njdot TP-848 A Solicitation.docx.pdf

PDF 189 KB Posted

Attached to
(1) - Hendricks Causeway Bridge Over Northern Running Track (Design B-1 Level C, E-3 Level A, H-1 Level A, T-1 Level A)
Solicitation number
TP-848
Issued by
Mercer County, New Jersey

About this file

This is a technical proposal solicitation issued by the New Jersey Department of Transportation for Design services on the Hendricks Causeway Bridge replacement project located in Ridgefield Borough, Bergen County. The project involves the full scope replacement of the bridge to address structural, geometric, and operational deficiencies. The proposed three-span continuous bridge will include a 9'-8 1/2" shared use path on the south, two 12'-0" eastbound lanes, one 12'-0" westbound lane, 6'-0" shoulders, and an 8'-0" shared use path on the north. The solicitation was posted on July 31, 2026, with a technical proposal closing date of August 31, 2026. The last date to submit questions is August 24, 2026, with an anticipated selection date in November 2026. This is a one-step procurement process with one selection to be made. The scope of work is limited to preliminary design activities only under the initial agreement, with final design and construction engineering services to be initiated later as extra work at the sole discretion of the state.

Eligible firms must be prequalified with NJDOT in the following disciplines: B-1 Bridge Design - Non-Movable Structure (Level C), E-3 Environmental Services (Level A), H-1 Highway Design (Level A), and T-1 Traffic Engineering (Level A). Only one technical proposal submission per firm is permitted unless otherwise noted; no teams are allowed unless submitted as a joint venture with all participating firms prequalified and all discipline requirements met. The project is federally funded and structured as a project-specific agreement with a cost plus fixed fee arrangement. There is no certified firm utilization goal for this project. All subconsultants must be cost basis approved by NJDOT as of 10:00 AM on the closing date. Proposing firms must comply with federal affirmative action requirements, post-employment restrictions for ex-NJDOT employees, and must submit required documentation including Business Registration Certificates, Ownership Disclosure Forms, and certifications regarding prohibited investment activities in Iran, Russia, and Belarus.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PM 1-Step Federal 1-2026 1

NEW JERSEY

DEPARTMENT OF TRANSPORTATION

SOLICITATION #848

FOR TECHNICAL PROPOSALS

(ONE STEP PROCUREMENT PROCESS)

HENDRICKS CAUSEWAY BRIDGE OVER NORTHERN

RUNNING TRACK

TYPE OF PROJECT (CES CATEGORY): Design

DIVISION: Division of Project Management Team A

FUNDING SOURCE: Federal

TYPE OF AGREEMENT:

Project Specific Agreement - Cost Plus Fixed Fee

NUMBER OF SELECTIONS: One selection will be made from technical proposals received

DATE OF SOLICITATION: 7/31/2026

CLOSING DATE: 8/31/2026

LAST DATE TO SUBMIT QUESTIONS: 8/24/26

ANTICIPATED SELECTION DATE: November 2026

PROJECT DESCRIPTION

This is a full scope Bridge replacement project in Ridgefield Borough of Bergen County. The purpose of this project is to replace the bridge and provide the minimum required curb-to-curb width and vertical under clearance and improve the vertical geometry to eliminate the substandard sight distances. The new structure will be a three-span continuous bridge and include a 9’-8 1/2” shared use path on the south, two 12’-0” EB lanes, a 12’-0” westbound lane, 6’-0” shoulders and an 8’-0” shared use path on the north. This project will address the structural, geometric and operational deficiencies of the bridge and to provide safe, efficient, and reliable passage for all users and modes of transportation.

PM 1-Step Federal 1-2026 2

ELIGIBLE FIRMS/

See the attached list of firms that are presently prequalified for this project. These firms are eligible to submit a Technical Proposal. If your firm is not on this list, your Technical Proposal will only be accepted if your firm becomes prequalified with the NJDOT as of 10:00 AM on the closing date of this solicitation in the following discipline(s) and level of service. Firms are urged to call Professional Services at 609-963-2324 if your firm is not on the attached eligible firm listing but intends to submit a Technical Proposal.

DISCIPLINE (S) LEVEL OF SERVICE

B-1, BRIDGE DESIGN – NON- MOVABLE STRUCTURE C

E-3, ENVIRONMENTAL SERVICES A

H-1, HIGHWAY DESIGN A

T-1, TRAFFIC ENGINEERING A

Only one (1) technical proposal submission is allowed per firm (no teams) unless otherwise noted on page 1 of this solicitation. The Department shall evaluate the technical qualifications and experience of the firm’s project team and select the most highly qualified team to perform the projects.

Subconsultants that plan to participate in this solicitation should be cost basis approved by the NJDOT as of 10:00 AM on the closing date of this solicitation. Failure to comply with this requirement may result in disqualification from the Project. Cost Basis Approval can take several weeks to complete.

Firms wanting to Joint Venture may do so by returning a completed Statement of Joint Venture as part of their submission of a Technical Proposal. Each firm participating in the Joint Venture must be prequalified by the NJDOT. Each discipline and level of service requirement of a project must be satisfied by at least one member of the Joint Venture. Please refer to our website for the Statement of Joint Venture form.

CERTIFIED FIRM UTILIZATION

Federal Goal:

There is no goal for the project.

CONSULTANT QUESTIONS

E-mail question(s) to PSPD@dot.nj.gov. Specify TP “posting number” question in subject line. The Bureau of Professional Services will forward the question(s) to the Project Manager and post all questions and answers on the Professional Services Website.

SUBMITTAL DUE DATE / TIME

Technical Proposals must be uploaded to the New Jersey Department of Transportation through Bid Express. The automatic Bid Express deadline for TP submission is 10:00 AM on the closing date of the solicitation. See the Professional Services website for the complete procedure. The file name format for uploading your submission shall be as follows:

TP-XXX FIRM NAME XXX = The TP Solicitation Number

(TP *dash* XXX *space* FIRM NAME) FIRM NAME = Your Company Name

AFFIRMATIVE ACTION

Bidders are required to comply with the requirements of Title VI of the Civil Rights Act of 1964. Specifically, "the contractor, sub recipient or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 C.F.R., part 26 in the award

PM 1-Step Federal 1-2026 3 and administration of DOT-assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the recipient deems appropriate."

Prior to execution of an Agreement, the selected firm will be required to submit the following documents disclosing Affirmative Action evidence: Letter of Federal Approval or Letter of Approval of EEO/AA Program provided by NJDOT Division of Civil Rights. If a firm does not have the approval letter, they must submit their Affirmative Action Plan to the NJDOT's Division of Civil Rights for approval.

POST EMPLOYMENT RESTRICTIONS OF THE NJ CONFLICTS OF INTEREST LAW

Firms are advised to be aware of Post Employment restrictions for ex-NJDOT employees who are utilized for work under this technical proposal. Failure to comply with this may result in disqualification from the Project. Refer to NJSA 52:13D-17, which states:

No State officer or employee or special State officer or employee, subsequent to the termination of his office or employment in any State agency, shall represent, appear for, negotiate on behalf of, or provide information not generally available to members of the public or services to, or agree to represent, appear for, negotiate on behalf of, or provide information not generally available to members of the public or services to, whether by himself or through any partnership, firm or corporation in which he has an interest or through any partner, officer or employee thereof, any person or party other than the State in connection with any cause, proceeding, application or other matter with respect to which such State officer or employee or special State officer or employee shall have made any investigation, rendered any ruling, given any opinion, or been otherwise substantially and directly involved at any time during the course of his office or employment. Any person who willfully violates the provisions of this section is a disorderly person; and shall be subject to a fine not to exceed $1000.00 or imprisonment not to exceed six months, or both.

BUSINESS REGISTRATION FOR PROVIDERS OF GOODS AND SERVICES TO THE STATE

(UPLOAD IN DESIGNATED AREA IN BID EXPRESS, DO NOT INCLUDE IN TECHNICAL PROPOSAL)

In accordance with N.J.S.A. 52:32-44, all New Jersey and out of State consultants must obtain a Business Registration Certificate (BRC) from the Department of the Treasury, Division of Revenue prior to conducting business with the Department. The bidder must submit a copy of its BRC and that of any named subcontractor to the Department prior to the time a contract is awarded or authorized. A bidder who fails to submit a copy of a valid BRC in accordance with the statute will be held liable for monetary penalties in accordance with N.J.S.A. 54 :49-4.1

Questions regarding how to obtain a BRC can be directed to the Division of Revenue at (609) 292-1730. The business registration form (Form NJ-REG) can be found online at: The Department of Treasury - Business Registration.

DIANE B. ALLEN EQUAL PAY ACT

Pursuant to the DIANE B. ALLEN EQUAL PAY ACT, N.J.S.A. 34:11-56.14(a)., the consultant shall provide the Commissioner of Labor and Workforce Development with a report regarding the compensation and hours worked by employees categorized by gender, race, ethnicity, and job category.

Information regarding the Diane B. Allen Equal Pay Act and its requirements may be obtained from the New Jersey Department of Labor and Workforce Development (LWD) web site at:

https://nj.gov/labor/equalpay/equalpay.html

LWD forms may be obtained from the online web site at:

https://nj.gov/labor/forms_pdfs/equalpayact/MW-562withoutfein.pdf

OWNERSHIP DISCLOSURE

No corporation, partnership, or limited liability company shall be awarded any contract nor shall any agreement be entered into for the performance of any work or the furnishing of any materials or supplies, the cost of which is to be

PM 1-Step Federal 1-2026 4 paid with or out of any public funds, by the State, or any county, municipality or school district, or any subsidiary or agency of the State, or of any county, municipality or school district, or by any authority, board, or commission which exercises governmental functions, unless prior to the receipt of the bid or accompanying the bid, of said corporation, said partnership, or said limited liability company there is submitted a statement setting forth the names and addresses of all stockholders in the corporation who own 10 percent or more of its stock, of any class, or of all individual partners in the partnership who own a 10 percent or greater interest therein, or of all members in the limited liability company who own a 10 percent or greater interest therein, as the case may be. If one or more such stockholder or partner or member is itself a corporation or partnership or limited liability company, the stockholders holding 10 percent or more of that corporation’s stock, or the individual partners owning 10 percent or greater interest in that partnership, or the members owning 10 percent or greater interest in that limited liability company, as the case may be, shall also be listed.

The disclosure shall be continued until names and addresses of every noncorporate stockholder, and individual partner, and member, exceeding the 10 percent ownership criteria established in this act, has been listed.

To comply with this section, a bidder with any direct or indirect parent entity which is publicly traded may submit the name and address of each publicly traded entity and the name and address of each person that holds a 10 percent or greater beneficial interest in the publicly traded entity as of the last annual filing with the federal Securities and Exchange Commission or the foreign equivalent, and, if there is any person that holds a 10 percent or greater beneficial interest, also shall submit links to the websites containing the last annual filings with the federal Securities and Exchange Commission or the foreign equivalent and the relevant page numbers of the filings that contain the information on each person that holds a 10 percent or greater beneficial interest.

Pursuant to N.J.S.A. 52:25-24.2, in the event the Bidder is a corporation, partnership or sole proprietorship, the Bidder must complete the attached Ownership Disclosure Form. A current completed Ownership Disclosure Form must be received prior to or accompany the proposal. Failure to submit the form will preclude the award of a contract.

NOTICE CERTIFICATION OF NON-INVOLVEMENT IN PROHIBITED ACTIVITIES IN IRAN

Pursuant to N.J.S.A. 52:32-58, the bidder must certify that neither the bidder, nor one of its parents, subsidiaries, and/or affiliates (as defined in N.J.S.A. 52:32-56(e)(3)), is listed on the Department of the Treasury's List of Persons or Entities Engaging in Prohibited Investment Activities in Iran and that neither is involved in any of the investment activities set forth in N.J.S.A. 52:32-56(f). If the bidder is unable to so certify, the bidder shall provide a detailed and precise description of such activities.

CERTIFICATION OF NON‐INVOLVEMENT IN PROHIBITED ACTIVITIES IN RUSSIA OR BELARUS

Pursuant to P.L. 2022, c.3, the bidder must certify that neither the bidder, nor one of its parents, subsidiaries, and/or affiliates engaged in any prohibited activities. The bidder shall have 90 days to cease engaging in any prohibited activities and on or before the 90th day after this certification, shall provide an updated certification. If the bidder does not provide the updated certification or at that time cannot certify on behalf of the entity that it is not engaged in prohibited activities, the State shall not award the business entity any contracts, renew any contracts, and shall be required to terminate any contract(s) the business entity holds with the State that were issued on or after the effective date of P.L. 2022, c. 3.

Use the following link to access the Ownership Disclosure form, Disclosure of Investment Activities in Iran form, and the Disclosure of Prohibited Activities in Russia/Belarus form which can be found in the “Vendor Forms Required For All Proposal Submissions” section on the New Jersey division of purchase and property website:

http://www.state.nj.us/treasury/purchase/forms.shtml

PM 1-Step Federal 1-2026 5

SCOPE OF WORK

The scope of work includes the completion of all Preliminary Engineering activities associated with the

Preliminary Preferred Alternative to replace the bridge and provide the minimum required curb-to-curb width and vertical under clearance and improve the vertical geometry to eliminate the substandard sight distances. The new structure will be a three-span continuous bridge and include a 9’-8 1/2” shared use path on the south, two

12’-0” Eastbound lanes, a 12’-0” Westbound lane, 6’-0” shoulders and an 8’-0” shared use path on the north. The proposed substructure eliminates the pier in the middle of Remsen Place and pushes the substructure outside the 25’ AREMA impact zone. The roadway profile will be raised to provide the minimum 23’-0” required vertical under clearance over the CSX tracks. The NJDOT Standard 6’-6” High parapet will have a 3’-0” curved top fence with holes no larger than 2”x2” to meet the requirements of CSX. The proposed profile includes a 368’ crest curve at the bridge with an entrance grade of 6.49% and exit grade of 5.82%. The western approach includes a

170’ sag curve with an entrance grade of 3.05% and exit grade of 6.49%. The eastern approach includes a 140’ sag curve with an entrance grade of -5.82% and exit grade of -2.99%. The profile in the proposed condition meets all geometric standards. Bridge lighting will be included if warranted during Preliminary Engineering.

New guide rail including bridge attachments will be installed at each corner of the bridge. New retaining walls will also be constructed at all four corners of the bridge and along Church Street to help minimize the impact from raising the profile of the bridge. The PPA will also include ADA improvements so that sidewalks and curb ramps are ADA compliant. The consultant will perform the tasks necessary for the advancement of the

Preliminary Preferred Alternative as established in the Concept Development phase. The scope of work also includes activities necessary to support the approval of the environmental document. Further details on the activities completed to date and the Preliminary Preferred Alternative can be found in the available CD report.

Further details on the proposed Preliminary Engineering activities can be found in the PE Scope Statement as part of the available CD report.

The scope of work includes Preliminary Design, Final Design and Construction Engineering Services. However, services under the original agreement shall be limited to Preliminary Design only, with Final Design and

Construction Engineering Services to be initiated later as Extra Work, at the sole discretion of the State.

File details come from the government source that posted it. Updated .