NLDS 90x90 pad sunshade footings.pdf

PDF 269 KB Posted

Attached to
NLDS Pad Sunshade Federal contract opportunity
Solicitation number
FA930226Q0035
Issued by
Department of the Air Force Materiel Command Test Center

About this file

This is a facility layout diagram for a 90-foot by 90-foot concrete operational area. The diagram depicts the spatial arrangement and electrical requirements for multiple containerized systems and storage facilities positioned around a central flightline.

The layout includes three storage containers on the left side powered by US 120V electricity, with one designated as PFE 2. The central area contains five operational containers: two Server Containers requiring EU 400V 63A power with data connections, one Mission Planning container requiring EU 400V 32A power with data connection, one DDF (Data Distribution Frame) container requiring US 208V power, and one OBK Container requiring US 120/208V power. A PFE (Portable Flightline Equipment) facility occupies the right side of the layout. Electrical infrastructure includes 120V lighting provisions under the roof structure and separate 120V lighting and air conditioning systems for PFE 2. The diagram specifies power and data connectivity requirements for each container, with dimensional annotations indicating spacing and structural positioning relative to the concrete pad and flightline.

View the file

Other files for this federal contract opportunity

Other files attached to NLDS Pad Sunshade, newest first.
File Type Posted
Questions and Answers - NLDS Pad Sunshade.pdf PDF
Solicitation - FA930226Q0035.pdf PDF
SOW - NLDS Pad Sunshade.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PFE 2

US power

120V Storage

Storage Storage

OBK

Container US power 120/208V

DDF

US POWER

208V

Server Container EU power 400V 63A

Power

Po w er +D at a

Power+Data

Dimensions of the concrete 90ft x 90ft

Fl ig h tl in e

Mission Planning

EU power 400V 32A

Server Container EU power 400V 63A

PowerData

Power

Data

Power

Data

8ft

PFE

Electrical 120V for Lighting under the Roof Next to foot for the Roof

Electrical 120V for

Lighting and AC in PFE 2

For Future use

3ft

1Ft

30ft3ft

5ft 5ft

8ft ft ft

.5 ft

.5 ft ft ft

Container park 12-Dec-2024.vsdx
Page-1

File details come from the government source that posted it. Updated .