTOMARY SPECIAL
:2
J u ly
T e m p o r a r y
C h a n n e l
D iv e r s io n
S h e
N M
\2
\R o a d w a y
\C A
D D
S h e e ts
\E
\S P
A
.d g n
SPECIAL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
NM
E1
OM3-L
OM3-L
OM3-R
OM3-R
W8-19
FW8-18c
FW8-18c
100'50'0
Scale in Feet
100+00
100+00
101+00
+00
109+00
:1 u g u s t
D D e s ig n I n tl
N M
\2
(1
R o a d w a y
\C A
D D
S h e e ts
\T -6
\S ig n in g
P la n
N M
F
T F
S
(1 d g n
STA. 101+00 TO 105+00
SCHEDULE A
SIGNING PLAN
STATE PROJECT
NUMBER
SHEET
NM
T1
W
3W
H
H
H
W 4
W 4 W 4
W
W 6
W
W
W m in
6' (min.)
m in
STOP
W
W of curb
Front face
SPEED
LIMIT
NO SCALE
** See Note 3
* See Note 2 pavement
Edge of
633-01
6' (min.)
m in shoulder
Edge of
6' (min.)
m in
M PH
pavement
Edge of
POST TYPE
POST
SINGLE
POST
DOUBLE
POST
TRIPLE
POST
QUADRUPLE
DETAIL APPROVED FOR USE
POST SIZE TABLE
MAXIMUM SIGN AREA (SQFT)
4" x 4"
SIZE
POST
4" x 6"
6" x 6"
3 lb/ft
2" 12 ga.
2" 12 ga.
Class B
10 ga.
2" x 2"
10*
10*
10*
10*
24**
SIGN STRUCTURES
m a x
H /5 o r m a x
H /5 o r m a x
H /5 o r
SINGLE POST DOUBLE POST TRIPLE POST QUADRUPLE POST
(min.)
2'
W
ROADSIDE SIGN IN RURAL DISTRICT
WITHOUT SHOULDER WITH SHOULDER
WITH ADVISORY SPEED PLAQUE
OR RESIDENTIAL DISTRICT
ROADSIDE SIGN IN BUSINESS
Wood
U-Channel Steel
Steel
Square Tubular
Resistant Steel
Corrosion m a x
W
W
W
(typ.)
2" (max.)
(typ.)
2" (max.)
(typ.)
2" (max.)
NOTES:
additional information.
Refer to Section 2A.21 of the MUTCD, latest edition, for
U-channel steel and square tubular steel posts.
Refer to Detail E633-04 for bracing details for wood, for wood, U-channel steel and square tubular steel posts.
Refer to Detail E633-03 for breakaway support details for corrosion resistant steel posts.
Refer to Detail E633-02 for breakaway support details according to manufacturer's recommendations.
panel area is equal to 24 square feet, use slip base
For square tabular steel double posts for which the sign feet or less but W is over 4 feet, use double posts.
steel posts for which the sign panel area is 10 square
For U-channel, square tubular, and corrosion resistant
(MUTCD), latest edition.
Uniform Traffic Control Devices for Streets and Highways"
Locate and set sign height according to the "Manual on
7.
6.
5.
4.
3.
2.
1.
REVISED: SEPTEMBER 2020
APPROVED: MAY 2011
:2
M a r c h
U
S C u s to m a r y B o r d
N M
\2 \R o a d w a y \C
A D
D S h e e ts
\T \s t6 d e ta il .d g n
DETAIL
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
CFLHD DETAIL
STATE PROJECT
NUMBER
SHEET
NM
T2
2" X 2" dia.
Bolt Torque ft-lbs
NOTES:
633-02
NO SCALE
(G) (H) (J) (K) (L) (M) (N)
DETAIL APPROVED FOR USE
POST SIZE
POST SIZE
t
CORROSION RESISTANT STEEL
BREAKAWAY SIGN SUPPORT
plates, 20 ga.
Bond breaking plates, 20 ga.
Bond breaking
POST SIZE
CONCRETE FOOTING
DIA. MINIMUM DEPTH
2" X 2" 12" 3'
1t(A) (B) (C) (D) (E) (F)
BOLT SPECIFICATIONS
d 3t 1 c
" weep hole4 1Drill
" weep hole4 1Drill
See Notes 4 and 5
SINGLE POST BREAKAWAY
4" 5"
FUSE PLATE DATA TABLE
4" "4 12 "8
11 2" "8 7 "16
9 "8 5 "16
7 "4 1 "4
1 "8
FOOTING DATA TABLE
BOND BREAKING PLATE DATA
w(R)
LEGEND:
in r o c k m a x
BASE CONNECTION DATA TABLE
Breakaway plate (typ.)
See Notes 4 and 5 w
E
REVISED: JANUARY 2019
APPROVED: MAY 2011
Weld triangle
High Strength HS
"2 16 "4
31 "4 3 "8
11 "8 5 "16
3 "16 3"16
Dia. Length in-lbs Torque
"8 52" X 2" "2
12 450
See Base Connection Data Table washers and nuts (typ.)
HS structural bolts with
A
CE
F
BD
A
B ig n p a n e l
3t
G
Sign post
K
L M
L
L t2
2t
Sign post
1t t1 w
2t
2t w
1t 1t
SIDE ELEVATION
SIDE ELEVATION
BOND BREAKING PLATE
SECTION A-A
BREAKAWAY PLATE
A
A
A A
Concrete footing
N
CONCRETE FOOTING
SINGLE POST BREAKAWAYMULTIPLE POST BREAKAWAY
for wrench access
Bevel to allow Sign post
FRONT ELEVATION
SIDE ELEVATION
J
Finished grade
See Note 6
See Note 6
1c , no cut bolt hole d
Diameter of
R (typ.)
R (typ.)
S e e F o o ti n g D a ta
T a b le
M in im u m f o o ti n g d e p th web cut through
One flange and at C of plate
C Post cut through
Sign post notches down
Fuse plate, FUSE PLATE
Fuse plate for wrench access
Bevel to allow
Concrete footing
Traffic flow
Traffic flow
Traffic flow and nuts (typ.)
with washers
Structural bolts
:2
M a r c h
U
S C u s to m a
N M
\2 \R o a d w a y \C
A D
D S h e e ts
\T \s t6 d e ta il .d g n
DETAIL
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
CFLHD DETAIL
STATE PROJECT
NUMBER
SHEET
NM
T3
Sign panel
4''
STATE PROJECT
m in m in m a x
S e e N o te
633-03
NOTES:NOTES:
NO SCALE
DETAIL APPROVED FOR USE
Traffic flow
DETAIL APPROVED FOR USE
Tr af fic fl ow
Tr af fic fl ow
U-CHANNEL STEEL POST SQUARE TUBULAR STEEL POST WOOD POST
POST SIZE HOLE DIAMETER
4'' x 4''
4'' x 6''
6'' x 6''
Not Required
1.5''
2''
3'
4'
4'
BREAKAWAY SIGN SUPPORT
t o s p li c e o v e r la p
Existing ground
(MIN.)
(D) m in
WOOD POST DATA TABLE
See Table
Holes (See Table)
WOOD AND STEEL POSTS
BREAKAWAY SIGN SUPPORT
m a x th is fa ce o f p os t)
(M ou nt si gn p an el on th is fa ce o f p os t)
(M ou nt si gn p an el on
See Notes 5 and 6
Galvanized steel corner bolt
See Notes 5 and 6
Anchor (12 ga. min.)
U-channel sign post
Square tubular sign post
Wood sign post
Stub bolts, nuts and washers
" dia. galvanized 16 5Four m a x
:2
M a r c h
U
S C u s to m a r y B o r d
N M
\2 \R o a d w a y \C
A D
D S h e e ts
\T \s t6 d e ta il .d g n
DETAIL
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
CFLHD DETAIL
STATE PROJECT
NUMBER
SHEET
NM
T4
WITH BATTEN WITHOUT BATTEN
1 (typ.)
1'' x 3'' Wood batten
Sign panel
Sign panel
633-04
NOTES:NOTES:
NO SCALE
DETAIL APPROVED FOR USEDETAIL APPROVED FOR USE
Sign panel sign bracing
" Galvanized steel 8
WOOD POST
Sign panel
Sign post
Sign bracing
SIGN BRACING
SQUARE TUBULAR STEEL POST
U-CHANNEL STEEL POST
TOLERANCES
BRACING INSTALLATION
Square tubular sign post
Wood sign post (typ.)
U-channel sign post
" x 0.012" (±) Shim plate2 1" x 32
Sign bracing (Stringer) hex nut, and washer
" dia. galvanized round head bolt, 16 head bolt, nut, and washers (typ.)
" dia. x 1" long galvanized hex 4 head bolt, nut, and washers (typ.)
" long galvanized hex 2 1" dia. x 38 nut and washer
" dia. galvanized bolt, 16 with nylon insert lock nut
" dia. galvanized steel bolt 16 in sign panel (typ.)
" dia. hole 16 5Field drill
" to 2"2 t o
:2
M a r c h
U
S C u s to m a r y B o r d
N M
\2 \R o a d w a y \C
A D
D S h e e ts
\T \s t6 d e ta il .d g n
DETAIL
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
CFLHD DETAIL
STATE PROJECT
NUMBER
SHEET
NM
T5
NOTES:
Traffic flow
Traffic flow
WORK SPACE
6" (max.)
ELEVATION
BUFFER SPACE
BUFFER SPACE
light
Type B warning
Traffic flow
Traffic flow
VARIABLE150'
with R11-2 (48"x30")
Barricade Type 3 light
Type B warning light
Type B warning in the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored field conditions as approved by the CO.
Final location and spacing of signs and devices may be changed to fit
2.
1.
ROAD CLOSED TO ALL TRAFFIC
ROAD
CLOSED
Centerline of Road with R11-2 (48"x30")
Barricade Type 3
Edge of roadway
ROAD
CLOSED
ROAD
CLOSED
150'
ROAD CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
635-A
:1 e b r u a r y
D D e s ig n S u r v
N M
\2 \R o a d w a y \C
A D
D S h e e ts
\T \s p A
.d g n
SPECIAL
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
CFLHD SPECIAL
STATE PROJECT
NUMBER
SHEET
NM
T6
U.S. CUSTOMARY SPECIAL
647-AADOPTED FROM US FOREST SERVICE - GILA NATIONAL FOREST
NO SCALE
:2 e p te m b e r
S p a n n e r J a m
S h e
N M
\2
\R o a d w a y
\C A
D D
S h e e ts
\T
\S p
A
S p a n n e r J a m
.d g n
SPECIAL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
SPANNER JAM DETAILS
STATE PROJECT
NUMBER
SHEET
NM
T7
| A-Gen_sht |
| TTL_US |
| sym |
| sym |
| NM_233(1)_Control_Sheet |
| STE_NM_FTFS_233(1) |
| TYP_LWC-Road_NM_FTFS_233(1) |
| TYP_Channel_NM_FTFS_233(1) |
| TYP_Channel_NM_FTFS_233(1) |
| TYP_Channel_NM_FTFS_233(1) |
| B-Sum |
| Summary of Quantities - Schedule A |
| Summary of Quantities - Option X |
| B_Sheets |
| B_Sheets |
| B_Sheets |
| B_Sheets |
| C-ML_P&P |
| PNP_NM_FTFS_233(1)_IntlFt |
| D-Minor_P&P |
| PNP(Channel)_NM_FTFS_233(1)_IntlFt |
| E-150 |
| SP157-A |
| T-600 |
| Signing_Plan_NM_FTFS_233(1) |
| st63301_detail |
| st63302_detail |
| st63303_detail |
| st63304_detail |
| sp635-A |
| Sp 647-A Spanner Jam |
| 2022-09-02T08:59:45-0600 | |
| CURTIS R SCOTT |
File details come from the government source that posted it. Updated .