This document outlines requirements for a federal construction contract opportunity for improvements to the Tularosa Arroyo Openings Project in New Mexico. The solicitation is for engineered log jams, articulated concrete blocks, erosion control, biological monitoring and a stream reconstruction. A pre-bid meeting presentation provides additional details on project scope including replacing an existing low water crossing and addressing downstream channel conditions. Contract requirements specify equipment sanitization, providing a biological monitor, developing an erosion control and stormwater pollution prevention plan, obtaining approval for working in the Tularosa River, and adhering to traffic control plans. The government will provide a stream restoration professional and has a listed source for logs. The small business set-aside contract is to be awarded in two schedules with a completion date of June 30, 2023 and no ground disturbing before February 15. The bid opening is December 1, 2022 and questions are due by November 23 to the identified email.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NM FTFS 233(1)
Tularosa AOP Improvements
Pre-Bid Meeting November 15, 2022
Presentation Outline
• Project Partners
• Project Introduction
• Project Photo Log
• Project Scope
• Contract Requirements & Solicitation Notes
Project Partners
Design Engineer;
Construction Contract
Administration
Owner, Maintaining Agency
Roles & Responsibilities
Project Introduction Project Location
Project Introduction Project Location
Project Photo Log Existing crossing with concrete apron, note plunge pool
Looking downstream at crossing and concrete apron
Looking upstream at concrete apron
Existing low water crossing
Downstream channel conditions
Downstream channel conditions
Downstream channel conditions, end of stream reconstruction
Crossing approach
Project Scope
• Articulated Concrete
Blocks
• Engineered Log Jams
Contract Requirements
• Sanitize equipment that comes in contact with raw water
• Provide Biological Monitor (site surveys, relocation of aquatic species)
• Contractor designed erosion control and SWPPP
• Submit diversion plan for work in Tularosa River
• Traffic Control (road can be closed to public traffic, allow emergency and administrative access through project site)
• Government-provided, stream restoration professional will be on site during beginning of stream reconstruction work
• Government Listed Source for Logs
• Contract Completion Date of June 30, 2023 (No ground disturbing activities until February 15, 2023)
Solicitation Notes
• Small business set-aside
• Intent is to award both Schedule A and Option X (split due to different funding sources).
• Bid opening scheduled for December 1, 2022 at 2:00pm MST.
• Submit all questions in writing to CFLContracts@dot.gov. Deadline for submitting technical questions is November 23, 2022 at 4:00pm MST.
Questions
Thank you for your interest in this project