This document is a Request for Bid for a project to replace the South Fork Negrito Creek Bridge on Forest Route 141 (MP 24.36) in Catron County, New Mexico. The existing single-span bridge is in poor condition and needs to be replaced with a similar structure, including new bridge rail, transition and guardrail, and paved approaches on each side. The project is located in the Gila National Forest with elevations up to 7500 ft. The Federal Highway Administration is the responsible agency. Proposal responses are being solicited, with plans and specifications available under the attachments. No other details are provided regarding proposal submission requirements, evaluation criteria, award dates, or pricing terms.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CURTIS R
SCOTT
Digitally signed by CURTIS R SCOTT Date: 2024.06.11 11:33:26 -06'00'
Sheet and Description
B3 B4 S2
Grading and Surfacing
Summaries
Miscellaneous Summaries
General Notes &
Estimates Allowance Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15214-1000 SURVEY AND STAKING, BRIDGE LPSM All ALL
A0060 15225-0000 SLOPE, REFERENCE, AND
CLEARING AND GRUBBING CONTROL MILE 0.071 0.071
A0080 15236-2000 SURVEY CONTROL, GRADE
FINISHING MILE 0.109 0.109
A0100 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0120 15401-0000 CONTRACTOR TESTING LPSM ALL
A0140 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0160 15701-0000 SOIL EROSION CONTROL LPSM ALL
A0180 20101-0000 CLEARING AND GRUBBING ACRE 0.48 0.07 0.55
A0200 20304-2000 REMOVAL OF BRIDGE LPSM All ALL
A0220 20310-1000 PLUG, EXISTING PIPE EACH 1 1
A0240 20420-0000 EMBANKMENT CONSTRUCTION CUYD 1,475 75 1,550
A0260 20801-0000 STRUCTURE EXCAVATION CUYD 100 100 Contract Quantity
A0280 20803-0000 STRUCTURAL BACKFILL CUYD 40 40 Contract Quantity
A0300 25101-2400 PLACED RIPRAP, METHOD B,
CLASS 4 CUYD 290 290
A0320 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 517 33 550
A0340 40301-0100 ASPHALT CONCRETE PAVEMENT,
TYPE 1 TON 138 14 152
A0360 41201-0000 TACK COAT TON 0.46 0.04 0.50
A0380 55201-0200 STRUCTURAL CONCRETE, CLASS A Contract Quantity
(AE) CUYD 44 44
A0400 55401-1000 REINFORCING STEEL LB 4,600 4,600 Contract Quantity
A0420 55504-0000 PRE-FABRICATED STEEL BRIDGE
(24'x78') LPSM All ALL
A0440 56501-0200 DRILLED SHAFT, 24-INCH
DIAMETER LNFT 142 142
A0460 61701-4550 GUARDRAIL SYSTEM MGS, TYPE 2,
CLASS A WOOD POSTS LNFT 25 25
A0480 61702-1500 TERMINAL SECTION, TYPE MGS
TANGENT EACH 4 4
A0500 61707-0000 STRUCTURE TRANSITION RAILING LNFT 50 50 Contract Quantity
A0520 62201-0200 DUMP TRUCK, 8 CUBIC YARD
MINIMUM CAPACITY HOUR 10
A0540 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT
MINIMUM RATED CAPACITY
BUCKET, 24-INCH WIDTH HOUR 10
MileStone: 100% Re-Estimate Date Completed: 02/08/24 Report Date: 02/08/24
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A
8- Fe b-
:5
PM
Remarks and/or Determination of Estimated
Quantity Pay Item Description Unit
Estimated Quantities
N
N M
\1
(1
R oa dw ay
\C A D
D _S he et s\ B -S um m su m m ar y2
0.
xl sm
]S he et
PROJECT
B1NM FS 141(1)
S. FORK NEGRITO CR BR
SHEET
NUMBER
Sheet and Description
B3 B4 S2
Grading and Surfacing
Summaries
Miscellaneous Summaries
General Notes &
Estimates Allowance Bid
Schedule
A0560 62201-0950 WHEEL LOADER, 3 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 10
A0580 62201-2750 MOTOR GRADER HOUR 10
A0600 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC
YARD MINIMUM CAPACITY HOUR 10
A0620 62301-0000 GENERAL LABOR HOUR 20
A0640 62302-1100 SPECIAL LABOR, HIRED SURVEY
SERVICES HOUR 20
A0660 62406-0300 PLACING CONSERVED TOPSOIL,
4-INCH DEPTH ACRE 0.38 0.07 0.45
A0680 62510-1000 SEEDING, DRY METHOD ACRE 0.38 0.07 0.45
A0700 62515-1000 MULCHING, DRY METHOD ACRE 0.38 0.07 0.45
A0720 63316-1000 REMOVE AND RESET SIGN EACH 2 2
A0740 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
8- Fe b-
:5
PM
MileStone: 100% Re-Estimate Date Completed: 02/08/24 Report Date: 02/08/24
N
N M
\1
(1
R oa dw ay
\C A D
D _S he et s\ B -S um m su m m ar y2
0.
xl sm
]S he et
2)
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
PROJECT
B2NM FS 141(1)
S. FORK NEGRITO CR BR
SHEET
NUMBER
Pay Item 20420-0000 For info only
BCY BCY BCY BCY BCY CCY CCY CCY CUYD CCY CCY CCY BCY
100+80 - 101+97 26 0 26 0 3 0.9 21 85 0 85 170 255 -235 261 101+97 - 102+97 0 0 0 0 0 0.9 0 848 0 848 71 919 -918 1,020 103+77 - 104+77 0 0 0 0 0 0.9 0 538 0 538 52 590 -590 655 104+77 - 105+36 30 0 30 0 5 0.9 22 4 0 4 5 9 14 -16
56 0 56 0 8 43 1,475 0 1,475 298 1,773 -1,729 1,920
NOTE:
1.
2.
3. Unavailable material includes Topsoil Stripping in Cuts.
4. Various additional backfill material needed onsite includes Topsoil Replacement Under Fill.
5.
6.
7.
For info only
Roadway Excavation
Available Material
Unclassified borrow quantity calculated using volumes adjusted for shrink/swell. An assumed value of 0.9 was used for calculations. The contractor is responsible for determining the shrink/swell on the borrow material.
TOTALS
GRADING SUMMARY
For info only
Approach Roads
Roadway Excavation Additional Excavation For info only Embankment
The quantities shown herein are approximations. Payment will be made for the actual quantities of work performed.
BCY = Bank cubic yard - one cubic yard of material as it lies in the natural state.
CCY = Compacted cubic yard - one cubic yard of material after it has been compacted to specification density.
Total Embankment
Excavation - Embankment
Various
Additional Backfill Material Needed Onsite
(see note 4)
Quantities based on prismoidal (surface to surface) volumes.
Conserve 4 inches of topsoil in cut and fill slope areas.
Shrink/Swell Factor
Total Excavation
Available For Fills
Unavailable
Material (see note 3)
Prismoidal Volume
Approach Roads
Embankment ConstructionStation to Station
Prismoidal Volume
Estimated Unclassified
Borrow Volume
(see note 5)
30202-2000 40301-0100 41201-0000
TON TON TON
100+80 - 101+97 167 101+97 - 102+97 133 44 0.23
103+77 - 104+77 133 44 0.23 104+77 - 105+36 84
517 138 0.46
NOTE:
1. Tack coat for bridge deck is include in price for 40301-0100
Values used for estimating purposes:
Aggregate base . . . . 139 lb/ft3
Hot asphalt concrete pavement . . . . 145.2 lb/ft3 Tack coat . . . . 0.1 gal/yd2 (233 gal/ton)
SURFACING SUMMARY
ASPHALT
CONCRETE
PAVEMENT,
TYPE 1
TACK COAT
TOTALS
Station to Station
ROADWAY
AGGREGATE,
METHOD 2
Bridge Deck
15225-0000 15236-2000
SLOPE, REFERENCE,
AND CLEARING AND
GRUBBING CONTROL
SURVEY CONTROL,
GRADE FINISHING Remarks
MILE MILE
100+80 - 101+97 0.022 0.022 101+97 - 102+97 0.019 0.038 103+77 - 104+77 0.019 0.038 104+77 - 105+36 0.011 0.011
0.071 0.109TOTAL
Item Number
Station to Station Side
SURVEY AND STAKING SUMMARY
20101-0000 62406-0300 62510-1000 62515-1000
CLEARING AND
GRUBBING
PLACING
CONSERVED
TOPSOIL, 4-INCH
DEPTH
SEEDING, DRY
METHOD
MULCHING, DRY
METHOD Remarks
ACRE ACRE ACRE ACRE
100+80 - 102+97 0.31 0.21 0.21 0.21 103+77 - 105+36 0.17 0.17 0.17 0.17
0.48 0.38 0.38 0.38TOTAL
Item Number
Station to Station Side
CLEARING AND GRUBBING AND SEEDING SUMMARY
63316-1000
REMOVE AND RESET
SIGN Remarks
EACH
RT 1 SOUTH FORK NEGRITO CR.
LT 1 SOUTH FORK NEGRITO CR.
REMOVALS SUMMARY
TOTAL
Item Number
Station to Station Side
103+18 103+78
20310-1000
PLUG, EXISTING PIPE Remarks
EACH
LT/RT 3 1
DRAINAGE SUMMARY
Item Number
Station Side
TOTAL
Skew (deg)
104+11
61701-4550 61702-1500
GUARDRAIL SYSTEM
MGS, TYPE 2, CLASS
A WOOD POSTS
TERMINAL SECTION,
TYPE MGS TANGENT Remarks
LNFT EACH
102+57.78 - 102+82.78 LT 1
102+51.72 - 102+89.22 RT 12.5 1
103+84.78 - 104+22.28 LT 12.5 1
103+91.22 - 104+16.22 RT 1
25 4TOTAL
Item Number
Station to Station Side
GUARDRAIL SUMMARY